CN109578359A - Intermittent steam supply valve - Google Patents
Intermittent steam supply valve Download PDFInfo
- Publication number
- CN109578359A CN109578359A CN201811606508.0A CN201811606508A CN109578359A CN 109578359 A CN109578359 A CN 109578359A CN 201811606508 A CN201811606508 A CN 201811606508A CN 109578359 A CN109578359 A CN 109578359A
- Authority
- CN
- China
- Prior art keywords
- air cavity
- valve body
- air
- upper valve
- steam supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B13/00—Details of servomotor systems ; Valves for servomotor systems
- F15B13/02—Fluid distribution or supply devices characterised by their adaptation to the control of servomotors
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Lift Valve (AREA)
- Self-Closing Valves And Venting Or Aerating Valves (AREA)
Abstract
It is specifically a kind of to be used for the intermittent steam supply valve of bus telescopic folding door gas ducting the present invention relates to a kind of switch pipeline valve.Including upper valve body, lower valve body, the upper valve body seals affixed with lower valve body, the upper valve body top is provided with gas outlet, the upper valve body is internally provided with ventilation lumen, the ventilation lumen is made of the first air cavity and the second air cavity and directly one chamber of gas supply, the lower valve body bottom is provided with air inlet, the lower valve body is built-in with binary channels for air cavity, the steam supply valve is supplied using mechanical adjustment control, instead of original electronic control mode, it is applicable to the poor environment such as non-transformer power-off, it especially applies in the air supply system of bus door, it ensure that bus is powering off, the normal work of steam supply valve when accident and danger, and then passenger on bus is made to obtain stable guarantee.
Description
Technical field
It is specifically a kind of to be used for bus telescopic folding door gas ducting the present invention relates to a kind of switch pipeline valve
Intermittent steam supply valve.
Background technique
As the improvement of people's living standards, the accelerating rhythm of life, traffic safety becomes gradually is related to the people's livelihood, ensures
One important thing of personal safety, mainly using the bus trip of green, bus trip has price low for present people's trip,
The features such as it is convenient to take, environmentally friendly, so bus travel becomes safely the key of bus operation, it is public in bus travel safety
The folding door of friendship becomes the most important thing using safe, in public transport folding door in use, needing to control hydraulic-driven by driver
Component Foldable door is opened and closed, but since hydraulic driving part is by solenoid valve control, when vehicle short of electricity
Or when solenoid valve damage, bus door will be unable to realize and open and close, and bring in vehicle traveling to passenger very big
Traffic safety hidden danger.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of realization physics intermittent gas supplies, without being driven by electricity
Intermittent steam supply valve.
To achieve the above object, the specific technical solution that the present invention uses is a kind of intermittent steam supply valve, including upper valve
Body, lower valve body, the upper valve body and lower valve body sealing are affixed, and the upper valve body top is provided with gas outlet, in the upper valve body
Portion is provided with ventilation lumen, and the ventilation lumen is made of the first air cavity and the second air cavity and directly one chamber of gas supply, and the gas outlet is logical
It crosses the first venthole to be connected to the first air cavity, gas outlet is connected to by the second venthole with the second air cavity, first air cavity
It is provided with the first air cavity air leakage hole on upper valve body outer wall, the excessive gas of the second air cavity is provided on the upper valve body outer wall of second air cavity
Hole is provided with transition separate space in the upper valve body between first air cavity and the second air cavity;First air cavity is built-in with air inlet
Piston, second air cavity are built-in with air bleed piston;The inlet piston and air bleed piston pass through reset spring and upper valve respectively
Internal wall apical grafting;The lower valve body bottom is provided with air inlet, and the lower valve body is built-in with binary channels for air cavity, the air inlet
It is connected to binary channels for air cavity, the binary channels is constituted for air cavity by supplying two chambers for air cavity and directly indirectly, the indirect confession
Air cavity is connected to the first air cavity, it is described supply indirectly it is intracavitary be equipped with needle-like adjusting nut, directly two chambers of gas supply and directly confession
The connection of one chamber of gas.
As further scheme of the invention: the inlet piston is disposed with third order PLL shape seal groove from top to bottom,
O-ring seal is provided in the annular seal groove.
As further scheme of the invention: it is provided with ring-like boss in the middle part of the air bleed piston, the ring-like boss
Outer edge is provided with annular seal groove, is provided with O-ring seal in the annular seal groove.
As further scheme of the invention: described indirectly for air cavity by the two-fold angle air supply channel of Z-type and nut built-in hole
It constitutes, nut built-in hole inner wall is provided with the internal screw thread with the cooperation of needle-like adjusting nut.
As further scheme of the invention: being provided with fixing ring between the upper valve body and lower valve body.
The beneficial effects of the present invention are:
1, the steam supply valve is supplied using mechanical adjustment control, instead of original electronic control mode, is applicable to no electricity
The poor environment such as source power-off, especially apply in the air supply system of bus door, ensure that bus is powering off, thing
Therefore the normal work with steam supply valve when danger, and then passenger on bus is made to obtain stable guarantee.
2, the steam supply valve lower valve body is provided with needle-like adjusting nut, and the needle-like adjusting nut is manually adjustable indirectly for air cavity
Air demand, and then control steam supply valve gas supply interval time, thus realize be directed to different air demands air supply system.
3, be provided with O-ring seal on the inlet piston and air bleed piston of the steam supply valve, O-ring seal ensure that into
Airtightness and inflation power in gas piston and air bleed piston motion process, to reach accurate air demand and interval time.
4, the inlet piston of the steam supply valve is ladder slot structure, between the first rank of inlet piston and second-order and third rank
Air communication slot, air communication slot and transition separate space are provided with by the first air cavity of upper valve body and the second air cavity connection, to guarantee
The stable reset of air bleed piston is prepared for gas supply next time.
Detailed description of the invention
Fig. 1 is present invention gas supply valve arrangement B-B schematic cross-sectional view.
Fig. 2 is present invention gas supply direct one chamber of air inlet of valve arrangement and two chamber D-D schematic cross-sectional view of direct air inlet.
Fig. 3 is steam supply valve present invention looks up structural representation of the present invention.
Fig. 4 is that steam supply valve of the present invention supplies cavity configuration cross-sectional view indirectly.
Fig. 5 is that steam supply valve of the present invention supplies process inlet and outlet schematic diagram.
In figure, needle-like adjusting nut 1, indirectly for air cavity 2, the first air cavity air leakage hole 3, O-ring seal 4, inlet piston 5,
First air cavity 6, the first venthole 7, gas outlet 8, the second venthole 9, reset spring 10, the second air cavity 11, the second air cavity overflow gas
Hole 12, transition separate space 13, air bleed piston 14, fixing ring 15, air inlet 16, upper valve body 17, lower valve body 18 directly supply two
Chamber 19, annular seal groove 20, ring-like boss 21, directly one chamber 22 of gas supply, the two-fold angle air supply channel 23 of Z-type, nut built-in hole 24.
Specific embodiment
In order to more fully explain implementation of the invention, embodiment of the invention presented below, these examples are only
To elaboration of the invention, do not limit the scope of the invention.
In the description of invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", " water
It is flat ", "inner", the instructions such as "outside" orientation or positional relationship be to be based on the orientation or positional relationship shown in the drawings, merely to just
In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with
Specific orientation construction and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", "
Three " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
Embodiment is as follows:
The present invention provides a kind of intermittent steam supply valve, including upper valve body 17, lower valve body 18, and upper valve body 17 and lower valve body 18 are six
Rib tubular structure is provided with outlet connection mouth at the top of upper valve body 17, and 18 bottom of lower valve body is provided with air inlet slot, the upper valve body
17 with lower valve body 18 by fixing ring 15 seal it is affixed.
Round gas outlet 8 is offered in 17 top outlet connection mouth of upper valve body, ventilation lumen is offered inside upper valve body 17, changes
Air cavity is by providing for the first air cavity 6 of airway dysfunction and the second air cavity 11 of offer deflation function and being connected to the first air cavity 6 straight
It connects one chamber 22 of gas supply to constitute, the first air cavity 6 is provided with inlet piston 5, and inlet piston 5 is disposed with third order PLL shape from top to bottom
Seal groove 20 is provided with O-ring seal 4 in the annular seal groove 20, and the second air cavity 11 has been provided with air bleed piston 14, deflates
Ring-like boss 21 is provided in the middle part of piston 14, the outer edge of the ring-like boss 21 is provided with annular seal groove 20, the annular
O-ring seal 4 is provided in seal groove 20.Inlet piston 5 and air bleed piston 14 pass through reset spring 10 and upper valve body 17 respectively
Inner wall apical grafting.
The gas outlet 8 of upper valve body 17 is connected to by the first venthole 7 with the first air cavity 6, and gas outlet 8 passes through the second venthole
9 are connected to the second air cavity 11, and the first venthole 7 and the second venthole 9 with inlet piston 5 and the cooperation of air bleed piston 14 by realizing
Steam supply valve supplies and the opening and closing of deflation, offers the first air cavity air leakage hole 3 on 17 outer wall of upper valve body of the first air cavity 6,
The second air cavity air leakage hole 12 is offered on 17 outer wall of upper valve body of second air cavity 11, between the first air cavity 6 and the second air cavity 11
Transition separate space 13 is provided in upper valve body 17, the first air cavity air leakage hole 3 and the second air cavity air leakage hole 12 cooperate with transition separate space 13
The reciprocating motion and interval for realizing inlet piston 5 and air bleed piston 14 are taken a breath.
18 bottom of lower valve body is provided with air inlet 16, and the lower valve body 18 is built-in with binary channels for air cavity, the air inlet
16 are connected to binary channels for air cavity, and binary channels is constituted for air cavity by supplying two chambers 19 for air cavity 2 and directly indirectly, the indirect confession
Air cavity 2 is made of the two-fold angle air supply channel 23 of Z-type and nut built-in hole 24, and 24 inner wall of nut built-in hole is provided with to be adjusted with needle-like
The internal screw thread that nut 1 cooperates.Indirectly for built in air cavity 2 needle-like adjusting nut 1 with connect indirectly for the inner thread of air cavity 2,
Apical grafting at the top of needle-like adjusting nut 1 and the dog-ear of the two-fold angle air supply channel 23 of Z-type, directly supply two chambers 19 with it is direct
Supply a chamber 22 connection.
The working principle of intermittent steam supply valve of the invention is summarized as follows:
First stage: when inlet charge, air-flow is entered by the E mouth of air inlet 6 indirectly for the Z-type of air cavity 2 simultaneously respectively
Two-fold angle air supply channel 23, two chambers 19 are directly supplied by G mouthfuls of entrance, the gas process into indirect inlet chamber 2 is built in spiral shell
Enter the first air cavity 6 by I mouthfuls after the needle-like adjusting nut 1 of female built-in hole 24, the gas into two chambers 19 of direct gas supply passes through again
It is led into the first air cavity due to the needle-like adjusting nut 1 being arranged in indirect inlet chamber 2 after crossing directly one chamber 22 of gas supply by D mouthfuls
It causes to act on D mouthfuls of time ratio of inlet piston 5 into the first air cavity 6 by I mouthful and acts on inlet piston 5 into the first air cavity 5
It is short, so gas enters the first air cavity 6 by directly two chambers 19 of gas supply and directly one chamber 22 of gas supply acts on air inlet first
On piston, while being discharged from the H mouth of the C mouth of the first venthole 7 and transition separate space 13, the gas being discharged from the C mouth of the first venthole 7
Body enters executive component.
Second stage: the gas entered from the H mouth of transition separate space 13 acts on the air bleed piston 14 in the second air cavity 11,
Air bleed piston 14 blocks the B mouth of the second venthole 9, and gas is by entering the first air cavity 6 for air cavity 2 indirectly at the same time
Gas act on inlet piston 5, then inlet piston 5 blocks the C mouth of the first venthole 7, and directly gas supply one
The D mouth of chamber 22 is in closed state, so that the F mouth of the first air cavity air leakage hole 3 be made to be connected to the H of transition separate space 13 mouth by the second gas
Gas in chamber 11 is bled off, and air bleed piston 14 is moved to initial position under the action of reset spring 10, then the second venthole 9
B mouth be again turned on and be connected to the A mouth of the second air cavity air leakage hole 12, enter executive component from the C mouth of the first venthole 7
Gas is bled off by the B mouth of the second venthole 9, and after the gas in executive component is bled off, the gas of the first air cavity 6 is from the first gas
The F mouth of chamber air leakage hole 3 bleeds off rear inlet piston 5 and is moved to initial position under the action of reset spring 10.
Phase III: it is completed when inlet piston 5 restores initial position the latter intermittent gas supply circulation, then repeatedly the first rank
The gas supply process of section and second stage.
The above specific embodiments are only exemplary, is to preferably make skilled artisans appreciate that originally
Patent, be not to be construed as include to this patent range limitation, as long as any made by the spirit according to disclosed in this patent
Equivalent change or decoration, each fall within the range that this patent includes.
Claims (5)
1. a kind of intermittent steam supply valve, including upper valve body (17), lower valve body (18), the upper valve body (17) and lower valve body (18) are close
Sealing connects, it is characterised in that:
Upper valve body (17) top is provided with gas outlet (8), and the upper valve body (17) is internally provided with ventilation lumen, the ventilation
By the first air cavity (6) and the second air cavity (11) and directly, gas supply one chamber (22) is constituted chamber, and the gas outlet (8) passes through the first ventilation
Hole (7) is connected to the first air cavity (6), and gas outlet (8) are connected to by the second venthole (9) with the second air cavity (11), and described first
The first air cavity air leakage hole (3), the upper valve body (17) of second air cavity (11) are provided on upper valve body (17) outer wall of air cavity (6)
The second air cavity air leakage hole (12), the upper valve body (17) between first air cavity (6) and the second air cavity (11) are provided on outer wall
Inside it is provided with transition separate space (13);
First air cavity (6) is built-in with inlet piston (5), and second air cavity (11) is built-in with air bleed piston (14);It is described
Inlet piston (5) and air bleed piston (14) pass through reset spring (10) and upper valve body (17) inner wall apical grafting respectively;
Lower valve body (18) bottom is provided with air inlet (16), and the lower valve body (18) is built-in with binary channels for air cavity, described
Air inlet (16) is connected to binary channels for air cavity, and the binary channels is for air cavity by supplying two chambers for air cavity (2) and directly indirectly
(19) it constitutes, it is described to be connected to indirectly for air cavity (2) with the first air cavity (6), it is described to be built-in with needle-like adjusting spiral shell for air cavity (2) indirectly
Female (1), the directly gas supply two chambers (19) are connected to direct gas supply one chamber (22).
2. intermittent steam supply valve according to claim 1, it is characterised in that: the inlet piston (5) is from top to bottom successively
It is provided with third order PLL shape seal groove (20), is provided with O-ring seal (4) in the annular seal groove (20).
3. intermittent steam supply valve according to claim 1, it is characterised in that: be provided with ring in the middle part of the air bleed piston (14)
The outer edge of type boss (21), the ring-like boss (21) is provided with annular seal groove (20), in the annular seal groove (20)
It is provided with O-ring seal (4).
4. intermittent steam supply valve according to claim 1, it is characterised in that: described indirectly for air cavity (2) by the two-fold angle of Z-type
Air supply channel (23) and nut built-in hole (24) are constituted, and nut built-in hole (24) inner wall is provided with matches with needle-like adjusting nut (1)
The internal screw thread of conjunction.
5. intermittent steam supply valve according to claim 1, it is characterised in that: the upper valve body (17) and lower valve body (18) it
Between be provided with fixing ring (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811606508.0A CN109578359B (en) | 2018-12-27 | 2018-12-27 | Intermittent air supply valve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811606508.0A CN109578359B (en) | 2018-12-27 | 2018-12-27 | Intermittent air supply valve |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109578359A true CN109578359A (en) | 2019-04-05 |
CN109578359B CN109578359B (en) | 2020-01-21 |
Family
ID=65931980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811606508.0A Active CN109578359B (en) | 2018-12-27 | 2018-12-27 | Intermittent air supply valve |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109578359B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715087A (en) * | 2019-11-04 | 2020-01-21 | 格迈科技河北有限公司 | Low-pressure air-cut-off valve |
CN114190728A (en) * | 2021-12-15 | 2022-03-18 | 上海泰毅实业有限公司 | Medical cushion and manufacturing process thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1912400A (en) * | 2006-08-03 | 2007-02-14 | 陆拓 | Energy-saving variable pressure charging valve |
CN201100453Y (en) * | 2007-08-14 | 2008-08-13 | 孙光锋 | Hand pull valve |
US20150369002A1 (en) * | 2014-06-19 | 2015-12-24 | Proserv Operations, Inc. | Stacked shuttle valve |
CN105650305A (en) * | 2016-02-24 | 2016-06-08 | 北京亚泰金合机械设备有限公司 | Cushion valve |
CN105889563A (en) * | 2016-06-03 | 2016-08-24 | 姜怀东 | Car door safety control valve and car door safety control system |
-
2018
- 2018-12-27 CN CN201811606508.0A patent/CN109578359B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1912400A (en) * | 2006-08-03 | 2007-02-14 | 陆拓 | Energy-saving variable pressure charging valve |
CN201100453Y (en) * | 2007-08-14 | 2008-08-13 | 孙光锋 | Hand pull valve |
US20150369002A1 (en) * | 2014-06-19 | 2015-12-24 | Proserv Operations, Inc. | Stacked shuttle valve |
CN105650305A (en) * | 2016-02-24 | 2016-06-08 | 北京亚泰金合机械设备有限公司 | Cushion valve |
CN105889563A (en) * | 2016-06-03 | 2016-08-24 | 姜怀东 | Car door safety control valve and car door safety control system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715087A (en) * | 2019-11-04 | 2020-01-21 | 格迈科技河北有限公司 | Low-pressure air-cut-off valve |
CN110715087B (en) * | 2019-11-04 | 2021-06-25 | 格迈科技河北有限公司 | Low-pressure air-cut-off valve |
CN114190728A (en) * | 2021-12-15 | 2022-03-18 | 上海泰毅实业有限公司 | Medical cushion and manufacturing process thereof |
CN114190728B (en) * | 2021-12-15 | 2023-07-28 | 上海泰毅实业有限公司 | Medical cushion and manufacturing process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109578359B (en) | 2020-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109578359A (en) | Intermittent steam supply valve | |
CN106764769B (en) | A kind of LED street lamp of maintenance easy to assemble | |
CN100582533C (en) | Pneumatic control proportioning time-delay change valve | |
CN101858356A (en) | Inflation and deflation control device | |
CN107597001B (en) | Piston type high-pressure water-gas mixing device, mixing method and application thereof | |
CN105952663A (en) | Multifunctional inflation and deflation pump | |
CN102793345B (en) | Umbrella with humidification function | |
CN208595082U (en) | A kind of inflatable body and air charging system | |
CN110318704A (en) | Pneumatic packer | |
CN208598349U (en) | Endoscope supplies gas, send water system | |
CN203634453U (en) | Massage pool system | |
CN201013988Y (en) | Pressure reducing valve | |
CN104956085B (en) | Air compressor is constructed | |
CN107901901A (en) | Multi-functional adjusting emergency brake | |
CN201679704U (en) | Air charging/discharging control device | |
CN204394397U (en) | Urinal | |
CN203374054U (en) | Bubble house | |
CN210772630U (en) | Folding water tank of humidifier and humidifier thereof | |
CN107386897A (en) | Automatic sun-shading glass device | |
CN205745447U (en) | A kind of air relief valve rotary switch | |
CN208057969U (en) | A kind of electric flow valve setting flow | |
CN201260639Y (en) | Battery power supply LED structure used on shower column | |
CN208492645U (en) | A kind of moisture separation device and hydrotherapy bed | |
CN105041680B (en) | A kind of air pump structure | |
CN207342925U (en) | Spray water control valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |