CN109583710A - A kind of standardized management method and system for nuclear power plant's change - Google Patents

A kind of standardized management method and system for nuclear power plant's change Download PDF

Info

Publication number
CN109583710A
CN109583710A CN201811345073.9A CN201811345073A CN109583710A CN 109583710 A CN109583710 A CN 109583710A CN 201811345073 A CN201811345073 A CN 201811345073A CN 109583710 A CN109583710 A CN 109583710A
Authority
CN
China
Prior art keywords
change
power plant
nuclear power
standard packet
standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811345073.9A
Other languages
Chinese (zh)
Inventor
冯伟岗
李健
李江
黄超
李志强
雷宁
彭小毛
吕芳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
Suzhou Nuclear Power Research Institute Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Suzhou Nuclear Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, Suzhou Nuclear Power Research Institute Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201811345073.9A priority Critical patent/CN109583710A/en
Publication of CN109583710A publication Critical patent/CN109583710A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of standardized management methods for nuclear power plant's change, comprising the following steps: carries out category filter, change needed for determining formulation standard packet to the change of nuclear power plant;Using reference format template, the standard packet comprising multiple technologies file is formulated;According to standard packet, corresponding change is executed.Thus, the standards system that can establish change technological document is conducive to the quality for improving change technological document, avoids the careless omission that change technological document is caused due to personnel's difference as far as possible, to which the reliability service of field conduct, equipment for change accomplishes fluently solid foundation, guarantee the safe operation of nuclear power plant;Furthermore, the standards system for establishing change technological document can also be improved the efficiency of change technological document establishment simultaneously, duplicate censorship is reduced, audit crew is allowed to focus on examination on key technical problem, also improves the quality of change technological document from side.

Description

A kind of standardized management method and system for nuclear power plant's change
Technical field
The present invention relates to a kind of standardized management method and systems for nuclear power plant's change.
Background technique
After nuclear power plant's comercial operation, due to design problem, equipment deficiency, ageing equipment, technology innovation, laws and regulations requirement, prolong The reasons such as longevity, partly or completely system equipment may need to change.These changes are carried out in the system to have put into operation Improve, the interface between software and hardware being related to is numerous, and coverage is big, therefore the design in change, installation, debugging stage all exist it is larger Risk.
The change of nuclear power plant largely implements window during major overhaul, and since nuclear power plant's overhaul time is short, respectively A window arrangement is compact, keeps for the implementation duration of change most of tight slightly, and this requires the design documents of change, construction text The problem of design, equipment or scene execute will such as occur very well, when because implementing in the technological documents quality such as part, procurement document, The time for leaving issue handling for is very short.
Nuclear power plant then leads the technical management of change the standard management that the management of change is mainly process at present Technical capability, the sense of responsibility that rely on audit crew do not form the standards system of technical quality control, therefore exist due to people Member's difference causes the problem of careless omission of change technological document, causes adverse effect to the safe operation of nuclear power plant.
In addition, most of nuclear power plant's change is improved to similar single devices or system, in nuclear power plant's longevity In phase, these similar changes are constantly repeated, and enormous amount, reduce the effect of audit crew establishment change technological document Rate increases duplicate censorship.
Summary of the invention
The purpose of the present invention is to provide a kind of standardized management method and systems for nuclear power plant's change.
The technical solution used to solve the technical problems of the present invention is that: a kind of standardization pipe for nuclear power plant's change is provided Reason method, which comprises the following steps:
Category filter, change needed for determining formulation standard packet are carried out to the change of nuclear power plant;
Using reference format template, the standard packet comprising multiple technologies file is formulated;
According to the standard packet, corresponding change is executed.
In the standardized management method changed provided by the present invention for nuclear power plant, classify to nuclear power plant's change It screens, before the step of change needed for determining formulation standard packet, further includes:
Statistics is collected to whole changes of nuclear power plant.
In the standardized management method changed provided by the present invention for nuclear power plant, the multiple technologies file includes setting Count file, construction documents and procurement document.
In the standardized management method changed provided by the present invention for nuclear power plant, using reference format template, formulate The step of standard packet comprising multiple technologies file includes:
The change according to needed for formulating standard packet, writes the standard packet of the technological document comprising reference format;
Check and correction audit is carried out to the standard packet.
In the standardized management method changed provided by the present invention for nuclear power plant, according to the standard packet, hold After the step that row changes accordingly further include:
According to the feedback in change implementation procedure, upgrading is optimized to the standard packet.
Correspondingly, the present invention also provides a kind of standardized management systems for nuclear power plant's change, comprising:
Screening module carries out category filter, change needed for determining formulation standard packet for the change to nuclear power plant;
Standard packs cover half block, is connected to the screening module, and for utilizing reference format template, formulating includes a variety of skills The standard packet of art file;And
Execution module is connected to the standard and packs cover half block, for executing corresponding change according to the standard packet.
In the standardized management system changed provided by the present invention for nuclear power plant, further includes:
Statistical module is connected to the screening module, is collected statistics for whole changes to nuclear power plant.
In the standardized management system changed provided by the present invention for nuclear power plant, the multiple technologies file includes setting Count file, construction documents and procurement document.
In the standardized management system changed provided by the present invention for nuclear power plant, the standard packs cover half block packet It includes:
Standard packet writes unit, for the change according to needed for formulating standard packet, writes the technology text comprising reference format The standard packet of part;
Standard packet audits unit, is connected to the standard packet and writes unit, for carrying out check and correction audit to the standard packet.
In the standardized management system changed provided by the present invention for nuclear power plant, further includes:
Optimization module, is connected to the execution module and the standard packs cover half block, for according to change implementation procedure In feedback, upgrading is optimized to the standard packet.
Standardized management method and system for nuclear power plant's change of the invention has the advantages that the present invention mentions The standardized management method and system for nuclear power plant's change supplied, is screened by the change to nuclear power plant, is determined and is formulated The change that standard packet needs;Again by reference format template, the standard packet comprising standard technique file is formulated for change;Later Implementation procedure in, execute corresponding change according to the standard packet;Thus, it is possible to the standards system of change technological document is established, The quality for being conducive to improve change technological document avoids the careless omission that change technological document is caused due to personnel's difference as far as possible, thus Solid foundation is accomplished fluently for the field conduct of change, the reliability service of equipment, guarantees the safe operation of nuclear power plant;In addition, establishing The standards system for changing technological document can also be improved the efficiency of change technological document establishment simultaneously, reduce duplicate examination work Make, audit crew is allowed to focus on examination on key technical problem, also improves the quality of change technological document from side.
Detailed description of the invention
Fig. 1 is the flow chart for the standardized management method for nuclear power plant's change that one embodiment of the invention provides;
Fig. 2 is the schematic diagram for the standardized management system for nuclear power plant's change that one embodiment of the invention provides;
Fig. 3 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
Description and claims of this specification and term " first ", " second ", " third " and " in above-mentioned attached drawing Four " etc. are not use to describe a particular order for distinguishing different objects.In addition, term " includes " and " having " and it Any deformation, it is intended that cover and non-exclusive include.Such as it contains the process, method of a series of steps or units, be System, product or equipment are not limited to listed step or unit, but optionally further comprising the step of not listing or list Member, or optionally further comprising other step or units intrinsic for these process, methods, product or equipment.
Below in conjunction with drawings and examples the present invention will be further explained explanation.
Fig. 1 is the flow chart for the standardized management method for nuclear power plant's change that one embodiment of the invention provides;Such as Fig. 1 It is shown, provided by the present invention for nuclear power plant change standardized management method the following steps are included:
S11, category filter, change needed for determining formulation standard packet are carried out to the change of nuclear power plant;
S12, reference format template, standard packet of the formulation comprising multiple technologies file are utilized;
S13, according to the standard packet, execute corresponding change.
In step s 11, category filter is carried out to nuclear power plant's change to be carried out first, determination needs to be included in standard management Change.Specifically, technological document is belonged into of a sort change and is classified as same class, to belong to of a sort change formulation standard Packet.Design problem, equipment deficiency, ageing equipment, technology innovation, laws and regulations requirement, lengthen the life etc. due to can all cause part or Person's whole system equipment changes, therefore, before the change to nuclear power plant carries out category filter, it is also necessary to nuclear power plant Change is counted.Specifically, before step S11 further include:
Statistics is collected to whole changes of nuclear power plant.
In step s 12, for the change for being included in standard management, the technological document of level of organization format, these technologies text Part includes design document, construction documents, procurement document.Specifically, the design document includes change reason, change scheme, ginseng Standard, process calculating etc. are examined, construction documents includes work ticket, installation procedure, debugging routine, risk analysis etc., procurement document packet Include buying range, technical requirements, test requirements document etc..Therefore, step S12 includes following sub-step:
The change according to needed for formulating standard packet, writes the standard packet of the technological document comprising reference format;
Check and correction audit is carried out to the standard packet.
After level of organization packet, also need to carry out check and correction audit to the content of standard packet, to further increase skill in standard packet The quality of art file can just be come into operation after related personnel ratifies by the standard packet of check and correction audit.By that will change The quality of change technological document can be improved in the relevant technologies file content criteria.
In step s 13, change is executed using the standard packet made, the effect in change implementation procedure can be improved Rate prevents the significant error of change, ensures the safety of nuclear power plant.Meanwhile in the process of implementation, user can be to standard packet Execution is fed back, and is optimized with facilitating to standard packet.Therefore, after step s 13, further includes:
According to the feedback in change implementation procedure, upgrading is optimized to the standard packet.
Provided by the present invention for the standardized management method of nuclear power plant's change, sieved by the change to nuclear power plant Choosing determines the change that formulation standard packet needs;Again by reference format template, the mark comprising standard technique file is formulated for change Quasi- packet;In implementation procedure later, corresponding change is executed according to the standard packet;Thus, it is possible to establish change technological document Standards system, be conducive to the quality for improving change technological document, avoid causing change technological document as far as possible due to personnel's difference Careless omission, thus for change field conduct, equipment reliability service accomplish fluently solid foundation, guarantee nuclear power plant safety fortune Row;In addition, the standards system for establishing change technological document can also be improved the efficiency of change technological document establishment simultaneously, weight is reduced Multiple censorship, allows audit crew to focus on examination on key technical problem, also improves change technology from side The quality of file.
Fig. 2 is the schematic diagram of the standardized management system provided in an embodiment of the present invention for nuclear power plant's change;Such as Fig. 2 institute Show, the standardized management system for nuclear power plant's change of the invention includes:
Screening module 210 carries out category filter, change needed for determining formulation standard packet for the change to nuclear power plant;
Standard packs cover half block 220, is connected to the screening module, for utilizing reference format template, formulates comprising more The standard packet of kind technological document;And
Execution module 230 is connected to the standard and packs cover half block, for executing corresponding become according to the standard packet More.
Specifically, the standardized management system for nuclear power plant's change further include:
Statistical module is connected to the screening module, is collected statistics for whole changes to nuclear power plant;
Optimization module, is connected to the execution module and the standard packs cover half block, for according to change implementation procedure In feedback, upgrading is optimized to the standard packet.
Specifically, in an embodiment of the present invention, the multiple technologies file includes design document, construction documents and buying File.
Specifically, in an embodiment of the present invention, the standard packs cover half block and includes:
Standard packet writes unit, for the change according to needed for formulating standard packet, writes the technology text comprising reference format The standard packet of part;
Standard packet audits unit, is connected to the standard packet and writes unit, for carrying out check and correction audit to the standard packet.
About the system in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
It is had the advantage that provided by the present invention for the standardized management system of nuclear power plant's change
1, establish change technological document standards system, be conducive to improve change technological document quality, avoid as far as possible by The careless omission of change technological document is caused in personnel's difference, to accomplish fluently for the field conduct of change, the reliability service of equipment solid Basis, guarantee the safe operation of nuclear power plant;
2, the standards system for establishing change technological document can also be improved the efficiency of change technological document establishment simultaneously, reduce Duplicate censorship, allows audit crew to focus on examination on key technical problem, also improves change skill from side The quality of art file;
3, the quality for being conducive to improve whole equipment change field, reduces technological deficiency and leftover problem, reduces O&M work It measures.
The following are a kind of example of the standard packet generated according to the method for the present invention (tranformer protection design for change files):
1. changing reason
Introduction causes the problem of change, and proves the necessity changed, encloses basic reason analysis report as far as possible.
2. the range and target of change
2.1 summarizing
System introduction, device and relaying configuration introduction, operating condition introduction;
It whether is that service life of equipment expires, aging;It is whether defective, if so, please be included in
Whether meet it is counter arrange, if being unsatisfactory for feeding back, anti-regulations of arranging please be included in.
2.2 scope of design
The range for introducing this transformation, is included in detail.
2.3 design object
1) * * * device is used
2) scene * * * is solved the problems, such as
3. design basis
List the relevant international standard of tranformer protection, national standard, nuclear power plant's application specific standard etc..
4. detailed design plan
The summary of 4.1 modification schemes
4.2 design input requirements
(1) technical requirements
(2) current loop accesses
(3) voltage circuit accesses
(4) non-ionizing energy loss inputs
(5) DC power supply configures
(6) mains lighting supply
4.3 design outputs require
4.4 short circuits are calculated
4.5 group screen modes
4.6 cable design
4.7 control boxs and voltage changing boxes (selection)
4.8 Interface design
4.9 installation requirement
Referring to Fig. 3, Fig. 3 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention, the electronic equipment 300, may include:
Processor 310, memory 320, communication interface 330 and bus 340;
The processor 310, the memory 320 and the communication interface 330 are connected and are completed by the bus 340 Mutual communication;
The memory 320 stores executable program code;
The processor 310 run by reading the executable program code stored in the memory 320 with it is described The corresponding program of executable program code, for executing a kind of standardized management method for nuclear power plant's change;Wherein, one Standardized management method of the kind for nuclear power plant's change, comprising the following steps:
Category filter, change needed for determining formulation standard packet are carried out to the change of nuclear power plant;
Using reference format template, the standard packet comprising multiple technologies file is formulated;
According to the standard packet, corresponding change is executed.
The embodiment of the invention also provides a kind of storage mediums, wherein the storage medium is described for storing application program Application program for executing a kind of standardized management method for nuclear power plant's change described in the embodiment of the present invention at runtime.
The embodiment of the invention also provides a kind of application programs, wherein the application program for executing this hair at runtime A kind of standardized management method for nuclear power plant's change described in bright embodiment.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a series of Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the sequence of acts described because According to the present invention, some steps may be performed in other sequences or simultaneously.Secondly, those skilled in the art should also know It knows, the embodiments described in the specification are all preferred embodiments, and related actions and modules is not necessarily of the invention It is necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed device, it can be by another way It realizes.For example, the apparatus embodiments described above are merely exemplary, such as the division of the unit, it is only a kind of Logical function partition, there may be another division manner in actual implementation, such as multiple units or components can combine or can To be integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Coupling, direct-coupling or communication connection can be through some interfaces, the indirect coupling or communication connection of device or unit, It can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above, above embodiments are only to illustrate technical solution of the present invention, rather than its limitations;Although referring to aforementioned Invention is explained in detail for embodiment, wherein those skilled in the art should understand that: it still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this It modifies or replaces, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of standardized management method for nuclear power plant's change, which comprises the following steps:
Category filter, change needed for determining formulation standard packet are carried out to the change of nuclear power plant;
Using reference format template, the standard packet comprising multiple technologies file is formulated;
According to the standard packet, corresponding change is executed.
2. the standardized management method according to claim 1 for nuclear power plant's change, which is characterized in that nuclear power plant It changes and carries out category filter, before the step of change needed for determining formulation standard packet, further includes:
Statistics is collected to whole changes of nuclear power plant.
3. the standardized management method according to claim 1 for nuclear power plant's change, which is characterized in that a variety of skills Art file includes design document, construction documents and procurement document.
4. the standardized management method according to claim 1 for nuclear power plant's change, which is characterized in that utilize reticle Formula template, the step for formulating the standard packet comprising multiple technologies file include:
The change according to needed for formulating standard packet, writes the standard packet of the technological document comprising reference format;
Check and correction audit is carried out to the standard packet.
5. the standardized management method according to claim 1 for nuclear power plant's change, which is characterized in that according to Standard packet, after executing the step that changes accordingly further include:
According to the feedback in change implementation procedure, upgrading is optimized to the standard packet.
6. a kind of standardized management system for nuclear power plant's change characterized by comprising
Screening module carries out category filter, change needed for determining formulation standard packet for the change to nuclear power plant;
Standard packs cover half block, is connected to the screening module, for utilizing reference format template, formulates comprising multiple technologies text The standard packet of part;And
Execution module is connected to the standard and packs cover half block, for executing corresponding change according to the standard packet.
7. the standardized management system according to claim 6 for nuclear power plant's change, which is characterized in that further include:
Statistical module is connected to the screening module, is collected statistics for whole changes to nuclear power plant.
8. the standardized management system according to claim 6 for nuclear power plant's change, which is characterized in that a variety of skills Art file includes design document, construction documents and procurement document.
9. the standardized management system according to claim 6 for nuclear power plant's change, which is characterized in that the standard packet Formulating module includes:
Standard packet writes unit, for the change according to needed for formulating standard packet, writes the technological document comprising reference format The standard packet;
Standard packet audits unit, is connected to the standard packet and writes unit, for carrying out check and correction audit to the standard packet.
10. the standardized management system according to claim 6 for nuclear power plant's change, which is characterized in that further include:
Optimization module, is connected to the execution module and the standard packs cover half block, for according in change implementation procedure Feedback, optimizes upgrading to the standard packet.
CN201811345073.9A 2018-11-13 2018-11-13 A kind of standardized management method and system for nuclear power plant's change Pending CN109583710A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811345073.9A CN109583710A (en) 2018-11-13 2018-11-13 A kind of standardized management method and system for nuclear power plant's change

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811345073.9A CN109583710A (en) 2018-11-13 2018-11-13 A kind of standardized management method and system for nuclear power plant's change

Publications (1)

Publication Number Publication Date
CN109583710A true CN109583710A (en) 2019-04-05

Family

ID=65922136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811345073.9A Pending CN109583710A (en) 2018-11-13 2018-11-13 A kind of standardized management method and system for nuclear power plant's change

Country Status (1)

Country Link
CN (1) CN109583710A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112667207A (en) * 2020-12-21 2021-04-16 苏州热工研究院有限公司 Design method for structuralization of operation program of nuclear power plant
CN112765951A (en) * 2021-01-20 2021-05-07 宁夏计量质量检验检测研究院 System for formulating environment and new energy field standard
CN112862457A (en) * 2021-03-02 2021-05-28 岭东核电有限公司 Nuclear power test procedure item jumping method and device, computer equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106325969A (en) * 2016-08-23 2017-01-11 上海创景计算机系统有限公司 Requirement change reverse tracking system
CN107437152A (en) * 2017-08-09 2017-12-05 苏州热工研究院有限公司 Procurement management system and purchasing management method suitable for nuclear power plant

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106325969A (en) * 2016-08-23 2017-01-11 上海创景计算机系统有限公司 Requirement change reverse tracking system
CN107437152A (en) * 2017-08-09 2017-12-05 苏州热工研究院有限公司 Procurement management system and purchasing management method suitable for nuclear power plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
林传清: "中国核电厂的技术管理", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112667207A (en) * 2020-12-21 2021-04-16 苏州热工研究院有限公司 Design method for structuralization of operation program of nuclear power plant
CN112667207B (en) * 2020-12-21 2023-04-28 苏州热工研究院有限公司 Nuclear power plant operation program structured design method
CN112765951A (en) * 2021-01-20 2021-05-07 宁夏计量质量检验检测研究院 System for formulating environment and new energy field standard
CN112862457A (en) * 2021-03-02 2021-05-28 岭东核电有限公司 Nuclear power test procedure item jumping method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
US8954931B2 (en) System test scope and plan optimization
CN109583710A (en) A kind of standardized management method and system for nuclear power plant's change
CN101651576B (en) Alarm information processing method and system
CN104881343B (en) A kind of method of testing and test system
CN109446076A (en) Software project testing method, system, storage medium and terminal device
CN108180599A (en) Adjustment method and debugging apparatus and computer readable storage medium
CN106201757A (en) A kind of abnormality eliminating method and device
CN101145130A (en) Simple network management protocol software test device and test method
WO2022170760A1 (en) Method and apparatus for cloud platform management, electronic device, and storage medium
CN111061741B (en) Power test data management method, system, terminal and storage medium
CN110928796A (en) Automatic change test platform
CN110968868A (en) Application security audit method and device, electronic equipment and storage medium
CN103064780A (en) Software testing method and device thereof
CN111679977B (en) Method, equipment and storage medium for testing exact project unit based on Jest
CN109002389A (en) The method and apparatus of page automatic test
CN110609761B (en) Method and device for determining fault source, storage medium and electronic equipment
RU2532714C2 (en) Method of acquiring data when evaluating network resources and apparatus therefor
CN103383711B (en) A kind of Universal electrical simulation platform
CN109669855A (en) Automated testing method and system based on analog interface
CN112787853B (en) Automatic generation method and device of network change scheme and related equipment
CN107578329A (en) Automatic account checking method and system
CN112003727A (en) Multi-node server power supply testing method, system, terminal and storage medium
CN110502429A (en) Management method, device, equipment and the storage medium of test macro
CN107291610A (en) Testing case management and device
CN110650063A (en) Centralized bank third-party software simulation system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405