CN109577123A CN201811568483.XA CN201811568483A CN109577123A CN 109577123 A CN109577123 A CN 109577123A CN 201811568483 A CN201811568483 A CN 201811568483A CN 109577123 A CN109577123 A CN 109577123A
Authority
CN
China
Prior art keywords
antiseepage film
filling
strong
saline
roadbed filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811568483.XA
Other languages
Chinese (zh)
Inventor
蔡伟
张杰胜
周春泽
徐书国
周浩
张明
刘顺涛
谢云峰
孙凯
马勇
张凯
李长亮
王雨
崔翔
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
First Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, First Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201811568483.XA priority Critical patent/CN109577123A/en
Publication of CN109577123A publication Critical patent/CN109577123A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method of a strong and over-salt alkaline earth foundation, which comprises the following steps of (1) road groove excavation: (2) paving an anti-seepage film; (3) first roadbed filling; (4) the anti-seepage film is reversely wrapped; (5) and (5) filling the roadbed for the second time. The anti-seepage film is used for wrapping the roadbed filling to form a closed space, so that water and saline alkali in the original soil around the roadbed filling are prevented from permeating into the roadbed filling, and the permeation damage of underground saline water to the roadbed filling is effectively prevented.

Description

One kind is strong, crosses saline-alkali soil foundation construction method
Technical field
The present invention relates to a kind of foundation construction methods, and specially one kind is strong, crosses saline-alkali soil foundation construction method.
Background technique
Widely distributed the saline-alkali soil of varying strength, salt ground water therein are filled out by roadbed in China's national territorial area Material capillary channel slowly infiltrate into roadbed filling at any time, and saline-alkali soil have with temperature reduce volume expansion characteristic, soil in Containing sulfate amount is more, expands more serious;Before melting from spring late autumn to next year, it makes roadbed generate differential expansion, causes ground Table pine is swollen to make road surface generate wave, bulge to cracking destruction, to reduce the capacity and level-of-service of road, China is long-term Since weak, middle intensity saline-alkali soil is concentrated mainly on to the process experience of saline-alkali soil, and to it is strong, cross saline-alkali soil basement process and lack warp It tests.
Summary of the invention
The purpose of the present invention is to provide one kind by force, crosses saline-alkali soil foundation construction method, to solve the above technical problems.
To achieve the above object, the invention provides the following technical scheme:
One kind is strong, crosses saline-alkali soil foundation construction method, including (1) road slot excavates, and further includes following steps:
(2) antiseepage film is laid with: it is successively paved with antiseepage film in slot bottom and side slope, it is then that adjacent antiseepage film is seamless spliced;
(3) first time roadbed filling: roadbed filling is carried out after the completion of step (2), roadbed filling is filled to original ground Below;
(4) antiseepage film anti-package: the antiseepage film both ends spliced in step (2) are closed up and are seamlessly connected, make antiseepage film by road Based filler encloses package;
(5) second of roadbed filling: roadbed filling construction is carried out after the completion of step (4) again and covers antiseepage film.
Preferably, the antiseepage film is composite geo-membrane.
Preferably, every volume antiseepage film is laid with along perpendicular to road direction of travel in the step (2).
Preferably, in the step (1), after the completion of road slot excavates, the slot that satisfies the need carry out it is smooth, roll and slope trimming.
Preferably, in the step (3), " following the method for filling out " is used when roadbed filling fills first layer, i.e., antiseepage film is spread If covering is filled in time after the completion, positive appliances carries out filling operation on the roadbed filling for filled completion, does not roll directly Antiseepage film.
Preferably, in the step (3), during roadbed filling, special messenger need to be arranged to adjust antiseepage film in time due to filling What is occurred upwarps, shifts situation, clears up big partial size sandstone in time.
Preferably, the step (2) is all connected by the way of welding with antiseepage film in step (4).
Preferably, road slot both ends also need arrangement antiseepage film, positioned at the antiseepage film and slot bottom at road slot both ends, side slope it is anti- Film seamless connection is seeped by roadbed filling sealed envelope.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention wraps up roadbed filling by antiseepage film and forms closure space, separates moisture and salt in the undisturbed soil of periphery Alkali infiltrates into roadbed filling, effectively completely cuts off saline groundwater and encroaches on the infiltration of roadbed filling.
2, the present invention has that barrier performance is good, intensity is high, acid and alkali-resistance, anticorrosive using composite geo-membrane, and ageing-resistant is excellent Point.
3, in the present invention, every volume antiseepage film subsequent is closed ground based filler along can be convenient perpendicular to the laying of road direction of travel Hold together package.
4, in the present invention, after the completion of road slot excavates, the slot that satisfies the need carry out it is smooth, roll and slope trimming, it is ensured that pave Smooth, the without hindrance block material of welding walking in the flatness and welding process of antiseepage film.
5, the present invention " following the method for filling out " is all used when filling and filling for the first time for the second time, it is ensured that it is filling and Shi Xing, and antiseepage film will not be destroyed when filling.
6, during roadbed filling of the present invention, arrange what special messenger adjusted that antiseepage film occurs because filling in time upwarp, shift Situation clears up big partial size sandstone in time, and antiseepage film can be prevented damaged.
7, in the present invention, antiseepage film can guarantee the leakproofness of antiseepage film using being welded to connect.
Detailed description of the invention
Fig. 1 is ground cross-sectional configuration schematic diagram of the present invention;
Fig. 2 is ground longitudinal plane structure schematic diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
One kind is strong referring to FIG. 1-2, crosses saline-alkali soil foundation construction method, includes the following steps:
(1) road slot excavation: carrying out road slot 4 according to design and excavate, and after the completion of road slot 4 excavates, the slot 4 that satisfies the need carries out smooth, stone roller Pressure and slope trimming;
(2) antiseepage film is laid with: being successively paved with antiseepage film 3 in slot bottom and side slope, every volume antiseepage film 3 is advanced along perpendicular to road Direction is laid with, then that adjacent antiseepage film 3 is seamless spliced by the way of welding;Antiseepage film 3 is composite geo-membrane;
(3) first time roadbed filling: roadbed filling is carried out after the completion of step (2), roadbed filling 2 is filled to original ground 1 or less;During roadbed filling, it need to arrange what special messenger adjusted that antiseepage film 3 occurs because filling in time upwarp, shift situation, and The big partial size sandstone of Shi Qingli;When roadbed filling 2 fills first layer use " following the method for filling out ", i.e., antiseepage film 3 be laid with after the completion of and When covering fill, positive appliances carries out filling operation on the roadbed filling 2 for having filled completion, does not roll antiseepage film 3 directly;
(4) antiseepage film anti-package: 3 both ends of antiseepage film spliced in step (2) are closed up and using seamless company by the way of welding It connects, encloses antiseepage film 3 by roadbed filling 2 and wrap up;Slot 4 both ends in road also need arrangement antiseepage film, the antiseepage film positioned at 4 both ends of road slot 3 with the seamless connection of antiseepage film 3 of slot bottom, side slope by 2 sealed envelope of roadbed filling;
(5) second of roadbed filling: carrying out roadbed filling construction using " following the method for filling out " again after the completion of step (4) will Antiseepage film 3 covers.

Claims (8)

1. one kind is strong, crosses saline-alkali soil foundation construction method, including (1) road slot excavates, it is characterised in that: further includes following steps:
(2) antiseepage film is laid with: it is successively paved with antiseepage film in slot bottom and side slope, it is then that adjacent antiseepage film is seamless spliced;
(3) first time roadbed filling: roadbed filling is carried out after the completion of step (2), roadbed filling is filled to original ground;
(4) antiseepage film anti-package: the antiseepage film both ends spliced in step (2) are closed up and are seamlessly connected, fill out antiseepage film by roadbed Material encloses package;
(5) second of roadbed filling: roadbed filling construction is carried out after the completion of step (4) again and covers antiseepage film.
2. it is according to claim 1 it is a kind of strong, cross saline-alkali soil foundation construction method, it is characterised in that: the antiseepage film is Composite geo-membrane.
3. one kind according to claim 1 is strong, crosses saline-alkali soil foundation construction method, it is characterised in that: in the step (2) Every volume antiseepage film is laid with along perpendicular to road direction of travel.
4. one kind according to claim 1 is strong, crosses saline-alkali soil foundation construction method, it is characterised in that: the step (1) In, after the completion of road slot excavates, the slot that satisfies the need carry out it is smooth, roll and slope trimming.
5. one kind according to claim 1 is strong, crosses saline-alkali soil foundation construction method, it is characterised in that: the step (3) In, " following the method for filling out " is used when roadbed filling fills first layer, i.e., covering in time is filled after the completion of antiseepage film is laid with, and fills machine Tool carries out filling operation on the roadbed filling for filled completion, does not roll antiseepage film, roadbed filling in the step (5) directly When equally use " following the method for filling out ".
6. one kind according to claim 1 is strong, crosses saline-alkali soil foundation construction method, it is characterised in that: the step (3) In, during roadbed filling, it need to arrange what special messenger adjusted that antiseepage film occurs because filling in time upwarp, shift situation, it is clear in time Manage big partial size sandstone.
7. it is according to claim 1 it is a kind of strong, cross saline-alkali soil foundation construction method, it is characterised in that: the step (2) and Antiseepage film is all connected by the way of welding in step (4).
8. one kind according to claim 1 is strong, crosses saline-alkali soil foundation construction method, it is characterised in that: road slot both ends Also arrangement antiseepage film is needed, is seamlessly connected positioned at the antiseepage film at road slot both ends with the antiseepage film of slot bottom, side slope and seals roadbed filling Package.
CN201811568483.XA 2018-12-21 2018-12-21 Construction method of strong and over-salt alkaline earth foundation Pending CN109577123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811568483.XA CN109577123A (en) 2018-12-21 2018-12-21 Construction method of strong and over-salt alkaline earth foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811568483.XA CN109577123A (en) 2018-12-21 2018-12-21 Construction method of strong and over-salt alkaline earth foundation

Publications (1)

Publication Number Publication Date
CN109577123A true CN109577123A (en) 2019-04-05

Family

ID=65930432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811568483.XA Pending CN109577123A (en) 2018-12-21 2018-12-21 Construction method of strong and over-salt alkaline earth foundation

Country Status (1)

Country Link
CN (1) CN109577123A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714387A (en) * 2019-11-15 2020-01-21 上海市市政规划设计研究院有限公司 Anti-pollution domestic waste incineration slag bituminous pavement structure
CN111218862A (en) * 2020-03-04 2020-06-02 中铁二院工程集团有限责任公司 High-speed railway saline soil filler embankment structure and construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140771A (en) * 2011-01-27 2011-08-03 河南省新开元路桥工程咨询有限公司 Construction method for processing saline soil roadbed by separation layer
CN102953367A (en) * 2011-08-30 2013-03-06 中国民航机场建设集团公司 Saline soil foundation treatment method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140771A (en) * 2011-01-27 2011-08-03 河南省新开元路桥工程咨询有限公司 Construction method for processing saline soil roadbed by separation layer
CN102953367A (en) * 2011-08-30 2013-03-06 中国民航机场建设集团公司 Saline soil foundation treatment method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714387A (en) * 2019-11-15 2020-01-21 上海市市政规划设计研究院有限公司 Anti-pollution domestic waste incineration slag bituminous pavement structure
CN111218862A (en) * 2020-03-04 2020-06-02 中铁二院工程集团有限责任公司 High-speed railway saline soil filler embankment structure and construction method

Similar Documents

Publication Publication Date Title
CN104358575B (en) A kind of water-rich sand layer slurry shield originates sealing device and originates sealing control method
CN109577123A (en) Construction method of strong and over-salt alkaline earth foundation
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN106836176B (en) The method reinforced sand soil using vacuum pumping technology and improve its engineering characteristic
CN103669375A (en) Double-layer steel sheet pile soil core composite cofferdam structure without inner support and application thereof
CN106593465B (en) A kind of structure and construction method improving tunnel-liner antidetonation shock attenuation ability
CN107605507A (en) Service channel shield-tunneling construction receives structure and construction method
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN102606176A (en) Collapsible loess tunnel construction method
CN203403892U (en) Waterproof structure of lining seam of shield tunnel in high-pressure water-rich stratum
CN104912561A (en) Construction method for continuously passing through vertical shaft by shield under high confined water complex stratum condition
CN111963201A (en) Tunnel segment structure and construction method
CN103306689A (en) Waterproof structure of lining seam of shield tunnel in high-pressure water-rich stratum and construction method of waterproof structure
CN106812540A (en) A kind of shield launching element wall closing water sealing consolidation structure and construction technology
CN209011159U (en) Buried pipeline leakage protection structure
CN106088113A (en) A kind of expansive soil slope reinforcement means
CN206539346U (en) Interlocking for enhancing country rock defective section tunnel antidetonation shock attenuation ability sets seam liner structure
CN108242604B (en) A kind of electric power line pole tower horizontal grounding resistance-reducing device and construction method
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN106522244A (en) Combined embankment edge covering structure and construction method thereof
CN106869962A (en) A kind of shield duct piece waterproof construction and its construction method
CN111456108B (en) Waterproof structure of foundation bearing platform and construction method thereof
CN105297572A (en) Permafrost fill construction method
US3909143A (en) Roadway construction and method therefor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405

RJ01 Rejection of invention patent application after publication