CN109557258A - A kind of flue gas continuous emission monitoring device - Google Patents

A kind of flue gas continuous emission monitoring device Download PDF

Info

Publication number
CN109557258A
CN109557258A CN201811425294.7A CN201811425294A CN109557258A CN 109557258 A CN109557258 A CN 109557258A CN 201811425294 A CN201811425294 A CN 201811425294A CN 109557258 A CN109557258 A CN 109557258A
Authority
CN
China
Prior art keywords
fixed
plate
bolt
several
lower box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811425294.7A
Other languages
Chinese (zh)
Other versions
CN109557258B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huayue Technology Co ltd
Original Assignee
Huang Yameng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huang Yameng filed Critical Huang Yameng
Priority to CN201811425294.7A priority Critical patent/CN109557258B/en
Publication of CN109557258A publication Critical patent/CN109557258A/en
Application granted granted Critical
Publication of CN109557258B publication Critical patent/CN109557258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0004Gaseous mixtures, e.g. polluted air
    • G01N33/0009General constructional details of gas analysers, e.g. portable test equipment
    • G01N33/0027General constructional details of gas analysers, e.g. portable test equipment concerning the detector
    • G01N33/0031General constructional details of gas analysers, e.g. portable test equipment concerning the detector comprising two or more sensors, e.g. a sensor array
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/0004Gaseous mixtures, e.g. polluted air
    • G01N33/0009General constructional details of gas analysers, e.g. portable test equipment
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20009Modifications to facilitate cooling, ventilating, or heating using a gaseous coolant in electronic enclosures
    • H05K7/20136Forced ventilation, e.g. by fans
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/2039Modifications to facilitate cooling, ventilating, or heating characterised by the heat transfer by conduction from the heat generating element to a dissipating body

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Analytical Chemistry (AREA)
  • Medicinal Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Combustion & Propulsion (AREA)
  • Thermal Sciences (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The present invention discloses a kind of flue gas continuous emission monitoring device, including upper box and lower box, and transverse slat is provided between upper box and lower box, several through-holes are equidistantly provided on transverse slat, several first mounting plates are vertically fixed by bolt on one end inner wall of lower box, the bottom end and bottom end of several first mounting plates are welded with fixed convex block, threaded hole is provided on fixed convex block, several first mounting plates are fixed on the inner wall of lower box by threaded hole, when use, data collecting module collected data are controlled by PLC controller, and it will be on real-time data transmission to server, when the continuous time of acquisition being more than the scheduled time, PLC controller controls data acquisition module and stops acquisition, and it controls blower and opens through conduit to heat dissipation and dedusting in lower box, blower unlatching is closed after a certain period of time, PLC control Device control data acquisition module processed acquires again, and whole process is not necessarily to manpower intervention, and data can be with continuous acquisition, real-time Transmission, monitoring efficiency height.

Description

A kind of flue gas continuous emission monitoring device
Technical field
The present invention relates to monitoring device field, specially a kind of flue gas continuous emission monitoring device belongs to flue gas and continuously arranges Put monitoring device applied technical field.
Background technique
Flue gas monitoring refers to that the gaseous pollutant to atmosphere pollution source emission, particulate matter carry out concentration and total emission volumn prison It surveys.Currently, the discharge amount of Chinese sulfur dioxide and carbon dioxide has ranked first in the world respectively and second.Cause big makings The main reason for amount seriously pollutes is the energy resource structure based on fire coal, and Chinese power industry 70% is coal fired power generation.It is coal-fired Contain flue dust, carbon dioxide, sulfur dioxide and nitrogen oxide and a small amount of carbon monoxide, the direct shadow of flue dust in power plant emission flue gas The environmental quality for arriving atmosphere is rung, carbon dioxide, sulfur dioxide and nitrogen oxide etc. are sour gas, are the main of acid rain formation Factor.The emission control of coal-fired plant flue gas pollutant should carry out the environmental monitoring work of pollution sources first.
With the enhancing of environmental consciousness, the research of the flue gas monitoring technology of the discharges such as coal-burning power plant is also increasingly closed Note, but current monitoring device is divided mostly or using acquisition equipment monitoring center to be understood after collection in worksite sample Analysis, is unfavorable for the real-time monitoring to flue gas, rare long-range flue gas monitoring equipment, and long-term installation at the scene, needs periodic cleaning Maintenance, higher cost are unfavorable for promoting on a large scale.
Summary of the invention
It is most with the monitoring device for solving current the purpose of the present invention is to provide a kind of flue gas continuous emission monitoring device Or using acquisition equipment, the monitoring center to be understood after collection in worksite sample is analyzed, and is unfavorable for the real-time monitoring to flue gas, Rare long-range flue gas monitoring equipment, long-term installation at the scene, need periodic cleaning to safeguard, higher cost is unfavorable for a wide range of The technical issues of popularization.
The purpose of the present invention can be achieved through the following technical solutions:
The present invention provides a kind of flue gas continuous emission monitoring device, including upper box and lower box, and upper box and nowel It is provided with transverse slat between body, several through-holes are equidistantly provided on transverse slat, it is solid vertically to pass through bolt on one end inner wall of lower box Surely there are several first mounting plates, the bottom end and bottom end of several first mounting plates are welded with fixed convex block, fix on convex block It is provided with threaded hole, several first mounting plates are fixed on the inner wall of lower box by threaded hole, and the top weldering of fixed convex block It connects and is fixed with mobile coordinating block, the top setting of mobile coordinating block is fluted, and the is equipped with immediately below several first mounting plates Two heat sink strips, the second heat sink strip is with the center line symmetrical setting of lower box, and the second heat sink strip is fixed by bolt and lower box Connection, the bottom end of the second heat sink strip are provided with the second mounting plate, and the second mounting plate is fixedly connected by bolt with lower box, and second Several movable plates are fixedly connected with by pin shaft on mounting plate, have been bolted to connection data acquisition module on movable plate, Several lineation rings are equipped with by bolt in the intermediate inner wall of lower box, it is fixed that the lower end of lower box has been bolted second Plate is equidistantly provided with several lineation buttons in the second fixed plate, and the lower end of the second fixed plate is provided with third fixed plate, and third is solid Fixed board has several U blocks composition;
There are four firm banking, firm bankings to be set in parallel between any two for the bottom end spaced set of upper box, two-by-two Connecting shaft is installed between parallel firm banking, is provided with the first fixed block between two parallel two firm bankings, First fixed block is fixedly connected by sleeve with connecting shaft, and the top of two the first fixed blocks passes through bolt and fixes with slide plate Connection, the top of two firm bankings far from first fixed block one end pass through bolt and are fixedly connected with slide plate, two connections Conduit is provided between axis, the both ends of conduit pass through bolt respectively and are fixedly connected with two the second fixed blocks, two second fixations The top of block passes through bolt and is fixedly connected with slide plate, and slide plate is vertical setting with connecting shaft, and one end of conduit is solid through second Determine block to be connected to blower, blower is fixedly connected by bolt with first support, and the top of first support passes through bolt and protection Plate is fixedly connected, and protective plate is bolted on the top of two slide plates, and protective plate is set in parallel with connecting shaft, and anti- It is equipped in backplate and destatics mechanism, destaticed mechanism and include static eliminator and destatic bar, static eliminator passes through bolt and cunning Plate is fixedly connected, and is destaticed bar and is fixedly connected by bolt with static eliminator.
Further, upper box and lower box are the structure of inner hollow, and one end of lower box is connected with sealing Cover board, several first mounting plates are zigzag shape structure, and groove is square through hole, the horizontal stripe being arranged on the inner wall of groove and lower box Cooperation.
Further, the centre of several first mounting plates, which is recessed inwardly, is provided with the first heat sink strip, and on the first heat sink strip Spaced set has several heat release holes, and the top of several first mounting plates has been bolted to connection take-up block, and take-up block is Centre is provided with the square structure of V-shaped groove.
Further, PLC controller, the side of PLC controller have been bolted to connection on several first mounting plates It is provided with built-in power, data acquisition module is bolted on several first mounting plates, and data acquisition module includes: sky Makings quantity sensor, carbon dioxide sensor, SO 2 sensor.
Further, built-in power is by several conducting wires respectively between PLC controller and data acquisition module in electricity Property connection, between PLC controller and data acquisition module be wired connection.
Further, the quantity of the second mounting plate is no less than two, and each second mounting plate is in the junction of vertical direction It is provided with the first fixed plate, the first fixed plate is fixedly connected by bolt with the inner wall of lower box, and several lineation rings are rectangular Cyclic structure, and the V-shaped setting two-by-two of several lineation rings.
Further, slide plate is that intermediate be recessed inwardly is provided with the plate structure of straight-line groove, and first support is L shape knot Structure, protective plate are U-shaped plate structure.
Further, protective plate surrounding be symmetrical arranged limited position mechanism, position-limit mechanism include second support, support column, Third fixed block, compressed spring and idler wheel, wherein second support is zigzag structure, and second support is solid by bolt and slide plate Fixed connection, the top of second support are provided with support column, and the bottom end of support column is extended downwardly through second support, and support column Bottom end is fixedly connected by threaded hole with the top of third fixed block, and compressed spring is provided on support column.
Further, the top of compressed spring and the top of second support are welded and fixed, and the bottom end of compressed spring and the The top of three fixed blocks is welded and fixed, and is connected with idler wheel by pin shaft in third fixed block.
The specific steps of the monitoring device application method include:
Several first mounting plates are sequentially arranged at the upper end of lower box by the first step, so that the first mounting plate top is arranged Groove be fixedly connected with the horizontal stripe on lower box, bolt is fixed in the threaded hole on fixed convex block, so that the first installation Plate is fixed on the upper end of lower box vertically, PLC controller is fixedly connected by bolt with the first mounting plate, and PLC is controlled Several conducting wires being arranged on device sequentially pass through take-up block and lineation ring is fixed in third fixed plate;
Second heat sink strip is horizontally fixed on the underface of the first mounting plate by second step by bolt, by the second mounting plate By the bottom end of bolt and the second heat sink strip, and movable plate is passed sequentially through into bolt and is fixed on the second mounting plate, first is consolidated Fixed board is fixedly connected by bolt with the bottom end of the second mounting plate, and data acquisition module is fixed on movable plate, and will be counted It draws outside lower box, and the probe of data acquisition module is mounted on to be measured across lineation ring according to the conducting wire and probe of acquisition module In pipeline;
Firm banking is fixedly connected by bolt with the bottom end of upper box, so that firm banking is in flat two-by-two by third step Row setting, the first fixed block is fixedly connected by sleeve with connecting shaft, and connecting shaft is arranged between two firm bankings, Slide plate is installed by bolt in the top of two the first fixed blocks, installs slide plate by bolt on the top of two firm bankings, makes Two slide plates are obtained to be set in parallel;
The bottom end of two slide plates is installed the second fixed block by bolt, passes through spiral shell between the second fixed block by the 4th step Bolt installs conduit, and installs blower in one end of conduit, blower is mounted in first support by bolt, the top of first support End is weldingly fixed on the top that protective plate is bolted on two slide plates, and protective plate is interior to install static electricity removing device by bolt Structure;
5th step, support column is down-set through the top of second support, and the bottom end of support column is passed through into threaded hole It is fixedly connected with third fixed block, compressed spring is weldingly fixed between support column and third fixed block, and by second support It is bolted on slide plate, second support is made to be close to protective plate;
6th step, in use, controlling data collecting module collected data by PLC controller, and by real-time data transmission To server, when the continuous time of acquisition being more than the scheduled time, PLC controller control data acquisition module stopping is adopted Collection, and control blower and open through conduit to heat dissipation and dedusting in lower box, blower unlatching is closed after a certain period of time, PLC control Device control data acquisition module acquires again, into next circulation.
Beneficial effects of the present invention:
1, several first mounting plates are sequentially arranged at the upper of lower box by a kind of flue gas continuous emission monitoring device of the present invention End, so that the groove 7 of the first mounting plate top setting is fixedly connected with the horizontal stripe on lower box, bolt is fixed to fixed convex blocks On threaded hole in so that the first mounting plate is fixed on the upper end of lower box vertically, the centre of several first mounting plates concaves It falls into and is provided with the first heat sink strip, and be equidistantly provided with several heat release holes on the first heat sink strip, the first mounting plate to be mounted on The intracorporal a component of nowel is not direct directly to be contacted with the inner wall of lower box, and convenient for heat dissipation, increase component uses the longevity Life.
2, a kind of flue gas continuous emission monitoring device of the present invention is equipped in the intermediate inner wall of lower box several by bolt Lineation ring, several lineation rings are square ring structure, and PLC controller is passed through bolt by and several lineation rings V-shaped setting two-by-two It is fixedly connected with the first mounting plate, and several conducting wires being arranged in PLC controller is sequentially passed through into take-up block and lineation ring is fixed It in third fixed plate, prevents the winding between conducting wire from causing line short, facilitates later period inspection maintenance.
3, a kind of flue gas continuous emission monitoring device of the present invention consolidates the bottom end of two slide plates by bolt installation second Determine block, conduit is installed by bolt between the second fixed block, and blower is installed in one end of conduit, blower is passed through into bolt installation In first support, the top of first support is weldingly fixed on the top that protective plate is bolted on two slide plates, protection Mechanism is destaticed by bolt installation in plate, when blower is opened, air-flow sky is crossed conduit and entered in lower box, and then passes through first Several heat release holes being arranged on mounting plate radiate, meanwhile, destaticing mechanism can be to electrostatic precipitation be carried out, greatly in lower box Reduce the cost of artificial periodic maintenance greatly.
4, a kind of flue gas continuous emission monitoring device of the present invention, in use, controlling data acquisition module by PLC controller Data are acquired, and by real-time data transmission to server, when the continuous time of acquisition being more than the scheduled time, PLC is controlled Device controls data acquisition module and stops acquisition, and controls blower unlatching and opened by conduit heat dissipation and dedusting, blower in lower box It opens and closes after a certain period of time, PLC controller control data acquisition module acquires again, and whole process is not necessarily to manpower intervention, and number According to can be with continuous acquisition, real-time Transmission, monitoring efficiency be high.
5, a kind of flue gas continuous emission monitoring device of the present invention, second support are fixedly connected by bolt with slide plate, and second The top of bracket is provided with support column, and the bottom end of support column is extended downwardly through second support, and the bottom end of support column passes through spiral shell Pit is fixedly connected with the top of third fixed block, is provided with compressed spring on support column, the top of compressed spring with second The top of frame is welded and fixed, and the bottom end of compressed spring and the top of third fixed block are welded and fixed, and pass through in third fixed block Pin shaft is connected with idler wheel, and idler wheel can reduce frictional force of the position-limit mechanism when moving on slide plate.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the drawings.
Fig. 1 is a kind of flue gas continuous emission monitoring device structural schematic diagram of the present invention.
Fig. 2 is lower box schematic diagram of internal structure of the present invention.
Fig. 3 is lower box internal structure axonometric drawing of the present invention.
Fig. 4 is the first mounting plates structure schematic diagram of the invention.
Fig. 5 is the part A enlarged drawing of Fig. 2 of the present invention.
Fig. 6 is upper box schematic diagram of internal structure of the present invention.
Fig. 7 is upper box internal front view of the present invention.
Fig. 8 is that the present invention destatics plate structural schematic diagram.
Fig. 9 is position-limit mechanism structural schematic diagram of the present invention.
In figure: 1, upper box;2, lower box;3, seal cover board;4, the first mounting plate;5, fixed convex block;6, mobile cooperation Block;7, groove;8, the first heat sink strip;9, heat release hole;10, take-up block;11, the second heat sink strip;12, the second mounting plate;13, movable Plate;14, the first fixed plate;15, lineation ring;16, the second fixed plate;17, lineation button;18, third fixed plate;19, through-hole;20, Firm banking;21, connecting shaft;22, the first fixed block;23, conduit;24, the second fixed block;25, blower;26, first support; 27, protective plate;28, slide plate;29, static eliminator;30, bar is destaticed;31, second support;32, support column;33, third is fixed Block;34, compressed spring;35, idler wheel.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with embodiment, it is clear that described reality Applying example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff all other embodiment obtained without creative efforts belongs to what the present invention protected Range.
Referring to Figure 1-9, a kind of flue gas continuous emission monitoring device, including upper box 1 and lower box 2, and upper box 1 with It is provided with transverse slat between lower box 2, several through-holes 19 are equidistantly provided on transverse slat, several through-holes 19 make upper box 1 and nowel Body 2 is connected to, and then makes to be able to carry out air circulation between upper box 1 and lower box 2, and upper box 1 and lower box 2 are in inside Empty structure, one end of lower box 2 are connected with seal cover board 3, and solid vertically by bolt on one end inner wall of lower box 2 Surely there are several first mounting plates 4, several first mounting plates 4 are zigzag shape structure, and the bottom end and bottom end of several first mounting plates 4 are equal It is welded with fixed convex block 5, is provided with threaded hole on fixed convex block 5, several first mounting plates 4 are fixed on down by threaded hole On the inner wall of cabinet 2, and the top of fixed convex block 5 is welded with mobile coordinating block 6, and the top of mobile coordinating block 6 is provided with Groove 7, groove 7 are square through hole, and the horizontal stripe being arranged on groove 7 and the inner wall of lower box 2 cooperates, so that several first mounting plates 4 is easy to disassemble in lower box 2, and the centre of several first mounting plates 4, which is recessed inwardly, is provided with the first heat sink strip 8, and first dissipates Several heat release holes 9 are equidistantly provided on hot item 8, the top of several first mounting plates 4 has been bolted to connection take-up block 10, take-up block 10 is the square structure that centre is provided with V-shaped groove, and cable is passed through out of V-shaped groove, and then cable is made to be fixed on V-arrangement In slot, avoids mutually winding between cable and cause not convenient for safeguarding, the company of being bolted on several first mounting plates 4 of cable knotting It is connected to PLC controller, the model CP1H-X40DT-D of PLC controller, the side of PLC controller is provided with built-in power, interior Power supply is set as the power supply of each component.
The underface of several first mounting plates 4 is equipped with the second heat sink strip 11, and the second heat sink strip 11 is with the center of lower box 2 Line is symmetrical arranged, and the second heat sink strip 11 is fixedly connected by bolt with lower box 2, and the bottom end of the second heat sink strip 11 is provided with the Two mounting plates 12, the second mounting plate 12 is buccal glyph shaped structure, and the second mounting plate 12 is fixedly connected by bolt with lower box 2, Several movable plates 13 are fixedly connected with by pin shaft on second mounting plate 12, several movable plates 13 can be on the second mounting plate 12 It moves horizontally, and has been bolted to connection data acquisition module on movable plate 13, data acquisition module is bolted On several first mounting plates 4, data acquisition module includes: air quality sensor (Siemens: QPA2000), carbon dioxide Sensor (bright Sheng science and technology: MH-Z19B), (converge SO 2 sensor a man of virtue and ability in Shanghai: EE800), data acquisition module being mounted on On several first mounting plates 4, so that there are gaps between data acquisition module and lower box 2, and then can be right by blower 25 Data acquisition module carries out heat dissipation and dedusting.
Built-in power is electrically connect between PLC controller and data acquisition module respectively by several conducting wires, and PLC controller and data acquisition module can also electrically be connect by several conducting wires with external power supply, PLC controller and data It is wired connection between acquisition module.
The quantity of second mounting plate 12 is no less than two, and each second mounting plate 12 is respectively provided in the junction of vertical direction There is the first fixed plate 14, the first fixed plate 14 is fixedly connected by bolt with the inner wall of lower box 2, and the first fixed plate 14 can be Protection is provided for data acquisition module on vertical direction, and several lineation rings are equipped with by bolt in the intermediate inner wall of lower box 2 15, several lineation rings 15 are square ring structure, and the V-shaped setting two-by-two of several lineation rings 15, lineation ring 15 can be by data Several conducting wires being arranged on acquisition module are fixed, and prevent the winding between conducting wire from causing line short, facilitate later period inspection dimension Shield.
The lower end of lower box 2 has been bolted the second fixed plate 16, if being equidistantly provided in the second fixed plate 16 Dry lineation button 17, lineation button 17 cooperates with lineation ring 15 carries out regular, the lower end of the second fixed plate 16 to the conducting wire in lower box 2 It is provided with third fixed plate 18, third fixed plate 18 has several U blocks composition, and lineation ring is placed through in third fixed plate 18 15 with the regular several conducting wires of lineation button 17.
There are four firm banking 20, firm bankings 20 to be set in parallel between any two for the bottom end spaced set of upper box 1, Connecting shaft 21 is installed between two parallel firm banking 20, is provided between two parallel two firm bankings 20 One fixed block 22, the first fixed block 22 is fixedly connected by sleeve with connecting shaft 21, and the top of two the first fixed blocks 22 is equal It is fixedly connected by bolt with slide plate 28, the top of two firm bankings 20 far from 22 one end of the first fixed block passes through bolt It is fixedly connected with slide plate 28, conduit 23 is provided between two connecting shafts 21, the both ends of conduit 23 pass through bolt and two respectively Second fixed block 24 is fixedly connected, and the top of two the second fixed blocks 24 passes through bolt and is fixedly connected with slide plate 28, slide plate 28 It is recessed inwardly for centre and is provided with the plate structure of straight-line groove, and the second fixed block 24 can slide in straight-line groove, it is sliding Plate 28 is vertical setting with connecting shaft 21, and firm banking 20 limits the moving range of the second fixed block 24, conduit in the horizontal direction 23 one end is connected to through the second fixed block 24 with blower 25, and blower 25 is fixedly connected by bolt with first support 26, and first Bracket 26 is L-shaped structure, and the top of first support 26 is fixedly connected by bolt with protective plate 27, and first support 26 is blower 25 provide support force, and protective plate 27 is bolted on the top of two slide plates 28, and protective plate 27 and connecting shaft 21 are in flat Row setting, protective plate 27 is U-shaped plate structure, and is equipped in protective plate 27 and destatics mechanism, and destaticing mechanism includes except quiet Electric appliance 29 is fixedly connected by bolt with slide plate 28 with bar 30, static eliminator 29 is destaticed, and is destaticed bar 30 by bolt and is removed Electrostatic device 29 is fixedly connected.
The surrounding of protective plate 27 is symmetrical arranged limited position mechanism, and position-limit mechanism includes second support 31, support column 32, third Fixed block 33, compressed spring 34 and idler wheel 35, wherein second support 31 be zigzag structure, and second support 31 by bolt with Slide plate 28 is fixedly connected, and the top of second support 31 is provided with support column 32, the bottom end of support column 32 through second support 31 to Lower extension, and the bottom end of support column 32 is fixedly connected by threaded hole with the top of third fixed block 33, is arranged on support column 32 Have compressed spring 34, the top of compressed spring 34 and the top of second support 31 are welded and fixed, and the bottom end of compressed spring 34 with The top of third fixed block 33 is welded and fixed, and is connected with idler wheel 35 by pin shaft in third fixed block 33, and idler wheel 35 can be with Reduce frictional force of the position-limit mechanism when moving on slide plate 28.
The specifically used and course of work of the flue gas continuous emission monitoring device are as follows:
Several first mounting plates 4 are sequentially arranged at the upper end of lower box 2 by the first step, so that 4 top of the first mounting plate is set The groove 7 set is fixedly connected with the horizontal stripe on lower box 2, bolt is fixed in the threaded hole on fixed convex block 5, so that first Mounting plate 4 is fixed on the upper end of lower box 2 vertically, PLC controller is fixedly connected by bolt with the first mounting plate 4, and will Several conducting wires being arranged in PLC controller sequentially pass through take-up block 10 and lineation ring 15 is fixed in third fixed plate 18;
Second heat sink strip 11 is horizontally fixed on the underface of the first mounting plate 4 by second step by bolt, by the second installation Plate 12 passes through the bottom end of bolt and the second heat sink strip 11, and movable plate 13 is passed sequentially through bolt and is fixed on the second mounting plate 12 On, the first fixed plate 14 is fixedly connected by bolt with the bottom end of the second mounting plate 12, and data acquisition module is fixed on On movable plate 13, and the conducting wire of data acquisition module and probe are drawn outside lower box 2 across lineation ring 15, and data are acquired The probe of module is mounted in pipe under test;
Firm banking 20 is fixedly connected by bolt with the bottom end of upper box 1, so that firm banking 20 is two-by-two by third step It is set in parallel, the first fixed block 22 is fixedly connected by sleeve with connecting shaft 21, connecting shaft 21 is arranged in two fixations Between pedestal 20, slide plate 28 is installed by bolt on the top of two the first fixed blocks 22, on the top of two firm bankings 20 Slide plate 28 is installed by bolt, so that two slide plates 28 are set in parallel;
The second fixed block 24 is installed by bolt, between the second fixed block 24 in the bottom end of two slide plates 28 by the 4th step Conduit 23 is installed by bolt, and blower 25 is installed in one end of conduit 23, blower 25 is mounted on first support by bolt On 26, the top of first support 26 is weldingly fixed on the top that protective plate 27 is bolted on two slide plates 28, protective plate Mechanism is destaticed by bolt installation in 27;
5th step, support column 32 is down-set through the top of second support 31, and the bottom end of support column 32 is passed through Threaded hole is fixedly connected with third fixed block 33, by compressed spring 34 be weldingly fixed on support column 32 and third fixed block 33 it Between, and second support 31 is bolted on slide plate 28, so that second support 31 is close to protective plate 27;
6th step, in use, controlling data collecting module collected data by PLC controller, and by real-time data transmission To server, when the continuous time of acquisition being more than the scheduled time, PLC controller control data acquisition module stopping is adopted Collection, and control blower 25 and open through conduit 23 to heat dissipation and dedusting in lower box 2, the unlatching of blower 25 is closed after a certain period of time, PLC controller control data acquisition module acquires again, into next circulation.
In the use of the present invention, several first mounting plates 4 to be sequentially arranged to the upper end of lower box 2, so that the first installation The groove 7 of 4 top of plate setting is fixedly connected with the horizontal stripe on lower box 2, and bolt is fixed to the threaded holes on fixed convex block 5 Interior, so that the first mounting plate 4 is fixed on the upper end of lower box 2 vertically, the centre of several first mounting plates 4, which is recessed inwardly, to be provided with First heat sink strip 8, and several heat release holes 9 are equidistantly provided on the first heat sink strip 8, the first mounting plate 4 to be mounted on nowel A component in body 2 is not direct directly to be contacted with the inner wall of lower box 2, convenient for heat dissipation, increases the service life of component; Several lineation rings 15 are equipped with by bolt in the intermediate inner wall of lower box 2, several lineation rings 15 are square ring structure, and if PLC controller is fixedly connected by bolt with the first mounting plate 4, and PLC is controlled by the dry V-shaped setting two-by-two of lineation ring 15 Several conducting wires being arranged on device sequentially pass through take-up block 10 and lineation ring 15 is fixed in third fixed plate 18, prevent between conducting wire Winding cause line short, facilitate the later period inspection maintenance;The second fixed block is installed by bolt in the bottom end of two slide plates 28 24, conduit 23 is installed by bolt between the second fixed block 24, and blower 25 is installed in one end of conduit 23, blower 25 is passed through Bolt is mounted in first support 26, and the top of first support 26 is weldingly fixed on protective plate 27 and is bolted on two cunnings The top of plate 28, protective plate 27 is interior to destatic mechanism by bolt installation, and when blower 25 is opened, air-flow sky crosses the entrance of conduit 23 In lower box 2, and then several heat release holes 9 by being arranged on the first mounting plate 4 radiate, meanwhile, destaticing mechanism can be with To electrostatic precipitation is carried out in lower box 2, the cost of artificial periodic maintenance is greatly reduced;In use, being controlled by PLC controller Data collecting module collected data, and by real-time data transmission to server, when the continuous time of acquisition is more than scheduled Between when, PLC controller control data acquisition module stop acquisition, and control blower 25 open by conduit 23 in lower box 2 It radiates and dedusting, the unlatching of blower 25 is closed after a certain period of time, PLC controller control data acquisition module acquires again, entire mistake Cheng Wuxu manpower intervention, and data can be with continuous acquisition, real-time Transmission, monitoring efficiency height;Second support 31 passes through bolt and cunning Plate 28 is fixedly connected, and the top of second support 31 is provided with support column 32, and the bottom end of support column 32 is downward through second support 31 Extend, and the bottom end of support column 32 is fixedly connected by threaded hole with the top of third fixed block 33, is provided on support column 32 Compressed spring 34, the top of compressed spring 34 and the top of second support 31 are welded and fixed, and the bottom end of compressed spring 34 and the The top of three fixed blocks 33 is welded and fixed, and is connected with idler wheel 35 by pin shaft in third fixed block 33, idler wheel 35 can subtract Few frictional force of the position-limit mechanism when being moved on slide plate 28.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (10)

1. a kind of flue gas continuous emission monitoring device, which is characterized in that including upper box (1) and lower box (2), and upper box (1) it is provided with transverse slat between lower box (2), is equidistantly provided on transverse slat several through-holes (19), in one end of lower box (2) Several first mounting plates (4) are vertically fixed by bolt on wall, the bottom end and bottom end of several first mounting plates (4) are welded solid Surely have fixed convex block (5), be provided with threaded hole on fixed convex block (5), several first mounting plates (4) are fixed on down by threaded hole On the inner wall of cabinet (2), and the top of fixed convex block (5) is welded with mobile coordinating block (6), the top of mobile coordinating block (6) Fluted (7) are arranged in end, are equipped with the second heat sink strip (11) immediately below several first mounting plates (4), the second heat sink strip (11) With the center line symmetrical setting of lower box (2), and the second heat sink strip (11) is fixedly connected by bolt with lower box (2), and second The bottom end of heat sink strip (11) is provided with the second mounting plate (12), and the second mounting plate (12) connects by the way that bolt and lower box (2) are fixed It connects, is fixedly connected with several movable plates (13) on the second mounting plate (12) by pin shaft, movable plate is bolted on (13) It is connected with data acquisition module, several lineation rings (15), lower box is equipped with by bolt in the intermediate inner wall of lower box (2) (2) lower end has been bolted the second fixed plate (16), and several lineation buttons are equidistantly provided in the second fixed plate (16) (17), the lower end of the second fixed plate (16) is provided with third fixed plate (18), and third fixed plate (18) has several U blocks composition;
For the bottom end spaced set of upper box (1) there are four firm banking (20), firm banking (20) is in set in parallel between any two It sets, is equipped with connecting shaft (21) between two parallel firm banking (20), between two parallel two firm bankings (20) It is provided with the first fixed block (22), the first fixed block (22) is fixedly connected by sleeve with connecting shaft (21), and two first The top of fixed block (22) passes through bolt and is fixedly connected with slide plate (28), two fixations far from the first fixed block (22) one end The top of pedestal (20) passes through bolt and is fixedly connected with slide plate (28), is provided with conduit (23) between two connecting shafts (21), The both ends of conduit (23) pass through bolt respectively and are fixedly connected with two the second fixed blocks (24), the top of two the second fixed blocks (24) End is fixedly connected by bolt with slide plate (28), and slide plate (28) is vertical setting with connecting shaft (21), one end of conduit (23) It being connected to through the second fixed block (24) with blower (25), blower (25) is fixedly connected by bolt with first support (26), and the The top of one bracket (26) is fixedly connected by bolt with protective plate (27), and protective plate (27) is bolted on two slide plates (28) top, and protective plate (27) is set in parallel with connecting shaft (21), and is equipped in protective plate (27) and destatics mechanism, It destatics mechanism to include static eliminator (29) and destatic bar (30), static eliminator (29) connects by the way that bolt and slide plate (28) are fixed It connects, destatics bar (30) and be fixedly connected by bolt with static eliminator (29).
2. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the upper box (1) with Lower box (2) is the structure of inner hollow, and one end of lower box (2) is connected with seal cover board (3), several first installations Plate (4) is zigzag shape structure, and groove (7) is square through hole, and the horizontal stripe being arranged on groove (7) and the inner wall of lower box (2) cooperates.
3. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that several first installations The centre of plate (4), which is recessed inwardly, to be provided with the first heat sink strip (8), and is equidistantly provided with several heat dissipations on the first heat sink strip (8) The top in hole (9), several first mounting plates (4) has been bolted to connection take-up block (10), and take-up block (10) sets for centre It is equipped with the square structure of V-shaped groove.
4. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that several first installations PLC controller is bolted to connection on plate (4), the side of PLC controller is provided with built-in power, data acquisition module It is bolted on several first mounting plates (4), data acquisition module includes: air quality sensor, carbon dioxide biography Sensor, SO 2 sensor.
5. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the built-in power passes through Several conducting wires are electrically connect between PLC controller and data acquisition module respectively, PLC controller and data acquisition module Between be wired connection.
6. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that second mounting plate 12 Quantity be no less than two, and each second mounting plate 12 is provided with the first fixed plate 14 in the junction of vertical direction, first Fixed plate 14 is fixedly connected by bolt with the inner wall of lower box 2, and several lineation rings 15 are square ring structure, and several lineations The V-shaped setting two-by-two of ring 15.
7. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the slide plate 28 is centre It is recessed inwardly and is provided with the plate structure of straight-line groove, first support 26 is L-shaped structure, and protective plate 27 is U-shaped plate structure.
8. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the four of the protective plate 27 Week is symmetrical arranged limited position mechanism, and position-limit mechanism includes second support 31, support column 32, third fixed block 33, compressed spring 34 With idler wheel 35, wherein second support 31 is zigzag structure, and second support 31 is fixedly connected by bolt with slide plate 28, second The top of bracket 31 is provided with support column 32, and the bottom end of support column 32 is extended downwardly through second support 31, and support column 32 Bottom end is fixedly connected by threaded hole with the top of third fixed block 33, and compressed spring 34 is provided on support column 32.
9. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the compressed spring 34 Top and the top of second support 31 are welded and fixed, and the bottom end of compressed spring 34 and the welding of the top of third fixed block 33 are solid It is fixed, idler wheel 35 is connected with by pin shaft in third fixed block 33.
10. a kind of flue gas continuous emission monitoring device according to claim 1, which is characterized in that the monitoring device uses The specific steps of method include:
Several first mounting plates 4 are sequentially arranged at the upper end of lower box 2 by the first step, so that the setting of 4 top of the first mounting plate Groove 7 is fixedly connected with the horizontal stripe on lower box 2, bolt is fixed in the threaded hole on fixed convex block 5, so that the first installation Plate 4 is fixed on the upper end of lower box 2 vertically, PLC controller is fixedly connected by bolt with the first mounting plate 4, and PLC is controlled Several conducting wires being arranged on device processed sequentially pass through take-up block 10 and lineation ring 15 is fixed in third fixed plate 18;
Second heat sink strip 11 is horizontally fixed on the underface of the first mounting plate 4 by second step by bolt, by the second mounting plate 12 By the bottom end of bolt and the second heat sink strip 11, and movable plate 13 is passed sequentially through into bolt and is fixed on the second mounting plate 12, it will First fixed plate 14 is fixedly connected by bolt with the bottom end of the second mounting plate 12, and data acquisition module is fixed on movable plate On 13, and the conducting wire of data acquisition module and probe are drawn outside lower box 2 across lineation ring 15, and by data acquisition module Probe is mounted in pipe under test;
Firm banking 20 is fixedly connected by bolt with the bottom end of upper box 1 by third step, so that firm banking 20 is two-by-two in flat First fixed block 22 is fixedly connected by sleeve with connecting shaft 21, connecting shaft 21 is arranged in two firm bankings by row setting Between 20, slide plate 28 is installed by bolt on the top of two the first fixed blocks 22, is passed through on the top of two firm bankings 20 Bolt installs slide plate 28, so that two slide plates 28 are set in parallel;
The bottom end of two slide plates 28 is installed the second fixed block 24 by bolt, passed through between the second fixed block 24 by the 4th step Bolt installs conduit 23, and installs blower 25 in one end of conduit 23, and blower 25 is mounted in first support 26 by bolt, The top of first support 26 is weldingly fixed on the top that protective plate 27 is bolted on two slide plates 28, leads in protective plate 27 It crosses bolt installation and destatics mechanism;
5th step, support column 32 is down-set through the top of second support 31, and the bottom end of support column 32 is passed through into screw thread Hole is fixedly connected with third fixed block 33, and compressed spring 34 is weldingly fixed between support column 32 and third fixed block 33, and Second support 31 is bolted on slide plate 28, second support 31 is made to be close to protective plate 27;
6th step in use, controlling data collecting module collected data by PLC controller, and real-time data transmission is extremely taken It is engaged on device, when the continuous time of acquisition being more than the scheduled time, PLC controller controls data acquisition module and stops acquisition, and It controls blower 25 to open through conduit 23 to heat dissipation and dedusting in lower box 2, the unlatching of blower 25 is closed after a certain period of time, PLC control Device control data acquisition module processed acquires again, into next circulation.
CN201811425294.7A 2018-11-27 2018-11-27 continuous emission monitoring equipment of flue gas Active CN109557258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811425294.7A CN109557258B (en) 2018-11-27 2018-11-27 continuous emission monitoring equipment of flue gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811425294.7A CN109557258B (en) 2018-11-27 2018-11-27 continuous emission monitoring equipment of flue gas

Publications (2)

Publication Number Publication Date
CN109557258A true CN109557258A (en) 2019-04-02
CN109557258B CN109557258B (en) 2020-01-31

Family

ID=65867604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811425294.7A Active CN109557258B (en) 2018-11-27 2018-11-27 continuous emission monitoring equipment of flue gas

Country Status (1)

Country Link
CN (1) CN109557258B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1924586A (en) * 2006-09-11 2007-03-07 王健 Smog discharge continuous monitor system
CN204630994U (en) * 2014-12-31 2015-09-09 力合科技(湖南)股份有限公司 Continuous fume emission monitoring system
CN205910614U (en) * 2016-08-11 2017-01-25 西安聚能仪器有限公司 Flue gas monitoring cabinet
CN206002428U (en) * 2016-08-23 2017-03-08 合肥金星机电科技发展有限公司 Flue gas detecting system
CN207457191U (en) * 2017-11-21 2018-06-05 太原海纳辰科仪器仪表有限公司 A kind of environmental monitoring flue gas on-Line Monitor Device convenient for being fixedly mounted
CN108376918A (en) * 2018-03-29 2018-08-07 盐城同舟电气有限公司 A kind of multifunctional building electrical cabinet
CN108426249A (en) * 2018-05-21 2018-08-21 浙江格扬热工装备科技有限公司 A kind of ill domestic animal pyrolysis charring processing unit
CN108575075A (en) * 2018-04-24 2018-09-25 滁州瑞能电力科技有限公司 A kind of safety control and its method of electric power monitoring system
CN208112072U (en) * 2018-05-17 2018-11-16 天津市云来机电设备发展有限公司 A kind of modified comprehensive distribution box
CN208127688U (en) * 2018-05-11 2018-11-20 中航宝胜电气股份有限公司 A kind of flexible distribution box of arc protection diffusion safety
CN208143691U (en) * 2018-04-26 2018-11-23 肖应龙 A kind of communication engineering equipment cabinet

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1924586A (en) * 2006-09-11 2007-03-07 王健 Smog discharge continuous monitor system
CN204630994U (en) * 2014-12-31 2015-09-09 力合科技(湖南)股份有限公司 Continuous fume emission monitoring system
CN205910614U (en) * 2016-08-11 2017-01-25 西安聚能仪器有限公司 Flue gas monitoring cabinet
CN206002428U (en) * 2016-08-23 2017-03-08 合肥金星机电科技发展有限公司 Flue gas detecting system
CN207457191U (en) * 2017-11-21 2018-06-05 太原海纳辰科仪器仪表有限公司 A kind of environmental monitoring flue gas on-Line Monitor Device convenient for being fixedly mounted
CN108376918A (en) * 2018-03-29 2018-08-07 盐城同舟电气有限公司 A kind of multifunctional building electrical cabinet
CN108575075A (en) * 2018-04-24 2018-09-25 滁州瑞能电力科技有限公司 A kind of safety control and its method of electric power monitoring system
CN208143691U (en) * 2018-04-26 2018-11-23 肖应龙 A kind of communication engineering equipment cabinet
CN208127688U (en) * 2018-05-11 2018-11-20 中航宝胜电气股份有限公司 A kind of flexible distribution box of arc protection diffusion safety
CN208112072U (en) * 2018-05-17 2018-11-16 天津市云来机电设备发展有限公司 A kind of modified comprehensive distribution box
CN108426249A (en) * 2018-05-21 2018-08-21 浙江格扬热工装备科技有限公司 A kind of ill domestic animal pyrolysis charring processing unit

Also Published As

Publication number Publication date
CN109557258B (en) 2020-01-31

Similar Documents

Publication Publication Date Title
CN203932744U (en) A kind of JP comprehensive distribution box
CN109557258A (en) A kind of flue gas continuous emission monitoring device
CN108982758B (en) Factory building air monitoring system based on thing networking
CN105067043B (en) A kind of power transmission and transforming equipment contamination rate of increase prediction meanss
CN212254186U (en) Intelligent miniature ambient air roof monitoring device
CN206411097U (en) A kind of novel air monitoring device
CN105450175B (en) Test the device of photovoltaic power station component pollution
CN205375128U (en) Coal mine safety monitoring information system based on PLC control
CN203847735U (en) Sealing flashboard valve for high-temperature flue
CN205785338U (en) Air automatic monitoring equipment
CN212942208U (en) Power equipment dehydrating unit
CN103925383A (en) High temperature flue seal gate valve
CN111487381B (en) Environment monitoring device and method
CN209399101U (en) A kind of portable meter reading recording device of Controlling line loss
CN209964419U (en) Dustproof device for instrument and meter
CN113643152A (en) Town energy panoramic interactive big data platform management system
CN212807123U (en) Environmental information detection device of inspection robot
CN203104983U (en) Cabinet for online monitoring of capacitive equipment and lightning arrester in electric power system
CN220120705U (en) Fume emission continuous monitoring cabinet and system
CN207649970U (en) A kind of back-blowing mechanism for CEMS systems
CN220932714U (en) Dust online detection micro station
CN213932643U (en) Miniature air monitoring station structure
CN217542751U (en) Wisdom building site is with raise dust monitoring devices
CN214503271U (en) Environmental monitor convenient to collect dust sample in air
CN219758009U (en) Solar particulate matter on-line monitoring appearance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200102

Address after: 510000 room 3-7, 14th floor, building a, No. 89 Zhongshan Avenue, Tianhe District, Guangzhou City, Guangdong Province (only for office use) (not for factory use)

Applicant after: Guangzhou Huayue Technology Co.,Ltd.

Address before: 430100 No. 8 Triangle Lake Road, Caidian District, Wuhan City, Hubei Province

Applicant before: Huang Yameng

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A continuous smoke emission monitoring device

Granted publication date: 20200131

Pledgee: Agricultural Bank of China Limited Guangzhou Tianhe sub branch

Pledgor: Guangzhou Huayue Technology Co.,Ltd.

Registration number: Y2024980022723