CN109577212A CN201910061061.1A CN201910061061A CN109577212A CN 109577212 A CN109577212 A CN 109577212A CN 201910061061 A CN201910061061 A CN 201910061061A CN 109577212 A CN109577212 A CN 109577212A
Authority
CN
China
Prior art keywords
pedestal
bracket
construction
precasting
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910061061.1A
Other languages
Chinese (zh)
Inventor
万彬
王亮
李长贵
张军营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, Sinohydro Bureau 11 Zhengzhou Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN201910061061.1A priority Critical patent/CN109577212A/en
Publication of CN109577212A publication Critical patent/CN109577212A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention patent belongs to infrastructure project technical field, and in particular to a kind of pretensioned prestressing Precasting Pedestal Construction method includes the following steps: that pedestal selects slot type pedestal;Slot type pedestal is made of gravity abutment, tensioning bracket, pressure column, stretch-drawing beam, anchorage beam;Pedestal arranges number: planning caisson platform precasting area quantity determines the tensioning slot number of predefined region;Pedestal length: after the completion of levelling of the land, it is compacted basal plane, after the completion of basal plane compacting, unwrapping wire is carried out, bracket, connection beam, force-transmitting pole plan-position are released, using mechanical excavation bracket position, hand excavation's force-transmitting pole, connection beam basis, it is poured according to bracket, biography column, base foundation, the sequence on pedestal basis, the present invention solves insecurity factor present in former pre-tensioning system abutment design, it is ensured that the economic rationality of Precasting Pedestal Construction;Improve the security reliability and economy of pre-tensioning system Precasting Pedestal Construction;Reduce construction land tenure, improve construction efficiency.

Description

A kind of pretensioned prestressing Precasting Pedestal Construction method
Technical field
The invention patent belongs to infrastructure project technical field, and in particular to a kind of pretensioned prestressing Precasting Pedestal Construction side Method.
Background technique
The construction of pre-tensioning system abutment design is at home and abroad applied relatively extensively, in recent years, huge in engineering construction task, especially It is to be removed under the drive rebuild due to lacking unified planning emphasis bridge construction project and early period, precast beam panel construction task is numerous Weight, still, pre-tensioning system abutment design is more demanding, there is the phenomenon that applying, and there are biggish security risk and wasting phenomenons.
The features such as geographical location locating for incorporation engineering, engineering-environment, with reference to the engineering model of domestic and international pre-tensioning system abutment design Example carries out the technical research of system from soil mechanics, the mechanics of materials, structural mechanics, building selection, prestressing force loss etc., most End form is at pre-tensioning system abutment design and application.
Based on above-mentioned prior art, the applicant has made lasting and beneficial exploration and design repeatedly, and carries out The test of non-finite number of time has finally found the method for solving above-mentioned technical problem and forms technology described below Scheme.
Summary of the invention
To solve problem of the prior art, the present invention provides a kind of pretensioned prestressing Precasting Pedestal Construction method, the present invention Purpose be to improve in view of the deficiencies of the prior art, construction method of the present invention is primarily adapted for use in constructing hollow slab beam.
In order to achieve the above object, the invention adopts the following technical scheme: a kind of pretensioned prestressing Precasting Pedestal Construction method, Include the following steps:
(1) pedestal type selecting:
Pedestal selects slot type pedestal;
(2) pedestal construction size is arranged:
Slot type pedestal is made of gravity abutment, tensioning bracket, pressure column, stretch-drawing beam, anchorage beam;
Gravity abutment is arranged in the both ends of stretching bed seat, and section structure is having a size of 1 × 2m, and laterally elongated arrangement, two sides exceed pressure 1m outside column;
Tensioning bracket is arranged in above gravity abutment, and section structure is having a size of 0.6 × 0.8m, long 2m, when construction together with pressure column It pours;
Pressure column cross dimensions is 0.5 × 0.5m, and longitudinal elongated arrangement, length is stretching bed seat length L, is embedded to underground 0.2m, Leak outside 0.3m;
Lateral linking beam is arranged every 10m in pressure column lower part, and the cross dimensions of linking beam is 0.3 × 0.2m;
Pedestal basis is 10cm thickness C30 concrete foundation, is poured together with pressure column integral;
Beam making bench is 10cm thickness C30 concrete foundation, and longitudinal elongated arrangement, width is beam body width 1.24m, is controlled with 5# U-steel frame Mesa width and flatness, table top upper berth 8mm thick steel plate;
Stretch-drawing beam and anchorage beam are all made of to be made of 2 I63C I-steel, is welded into one with wall thickness 2cm steel plate side by side It is whole, the space 40mm is reserved between two I-steel for wearing puts transmission rod, stretch-drawing beam length 3.5m long;Anchorage beam length is Draw pedestal laterally wide;
(3) pedestal integral arrangement includes the following steps:
1) pedestal arranges number:
It plans caisson platform precasting area quantity, determines the tensioning slot number of predefined region;
2) pedestal length:
Pedestal length formula: L=× n+(n-1) × 1m+2k;
(4) pedestal is built:
After the completion of levelling of the land, it is compacted basal plane and carries out unwrapping wire after the completion of basal plane compacting, it is flat to release bracket, connection beam, force-transmitting pole Face position, using mechanical excavation bracket position, hand excavation's force-transmitting pole, connection beam basis are each using carrying out after vibration compacting Member base and the binding of superstructure reinforcing bar, it is desirable that foundation reinforcing bar passes column reinforcing bar, connection beam steel, bracket reinforcing bar one Secondary binding is poured according to bracket → biography column → base foundation → pedestal basis sequence.
The invention has the following beneficial effects:
1) insecurity factor present in former pre-tensioning system abutment design is solved, it is ensured that the economic rationality of Precasting Pedestal Construction;
2) security reliability and economy of pre-tensioning system Precasting Pedestal Construction are improved;
3) reduce construction land tenure, improve construction efficiency, reduce personnel's investment, saved cost of investment.
Detailed description of the invention
Fig. 1 is pre-tensioning system pedestal layout drawing of the present invention.
Fig. 2 is pre-tensioning system pedestal sectional schematic diagram.
Specific embodiment
The present invention is described in further details below by embodiment, embodiment is only used to illustrate the present invention, and unlimited The scope of the present invention processed.
A kind of pretensioned prestressing Precasting Pedestal Construction method as shown in Figs. 1-2, (1) pedestal type selecting:
This engineering hollow slab girder is pretensioned prestressing construction, and stretching bed seat construction is first carried out before prefabrication of beam construction, and And require stretching bed seat that should have enough intensity and stability, both ends deformed bar anchorage beam, pedestal selects slot type pedestal, The reliably safe precaution measures such as fixed should be had by putting sand cylinder etc., prevent and treat the generation safety accidents such as turn over, slip.
Stretching bed seat can be divided into: pier formula, slot type, framework type, change it is buried etc., this engineering selection slot type pedestal be designed, Arrangement, advantage are that transmission force property is good, stability is good, its form is conducive to template installation and concrete pouring construction, cost phase To it is lower, be easy to dismounting, second ploughing etc..
(2) pedestal construction size is arranged
Slot type pedestal is made of gravity abutment, tensioning bracket, pressure column, stretch-drawing beam, anchorage beam;
1), gravity abutment
Gravity abutment is arranged in the both ends of stretching bed seat, and section structure is having a size of 1 × 2m, and laterally elongated arrangement, two sides exceed pressure 1m outside column.
2), tensioning bracket
Tensioning bracket is arranged in above gravity, and section structure is having a size of 0.6 × 0.8m, long 2m, and when construction pours together with pressure column It builds.
3), pressure column
Pressure column cross dimensions is 0.5 × 0.5m, and longitudinal elongated arrangement, length is stretching bed seat length L.It is embedded to underground 0.2m, Leak outside 0.3m.
4), linking beam
For the overall stability for reinforcing pressure column, shorten drift, it is special to be arranged in pressure column lower part every 10m to prevent unstability One lateral linking beam.When live actual arrangement according to pressure column length therefrom between to both sides point arrangement linking beam such as carry out, will between Gauge is arranged in tip position from short linking beam, and the cross dimensions of linking beam is 0.3 × 0.2m.
5) pedestal basis
Pedestal basis is 10cm thickness C30 concrete foundation, is poured together with pressure column integral.
6) beam making bench
Beam making bench is 10cm thickness C30 concrete foundation, and longitudinal elongated arrangement, width is beam body width 1.24m.It is controlled with 5# U-steel frame Mesa width and flatness, table top upper berth 8mm thick steel plate.
7), stretch-drawing beam, anchorage beam:
It is all made of using the production of 2 I63C I-steel, is welded into an entirety with wall thickness 2cm steel plate side by side, it is pre- between two I-steel Stay the space 40mm to put transmission rod for wearing, with the pre-buried 2cm thick steel plate in pedestal pressure column contact site so that power transmission column end by Power is uniform.Stretch-drawing beam length 3.5m long;Anchorage beam length is that stretching bed seat is laterally wide.
(3) pedestal integral arrangement includes the following steps:
1) pedestal arranges number;
It plans caisson platform precasting area quantity, determines the tensioning slot number of predefined region;
2) pedestal length and each predefined region deployment scenarios;
Pedestal length formula: L=× n+(n-1) × 1m+2k.(: component length, 20m;The component produced in n: one slot production line Number, 4 or 3 components;Distance between the adjacent end of 1m: two components;K: the distance of pedestal crossbeam to first component end, one As be 1.25-1.5m.
(4) pedestal is built
After the completion of levelling of the land, it is compacted basal plane, the mode for taking quiet shake to combine is compacted basal plane and is put after the completion of basal plane compacting Line releases bracket, connection beam, force-transmitting pole plan-position, using mechanical excavation bracket position, hand excavation's force-transmitting pole, connection beam Basis, carries out each member base after tamping using vibration and superstructure reinforcing bar is bound, it is desirable that foundation reinforcing bar passes column Reinforcing bar, connection beam steel, bracket bar one-time binding, according to bracket → biography column → base foundation → pedestal basis sequence into Row pours, and ensures integrally-built stability with this.
In implementing process of the present invention (1), structure size draft according to design drawing, determine side bar, middle case bay, draft Tensioning and anchoring section buried depth calculate pressure column, bracket and gravity abutment cross dimensions.
(2), stable calculation
According to side bar separation, central sill separation, specific cell block is taken to carry out Force Calculation, check load are as follows: to consider super The factors such as drawing and stress loss, take 1.2 times of safety coefficients, and calculating load is that Force Calculation value is taken to be calculated for 4700kN.
(3), topple checking computations
It is checked with usual pedestal, calculation of Bending Moment is carried out with a little.
(4), arrangement of reinforcement calculates
Cracking checking computations are carried out after determining size
(5), linking beam is arranged
For the overall stability for reinforcing pressure column, shorten drift, it is special to be arranged in pressure column lower part specific range to prevent unstability One lateral linking beam.When live actual arrangement according to pressure column length therefrom between to both sides point arrangement linking beam such as carry out, will between Gauge is arranged in tip position from short linking beam.
(6) stretch-drawing beam, anchorage beam
In conjunction with stretch-drawing beam, the design feature of anchorage beam and using function, stretch-drawing beam size and steel plate thickness are selected, and open Hole site.
Further illustrate: in (2), check principle: gravity abutment, bracket and pressure column are connected in end, and pressure column It is again longitudinal elongated arrangement, when checking overturning stability, fixing end, pedestal end can be used as free end using in the middle part of pressure column It is checked.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. Imitate embodiment.But without departing from the technical solutions of the present invention, according to the technical essence of the invention to above embodiments institute Any simple modification, equivalent variations and the remodeling made, still fall within the protection scope of technical solution of the present invention.

Claims (1)

1. a kind of pretensioned prestressing Precasting Pedestal Construction method, characterized by the following steps:
(1) pedestal type selecting:
Pedestal selects slot type pedestal;
(2) pedestal construction size is arranged:
Slot type pedestal is made of gravity abutment, tensioning bracket, pressure column, stretch-drawing beam, anchorage beam;
Gravity abutment is arranged in the both ends of stretching bed seat, and section structure is having a size of 1 × 2m, and laterally elongated arrangement, two sides exceed pressure 1m outside column;
Tensioning bracket is arranged in above gravity abutment, and section structure is having a size of 0.6 × 0.8m, long 2m, when construction together with pressure column It pours;
Pressure column cross dimensions is 0.5 × 0.5m, and longitudinal elongated arrangement, length is stretching bed seat length L, is embedded to underground 0.2m, Leak outside 0.3m;
Lateral linking beam is arranged every 10m in pressure column lower part, and the cross dimensions of linking beam is 0.3 × 0.2m;
Pedestal basis is 10cm thickness C30 concrete foundation, is poured together with pressure column integral;
Beam making bench is 10cm thickness C30 concrete foundation, and longitudinal elongated arrangement, width is beam body width 1.24m, is controlled with 5# U-steel frame Mesa width and flatness, table top upper berth 8mm thick steel plate;
Stretch-drawing beam and anchorage beam are all made of to be made of 2 I63C I-steel, is welded into one with wall thickness 2cm steel plate side by side It is whole, the space 40mm is reserved between two I-steel for wearing puts transmission rod, stretch-drawing beam length 3.5m long;Anchorage beam length is Stretching bed seat is laterally wide;
(3) pedestal integral arrangement includes the following steps:
1) pedestal arranges number:
It plans caisson platform precasting area quantity, determines the tensioning slot number of predefined region;
2) pedestal length:
Pedestal length formula: L=× n+(n-1) × 1m+2k;
(4) pedestal is built:
After the completion of levelling of the land, it is compacted basal plane and carries out unwrapping wire after the completion of basal plane compacting, it is flat to release bracket, connection beam, force-transmitting pole Face position, using mechanical excavation bracket position, hand excavation's force-transmitting pole, connection beam basis are each using carrying out after vibration compacting Member base and the binding of superstructure reinforcing bar, it is desirable that foundation reinforcing bar passes column reinforcing bar, connection beam steel, bracket reinforcing bar one Secondary binding is poured according to bracket, biography column, base foundation, the sequence on pedestal basis.
CN201910061061.1A 2019-01-23 2019-01-23 A kind of pretensioned prestressing Precasting Pedestal Construction method Pending CN109577212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910061061.1A CN109577212A (en) 2019-01-23 2019-01-23 A kind of pretensioned prestressing Precasting Pedestal Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910061061.1A CN109577212A (en) 2019-01-23 2019-01-23 A kind of pretensioned prestressing Precasting Pedestal Construction method

Publications (1)

Publication Number Publication Date
CN109577212A true CN109577212A (en) 2019-04-05

Family

ID=65917035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910061061.1A Pending CN109577212A (en) 2019-01-23 2019-01-23 A kind of pretensioned prestressing Precasting Pedestal Construction method

Country Status (1)

Country Link
CN (1) CN109577212A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546488A (en) * 2020-05-11 2020-08-18 武汉市华江幸福装配式建筑有限公司 Collinear production process of prestressed beam plate
CN111910760A (en) * 2020-07-08 2020-11-10 五冶集团上海有限公司 Construction method of integral counterweight type pretensioning method prestress tensioning platform
CN111910667A (en) * 2020-07-08 2020-11-10 五冶集团上海有限公司 Construction method of split counterweight and integral counterweight combined pre-tensioning method prestress tensioning platform
CN113944110A (en) * 2021-11-23 2022-01-18 中国二十冶集团有限公司 Precast beam slab pedestal construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN201970395U (en) * 2011-01-26 2011-09-14 南昌市建筑工程集团有限公司 Large-scale groove style base for pre-stressing hollow slab preparation
CN105835226A (en) * 2016-05-26 2016-08-10 中铁二十三局集团轨道交通工程有限公司 Precast beam pedestal obtained through pre-tensioning method
CN205630974U (en) * 2016-05-26 2016-10-12 中铁二十三局集团轨道交通工程有限公司 Pre -tensioning system precast beam pedestal
JP2017002560A (en) * 2015-06-10 2017-01-05 株式会社富士ピー・エス Pretension floor slab construction method based on overhanging construction
CN205969481U (en) * 2016-08-24 2017-02-22 济南市市政工程设计研究院(集团)有限责任公司 Open broken line prestressing force precast beam stretch -draw pedestal earlier
CN206825668U (en) * 2017-03-31 2018-01-02 中铁二十三局集团轨道交通工程有限公司 A kind of stretching bed seat of the bidirectional pre-tensioned prestressing force fragment-free track slab of high-speed railway

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN201970395U (en) * 2011-01-26 2011-09-14 南昌市建筑工程集团有限公司 Large-scale groove style base for pre-stressing hollow slab preparation
JP2017002560A (en) * 2015-06-10 2017-01-05 株式会社富士ピー・エス Pretension floor slab construction method based on overhanging construction
CN105835226A (en) * 2016-05-26 2016-08-10 中铁二十三局集团轨道交通工程有限公司 Precast beam pedestal obtained through pre-tensioning method
CN205630974U (en) * 2016-05-26 2016-10-12 中铁二十三局集团轨道交通工程有限公司 Pre -tensioning system precast beam pedestal
CN205969481U (en) * 2016-08-24 2017-02-22 济南市市政工程设计研究院(集团)有限责任公司 Open broken line prestressing force precast beam stretch -draw pedestal earlier
CN206825668U (en) * 2017-03-31 2018-01-02 中铁二十三局集团轨道交通工程有限公司 A kind of stretching bed seat of the bidirectional pre-tensioned prestressing force fragment-free track slab of high-speed railway

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张彦龙: "先张法组合张拉台座设计与施工", 《科技创新与生产力》 *
李生金: "先张法预制梁地锚槽式长线台座设计与施工", 《山西建筑》 *
李英: "先张法预应力空心板张拉台座的施工及应用", 《山西建筑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546488A (en) * 2020-05-11 2020-08-18 武汉市华江幸福装配式建筑有限公司 Collinear production process of prestressed beam plate
CN111910760A (en) * 2020-07-08 2020-11-10 五冶集团上海有限公司 Construction method of integral counterweight type pretensioning method prestress tensioning platform
CN111910667A (en) * 2020-07-08 2020-11-10 五冶集团上海有限公司 Construction method of split counterweight and integral counterweight combined pre-tensioning method prestress tensioning platform
CN111910667B (en) * 2020-07-08 2022-07-01 五冶集团上海有限公司 Construction method of split counterweight and integral counterweight combined pre-tensioning method prestress tensioning platform
CN113944110A (en) * 2021-11-23 2022-01-18 中国二十冶集团有限公司 Precast beam slab pedestal construction method

Similar Documents

Publication Publication Date Title
CN109577212A (en) A kind of pretensioned prestressing Precasting Pedestal Construction method
CN109778721A (en) Synchronization of jacking up bridge top and the bottom structure carries out the method that bridge increases transformation
CN203923924U (en) No. 0 section bracket prepressing device
CN106702910A (en) Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes
CN106522096A (en) Curved incremental launching construction technology for 48m-long-span railway simply-supported box girders and high piers
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN104452597B (en) Pier prestressed cap beam with extra length Construction Supporting System in water
CN111455859A (en) Construction method for bracket of No. 0 and No. 1 steel bridge with high piers and continuous steel structure
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN104831639B (en) A kind of ultra-wide nonprismatic continuous beam 0# block consolidation and releasing construction method
CN111411985A (en) Bridge bearing structure penetrating through giant karst cave and construction method
CN103835226B (en) Plane curve beam bridge anti-creep moves stopping means
CN104358213B (en) Consider the firm structure limited bracket of concrete triangle of battered leg effect of contraction with to pull bar combination constructing method thereof
CN101469533A (en) Pier top supportless temporary consolidation technique
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN103628422A (en) Counter-force type stay rope hanging basket prepressing device and implement method thereof
CN104929047A (en) V-shaped pier outer support construction method
CN202814388U (en) Device for tunnel pipe shed support deformation testing
CN202989781U (en) Width widened cast-in-place box beam moving support
CN205676784U (en) Bracket reverse drawing loads prepressing device
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN102605718A (en) Prefabrication and construction method of box girder in-situ pedestal
CN202865837U (en) Reinforcement core filling structure of prestressed concrete pipe pile
CN109797660A (en) A kind of segment bracket construction method of beam bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant after: China Power Construction Eleventh Bureau Engineering Co., Ltd.

Applicant after: SINOHYDRO Bureau 11 Co., Ltd.

Address before: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant before: China Hydropower eleventh Engineering Bureau (Zhengzhou) Co., Ltd.

Applicant before: SINOHYDRO Bureau 11 Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405