CN109578013A - A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall - Google Patents

A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall Download PDF

Info

Publication number
CN109578013A
CN109578013A CN201811529871.7A CN201811529871A CN109578013A CN 109578013 A CN109578013 A CN 109578013A CN 201811529871 A CN201811529871 A CN 201811529871A CN 109578013 A CN109578013 A CN 109578013A
Authority
CN
China
Prior art keywords
liquid
advanced tubule
pouring grout
parts
slip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811529871.7A
Other languages
Chinese (zh)
Other versions
CN109578013B (en
Inventor
卢晓强
赵德皓
文榕宁
黄志发
李耀光
董绍归
罗学欢
邓文辉
邱敏
杨奖才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
Guangxi Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road and Bridge Engineering Group Co Ltd filed Critical Guangxi Road and Bridge Engineering Group Co Ltd
Priority to CN201811529871.7A priority Critical patent/CN109578013B/en
Publication of CN109578013A publication Critical patent/CN109578013A/en
Application granted granted Critical
Publication of CN109578013B publication Critical patent/CN109578013B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Abstract

The present invention provides a kind of method using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, is related to tunnel protection technical field.The following steps are included: S1. early-stage preparations;S2. it advanced tubule pre-pouring grout: is constructed using advanced tubule pre-pouring grout technology utilization advanced tubule pre-pouring grout technique;The dual-liquid slip-casting material includes liquid A and liquid B, and the second liquid is waterglass;The solution A includes: cement, flyash, bentonite, disodium hydrogen phosphate, aluminium oxide, sodium hydroxide, water according to parts by weight;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.2~1 to get the dual-liquid slip-casting material is arrived;S3. effect monitoring.Tunnel Landslide roof fall is handled using the construction technology of advanced tubule pre-pouring grout using the dual-liquid slip-casting material, it can solve the problems, such as that conventional cement-waterglass slurries gel is too fast to a certain extent, structural stability and persistence are improved, and reduces construction cost.

Description

A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall
Technical field
The present invention relates to tunnel protection technical fields, and in particular to a kind of to use advanced tubule pre-pouring grout process tunnel The method of road collapse and cave-in.
Background technique
With China's expanding economy, expressway construction project is more and more.Pass through ground in Highway Construction in Mountainous Area When layer covers relatively thin Shallow Section, the accident of landslide and roof fall often occurs.When serious, big landslide can not only be blocked Hole influences the progress of engineering, and has serious threat to the life of construction personnel.How vcehicular tunnel is effectively handled shallow Burying a section collapse and cave-in is present issues that need special attention.
Injecting paste material is the main matter that filling and consolidation are played in stratum crack and hole, it be realize water blockoff or The key of reinforcement effect.Injecting paste material can be divided into particulate slurry, chemical grout and fine mineral slurries.The graininess applied at present Injecting paste material mainly has single liquid cement slurry, clay cement grout, cement-sodium silicate slurry.Cement-water-clay system is also referred to as C-S slurries, Being is at present using cement and waterglass as host agent using most suspended type dual-liquid slip-casting materials of waterglass, and the two is pressed certain Accelerator or retarder is added in ratio when necessary, the injecting paste material formed using biliquid injection mode.C-S slurries are public in processing Road railway, water conservancy and hydropower, geotechnical engineering water leak accident and closure shaft wall leak application effect are preferable, in recent years adding in each field Gu application is also more.Advantage is that gel time can be adjusted flexibly as needed from several seconds to a few minutes, and material source is extensive, price Cheaply, non-toxic.However long-term engineering practice shows, C-S slurries Seed harvest durability is poor, and generally acknowledged C-S slurries are deposited at present The problem of Seed harvest later strength declines, using being restricted, it is only used as temporary material in some industries, is rarely had For permanently reinforcing.
Application No. is the patents of invention of CN201811083630.4 to disclose a kind of modified dual-liquid slip-casting material, using zeolite The modified cement grout of powder, slag and cement composition, then mixes with waterglass, obtains injecting paste material, improve to a certain extent The defect of traditional C-S slurries durability difference, but in processing Tunnel Landslide roof fall situation, especially intense weathering soft rock tunnel When situation, however it remains the problem that gel is too fast, structural stability is poor.
In addition, front of tunnel heading geological conditions need to be verified first when implementing slip casting using injecting paste material, under normal circumstances, The means such as geologic survey method, physical prospecting are more common.After front of tunnel heading geological conditions is verified, it can be implemented with according to geological conditions Targetedly front pre-grouting is in the milk, and front pre-grouting grouting is general by the way of drilling and being in the milk parallel operations.It is advanced pre- As disclosed big flow underground water during inlet well, drilling device, installation grouting equipment, complex procedures, time-consuming consumption need to be replaced Power, cannot quick water blockoff, and increase the expense of pump drainage water.
Summary of the invention
Goal of the invention of the invention is to use advanced tubule pre-pouring grout process tunnel in view of the above-mentioned problems, providing The method of collapse and cave-in can solve the problems, such as that conventional cement-waterglass slurries gel is too fast to a certain extent, and it is steady to improve structure Qualitative and persistence, and reduce construction cost.
In order to achieve the above objectives, the technical scheme adopted by the invention is that:
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, the following steps are included:
S1. early-stage preparations: being in the milk to earth's surface Collapse Pit and backfill, and then completes the hardening Seal treatment of earth's surface coombe, carries out Coombe drainage works, it is ensured that water flow is not directly lower in coombe seeps.
S2. advanced tubule pre-pouring grout: advanced tubule pre-pouring grout technology utilization advanced tubule pre-pouring grout technique is used It constructs.
The dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A is according to parts by weight packet Include following components: 500~700 parts of cement, 200~300 parts of flyash, 100~200 parts of bentonite, disodium hydrogen phosphate 5~30 Part, 0~20 part of aluminium oxide, 5~10 parts of sodium hydroxide, 800~1000 parts of water;Liquid A and liquid B is pressed to the volume ratio of 1 ︰ 0.2~1 It uniformly mixes to get the dual-liquid slip-casting material is arrived.
S3. effect monitoring: water absorption rate or infiltration coefficient test are carried out after slip casting terminates 14d, determines whether qualification;It excavates Leakage water spot is met in the process and reinforces slip casting closure, it is ensured that side wall is without bright water.
Preferably, the waterglass Baume degrees is 25~38Be '.
Preferably, the cement is the ordinary portland cement that intensity is 42.5.
Preferably, for the moisture content of the flyash less than 0.2%, partial size is 5 μm -25 μm.
Preferably, liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
Preferably, in step S2, the advanced tubule pre-pouring grout technique includes: positioning, drilling, installation and slip casting.
Preferably, in boring procedure, long duct angle is in 8~12 °, short-range missile tube angulation at 15~25 °.
Preferably, during slip casting, first pressing 0.3Mpa, final pressure 1.0Mpa are climbed to final pressure from first pressing and keep Terminate to slip casting;Grouting pressure reaches final pressure 1.0Mpa, when dual-liquid slip-casting material injection rate reaches 80% of calculated value or more, i.e., It can stop slip casting.
Preferably, in step S3, inspection hole water yield should be less than 0.4L/min.m, and inspection hole is intake under 1.0MPa pressure Amount should be less than 2L/min.m, otherwise should encrypt bored grouting.
Cement-water-clay system condenses hardening mechanism:
The ingredient of cement is tricalcium silicate (C2S), dicalcium silicate (C2S), tricalcium aluminate (C3) and tetra calcium aluminoferrite A (C4AF).The above two are the main component of cement, account for the 70%~80% of cement gross mass.The water of tricalcium silicate and dicalcium silicate It is essentially identical to change reaction product, is all hydrated calcium silicate (C-S-H) and calcium hydroxide (Ca (OH)2), only hydration reaction speed With heat of hydration height difference.Hydration reaction can be expressed with following formula:
C3S(C2S)→C-S-H+nCa(OH)2 (1)
The hydrated product hydrated calcium silicate of cement is in glial state, is practically insoluble in water, and the calcium hydroxide generated is quickly It is reacted with waterglass, reaction process is as follows:
nCa(OH)2+Na2·SiO2+mnH20→n(CaO·SiO2·mH20)↓+2NaOH (2)
Reaction be carried out continuously generate have some strength gel, with by filling rock mass it is cementing-together, intensity is continuous Increase is converted into stable solidifying body, to achieve the purpose that consolidation by grouting.
Flyash, cement-water-clay system alkali-activated carbonatite mechanism of polymerization:
Research shows that NaOH and flyash, bentonite, which can react, generates the formation alkali-activated carbonatite gelling of class zeolite material Material, Na+It is present in hydrated product with chemically bound form.Polymer obtained is reacted with flyash using NaOH, is had Good Na+Ability to cure can improve the pore structure of Seed harvest, and the porosity for keeping Seed harvest total reduces, average pore size drop It is low, pore structure refinement, to improve the later period compression strength of Seed harvest.
Due to the adoption of the above technical scheme, the invention has the following advantages:
1. the method for the invention using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, the biliquid note of use Pulp material adds flyash, bentonite, disodium hydrogen phosphate, aluminium oxide, hydrogen-oxygen on the basis of conventional cement-waterglass slurries Change sodium, on the one hand postpones the gel time of dual slurry, on the other hand improve the pore structure of Seed harvest, to improve the strong of Seed harvest Degree and durability.
Addition flyash and bentonite can react in the case where alkalinity is submitted generates class zeolite material formation alkali-activated carbonatite glue Gel material improves the pore structure of Seed harvest, and the porosity for keeping Seed harvest total reduces, and average pore size reduces, pore structure refinement, thus Improve the later period compression strength of Seed harvest.Price of the current 42.5 cement unit price compared with the high half of flyash, incorporation flyash replacement Part of cement, knot has saved construction cost to a certain degree while reaching water blockoff.Addition bentonite can also improve slurries calculus The impermeability of body reduces running pulp phenomenon and invalid diffusion phenomena during slip casting, saves injecting paste material, improves slip casting effect Rate.
Addition disodium hydrogen phosphate can significantly postpone the gel time of dual slurry, neither it be made to condense rapidly and generate plugging Phenomenon, and early epistasis energy will not be lost too long because of slow setting, to improve Seed harvest compression strength.Add NaOH and flyash It can react and generate class zeolite material formation alkali-activated carbonatite cementitious material, so as to improve the pore structure of Seed harvest, raising calculus The later period compression strength of body.
2. the method that the present invention uses the Tunnel Landslide roof fall of advanced tubule pre-pouring grout process, using advanced tubule Pre-pouring grout mode, during ductule and tunnel cutting, pore-forming situation is all preferable, and conduit heads into very smoothly, without collapse hole etc. Situation occurs, after the completion of pre-pouring grout, it is not necessary to which next process can be carried out for a long time by waiting, and illustrate pre grouting from the working face Plumpness and setting time all meet actual needs, reduce the loss of duration.Ductule is radially set, effectively reinforcing periphery Country rock makes country rock participate in stress, compensates for the adjoining rock stability of no steel tube shed supporting.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Embodiment 1
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, the following steps are included:
S1. early-stage preparations: being in the milk to earth's surface Collapse Pit and backfill, and then completes the hardening Seal treatment of earth's surface coombe, carries out Coombe drainage works, it is ensured that water flow is not directly lower in coombe seeps.
S2. advanced tubule pre-pouring grout: advanced tubule pre-pouring grout technology utilization advanced tubule pre-pouring grout technique is used It constructs.
The dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A is according to parts by weight packet Include following components: 700 parts of cement, 200 parts of flyash, 100 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, hydroxide 10 parts of sodium, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
The advanced tubule pre-pouring grout technique includes: positioning, drilling, installation and slip casting.In boring procedure, long duct angle Degree is in 8~12 °, short-range missile tube angulation at 15~25 °.During slip casting, first pressing 0.3Mpa, final pressure 1.0Mpa are fast from first pressing Speed, which rises to final pressure and remains to slip casting, to be terminated;Grouting pressure reaches final pressure 1.0Mpa, and dual-liquid slip-casting material injection rate reaches calculating Value 80% or more when, slip casting can be stopped.
S3. effect monitoring: water absorption rate or infiltration coefficient test are carried out after slip casting terminates 14d, determines whether qualification;It excavates Leakage water spot is met in the process and reinforces slip casting closure, it is ensured that side wall is without bright water.
Inspection hole water yield should be less than 0.4L/min.m, and inspection hole inflow should be less than 2L/ under 1.0MPa pressure Otherwise min.m should encrypt bored grouting.
Embodiment 2
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
The dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A is according to parts by weight packet Include following components: 600 parts of cement, 300 parts of flyash, 100 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, hydroxide 10 parts of sodium, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
Embodiment 3
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 500 parts of cement, 300 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
Embodiment 4
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 450 parts of cement, 350 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
Embodiment 5
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 500 parts of cement, 300 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.2 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
Embodiment 6
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 500 parts of cement, 300 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.3 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 5 μm -25 μm.
Embodiment 7
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 500 parts of cement, 300 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
Embodiment 8
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, compared with Example 1, step Dual-liquid slip-casting material in S2 is formulated difference, other steps are identical.
Dual-liquid slip-casting material, including liquid A and liquid B, the second liquid are waterglass;The solution A according to parts by weight include with Lower component: 500 parts of cement, 300 parts of flyash, 200 parts of bentonite, 20 parts of disodium hydrogen phosphate, 10 parts of aluminium oxide, sodium hydroxide 10 Part, 1000 parts of water;Liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 1 to get the dual-liquid slip-casting material is arrived.
The waterglass Baume degrees is 35Be '.The cement is the ordinary portland cement that intensity is 42.5.
For the moisture content of the flyash less than 0.2%, partial size is 15 μm.
The dual-liquid slip-casting material performance used Examples 1 to 8 preparation is measured, and measurement result is shown in Table 1.
1 result test comparison of table
Can be seen that dual-liquid slip-casting material of the invention from the data of embodiment 1-8 combination table 1 can postpone dual slurry Gel time, and improve the pore structure of Seed harvest, to improve the intensity and durability of Seed harvest.
It can be seen that the increase with doping quantity of fly ash, the gel time of slurries from the data of embodiment 1-4 combination table 1 It is gradually increased, and doping quantity of fly ash is bigger, and the compression strength of Seed harvest increases, but as doping increases, pressure resistance Degree can be declined, and therefore, answer strict control dosage.
It can be seen that the reduction with cement-sodium silicate ratio, Water glass content from the data of embodiment 5-8 combination table 1 Increase, the gel times of slurries extends, but the compression strength of Seed harvest reduces, relatively more reasonable in 1 ︰ 0.5.
Embodiment 9
Specific construction situation
Stone mill ridge tunnel entrance is located at Hezhou City Zhaoping County outskirts of a town, and outlet is located at Zhaoping County asparagus fern town, and length is 4067m points From the ridge Shi Yue super long tunnel;Tunnel maximum buried depth about 559.5m crosses over coombe, thickness 11.5m at minimum overburden layer.According to surveying It examines, stone mill ridge Close Tunnel stratum is mainly system and the lower subgroup stratum group of Cambrian system mouth of a river group under eluvial layer, the Devonian system by the 4th At being respectively as follows: erratic boulder silty clay, severely-weathered argillaceous siltstoue, middle weathered layer argillaceous siltstoue from top to bottom.Tunnel surrounding section It manages crack relatively to develop, rock crushing.
Collapse and cave-in event summary
11.5m, left and right are pushed up away from hole far from the coombe that catchments at one, coombe lowest part is worn under at the 220m of hole in the tunnel Zhaoping hole Duan Zuo Line rock stratum riverbed area is based on erratic boulder layer, and underlie severely-weathered argillaceous siltstoue.The rock stratum is smashed to pieces, meets water and easily softens, loses Self-stable ability, the 6 points of left lines on the 12nd of August in 2018, which tunnel to ZK57+680 riverbed area to slip, to collapse, and slipping the soil body that collapses is soft powder Sandy gravel soils are 2 meters to the left of vault to haunch, and about 8 meters of circumferential width, past big pile No. direction caves in about 6 meters of length, depth of caving in About 5 meters, landslide amount about 240m3.To 13 days 10 points collapse to earth's surface, earth's surface forms radius about 4m, deep 3.5m.
Use raw material: cement: China Resources cement is P.042.5;Waterglass buying is raw in the grand new material limited liability company in Zhuzhou Production lot number is xl-QESIV-ZJ-08;Water is drinking water;Measuring waterglass density through test is 1320Kg/m3, and Baume degrees is 35.0Be’。
Specific processing scheme:
A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, the following steps are included:
S1. early-stage preparations: being in the milk to earth's surface Collapse Pit and backfill, and then completes the hardening Seal treatment of earth's surface coombe, carries out Coombe drainage works, it is ensured that water flow is not directly lower in coombe seeps.
To collapse in hole chamber using pumping C20 concrete filling, and using geological radar to country rock carry out geology sondage, verify whether There are still cavitys, have such as verified cavity, using pumping C20 concrete filling.
After the completion of backfilling back-pressure work in hole, the backfill of C20 concrete, pump are pumped using modes such as adapter tubes to earth's surface subsidence area domain Vehicle and loaded vehicle are forbidden out to collapsing within the scope of pit edge 20m.
After grouting backfill is cheated in surface subsidence, the hardening Seal treatment of massif earth's surface coombe is completed as early as possible, carries out punching Ditch water discharge work, it is ensured that infilter under water flow is not direct in coombe into massif.
S2. advanced tubule pre-pouring grout: advanced tubule pre-pouring grout technology utilization advanced tubule pre-pouring grout technique is used It constructs.
According to the formula of embodiment 3, cement, flyash, bentonite, disodium hydrogen phosphate, aluminium oxide, hydrogen-oxygen are weighed in proportion Change sodium and water, stirs, uniform slurry i.e. solution A is made;The waterglass i.e. second watch is weighed in proportion, is mixed into the first In liquid, it is again stirring for uniformly up to the dual-liquid slip-casting material.
1. positioning: according to the mileage of design, marking the orifice position of ductule, ductule circumferential direction spacing in excavation face 1.2m, longitudinal pitch 1.2m.
2. drilling: normal no swell water area ductule is radially set by tunnel, has water burst region according to ductule diffusion half 0.5 meter of calculating cloth pitch of holes of diameter is 1 meter of length interlaced arrangement, is marked on steel grating with red paint;It will be in steel pipe front end Heart alignment mark is headed into stratum using wind high-pressure blast, heads into length is not less than length of steel pipe 90%.Long duct angle is 8 ~12 ° or so, short-range missile tube angulation is at 15~25 ° or so.Steel pipe with quick-setting mortar blocks aperture and surrounding crack after the completion of installing, It prevents from emitting outside slurries when slip casting.
3. installation: the ductule that will have been processed throws eyelet into, and surrounding catheter is blocked with plasticine for physical, stays 35cm left outside Right length connects slip casting hose.
4. slip casting: slip casting carries out the sequence of construction of slip casting downwards from arch sequence to determine that grouting parameter-sets up slip casting It stands-formal slip casting-inspection-the record of pump testing-packer permeability test-.
According to water burst pressure (excavated surface hydrostatic pressure, the dynamic pressure of gushing water), crack size and degree of roughness, slurries Each concentration of property, requirement dilation angle determine grouting pressure.According to setting time, consolidating strength and constructing operation etc. Factor determines concentration of slurry.
Grouting sequence first applies short-bore in principle, then applies long hole, finally applies inspection hole.By " from outside to inside, from upper past Under " principle constructs, in combination with reading aloud water water source point position and water (flow) direction, by sequentially being applied by " having water hole to no water hole " Make;Inspection hole sequence of construction is to the end of injected hole slip casting depending on backsight field condition.
When mud jacking, match ratio is usually first dilute rear dense, converts step by step, and pass through the discharge coefficient of two grouting pumps, to control Gelling time.
When there is mortar in adjacent non-injected hole;Grouting pressure reaches design final pressure 1.0Mpa;Slurries injection rate reaches meter Calculation value 80% or more when, slip casting can be stopped.After slip casting, slurries in timely cleaning pipe, and sealed with plasticine for physical, To increase the stiffness and strength of ductule.
S3. effect monitoring: water absorption rate or infiltration coefficient test are carried out after slip casting terminates 14d, determines whether qualification;It excavates Leakage water spot is met in the process and reinforces slip casting closure, it is ensured that side wall is without bright water.
Inspection hole water yield should be less than 0.4L/min.m, and inspection hole inflow should be less than 2L/ under 1.0MPa pressure Otherwise min.m should encrypt bored grouting.
Stone mill ridge tunnel was constructed according to the above method on August 13rd, 2018, passed through the rich water on September 13rd, 2018 Section, lasts 30d, excavation supporting 26m (comprising getting out of a predicament or an embarrassing situation and inverted arch part), shows to utilize using the invention dual-liquid slip-casting material The excavation that front pre-grouting technology combination ductule is applied to collapse and cave-in section is very successfully, to have reached design and construction Purpose.
Above description is the detailed description for the present invention preferably possible embodiments, but embodiment is not limited to this hair Bright patent claim, it is all the present invention suggested by technical spirit under completed same changes or modifications change, should all belong to In the covered the scope of the patents of the present invention.

Claims (9)

1. a kind of method using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, which is characterized in that including following Step:
S1. early-stage preparations: being in the milk to earth's surface Collapse Pit and backfill, and then completes the hardening Seal treatment of earth's surface coombe, carries out coombe Drainage works, it is ensured that water flow is not directly lower in coombe seeps;
S2. it advanced tubule pre-pouring grout: is carried out using advanced tubule pre-pouring grout technology utilization advanced tubule pre-pouring grout technique Construction;
The dual-liquid slip-casting material includes liquid A and liquid B, and the second liquid is waterglass;The solution A according to parts by weight include with Lower component: 500~700 parts of cement, 200~300 parts of flyash, 100~200 parts of bentonite, 5~30 parts of disodium hydrogen phosphate, oxygen Change 0~20 part of aluminium, 5~10 parts of sodium hydroxide, 800~1000 parts of water;Liquid A and liquid B is uniform by the volume ratio of 1 ︰ 0.2~1 It mixes to get the dual-liquid slip-casting material is arrived;
S3. effect monitoring: water absorption rate or infiltration coefficient test are carried out after slip casting terminates 14d, determines whether qualification;Digging process Middle chance leakage water spot is reinforced slip casting and is blocked, it is ensured that side wall is without bright water.
2. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S2, the waterglass Baume degrees is 25~38Be '.
3. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S2, the cement is the ordinary portland cement that intensity is 42.5.
4. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S2, for the moisture content of the flyash less than 0.2%, partial size is 5 μm -25 μm.
5. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S2, liquid A and liquid B is uniformly mixed by the volume ratio of 1 ︰ 0.5 to get the dual-liquid slip-casting material is arrived.
6. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S2, the advanced tubule pre-pouring grout technique includes: positioning, drilling, installation and slip casting.
7. the method according to claim 1 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in boring procedure, long duct angle is in 8~12 °, short-range missile tube angulation at 15~25 °.
8. the method using advanced tubule pre-pouring grout process Tunnel Landslide roof fall stated according to claim 7, feature It is, during slip casting, first pressing 0.3Mpa, final pressure 1.0Mpa, being climbed to final pressure from first pressing and remaining to slip casting terminates; Grouting pressure reaches final pressure 1.0Mpa, when dual-liquid slip-casting material injection rate reaches 80% of calculated value or more, can stop slip casting.
9. the method according to claim 7 using advanced tubule pre-pouring grout process Tunnel Landslide roof fall, special Sign is, in step S3, inspection hole water yield should be less than 0.4L/min.m, and inspection hole inflow should be less than under 1.0MPa pressure Otherwise 2L/min.m should encrypt bored grouting.
CN201811529871.7A 2018-12-14 2018-12-14 Method for treating tunnel collapse roof fall by adopting advanced small conduit pre-grouting process Active CN109578013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811529871.7A CN109578013B (en) 2018-12-14 2018-12-14 Method for treating tunnel collapse roof fall by adopting advanced small conduit pre-grouting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811529871.7A CN109578013B (en) 2018-12-14 2018-12-14 Method for treating tunnel collapse roof fall by adopting advanced small conduit pre-grouting process

Publications (2)

Publication Number Publication Date
CN109578013A true CN109578013A (en) 2019-04-05
CN109578013B CN109578013B (en) 2021-02-26

Family

ID=65928490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811529871.7A Active CN109578013B (en) 2018-12-14 2018-12-14 Method for treating tunnel collapse roof fall by adopting advanced small conduit pre-grouting process

Country Status (1)

Country Link
CN (1) CN109578013B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111004008A (en) * 2019-11-11 2020-04-14 河北大白阳金矿有限公司 Method for reinforcing and reinforcing pre-control roof-pillar method ore pillar
CN111271083A (en) * 2019-04-27 2020-06-12 石家庄国盛矿业科技有限公司 Construction process for treating coal roadway roof area by using high-molecular grouting material
CN113089447A (en) * 2021-04-22 2021-07-09 广东省水利水电第三工程局有限公司 Concrete pavement void grouting construction method
CN116041032A (en) * 2023-01-09 2023-05-02 中国建筑第八工程局有限公司 Double-liquid slurry injection for freezing engineering gushing water and preparation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN104628351A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Unsaturated loess ns composite grouting material and preparation method thereof
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN108678776A (en) * 2018-03-29 2018-10-19 中交路桥北方工程有限公司 Sandy clay geology tunnel treatment of roof collapse method
CN109534769A (en) * 2018-12-14 2019-03-29 沈阳建筑大学 A kind of application method of magnetorheological intelligent shield grouting material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104628351A (en) * 2013-11-08 2015-05-20 中国石油天然气股份有限公司 Unsaturated loess ns composite grouting material and preparation method thereof
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN108678776A (en) * 2018-03-29 2018-10-19 中交路桥北方工程有限公司 Sandy clay geology tunnel treatment of roof collapse method
CN109534769A (en) * 2018-12-14 2019-03-29 沈阳建筑大学 A kind of application method of magnetorheological intelligent shield grouting material

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李永春: "浅谈盾构机在复杂地质条件下穿越高压燃气管道的施工技术", 《水力建设与管理》 *
袁振春: "穿层钻孔过出水点快速封孔技术研究", 《山东煤炭科技》 *
赵宏海 等: "裂隙岩体加固浆材的试验研究", 《长江科学院院报》 *
陈金平等: "盾构法同步注浆材料的试验研究综述", 《粉煤灰综合利用》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111271083A (en) * 2019-04-27 2020-06-12 石家庄国盛矿业科技有限公司 Construction process for treating coal roadway roof area by using high-molecular grouting material
CN111271083B (en) * 2019-04-27 2021-04-06 石家庄国盛矿业科技有限公司 Construction process for treating coal roadway roof area by using high-molecular grouting material
CN111004008A (en) * 2019-11-11 2020-04-14 河北大白阳金矿有限公司 Method for reinforcing and reinforcing pre-control roof-pillar method ore pillar
CN111004008B (en) * 2019-11-11 2021-05-07 河北大白阳金矿有限公司 Method for reinforcing and reinforcing pre-control roof-pillar method ore pillar
CN113089447A (en) * 2021-04-22 2021-07-09 广东省水利水电第三工程局有限公司 Concrete pavement void grouting construction method
CN116041032A (en) * 2023-01-09 2023-05-02 中国建筑第八工程局有限公司 Double-liquid slurry injection for freezing engineering gushing water and preparation method

Also Published As

Publication number Publication date
CN109578013B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN109578013A (en) A method of using advanced tubule pre-pouring grout process Tunnel Landslide roof fall
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN105201448B (en) Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway
CN110230309A (en) Karst region bridge solution cavity pile base construction method
CN101806059B (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN110924967B (en) Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum
CN103835729B (en) Deep distance roadway surrounding rock pre grouting from the surface reinforcement process
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN102587859A (en) Technology for blocking mine water bursting through backflow grouting
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN102660952B (en) Controllable clay paste slurry grouting technique
CN109681236A (en) Big cross section water-rich sand layer shield driving synchronous grouting method
CN108166994A (en) A kind of construction method of grouting reinforced region applied to water-rich sand layer shield tunnel
CN109736815A (en) Grouting serous fluid and grouting process for subway tunnel tunneling water sealing consolidation
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN106837382B (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN108517877A (en) Miscellaneous fill ultra-deep foundation pit consolidates slip casting combination double-row steel pipe stake supporting construction method
CN108708743A (en) A method of using grouting treatment Tunnel Collapse
Littlejohn The development of practice in permeation and compensation grouting: a historical review (1802–2002): part 1 permeation grouting
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN110500119B (en) Waterproof consolidation structure construction method for penetrating through debris flow accumulation body tunnel
CN105735236B (en) The soil body pre-add solid method that continuous wall trench underground is constructed in a kind of thick mud layer
Gysel Anhydrite dissolution phenomena: Three case histories of anhydrite karst caused by water tunnel operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant