CN109558636A - A kind of creation method based on Revit pipe gallery BIM model - Google Patents

A kind of creation method based on Revit pipe gallery BIM model Download PDF

Info

Publication number
CN109558636A
CN109558636A CN201811272934.5A CN201811272934A CN109558636A CN 109558636 A CN109558636 A CN 109558636A CN 201811272934 A CN201811272934 A CN 201811272934A CN 109558636 A CN109558636 A CN 109558636A
Authority
CN
China
Prior art keywords
model
piping lane
revit
established
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811272934.5A
Other languages
Chinese (zh)
Inventor
程海川
王玉明
谷守奎
刘洁
王官冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
CCCC First Harbor Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, CCCC First Harbor Installation Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201811272934.5A priority Critical patent/CN109558636A/en
Publication of CN109558636A publication Critical patent/CN109558636A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Abstract

The present invention provides a kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows: plans piping lane agent model, piping lane agent model is carried out to split into piping lane module;The CAD diagram paper of piping lane is imported into model file, absolute altitude axis net is established;Construct piping lane modular model;The auxiliary construction established needed for piping lane is arranged, the model of each auxiliary construction is established;Each auxiliary construction is imported into piping lane agent model, the corresponding position of piping lane main body is placed it in, is attached to the top and bottom of each wall are corresponding on piping lane top plate and bottom plate.The calculator memory consumed when constructing pipe gallery BIM model according to the method described in the present invention, reduce the degree-of-difficulty factor of building auxiliary construction model, and reducing building auxiliary construction model, avoids Caton phenomenon, improves work efficiency;In addition, the difficult problem of connection at the method effective solution of interior established model pipeline model inflection point.

Description

A kind of creation method based on Revit pipe gallery BIM model
Technical field
The present invention relates to pipe gallery technical field of construction, more particularly to one kind to be based on Revit pipe gallery BIM model Creation method.
Background technique
Pipe gallery is a kind of Urban Underground that is built in for accommodating the structures of two classes and the above municipal engineering pipeline and attached Belong to facility, is the comprehensive corridor of urban Underground pipeline, i.e., builds a tunnel space in Urban Underground, by electric power, communicate, combustion gas, The various utilities pipelines such as heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system, implement unified Planning, Uniting, unified construction and management, are the important infrastructure and lifeline for ensureing city operations.
BIM (Building Information Model) is to establish three based on 3-dimensional digital technology with the various relevant informations of architectural engineering D Data Model is the digital expression to engineering entity and functional characteristic.BIM is mentioned by 3D digital technology for operation management For dummy model, it has the characteristics that visualization, harmony, simulation.
Pipe gallery profession is numerous, pipeline is complicated, and traditional design method draws plan view, sectional view, can not open up completely Show the numerous and complicated content of piping lane, and be easy to produce the mistake of chain reaction when adjusting pipeline, therefore frequently with building BIM The mode of model carries out, during traditional application Revit software creation piping lane threedimensional model, since piping lane is longer, if adopting With auxiliary construction model is constructed directly in piping lane overall model, not only degree-of-difficulty factor is larger, but also also results in whole mould Type needs to consume biggish calculator memory during creation, and the unusual Caton of meeting in modeling process reduces working efficiency; And during pipeline model creation, since piping lane length is larger and very tortuous, there is also pipeline models at inflection point The very difficult problem of connection.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of creation based on Revit pipe gallery BIM model is provided Method.
The present invention to achieve the above object, using following technical scheme:
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
The beneficial effects of the present invention are: constructing pipe gallery BIM model according to the method described in the present invention, building is reduced The degree-of-difficulty factor of auxiliary construction model, and the calculator memory consumed when constructing auxiliary construction model is reduced, it keeps away Caton phenomenon is exempted from, has improved work efficiency;In addition, being connected at the method effective solution of interior established model pipeline model inflection point Difficult problem.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
Embodiment one
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall Be attached on piping lane top plate and bottom plate.
Preferably, it includes establishing civil engineering model and establishing electromechanical model that piping lane modular model is constructed in step 3.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
Embodiment two
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall Section is respectively created.
The present invention is exemplarily described above in conjunction with specific embodiment, it is clear that the present invention implements not by upper The limitation of mode is stated, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved straight It scoops out for other occasions, it is within the scope of the present invention.

Claims (5)

1. a kind of creation method based on Revit pipe gallery BIM model, which is characterized in that specific step is as follows:
Step 1 plans piping lane agent model, intersects according to slope change point, pipeline outlet and the piping lane with piping lane The node that changes of the point piping lane gradient and piping lane standard paragraphs and non-standard segment tie point are the principle of cut-point by piping lane main body Model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and the modeling of piping lane is carried out using this CAD diagram paper as base map, Establish absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model that step 3 constructs each The model of auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in the correspondence position of piping lane main body It sets, it is using the order at the top and bottom of the wall attached in Revit software, the top and bottom of each wall are corresponding attached To on piping lane top plate and bottom plate.
2. the creation method according to claim 1 based on Revit pipe gallery BIM model, which is characterized in that step 3 It is middle building piping lane modular model modeling sequence are as follows: first establish civil engineering model, after establish electromechanical model.
3. the creation method according to claim 2 based on Revit pipe gallery BIM model, which is characterized in that building soil Specific step is as follows for established model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to the vertical of piping lane when bottom plate creates Cross-section diagram determines the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, creating the building wall of piping lane module between top plate and bottom plate, it should be segmented and be divided according to piping lane module when creating wall It does not create.
4. the creation method according to claim 2 based on Revit pipe gallery BIM model, which is characterized in that building machine When electric model, pipeline is created using the method for interior established model.
5. the creation method according to claim 4 based on Revit pipe gallery BIM model, which is characterized in that interior modeling Specific step is as follows for type:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
CN201811272934.5A 2018-10-26 2018-10-26 A kind of creation method based on Revit pipe gallery BIM model Pending CN109558636A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811272934.5A CN109558636A (en) 2018-10-26 2018-10-26 A kind of creation method based on Revit pipe gallery BIM model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811272934.5A CN109558636A (en) 2018-10-26 2018-10-26 A kind of creation method based on Revit pipe gallery BIM model

Publications (1)

Publication Number Publication Date
CN109558636A true CN109558636A (en) 2019-04-02

Family

ID=65865340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811272934.5A Pending CN109558636A (en) 2018-10-26 2018-10-26 A kind of creation method based on Revit pipe gallery BIM model

Country Status (1)

Country Link
CN (1) CN109558636A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960895A (en) * 2019-04-11 2019-07-02 华夏天信(北京)智能低碳技术研究院有限公司 Revit preprocess method based on BIM model
CN110765535A (en) * 2019-10-28 2020-02-07 湖北建科国际工程有限公司 Method and device for constructing tied arch bridge model based on Revit
CN113127949A (en) * 2019-12-31 2021-07-16 久瓴(上海)智能科技有限公司 Building model processing method and device, computer equipment and readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524884A (en) * 2017-10-18 2017-12-29 丁志国 A kind of piping lane monitoring system
CN108121861A (en) * 2017-12-13 2018-06-05 济南市市政工程设计研究院(集团)有限责任公司 A kind of pipe gallery crosspoint modular design method based on BIM
CN108343059A (en) * 2017-01-22 2018-07-31 杭州南联地基基础工程有限公司 The two walls unification half that underground pipe gallery combines prefabricated socket inverse makees method of construction
CN108510589A (en) * 2018-04-09 2018-09-07 长沙市海图科技有限公司 Conversion method and device of the two dimensional pipeline to threedimensional model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343059A (en) * 2017-01-22 2018-07-31 杭州南联地基基础工程有限公司 The two walls unification half that underground pipe gallery combines prefabricated socket inverse makees method of construction
CN107524884A (en) * 2017-10-18 2017-12-29 丁志国 A kind of piping lane monitoring system
CN108121861A (en) * 2017-12-13 2018-06-05 济南市市政工程设计研究院(集团)有限责任公司 A kind of pipe gallery crosspoint modular design method based on BIM
CN108510589A (en) * 2018-04-09 2018-09-07 长沙市海图科技有限公司 Conversion method and device of the two dimensional pipeline to threedimensional model

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛扬: "一种BIM 技术在综合管廊项目设计中的应用", 《第三届全国BIM学术会议论文集》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960895A (en) * 2019-04-11 2019-07-02 华夏天信(北京)智能低碳技术研究院有限公司 Revit preprocess method based on BIM model
CN110765535A (en) * 2019-10-28 2020-02-07 湖北建科国际工程有限公司 Method and device for constructing tied arch bridge model based on Revit
CN113127949A (en) * 2019-12-31 2021-07-16 久瓴(上海)智能科技有限公司 Building model processing method and device, computer equipment and readable storage medium
CN113127949B (en) * 2019-12-31 2023-05-09 久瓴(上海)智能科技有限公司 Building model processing method, device, computer equipment and readable storage medium

Similar Documents

Publication Publication Date Title
CN107391862B (en) Three-dimensional collaborative design method for prefabricated concrete structure
CN106709660B (en) BIM-based building design method
CN106407540B (en) A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology
CN107423518B (en) Comprehensive pipe gallery full-line BIM collaborative design method combining Civil3D and Revit
CN109359351B (en) Three-dimensional modeling method for pipeline and pipeline design method
CN102201129B (en) Three-dimensional visual operation maintenance system and method of subway comprehensive pipelines
CN109558636A (en) A kind of creation method based on Revit pipe gallery BIM model
CN105224747B (en) Urban waterlogging model building method based on CAD engineering drawings information and design of pipe networks computational chart
CN106202825A (en) Underground pipe gallery method for designing based on BIM
CN105447278A (en) Method for producing typified form under assistance of BIM (building information modeling) model
CN108597020A (en) A kind of three-dimensional underground utilities detection data quick mapping method and system
CN102750419B (en) Subway comprehensive pipeline aided design system and method
CN101964084A (en) Intelligent dynamic network structure modeling and processing method applied to urban integrated pipeline system
CN110889160A (en) Municipal pipeline construction method based on BIM technology
CN104392482A (en) Substation engineering project three-dimensional calculation quantity model generation system and method
CN112257160A (en) BIM-based standardized forward design method for waste incineration power plant
CN108022296A (en) A kind of BIM interior decorations current floor and region design system and method
CN113190938A (en) Method, system and medium for rapidly establishing municipal pipe network parameterized model
Li et al. Information modeling of mine working based on BIM technology
CN104700453A (en) Method for generating three-dimensional model of cable pipe network based on GIS
CN108984876A (en) A kind of service sleeve automation modeling method and system based on BIM
CN109271701B (en) Water supply and drainage BIM forward design method based on reach system
CN116383950A (en) Multi-platform collaborative outdoor rainwater pipe network parameterization design method and system
CN116070311A (en) BIM forward design method for long and large bridge
CN112926105B (en) Method for rapidly and finely modeling municipal pipe network by using BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190402