CN109577193A - Viaduct bridge floor Rapid Combination linked set and construction method - Google Patents

Viaduct bridge floor Rapid Combination linked set and construction method Download PDF

Info

Publication number
CN109577193A
CN109577193A CN201811412698.2A CN201811412698A CN109577193A CN 109577193 A CN109577193 A CN 109577193A CN 201811412698 A CN201811412698 A CN 201811412698A CN 109577193 A CN109577193 A CN 109577193A
Authority
CN
China
Prior art keywords
reaming
bridge floor
fixed
viaduct bridge
fixation hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811412698.2A
Other languages
Chinese (zh)
Other versions
CN109577193B (en
Inventor
梁彬
孙勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang College of Construction
Original Assignee
Heilongjiang College of Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang College of Construction filed Critical Heilongjiang College of Construction
Priority to CN201811412698.2A priority Critical patent/CN109577193B/en
Publication of CN109577193A publication Critical patent/CN109577193A/en
Application granted granted Critical
Publication of CN109577193B publication Critical patent/CN109577193B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Viaduct bridge floor Rapid Combination linked set and construction method.Its composition of this product includes: viaduct bridge floor, the side of the viaduct bridge floor is provided with one group of transversely arranged perpendicular fixation hole, the bottom of the perpendicular fixation hole connects reaming, the reaming circumferentially connects the straight trough that 3 angles are 120 °, the reaming connects bottom reaming, reaming is connected and fixed at the top of the perpendicular fixation hole, the side in the middle position of the perpendicular fixation hole connects horizontal jack, the other side of the viaduct bridge floor is provided with one group of transversely arranged side and erects fixation hole, erect the bottom connecting side reaming of fixation hole in the side, the side reaming circumferentially connects the side straight trough that 3 angles are 120 °, the side reaming connecting side bottom reaming, erect the fixed reaming of top connecting side of fixation hole in the side, erect the horizontal jack of side connecting side in the middle position of fixation hole in the side.The present invention is used for the assembling of viaduct bridge floor.

Description

Viaduct bridge floor Rapid Combination linked set and construction method
Technical field:
The present invention relates to a kind of viaduct bridge floor Rapid Combination linked set and construction methods.
Background technique:
Viaduct bridge floor needs to be attached when being assembled, and how accurately quickly to be assembled, and group It needs very securely, to be merely able to be fixed in one direction if be individually attached with bolt after dress, fixed will not Very securely, using there are some potential safety problemss.
Summary of the invention:
The object of the present invention is to provide one kind will tightly link together between viaduct bridge floor, using safe Viaduct bridge floor Rapid Combination linked set and construction method.
Above-mentioned purpose is realized by following technical scheme:
A kind of viaduct bridge floor Rapid Combination linked set, composition includes: viaduct bridge floor, the viaduct bridge floor Side be provided with one group of transversely arranged perpendicular fixation hole, the bottom of the perpendicular fixation hole connects reaming, and the reaming is around circle The straight trough that 3 angles of week connection are 120 °, the reaming connect bottom reaming, are connected and fixed expansion at the top of the perpendicular fixation hole The side in hole, the middle position of the perpendicular fixation hole connects horizontal jack, and the other side of the viaduct bridge floor is provided with one group Fixation hole is erected in transversely arranged side, and the bottom connecting side reaming of fixation hole is erected in the side, and the side reaming circumferentially connects 3 The side straight trough that a angle is 120 °, the side reaming connecting side bottom reaming, the top connecting side that fixation hole is erected in the side are solid Determine reaming, the horizontal jack of side connecting side in the middle position of fixation hole is erected in the side.
The viaduct bridge floor Rapid Combination linked set, interior be inserted into of the perpendicular fixation hole erects fixed link, described The bottom of perpendicular fixed link has thread segment, and the thread segment is connected and fixed nut, and the fixture nut circumferentially welds 3 The fixed transverse rod that angle is 120 °, the fixed transverse rod are inserted into the straight trough, and the fixture nut is packed into described In reaming, bottom fixed plate is welded in the bottom of the fixture nut, and the bottom fixed plate is lying into the bottom reaming.
The viaduct bridge floor Rapid Combination linked set, it is the perpendicular fixed link, the fixture nut, described Fixed transverse rod, the bottom fixed plate are embedded in the side of the viaduct bridge floor, and the bottom of the bottom reaming is used mixed Solidifying grave is stifled.
The viaduct bridge floor Rapid Combination linked set, the perpendicular fixed link pass through horizontal inserted link, and described is horizontal slotting The side of bar is provided with circular hole, and the perpendicular fixed link passes through the circular hole, and the circular hole is overlapped with the perpendicular fixation hole, It is described in the horizontal jack of other side insertion side of the horizontal inserted link in the side insertion of the horizontal inserted link horizontal jack The end side of horizontal inserted link be provided with side jack, the side jack erects fixation hole with the side and is overlapped.
The viaduct bridge floor Rapid Combination linked set, the side erect insertion side in fixation hole and erect motion bar, institute The bottom that motion bar is erected in the side stated has a thread segment, the thread segment connecting side fixture nut, the side fixture nut around The side fixed transverse rod that 3 angles of circumference soldering are 120 °, the side fixed transverse rod are inserted into the side straight trough, the side Fixture nut is packed into the side reaming, the bottom weld side bottom fixed plate of the side fixture nut, and the side bottom is solid Fixed board is lying into the side bottom reaming.
The viaduct bridge floor Rapid Combination linked set, the side fixture nut, the side fixed transverse rod, institute The side fixture nut stated is embedded in the other side of the viaduct bridge floor, before the viaduct bridge floor docking described in taking-up Side erect motion bar, when the described viaduct bridge floor docking described in horizontal inserted link the other side insertion horizontal jack in side, institute It erects motion bar and is fixed across the side jack connection side fixture nut in the side stated.
The viaduct bridge floor Rapid Combination linked set, the top of the perpendicular fixed link have top thread segment, institute The top thread segment connection jacking nut stated, the fixation reaming interior embedment jacking nut, the top of the top thread segment Magnetic sheet is welded, the magnetic sheet is attracted top magnetic lid, and the top magnetic lid connects serum cap, and the serum cap is located at described consolidate Determine in reaming.
There is side to push up screw thread for the viaduct bridge floor Rapid Combination linked set, the top that fixed link is erected in the side Thread segment connecting side jacking nut is pushed up in section, the side, and the side jacking nut embedment side is fixed in reaming, the side The top weld side magnetic sheet of thread segment is pushed up, the side magnetic sheet is attracted side and pushes up magnetic lid, and magnetic lid connecting side serum cap is pushed up in the side, The side serum cap is located in the fixed reaming in the side.
A kind of construction method of viaduct bridge floor Rapid Combination linked set, this construction method include ten steps, and the first step will Perpendicular fixed link, fixture nut, fixed transverse rod, bottom fixed plate, horizontal inserted link side fit together and be embedded in viaduct bridge floor Viaduct bridge floor is extended in side, the other side of the horizontal inserted link of second step, and third step is by side fixture nut, side fixed transverse rod, side bottom Fixed plate is embedded in the other side of viaduct bridge floor, and side is erected fixed link and is assembled in the fixture nut of side by the 4th step, and the 5th step will Viaduct bridge floor is transported to scene and is assembled, and side is erected fixed link first and unloaded by the 6th step, and the 7th step carries out viaduct bridge floor Abutting joint, by the horizontal jack of other side insertion side of horizontal inserted link, fixed link is being erected across side jack connecting side in side by the 8th step Fixture nut is fixed, and jacking nut is connected on the thread segment of top by the 9th step, assembles serum cap, and side jacking nut is connected to by the tenth step Side is pushed up on thread segment, and side serum cap is assembled.
The utility model has the advantages that
1. the present invention passes through the lateral fixed force of horizontal inserted link and the vertical fixation of perpendicular fixed link in the side of viaduct bridge floor Power is fixed simultaneously, and the other side of viaduct bridge floor erects the vertical fixation of fixed link by the lateral fixed force of horizontal inserted link and side Power is fixed simultaneously, will can tightly be connected and fixed between viaduct bridge floor, connection very securely, use spy It is unsafe.
2. the perpendicular fixed link in side of the invention is packed into, taking-up is all very convenient, it is all convenient to assemble and unload, to horizontal slotting when unloading The assembling of bar provides necessary guarantee, can firmly be fixed when group is loaded onto side erect fixed link, it is ensured that viaduct bridge floor it Between connection it is very secured, use is safer.
3. fixture nut of the invention, fixed transverse rod, bottom fixed plate are embedded in viaduct bridge floor, fixed viaduct Being connected firmly, stablizing between bridge floor.
4. side fixture nut of the invention, side fixed transverse rod, side bottom fixed plate are embedded in viaduct bridge floor, fixed Being connected firmly, stablizing between viaduct bridge floor.
Detailed description of the invention:
Attached drawing 1 is the structural schematic diagram of this product.
Attached drawing 2 is the vertical view truncation figure of attached drawing 1.
Specific embodiment:
Embodiment 1:
A kind of viaduct bridge floor Rapid Combination linked set, composition includes: viaduct bridge floor 1, the viaduct bridge The side in face is provided with one group of transversely arranged perpendicular fixation hole 2, and the bottom of the perpendicular fixation hole connects reaming 3, the reaming The straight trough 4 that 3 angles are 120 ° is circumferentially connected, the reaming connects bottom reaming 5, the top connection of the perpendicular fixation hole The side of fixed reaming 6, the middle position of the perpendicular fixation hole connects horizontal jack 7, the other side of the viaduct bridge floor It is provided with one group of transversely arranged side and erects fixation hole 8, the bottom connecting side reaming 9 of fixation hole, the side reaming are erected in the side The side straight trough 10 that 3 angles are 120 ° is circumferentially connected, the side reaming connecting side bottom reaming 11, fixation hole is erected in the side The fixed reaming 12 of top connecting side, the horizontal jack 13 of side connecting side in the middle position of fixation hole is erected in the side.
Fixation hole, side reaming, side straight trough, side are erected in perpendicular fixation hole, reaming, straight trough, bottom reaming, fixed reaming, horizontal jack, side Bottom reaming, the fixed reaming in side, the horizontal jack in side provide necessary guarantee to the assembling of connecting component, and all holes and slot are all arranged Very rationally, necessary guarantee can be provided to the connection between viaduct bridge floor.
Embodiment 2:
Viaduct bridge floor Rapid Combination linked set described in embodiment 1, the perpendicular fixation hole is interior to be inserted into perpendicular fixed link 14, the bottom of the perpendicular fixed link has a thread segment, and the thread segment is connected and fixed nut 15, the fixture nut around The fixed transverse rod 16 that 3 angles of circumference soldering are 120 °, the fixed transverse rod are inserted into the straight trough, the fixation spiral shell Mother is packed into the reaming, and bottom fixed plate 17 is welded in the bottom of the fixture nut, and the bottom fixed plate is lying into described Bottom reaming in.
Fixed transverse rod is attached around fixture nut, can be securely seated between fixture nut in viaduct bridge floor Face, it is ensured that perpendicular fixed link is assembled in viaduct bridge floor very securely, and then keeps the connection between viaduct bridge floor stronger, Using very safe.
Embodiment 3:
Viaduct bridge floor Rapid Combination linked set as described in example 2, the perpendicular fixed link, the fixation spiral shell Female, described fixed transverse rod, the bottom fixed plate are embedded in the side of the viaduct bridge floor, the bottom reaming Bottom blocks 18 with concrete.
Perpendicular fixed link, fixture nut, fixed transverse rod, bottom fixed plate are embedded in viaduct bridge floor very securely, it is ensured that horizontal Inserted link connects secured, stable, and use is safe, effect is good.
Embodiment 4:
Viaduct bridge floor Rapid Combination linked set described in embodiment 3, the perpendicular fixed link pass through horizontal inserted link 19, institute The side for the horizontal inserted link stated is provided with circular hole 20, and the perpendicular fixed link passes through the circular hole, and the circular hole is erected with described Fixation hole is overlapped, and in the side insertion of the horizontal inserted link horizontal jack, the other side insertion side of the horizontal inserted link is horizontal In jack, the end side of the horizontal inserted link is provided with side jack 21, and fixation hole weight is erected in the side jack and the side It closes.
Horizontal inserted link can be by linking together tightly between viaduct bridge floor, and when assembling only needs in the horizontal jack of insertion side , simple and convenient, assembling is secured, assembling speed is fast.
Embodiment 5:
The perpendicular work of insertion side in fixation hole is erected in viaduct bridge floor Rapid Combination linked set described in embodiment 1, the side Lever 22, the bottom that motion bar is erected in the side have thread segment, the thread segment connecting side fixture nut 23, the side Fixture nut circumferentially welds the side fixed transverse rod 24 that 3 angles are 120 °, and the side fixed transverse rod insertion side is straight In slot, the side fixture nut is packed into the side reaming, the bottom weld side bottom fixed plate of the side fixture nut 25, the side bottom fixed plate is lying into the side bottom reaming.
It is convenient when unloading that motion bar is erected in side, also very convenient when group is loaded onto, and speed is all fast, side erect when motion bar unloads to Horizontal inserted link insertion side erects in fixation hole and the horizontal jack in side and provides space, horizontal inserted link can be firmly fixed when group is loaded onto, really Connection between viaduct bridge floor can tightly be held by protecting horizontal inserted link.
Embodiment 6:
Viaduct bridge floor Rapid Combination linked set described in embodiment 5, the side fixture nut, the side are fixed Cross bar, the side fixture nut are embedded in the other side of the viaduct bridge floor, before the viaduct bridge floor docking Take out the side and erect motion bar, when the described viaduct bridge floor docking described in horizontal inserted link other side insertion it is described side it is horizontal Jack, the side are erected motion bar and are fixed across the side jack connection side fixture nut.
It is activity, fixing piece that motion bar is erected in side, has both played the role of connection, fixation, can also be mentioned to the assembling of horizontal inserted link Necessary guarantee is supplied, use is safe, effect is good.
Embodiment 7:
Viaduct bridge floor Rapid Combination linked set as described in example 2, the top of the perpendicular fixed link have top spiral shell Line section, the top thread segment connect jacking nut 26, the embedment jacking nut, the top screw thread in the fixation reaming Magnetic sheet 27 is welded at the top of section, and the magnetic sheet is attracted top magnetic lid 28, and the top magnetic lid connects serum cap 29, the rubber Lid is located in the fixation reaming.
Jacking nut can firmly fix perpendicular fixed link, can reinforce perpendicular fixed link, it is ensured that perpendicular fixed link was fixed Securely, the safety used, serum cap can protect jacking nut and perpendicular fixed link, and use is safe, effect is good.
Embodiment 8:
Viaduct bridge floor Rapid Combination linked set described in embodiment 5, the top that fixed link is erected in the side have side Thread segment is pushed up, thread segment connecting side jacking nut 30 is pushed up in the side, and the side jacking nut embedment side is fixed in reaming, The top weld side magnetic sheet 31 of the side top thread segment, the side magnetic sheet are attracted side and push up magnetic lid 32, and magnetic lid is pushed up in the side Connecting side serum cap 33, the side serum cap are located in the fixed reaming in the side.
Side can be erected fixed link and firmly fixed by side jacking nut, can be reinforced side and be erected fixed link, it is ensured that side is perpendicular to be fixed Fixed secured, the safety used of bar, side serum cap can protect side jacking nut and side to erect fixed link, and use is safe, effect is good.
Embodiment 9:
A kind of construction method of viaduct bridge floor Rapid Combination linked set, this construction method include ten steps, and the first step will Perpendicular fixed link, fixture nut, fixed transverse rod, bottom fixed plate, horizontal inserted link side fit together and be embedded in viaduct bridge floor Viaduct bridge floor is extended in side, the other side of the horizontal inserted link of second step, and third step is by side fixture nut, side fixed transverse rod, side bottom Fixed plate is embedded in the other side of viaduct bridge floor, and side is erected fixed link and is assembled in the fixture nut of side by the 4th step, and the 5th step will Viaduct bridge floor is transported to scene and is assembled, and side is erected fixed link first and unloaded by the 6th step, and the 7th step carries out viaduct bridge floor Abutting joint, by the horizontal jack of other side insertion side of horizontal inserted link, fixed link is being erected across side jack connecting side in side by the 8th step Fixture nut is fixed, and jacking nut is connected on the thread segment of top by the 9th step, assembles serum cap, and side jacking nut is connected to by the tenth step Side is pushed up on thread segment, and side serum cap is assembled.

Claims (9)

1. a kind of viaduct bridge floor Rapid Combination linked set, composition includes: viaduct bridge floor, it is characterized in that: described is vertical The side of bridge bridge floor is handed over to be provided with one group of transversely arranged perpendicular fixation hole, the bottom of the perpendicular fixation hole connects reaming, described Reaming circumferentially connects the straight trough that 3 angles are 120 °, and the reaming connects bottom reaming, connects at the top of the perpendicular fixation hole Fixed reaming is connect, the side in the middle position of the perpendicular fixation hole connects horizontal jack, the other side of the viaduct bridge floor Be provided with one group of transversely arranged side erect fixation hole, the side erect fixation hole bottom connecting side reaming, the side reaming around Circumference connects the side straight trough that 3 angles are 120 °, the side reaming connecting side bottom reaming, and the top of fixation hole is erected in the side Connecting side fixes reaming, and the horizontal jack of side connecting side in the middle position of fixation hole is erected in the side.
2. viaduct bridge floor Rapid Combination linked set according to claim 1, it is characterized in that: in the perpendicular fixation hole It is inserted into perpendicular fixed link, the bottom of the perpendicular fixed link has thread segment, and the thread segment is connected and fixed nut, and described consolidates Determine nut and circumferentially weld the fixed transverse rod that 3 angles are 120 °, the fixed transverse rod is inserted into the straight trough, described Fixture nut is packed into the reaming, and bottom fixed plate is welded in the bottom of the fixture nut, and the bottom fixed plate is lying into In the bottom reaming.
3. viaduct bridge floor Rapid Combination linked set according to claim 2, it is characterized in that: the perpendicular fixed link, The fixture nut, the fixed transverse rod, the bottom fixed plate are embedded in the side of the viaduct bridge floor, institute The bottom for the bottom reaming stated is blocked with concrete.
4. viaduct bridge floor Rapid Combination linked set according to claim 3, it is characterized in that: the perpendicular fixed link is worn Cross horizontal inserted link, the side of the horizontal inserted link is provided with circular hole, and the perpendicular fixed link passes through the circular hole, the circular hole with The perpendicular fixation hole is overlapped, in the side insertion of the horizontal inserted link horizontal jack, the other side of the horizontal inserted link In the horizontal jack of insertion side, the end side of the horizontal inserted link is provided with side jack, and the side jack and the side are perpendicular solid Determine Kong Chonghe.
5. viaduct bridge floor Rapid Combination linked set according to claim 1, it is characterized in that: fixation hole is erected in the side Interior insertion side erects motion bar, and the bottom that motion bar is erected in the side has a thread segment, the thread segment connecting side fixture nut, The side fixture nut circumferentially welds the side fixed transverse rod that 3 angles are 120 °, described in the side fixed transverse rod insertion Side straight trough in, the side fixture nut is packed into the side reaming, the bottom weld side bottom of the side fixture nut Fixed plate, the side bottom fixed plate are lying into the side bottom reaming.
6. viaduct bridge floor Rapid Combination linked set according to claim 5, it is characterized in that: the fixed spiral shell in the side Female, described side fixed transverse rod, the side fixture nut are embedded in the other side of the viaduct bridge floor, and described is vertical Hand over and take out the side before the docking of bridge bridge floor and erect motion bar, when the described viaduct bridge floor docking described in horizontal inserted link the other side The insertion horizontal jack in side, the side are erected motion bar and are fixed across the side jack connection side fixture nut.
7. viaduct bridge floor Rapid Combination linked set according to claim 2, it is characterized in that: the perpendicular fixed link Top has top thread segment, and the top thread segment connects jacking nut, the embedment jacking nut, institute in the fixation reaming The top welding magnetic sheet for the top thread segment stated, the magnetic sheet are attracted top magnetic lid, and the top magnetic lid connects serum cap, described Serum cap is located in the fixation reaming.
8. viaduct bridge floor Rapid Combination linked set according to claim 5, it is characterized in that: fixed link is erected in the side Top there is side to push up thread segment, thread segment connecting side jacking nut, the side jacking nut embedment side are pushed up in the side In fixed reaming, the top weld side magnetic sheet of the side top thread segment, the side magnetic sheet is attracted side and pushes up magnetic lid, the side Magnetic lid connecting side serum cap is pushed up, the side serum cap is located in the fixed reaming in the side.
9. a kind of construction method of viaduct bridge floor Rapid Combination linked set, it is characterized in that: this construction method includes ten steps, the The side of perpendicular fixed link, fixture nut, fixed transverse rod, bottom fixed plate, horizontal inserted link is fitted together and is embedded in viaduct by one step Viaduct bridge floor is extended in the side of bridge floor, the other side of the horizontal inserted link of second step, and third step is fixed horizontal by side fixture nut, side Bar, side bottom fixed plate are embedded in the other side of viaduct bridge floor, and side is erected fixed link and is assembled in the fixture nut of side by the 4th step, the Viaduct bridge floor is transported to scene and assembled by five steps, and side is erected fixed link first and unloaded by the 6th step, and the 7th step is by viaduct bridge Face carries out abutting joint, and by the horizontal jack of other side insertion side of horizontal inserted link, fixed link is being erected across side jack in side by the 8th step Connecting side fixture nut is fixed, and jacking nut is connected on the thread segment of top by the 9th step, assembles serum cap, and the tenth step is by side jacking nut It is connected on the thread segment of side top, assembles side serum cap.
CN201811412698.2A 2018-11-14 2018-11-14 Quick combined link device for overpass bridge floor and construction method Expired - Fee Related CN109577193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811412698.2A CN109577193B (en) 2018-11-14 2018-11-14 Quick combined link device for overpass bridge floor and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811412698.2A CN109577193B (en) 2018-11-14 2018-11-14 Quick combined link device for overpass bridge floor and construction method

Publications (2)

Publication Number Publication Date
CN109577193A true CN109577193A (en) 2019-04-05
CN109577193B CN109577193B (en) 2020-09-01

Family

ID=65924367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811412698.2A Expired - Fee Related CN109577193B (en) 2018-11-14 2018-11-14 Quick combined link device for overpass bridge floor and construction method

Country Status (1)

Country Link
CN (1) CN109577193B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0227097A (en) * 1988-07-16 1990-01-29 Kumagai Gumi Co Ltd Joint member for civil engineering and construction
CN201411882Y (en) * 2008-12-25 2010-02-24 陈茂莲 Wood floor board lock bucket
CN101855459A (en) * 2007-11-09 2010-10-06 黑蒂赫-海因泽有限及两合公司 Connecting fitting and installation arrangement
CN103452281A (en) * 2013-09-09 2013-12-18 苏州雍阳装饰材料有限公司 I-shaped keel floor with elastic hooks
CN204608596U (en) * 2015-05-15 2015-09-02 张学文 Road and bridge use assembly and connection part
CN205369550U (en) * 2016-02-25 2016-07-06 金胜昔 Module mosaic structure
CN206052987U (en) * 2016-08-30 2017-03-29 河北建筑工程学院 Connecting structure with H type slotted wall structure precast shear walls

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0227097A (en) * 1988-07-16 1990-01-29 Kumagai Gumi Co Ltd Joint member for civil engineering and construction
CN101855459A (en) * 2007-11-09 2010-10-06 黑蒂赫-海因泽有限及两合公司 Connecting fitting and installation arrangement
CN201411882Y (en) * 2008-12-25 2010-02-24 陈茂莲 Wood floor board lock bucket
CN103452281A (en) * 2013-09-09 2013-12-18 苏州雍阳装饰材料有限公司 I-shaped keel floor with elastic hooks
CN204608596U (en) * 2015-05-15 2015-09-02 张学文 Road and bridge use assembly and connection part
CN205369550U (en) * 2016-02-25 2016-07-06 金胜昔 Module mosaic structure
CN206052987U (en) * 2016-08-30 2017-03-29 河北建筑工程学院 Connecting structure with H type slotted wall structure precast shear walls

Also Published As

Publication number Publication date
CN109577193B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
CN203701562U (en) Tool scaffold wall connecting piece
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
TW200427904A (en) A construct for buildings and a method for manufacturing the same
CN106337532A (en) Double-toothed-connection-component inner double-walled pipe combination member and manufacturing method thereof
CN103911952B (en) Prestressed reinforcement bellows positioning construction method
CN102900166B (en) Buckling restrained brace, as well as joint connecting plate and mounting method thereof
CN202279217U (en) Pin-type scaffold
CN103590332A (en) Tunnel type anchorage suitable for soft rock area
CN109577193A (en) Viaduct bridge floor Rapid Combination linked set and construction method
CN110714535A (en) Three-dimensional assembled beam column node structure
CN209457418U (en) A kind of quick positioning connection structure of assembled architecture light plate shear wall
CN208934111U (en) A kind of steel structure frame combined joint
CN204983719U (en) Assembly type structure faces flat protection of edge water and chooses net
CN205295915U (en) Wave form steel web nose girder
CN204097875U (en) A kind of steel bridge deck connected node
CN204875493U (en) Precast reinforced concrete post convenient to assembly
CN209228135U (en) A kind of reinforced concrete precast assembling movie theatre stand structure
CN207620441U (en) The detachable reinforcing steel processing shed of regularization
CN203475920U (en) Flange assembled type power transformation framework column
CN203361469U (en) Butting structure of box type columns or box type beams
CN205530328U (en) Rim of a cup basis support post mounting structure
CN209925776U (en) Pipeline supporting device for natural gas exploitation
CN203462651U (en) Insertion directly-embedded type steel truss connecting structure
CN205421552U (en) Mechanical connection device between housing industrialization component
CN205954834U (en) Combination framework and connecting piece of rack formula gable and main truss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200901

Termination date: 20211114