CN109560973A - A kind of the increase terminal method and deletion terminal method of feeder automation topological link - Google Patents
A kind of the increase terminal method and deletion terminal method of feeder automation topological link Download PDFInfo
- Publication number
- CN109560973A CN109560973A CN201910025973.3A CN201910025973A CN109560973A CN 109560973 A CN109560973 A CN 109560973A CN 201910025973 A CN201910025973 A CN 201910025973A CN 109560973 A CN109560973 A CN 109560973A
- Authority
- CN
- China
- Prior art keywords
- terminal
- link
- topological
- topological link
- feeder automation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
Abstract
The invention belongs to technical field of electric power, increase terminal method and deletion terminal method more particularly, to a kind of feeder automation topological link.When increasing or deleting a certain terminal, according to the request of the terminal, adjacent end is automatically performed the check and change of topological parameter, and without manually changing terminal parameter setting one by one, live O&M is convenient and efficient, not easy to make mistakes.
Description
Technical field
The invention belongs to technical field of electric power, more particularly, to a kind of increase terminal of feeder automation topological link
Method and deletion terminal method.
Background technique
Feeder automation (FA, Feeden Autonation) is an extremely important aspect of electrical power distribution automatization system, point
Cloth feeder automation come positioning failure region and completes troubleshooting by communication between adjacent end and information exchange.For
Above-mentioned communication is carried out, needs to establish relevant topology information between adjacent end.
Currently, the foundation of topology information is realized by the parameter configuration of each terminal.For a certain terminal, need
The address information of its all adjacent end is set by tool software or man-machine interface.In practical application, due to urban construction
The many reasons such as development or temporary construction erection, wire topologies variation are frequent, it is often necessary to increase or delete a certain end
End, needs the parameter to the terminal and adjacent end to reconfigure, the configuration for manually carrying out more terminals is not only numerous at this time
Trivial and error-prone, and parameter investment will debug simultaneously match with the construction at scene;Simultaneously for not having remote parameter
For the terminal of change, it is necessary to go to be altered to the scene of each terminal, each terminal filed has certain distance each other, construction
Condition is poor, for terminal on column, it is also necessary to pole ascending operation;Therefore whole O&M is complicated, is easy error, cost
It is higher, poor user experience.
Summary of the invention
In view of the above-mentioned problems, the invention proposes a kind of increase terminal method of feeder automation topological link and deleting eventually
End method, when increasing or deleting a certain terminal, according to the request of the terminal, adjacent end is automatically performed the school of topological parameter
Core and change, without manually changing terminal parameter setting one by one, live O&M is convenient and efficient, not easy to make mistakes.
The present invention adopts the following technical scheme:
A kind of increase terminal method of feeder automation topological link, includes the following steps,
S1, terminal topology link structure is obtained, first terminal is increased between second terminal and third terminal;
S2, the two sides terminal address parameter for configuring first terminal are second terminal and third terminal;
S3, first terminal are linked into communication network, and first terminal issues topological link to second terminal and third terminal and builds
Vertical request message;
After the topological link that S4, second terminal and third terminal receive first terminal establishes request, inquired to another party
The topological link for whether also having received first terminal establishes request;
S5, after receiving positive reply, second terminal and third terminal are completed topology and are checked, and establish topological chain with first terminal
It connects, but the link at this time is still in being not enabled on state;
S6, after first terminal confirmation and second terminal and third terminal all establish topological link, first terminal is to second
Terminal, which issues topological link with third terminal, to be made can request that, second terminal and third terminal disconnect former topological chain to each other at this time
It connects, and the enabled topological link with first terminal.
The technical program further optimizes, and further includes that step S7 prompt increases terminal success, including indicator light, native
Machine interface successfully increases terminal to main website transmission signal and event mode prompt.
The technical program further optimizes, and the communication mode of the topological link includes Ethernet, 4G, bus.This skill
Art scheme further optimizes, and the communication protocol of the topological link includes the communication protocol based on TCP/IP, GOOSE.
A kind of deletion terminal method of feeder automation topological link, includes the following steps,
S1, terminal topology link structure is obtained, first terminal between second terminal and third terminal is deleted;
S2, first terminal issue topological link removal request message to second terminal and third terminal;
After S3, second terminal and third terminal receive the topological link removal request of first terminal, inquired to another party
After whether also having received the topological link removal request of first terminal;
S4, after receiving positive reply, second terminal and third terminal are respectively completed topological check, and establish topology with other side
Link, but the link at this time is still in being not enabled on state;
S5, first terminal confirmation second terminal and after third terminal is successfully established topological link, request second terminal with
Third terminal enables the topological link, and after the topological link is enabled, first terminal is disconnected and second terminal and third terminal
Original link.
The technical program further optimizes, and further includes that terminal success, including indicator light, native are deleted in step S6 prompt
Machine interface prompts successfully to delete terminal to main website transmission pass signal and event mode.
The technical program further optimizes, and the communication mode of the topological link includes Ethernet, 4G, bus.
The technical program further optimizes, and the communication protocol of the topological link includes logical based on TCP/IP, GOOSE
Believe agreement.
The present invention has the advantage that
1) terminal parameter for only needing configuration to be changed, remaining terminal without configuring one by one;
2) automatic to establish distributed feeder automation topological structure, and have the function of topology check, it is not easy to make mistakes;
3) O&M simply, conveniently, greatly reduces site workload.
Detailed description of the invention
Fig. 1 is the topological line map that the present invention increases terminal;
Fig. 2 is the flow chart that the present invention increases terminal;
Fig. 3 is the topological line map that the present invention deletes terminal;
Fig. 4 is the flow chart that the present invention deletes terminal.
Specific embodiment
To further illustrate that each embodiment, the present invention are provided with attached drawing.These attached drawings are that the invention discloses one of content
Point, mainly to illustrate embodiment, and the associated description of specification can be cooperated to explain the operation principles of embodiment.Cooperation ginseng
These contents are examined, those of ordinary skill in the art will be understood that other possible embodiments and advantages of the present invention.In figure
Component be not necessarily to scale, and similar component symbol is conventionally used to indicate similar component.
Now in conjunction with the drawings and specific embodiments, the present invention is further described.
As shown in fig.1, the topological line map of the increase terminal of a present invention preferably embodiment, substation 1 and substation 2
Between original switch 1, switch 2, switch 3, switch 4 totally 4 terminals, now since route changes, need switch 2 and switch 3 it
Between increase by 6 terminal of switch.
As shown in fig.2, to increase the flow chart of terminal.A kind of increase terminal method of feeder automation topological link,
Include the following steps,
1) the two sides terminal address parameter for configuring switch 6 is switch 2 and switch 3;
2) switch 6 is linked into communication network, and switch 6 issues topological link to switch 2 and switch 3 and establishes request message;
3) after the topology that switch 2 receives switch 6 establishes request, Xiang Kaiguan 3 inquires the topological chain for whether also having received switch 6
Connect foundation request;
4) after switch 2 receives the positive reply of above-mentioned query result, switch 2 is completed topology and is checked, and opens up with the foundation of switch 6
Link is flutterred, but the link at this time is still in being not enabled on state;
5) topology of switch 3 is established and is checked with above-mentioned 3-4 step;
6) after the confirmation of switch 6 and switch 2 and switch 3 all establish topological link, switch 6 is opened up to switch 2 and the sending of switch 3
Flutterring link makes can request that, switch 2 and switch 3 disconnect former topological link to each other, and the enabled topological link with switch 6 at this time,
So far 6 terminal of switch has been successfully accessed in distributed FA communication network.
Switch 6 has been successfully accessed in distributed FA communication network at this time, and with include but is not limited to indicator light, it is local man-machine
Interface prompts successfully to be increased to the main website transmission modes such as signal and event.
The topological link of the embodiment includes but is not limited to the communication modes such as Ethernet, 4G, bus, including but unlimited
In based on communication protocols such as TCP/IP, GOOSE.
As shown in fig.3, for delete terminal topological line map, between substation 1 and substation 2 original switch 1, open
2, switch 3, switch 4 totally 4 terminals are closed, now since route changes, need to delete 2 terminal of switch.
As shown in fig.4, to delete the flow chart of terminal.A kind of deletion terminal method of feeder automation topological link,
Include the following steps,
1) switch 2 receives to be deleted instruction, process is exited in starting by remotely-or locally mode;
2) switch 2 issues topological link removal request message to switch 1 and switch 3;
3) after switch 1 receives the topological link removal request of switch 2, Xiang Kaiguan 3 inquires the topological chain for whether receiving switch 2
Connect removal request;
4) after switch 1 receives the positive reply of above-mentioned query result, switch 1 is completed topology and is checked, and opens up with the foundation of switch 3
Link is flutterred, but the link at this time is still in being not enabled on state;
5) the topological removal request of switch 3 is handled with above-mentioned 3-4 step;
6) after switch 2 confirms that switch 1 and switch 3 are successfully established topological link, request switch 1 and switch 3 enable this and open up
Link is flutterred, after the topological link is enabled, switch 2 is disconnected to be linked with the original of switch 1 and switch 3, and so far, switch 2 is deleted successfully.
Switch 2 is successfully completed exiting for distributed FA communication network at this time, and to include but is not limited to indicator light, native
Machine interface prompts successfully to be deleted to the main website transmission modes such as signal and event.
Skilled person will appreciate that above topology connection includes but is not limited to the communication modes such as Ethernet, 4G, bus,
Including but not limited to based on communication protocols such as TCP/IP, GOOSE.
Although specifically showing and describing the present invention in conjunction with preferred embodiment, those skilled in the art should be bright
It is white, it is not departing from the spirit and scope of the present invention defined by the appended claims, it in the form and details can be right
The present invention makes a variety of changes, and is protection scope of the present invention.
Claims (8)
1. a kind of increase terminal method of feeder automation topological link, it is characterised in that: include the following steps,
S1, terminal topology link structure is obtained, first terminal is increased between second terminal and third terminal;
S2, the two sides terminal address parameter for configuring first terminal are second terminal and third terminal;
S3, first terminal are linked into communication network, and first terminal issues topology to second terminal and third terminal and establishes request report
Text;
S4, second terminal and third terminal receive first terminal topological link establish request after, to another party inquiry whether
Also the topological link for having received first terminal establishes request;
S5, after receiving positive reply, second terminal and third terminal are completed topology and are checked, establish topological link with first terminal,
But the link at this time is still in being not enabled on state;
S6, after first terminal confirmation and second terminal and third terminal all establish topological link, first terminal is to second terminal
Issuing topological link with third terminal makes can request that, second terminal and third terminal disconnect former topological link to each other at this time, and
The enabled topological link with first terminal.
2. the increase terminal method of feeder automation topological link as described in claim 1, it is characterised in that: further include step
S7 prompt increase terminal success, including indicator light, local man-machine interface, to main website send signal and event mode prompt succeeded
Increase terminal.
3. the increase terminal method of feeder automation topological link as described in claim 1, it is characterised in that: the topology chain
The communication mode connect includes Ethernet, 4G, bus.
4. the increase terminal method of feeder automation topological link as described in claim 1, it is characterised in that: the topology chain
The communication protocol connect includes the communication protocol based on TCP/IP, GOOSE.
5. a kind of deletion terminal method of feeder automation topological link, it is characterised in that: include the following steps,
S1, terminal topology link structure is obtained, first terminal between second terminal and third terminal is deleted;
S2, first terminal issue topological link removal request message to second terminal and third terminal;
After S3, second terminal and third terminal receive the topological link removal request of first terminal, to another party inquiry whether
Also after having received the topological link removal request of first terminal;
S4, after receiving positive reply, second terminal and third terminal are respectively completed topological check, and establish topological chain with other side
It connects, but the link at this time is still in being not enabled on state;
After S5, first terminal confirmation second terminal and third terminal are successfully established topological link, second terminal and third are requested
Terminal enables the topological link, and after the topological link is enabled, first terminal disconnects the former chain with second terminal and third terminal
It connects.
6. the deletion terminal method of feeder automation topological link as claimed in claim 5, it is characterised in that: further include step
S6 prompt delete terminal success, including indicator light, local man-machine interface, to main website send signal and event mode prompt succeeded
Delete terminal.
7. the deletion terminal method of feeder automation topological link as claimed in claim 5, it is characterised in that: the topology chain
The communication mode connect includes Ethernet, 4G, bus.
8. the deletion terminal method of feeder automation topological link as claimed in claim 5, it is characterised in that: the topology chain
The communication protocol connect includes the communication protocol based on TCP/IP, GOOSE.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910025973.3A CN109560973B (en) | 2019-01-10 | 2019-01-10 | Terminal adding method and terminal deleting method for feeder automation topological link |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910025973.3A CN109560973B (en) | 2019-01-10 | 2019-01-10 | Terminal adding method and terminal deleting method for feeder automation topological link |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109560973A true CN109560973A (en) | 2019-04-02 |
CN109560973B CN109560973B (en) | 2022-02-22 |
Family
ID=65872749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910025973.3A Active CN109560973B (en) | 2019-01-10 | 2019-01-10 | Terminal adding method and terminal deleting method for feeder automation topological link |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109560973B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5740164A (en) * | 1993-02-09 | 1998-04-14 | Teledesic Corporation | Traffic routing for satellite communication system |
US6041358A (en) * | 1996-11-12 | 2000-03-21 | Industrial Technology Research Inst. | Method for maintaining virtual local area networks with mobile terminals in an ATM network |
CN1901399A (en) * | 2006-07-10 | 2007-01-24 | 京信通信技术(广州)有限公司 | Repeater station capable of self adapting regulation group net mode and its data interacting method |
CN101227310A (en) * | 2008-01-29 | 2008-07-23 | 华为技术有限公司 | System, apparatus and method for obtaining multicast topology information |
CN104460346A (en) * | 2014-11-18 | 2015-03-25 | 江苏省电力公司扬州供电公司 | Feeder automation action logic test method based on power distribution terminal service verification |
CN105790254A (en) * | 2016-01-26 | 2016-07-20 | 山东大学 | Multi-tree-based feeder topology representation method |
CN106651635A (en) * | 2016-10-10 | 2017-05-10 | 中国南方电网有限责任公司 | Distributed storage-based power distribution network topology adaptive protection method |
CN106685716A (en) * | 2016-12-29 | 2017-05-17 | 平安科技(深圳)有限公司 | Network topology self-adapting data visualization method and device |
CN107357985A (en) * | 2017-07-03 | 2017-11-17 | 国网江苏省电力公司南京供电公司 | A kind of check scheme on distribution main website feeder line topological model |
-
2019
- 2019-01-10 CN CN201910025973.3A patent/CN109560973B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5740164A (en) * | 1993-02-09 | 1998-04-14 | Teledesic Corporation | Traffic routing for satellite communication system |
US6041358A (en) * | 1996-11-12 | 2000-03-21 | Industrial Technology Research Inst. | Method for maintaining virtual local area networks with mobile terminals in an ATM network |
CN1901399A (en) * | 2006-07-10 | 2007-01-24 | 京信通信技术(广州)有限公司 | Repeater station capable of self adapting regulation group net mode and its data interacting method |
CN101227310A (en) * | 2008-01-29 | 2008-07-23 | 华为技术有限公司 | System, apparatus and method for obtaining multicast topology information |
CN104460346A (en) * | 2014-11-18 | 2015-03-25 | 江苏省电力公司扬州供电公司 | Feeder automation action logic test method based on power distribution terminal service verification |
CN105790254A (en) * | 2016-01-26 | 2016-07-20 | 山东大学 | Multi-tree-based feeder topology representation method |
CN106651635A (en) * | 2016-10-10 | 2017-05-10 | 中国南方电网有限责任公司 | Distributed storage-based power distribution network topology adaptive protection method |
CN106685716A (en) * | 2016-12-29 | 2017-05-17 | 平安科技(深圳)有限公司 | Network topology self-adapting data visualization method and device |
CN107357985A (en) * | 2017-07-03 | 2017-11-17 | 国网江苏省电力公司南京供电公司 | A kind of check scheme on distribution main website feeder line topological model |
Also Published As
Publication number | Publication date |
---|---|
CN109560973B (en) | 2022-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103516541B (en) | Configuration information automatic management method based on Intelligent transformer station | |
CN111564903B (en) | Intelligent distribution transformer terminal, intelligent electric meter access method and distribution Internet of things | |
CN110429708B (en) | Method and system for realizing plug and play of power distribution equipment | |
CN107959620B (en) | Fully mechanized mining equipment identification method, device, system, gateway and storage medium | |
CN102857380B (en) | Remote upgrading method for power line carrier communication routing | |
CN107094102A (en) | The transmission method and equipment of information | |
CN105991680A (en) | Internet of things smart device software automatic upgrading method and system | |
CN112542888A (en) | Method for realizing plug and play of power distribution and utilization intelligent equipment | |
CN108255677A (en) | The vehicle-mounted vehicle device of car networking and Android device communication means and its device | |
CN106506230A (en) | Method and system based on wireless network remote maintenance field apparatus | |
CN111405059B (en) | Cloud device data transmission method, electronic device and Internet of things system | |
CN113259893B (en) | Power distribution body area network node authentication system and method | |
CN103179226A (en) | Method for connecting power distribution terminal into scheduling data network through NAT (Network Address Translation) manner | |
CN113343044A (en) | Method and system for splicing CIM graph model and distribution line based on transformer substation | |
CN109560973A (en) | A kind of the increase terminal method and deletion terminal method of feeder automation topological link | |
CN103607051B (en) | A kind of transformer station's enlargement method and system | |
CN104022901B (en) | Method of configuring and managing ONU (Optical Network Unit) module of state grid concentrator by utilizing PLC (Programmable Logic Controller) | |
CN215494685U (en) | Industrial data remote debugging acquisition platform | |
CN104468367A (en) | Method for modifying region dispatch data network address | |
CN109151047A (en) | A kind of method and device accessing regulation main website for substation's procedure | |
CN213661666U (en) | Intelligent network connecting device | |
CN113992506A (en) | Intelligent convergence terminal online configuration method and system | |
Li et al. | Research on designing methods of the secondary system in digital substation | |
CN114143372A (en) | End network control method and system based on converged network splitter | |
CN111404264B (en) | Method for maintaining source end of low-voltage distribution transformer area equipment and realizing plug and play |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |