CN109577457A - A kind of method of efficient replacement sewage conduct - Google Patents

A kind of method of efficient replacement sewage conduct Download PDF

Info

Publication number
CN109577457A
CN109577457A CN201811485499.4A CN201811485499A CN109577457A CN 109577457 A CN109577457 A CN 109577457A CN 201811485499 A CN201811485499 A CN 201811485499A CN 109577457 A CN109577457 A CN 109577457A
Authority
CN
China
Prior art keywords
pipeline
new
equipment
port
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811485499.4A
Other languages
Chinese (zh)
Inventor
刘建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Nanyi Pipe Industry Co Ltd
Original Assignee
Zhejiang Nanyi Pipe Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Nanyi Pipe Industry Co Ltd filed Critical Zhejiang Nanyi Pipe Industry Co Ltd
Priority to CN201811485499.4A priority Critical patent/CN109577457A/en
Publication of CN109577457A publication Critical patent/CN109577457A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • E03F2003/065Refurbishing of sewer pipes, e.g. by coating, lining

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention discloses one kind not to disturb residents, does not destroy surrounding building basis and the method for underground utilities, the replacement sewage conduct for not interfering traffic, of low pollution environment, construction cost cheap, comprising the following steps: (1) preplanning of constructing;(2) material and equipment prepare;(3) working pit is set;(4) prepare before replacement;(5) Material ports are handled;(6) old pipeline removes;(7) new Pipe installing;(8) it bankets back and buries.

Description

A kind of method of efficient replacement sewage conduct
Technical field
The invention belongs to the technical fields of architectural engineering, more particularly to a kind of method of efficiently replacement sewage conduct.
Background technique
Many underground sewers domestic at present with age aging and leak, be badly in need of the sewage conduct more renewed.But by Generally there are many residential areas, commercial facility, traffic route etc. in the ground where underground sewer, it will if all excavated The life of the people can be seriously affected, surrounding building basis and underground utilities is destroyed, interferes traffic, pollute environment, construction cost It is huge.
Summary of the invention
Technology of the invention solves the problems, such as: overcoming that existing replacement sewage conduct engineering amount is big, noise is big, environment is broken The disadvantages of bad serious and at high cost, provides method that is a kind of novel and having the advantages that a variety of replacement sewage conducts, this method work Journey amount is small, noise is low, does not influence peripheral facilities and the masses life and work, and engineering cost few to environmental disruption are low.
The technical solution of the invention is as follows: the method for this replacement sewage conduct, comprising the following steps:
(1) it constructs preplanning: according to job location and ambient enviroment facility, formulating science and detailed arrangement and method for construction and not Same construction section;
(2) material and equipment prepare: all the setting for getting out required new tubing and construction needs is required according to scheme Standby and tool.
(3) working pit is set: a certain size is arranged at each construction section both ends according to pipeline, equipment and personnel's space requirement Working pit,;
(4) prepare before replacement: (2) ready material and equipment be placed individually into the working pit at construction section both ends, And equipment is installed according to specified requirement;
(5) Material ports are handled: new pipeline being carried out to replace preceding pretreatment, including port processing, port connection etc.;
(6) old pipeline removes: being crushed old pipeline using broken and tube expansion tool, cleans out new Pipe installing space;
(7) new Pipe installing: new pipeline is installed according to original position using bench;
(8) it bankets back and buries: the soil of excavation being returned and is buried, is tamped, restore to the original state.
Since this method is that project amount is smaller, it is only necessary to excavate two working pits, method is simple and effective, has noise The advantages such as life and work that is low, not influencing peripheral facilities and the masses, and engineering cost few to environmental disruption be low.
Specific embodiment
Below in conjunction with the embodiment of the present invention, the technical solution in the present invention is clearly and completely described, is shown So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
The method of this replacement sewage conduct, comprising the following steps:
(1) several construction sections are divided into according to the diameter difference and break of sewage conduct;
(2) the first working pit, the second working pit is respectively set at the both ends of each construction section;
(3) new pipeline is put into the first working pit, including port polishing, heat treatment, the pressure maintaining of new pipeline is cooling, so One is melted under the effect of hydraulic Self-pressurizing agri afterwards, then by new pipe joint sweat soldering;
(4) trombone slide machine equipment is installed in the second working pit;
(5) broken and tube expansion tool is inserted into old pipeline from from the second working pit, carries out the broken of old pipeline, makes brokenly The diameter of the tube expansion head of broken and tube expansion tool is greater than the diameter of old pipeline.Enough rings are provided when purpose is to replace pipeline The frictional force between the new pipeline of replacement and stratum is reduced in border space;
(6) new pipeline is pulled in the position of old pipeline using trombone slide machine equipment.The tube expansion tool of a cone is inserted Enter in old pipeline for guide, rupture old pipeline by pulling force, broken pipeline fragment is squeezed into soil around, using bench New pipeline is pulled in old pipeline position by equipment, completes the replacement construction of sewage conduct.
It is noted that the setting of working pit should avoid road and business doorway, facilitate resident trip;It is one with caliber Section;Pipeline has another point one section of break, when replacement pulling force is excessive, in fact it could happen that nozzle is staggered, and Xiu Zhihou is replaced again.
Preferably, new pipeline uses high density polyvinyl-chloride tubing.That is PE tubing, feature be it is corrosion-resistant, high temperature resistant, do not tie Dirt, service life are long.
It is constructed using this method, solves the problems, such as that the eighties, sewage conduct was leaked because of pipeline aging, maintenance replacement ground When underground pipelines, construct without " belly breaking " again.This method has operation side small, digging-free, and short construction period is comprehensive It closes at low cost, many advantages, such as being widely used, the interference to traffic and the pollution to environment can be reduced to the maximum extent, reduced Construct the bring sorrow people, reduces the destruction criss-cross to surrounding building basis and underground utilities, reduces construction cost. To the protection fee and removal expense of underground utilities when reducing excavation simultaneously, abolishes old pipe and more renew pipe and once complete, short time limit is comprehensive It closes at low cost.
Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts The every other embodiment obtained, shall fall within the protection scope of the present invention.

Claims (2)

1. a kind of method of efficiently replacement sewage conduct, which comprises the following steps:
(1) it constructs preplanning: according to job location and ambient enviroment facility, formulating science and detailed arrangement and method for construction and different Construction section;
(2) material and equipment prepare: according to scheme require to be ready to all devices that required new tubing and construction need and Tool.
(3) working pit is set: a certain size work is arranged at each construction section both ends according to pipeline, equipment and personnel's space requirement Cheat, including the pretreatment before being replaced new pipeline, be divided into: (1) port is handled: polishing, heat treatment, pressure maintaining are cooling;(2) Port connection: port is melted and is welded by hydraulic action;
(4) prepare before replacement: (2) ready material and equipment being placed individually into the working pit at construction section both ends, and pressed Equipment is installed according to specified requirement;
(5) Material ports are handled: new pipeline being carried out to replace preceding pretreatment, including port processing, port connection etc.;
(6) old pipeline removes: being crushed old pipeline using broken and tube expansion tool, cleans out new Pipe installing space, removes The diameter of the tool tube expansion head of old pipeline has to be larger than the diameter of old pipeline, is conducive to carry out tube expansion and broken behaviour;
(7) new Pipe installing: new pipeline is installed according to original position using bench;
(8) it bankets back and buries: the soil of excavation being returned and is buried, is tamped, restore to the original state.
2. material is high density polychlorostyrene the method according to claim 1, wherein new pipeline uses high-quality tubing Ethylene.
CN201811485499.4A 2018-12-06 2018-12-06 A kind of method of efficient replacement sewage conduct Withdrawn CN109577457A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811485499.4A CN109577457A (en) 2018-12-06 2018-12-06 A kind of method of efficient replacement sewage conduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811485499.4A CN109577457A (en) 2018-12-06 2018-12-06 A kind of method of efficient replacement sewage conduct

Publications (1)

Publication Number Publication Date
CN109577457A true CN109577457A (en) 2019-04-05

Family

ID=65927611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811485499.4A Withdrawn CN109577457A (en) 2018-12-06 2018-12-06 A kind of method of efficient replacement sewage conduct

Country Status (1)

Country Link
CN (1) CN109577457A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725387A (en) * 2019-11-26 2020-01-24 中铁十八局集团建筑安装工程有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725387A (en) * 2019-11-26 2020-01-24 中铁十八局集团建筑安装工程有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline
CN110725387B (en) * 2019-11-26 2021-02-26 中铁十八局集团有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline

Similar Documents

Publication Publication Date Title
Lu et al. Trenchless construction technologies for oil and gas pipelines: State-of-the-art review
CN105673935B (en) Split slotting method underground utilities replacing options
CN102121268A (en) Method for replacing sewage pipeline
CN103696486A (en) Method for replacing sewage conduits
Pietrucha-Urbanik Failure prediction in water supply system–current issues
Damvergis Sewer systems: Failures and rehabilitation
CN106088293A (en) A kind of small-bore sewage conduct restorative procedure
CN101338847A (en) HDPE tube welding-free interpenetration inner liner pipe-repairing method
CN202852194U (en) Device and system of under ground pipeline repair without excavation of pneumatic burst pipe
CN104727425A (en) Traction-type non-excavation pipeline repairing method
CN104405998A (en) Repairing method for adding liner on underground pipe
CZ159997A3 (en) Insulation process of buried steam piping inside a channel and re-insulated buried steam piping
CN109577457A (en) A kind of method of efficient replacement sewage conduct
CN103629474B (en) For repairing the restorative procedure connecting aqueduct of impaired cast iron fire protection pipeline
KR20150133996A (en) Method for repaering a non-excavation drainpipecapable
Hashemi Construction cost of underground infrastructure renewal: A comparison of traditional open-cut and pipe bursting technology
Das Evaluation of cured-in-place pipe lining installations
Gupta et al. A survey of sewer rehabilitation in Malaysia: application of trenchless technologies
CN203546725U (en) Backfilling grouting device capable of being recycled
CN113124258A (en) Large box culvert uninterrupted water plugging device and repairing method using same
CN110424517A (en) A kind of underground pipe gallery construction rain sewage in urban core region is relocated construction method
CN219673666U (en) Municipal administration pipeline static pressure split tube prosthetic devices
CN212614489U (en) Circular cutting tube drawing drilling machine
CN220566711U (en) Traction tube cracking device with replaceable cutter for short tube replacement
Askari et al. Using Modern Systems for Online Replacement of Pipelines in Crisis Management and Critical Passive Defense Arteries

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190405

WW01 Invention patent application withdrawn after publication