CN109556770A CN201910036916.5A CN201910036916A CN109556770A CN 109556770 A CN109556770 A CN 109556770A CN 201910036916 A CN201910036916 A CN 201910036916A CN 109556770 A CN109556770 A CN 109556770A
Authority
CN
China
Prior art keywords
anchor bolt
gasket
deformation
signal
prompt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910036916.5A
Other languages
Chinese (zh)
Inventor
刘平原
多俊军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fazhida (beijing) Technology Co Ltd
Original Assignee
Fazhida (beijing) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fazhida (beijing) Technology Co Ltd filed Critical Fazhida (beijing) Technology Co Ltd
Priority to CN201910036916.5A priority Critical patent/CN109556770A/en
Publication of CN109556770A publication Critical patent/CN109556770A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L1/00Measuring force or stress, in general
    • G01L1/20Measuring force or stress, in general by measuring variations in ohmic resistance of solid materials or of electrically-conductive fluids; by making use of electrokinetic cells, i.e. liquid-containing cells wherein an electrical potential is produced or varied upon the application of stress
    • G01L1/22Measuring force or stress, in general by measuring variations in ohmic resistance of solid materials or of electrically-conductive fluids; by making use of electrokinetic cells, i.e. liquid-containing cells wherein an electrical potential is produced or varied upon the application of stress using resistance strain gauges
    • G01L1/2206Special supports with preselected places to mount the resistance strain gauges; Mounting of supports
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/04Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/04Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
    • F16B13/10Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front with separate gripping parts moved into their final position in relation to the body of the device by a separate operation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/16Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge
    • G01B7/18Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge using change in resistance

Abstract

The present invention discloses a kind of intelligent anchor bolt, the anchor bolt includes anchor bolt seat, screw rod and nut, it further include gasket, the gasket is set on the screw rod, between the anchor bolt seat and the nut, the intelligence anchor bolt is equipped with axial pre tightening force early warning mechanism, the pretightning force early warning mechanism includes signal acquisition unit, control unit and prompt unit, wherein signal acquisition unit includes the strain gauge being arranged on the gasket, and the strain gauge is used to acquire the deformation of gasket and transmits a signal to control unit;Judging result is sent to the prompt unit whether in normal range by the axial pre tightening force of described control unit anchor bolt according to the information discriminatory analysis of strain gauge.The present invention can monitor the pretightning force of anchor bolt in real time and can issue prompt information, and engineering staff convenient and efficient can efficiently note abnormalities anchor bolt, carry out checking that excluding hidden danger avoids causing danger in time.

Description

A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt
Technical field
The present invention relates to architectural engineering anchoring assembly fields, have the intelligence more particularly, to a kind of intelligent anchor bolt and one kind The steel plate support construction of anchor bolt.
Background technique
Anchor bolt is a kind of component that structural member and substrate are tightly fastened, and it is one that anchor bolt one end, which is deep into base internal, which melts, Body, other end are closely connect by gasket, nut with knot part structure.It is commonly used for highway bridge, dam, billboard, curtain wall, The equipment in the places such as industrial premises is installed and is fixed, to achieve the purpose that ensure to firmly install.
In practical applications due to lack of standardization, the environment of installation change and natural aging etc., so that anchor bolt Pretightning force is beyond carrying range or loosens, to cannot achieve effective carrying of anchor bolt, causes anchor under serious situation Falling off for firmware and cause an accident.In order to avoid the generation of such accident, it usually needs put into a large amount of manpowers and visually supervised to anchor bolt It surveys to check the anchor bolt for the abnormalities such as occurring loosening, such investigation not only needs to put into a large amount of manpowers and consumes a longer time, and And visual inspection can not reliably find the anchor bolt there are security risk.More disadvantageously part occasion monitors window time Anchor bolt amount that is limited but needing to monitor is huge, thus cannot achieve substantially by manpower monitoring.Such as the anchor bolt in rail traffic The exception that monitoring problem just shows is prominent.
Therefore a kind of intelligent anchor bolt is urgently developed, reliably to detect anchor bolt pretightning force, is occurred in anchor bolt pretightning force Warning information can be issued when abnormal in time, investigation security risk is prompted to avoid the occurrence of danger.
Summary of the invention
Embodiment of the present invention is designed to provide a kind of intelligent anchor bolt, is not only able to the axis of accurate monitoring bolt To pretightning force, moreover it is possible to real-time and easily obtain specific warning information.
A kind of intelligence anchor bolt, including anchor bolt seat, screw rod and nut, gasket and the bracket being connected on gasket, wherein institute It states gasket to be set on the screw rod, between the anchor bolt seat and the nut, the intelligence anchor bolt is equipped with axial pre- Clamp force early warning mechanism, the pretightning force early warning mechanism include signal acquisition unit, control unit and prompt unit, wherein signal acquisition Unit includes the strain gauge being arranged on the gasket, and the strain gauge is used to acquire the deformation of gasket and by signal It is transferred to control unit;The axial pre tightening force of described control unit anchor bolt according to the information discriminatory analysis of strain gauge is No to be sent to the prompt unit in normal range, and by judging result, the prompt unit includes live prompt unit Live prompt unit and remote prompts unit, the scene prompt unit setting have on the bracket and with described control unit Line communication connection, the remote prompts unit setting are connect in remote monitoring terminal with described control unit wireless telecommunications.
Preferably, in the above solution, above-mentioned strain gauge is arranged in the gasket, including in the axial direction of the gasket The first deformation acquisition device being arranged and the second deformation acquisition device being radially arranged in the gasket, first deformation Acquisition device acquires the gasket in the deformation axially occurred;The second deformation acquisition device acquires the gasket in radial hair Raw deformation.
Preferably, in the above solution, the first deformation acquisition device and the second deformation acquisition device are resistance-strain It counts, the multiple strain ga(u)ges composition bridge circuit being provided on the annular gasket.
Preferably, in the above solution, being drawn and the first deformation acquisition device and the second deformation acquisition device from the gasket The signal cable of connection, the signal cable are connected to the microcontroller on the bracket by the bracket.
Preferably, in the above solution, the bracket is formed with an accommodating chamber or is fixed with a shell, for putting the micro-control Device processed and the live prompt unit.
Preferably, in the above solution, the scene prompt unit is sounding device and/or light emitting device.
Preferably, in the above solution, the microcontroller includes power circuit, analog to digital conversion circuit signal processing unit, micro-control Device processed, the signal processing unit include amplifying circuit, analog to digital conversion circuit, multiple strain ga(u)ges of the strain gauge Bridge circuit is formed, the power circuit provides excitation power supply, bridge output voltage signal, through the amplification to the bridge circuit Circuit is enlarged into analog voltage signal, and the analog voltage signal passes through analog-digital conversion circuit as described, analog signal is converted to Digital signal is simultaneously sent to microcontroller, and the microcontroller is filtered the digital signal, is rejected interference signal, is filtered out Effective digital signal calculates the practical pressure born of sensor according to the corresponding relationship of digital signal and stress;Then biography The practical pressure born of sensor pre-tightens force threshold with anchor bolt and compares, and judges whether intelligent anchor bolt working condition is normal.
Preferably, in the above solution, when microcontroller judges that the practical pressure born of the sensor is pre-tightened greater than the anchor bolt Force threshold maximum value, the microcontroller issue overload prompt to the prompt unit;When microcontroller judges the sensor The pressure actually born thinks that pretightning force is reduced when pre-tightening force threshold minimum value lower than the anchor bolt, the microcontroller is to described Prompt unit, which issues, loosens prompt.
Preferably, in the above solution, overload/loosening prompt that the prompt unit is issued includes the finger of live prompt unit Show that lamp issues alarm signal and remote monitoring terminal host alarm signal.
Preferably, in the above solution, intelligent anchor bolt further includes the base expanding and base expanding blade being arranged on the screw rod, the base expanding and base expanding blade Anchor bolt seat periphery is slid into when the intelligent anchor bolt is anchored in the substrate.
The present invention also provides a kind of steel plate support construction, use intelligent anchor bolt described at least the above either a program by its It is fixed on support object.
Intelligence anchor bolt according to the present invention, is arranged strain gauge, which is acquired using deformation on gasket Device, when abnormal conditions occurs in the pretightning force of anchor bolt, the deformation values of deformation acquisition device acquisition can change, and by deformation Signal is sent to control unit, and control unit judges whether that warning information, which is sent to indicating unit, after exception issues prompt letter Breath, such engineering staff convenient and efficient can efficiently note abnormalities anchor bolt, carry out checking that excluding hidden danger avoids endangering in time Danger, the technical solution of the application greatly improves the security performance and reliability of anchor bolt, while greatly having saved the cost of overhaul.
Detailed description of the invention
Fig. 1 is the overall structure figure of the intelligent anchor bolt of the present invention
Fig. 2 is the gasket construction figure of the intelligent anchor bolt of the present invention
Fig. 3 is the schematic diagram that fixture is fixed in the intelligent anchor bolt anchoring of the present invention in the substrate
Fig. 4 is the electrical circuit theory schematic diagram that the intelligent anchor bolt of the present invention realizes monitoring
Fig. 5 is that the intelligent anchor bolt of the present invention realizes that the electrical frame of monitoring refines structural schematic diagram
Fig. 6 is the equivalent circuit diagram of the intelligent anchor bolt strain ga(u)ge of the present invention
Fig. 7 is the corresponding relationship that the intelligent anchor bolt stress of the present invention and strain ga(u)ge export electric signal
Specific embodiment
The present invention protects a kind of intelligent anchor bolt and a kind of steel plate structure with the intelligence anchor bolt.
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
Embodiment 1:
Technical solution of the present invention is schematically illustrated by Fig. 1 and Fig. 2, which includes anchor bolt seat 10, screw rod 11 and nut 13, further include gasket 12, the gasket 12 is set on the screw rod, be located at the anchor bolt seat 10 and nut 13 it Between.The anchor bolt seat 10 of anchor bolt can be according to requirement of engineering, not according to the setting of the factors such as the substrate hardness of anchoring in the present embodiment Similar shape, the anchor bolt seat 11 as shown in the present embodiment Fig. 1 select taper, other shapes also can be set into, it is preferred that anchor bolt seat 11 Outer diameter be greater than 11 outer diameter of screw rod, with better play anchoring effect.
In order to realize the intellectual monitoring of intelligent anchor bolt, intelligent anchor bolt is equipped with axial pre tightening force early warning as shown in fig. 4-5 Mechanism, the pretightning force early warning mechanism include signal acquisition unit 100, control unit 200 and prompt unit 300.
Preferably, signal acquisition unit 100 is equipped with strain gauge on institute's gasket 12, for acquiring the deformation of gasket 12 And transmit a signal to control unit 200.Control unit 200 is pre- according to the axial direction of the information discriminatory analysis anchor bolt of strain gauge Judging result is sent to prompt unit 300 whether in normal range by clamp force, and preferred prompt unit 300 includes existing Prompt unit 302 and remote prompts unit (not shown), live prompt unit 302 be arranged on the bracket 20 and with The connection of 200 wire communication of described control unit carries out live prompt, remote prompts unit and control unit and passes through wireless telecommunications electricity The connection of road 307 carries out remote prompts, it might even be possible on the mobile phone of interconnection technique responsible person.
Preferably, strain gauge is arranged in gasket 12, in order to which whether the monitoring anchor bolt of more reliable property occurs loosening Abnormal conditions, the first deformation acquisition device 121 that the axis that strain gauge is preferably included in the gasket 12 is set up and The the second deformation acquisition device 122 of gasket 12 being radially arranged, wherein the first deformation acquisition device 121 acquires gasket 12 in axis To the deformation of generation;Second deformation acquisition device 122 acquires gasket in the deformation radially occurred, first direction and the second party To vertically capable of preferably realizing the accurate of monitoring in this way.In order to further increase the sensitivity and precision of measurement, the first deformation Acquisition device 121 and the second deformation acquisition device 122 can preferably (hereinafter strain ga(u)ge be also with 121 for strain ga(u)ge With 122 calibration), and be mounted in gasket 12, because gasket 12 is easy to generate deformation, such as between gasket 12 and steel plate 4 Pressure when becoming larger, 12 thickness value of gasket can become smaller namely it is axial deformation occurs, horizontal direction diameter will increase namely radial hair Raw deformation, deformation occurs generates the first deformation signal and the second deformation signal for corresponding two strain ga(u)ges.Further preferably , multiple strain ga(u)ges of the first deformation acquisition device 121 and the second deformation acquisition device 122 composition bridge circuit is with by the One deformation signal and the second deformation signal are conveniently converted into voltage signal.
Placing structure about gasket 12 as shown in Figure 2, the preferably gasket 12 are provided in a first direction namely axially First accommodating chamber, for accommodating strain ga(u)ge 121;It has been arranged radially the second accommodating chamber in second direction namely gasket 12, For accommodating strain ga(u)ge 122.
Installation control unit 200 for convenience is provided in the periphery of gasket 12 for fixing consolidating for control unit 200 Determine frame 20.The fixed frame 20 is preferably designed for semiclosed shape, such as be arranged to U-shaped structure as shown in Figure 1, and wherein U-shaped is opened It mouthful is fixed on gasket 12, fixed form can be welding or bolt is fixed etc., such as Fig. 2 example, be provided with spiral shell on gasket 12 Keyhole, the fixed bracket 20 of U-shaped is bolted on gasket 12, in the enclosure portion namely U-shaped bottom position of U-shaped structure For fixing suggestion device 30.Fixed bracket 20 can also be wherein integrally formed with gasket 12.
To realize the transmission of signal and the scene prompt of prompt unit 300, gasket 12 is passed through with 301 one end of a signal cable With 122 communication connection of the first deformation acquisition device 121 and the second deformation acquisition device, the other end is drawn through gasket from gasket 12 Bracket 20 on 12 is connected to the control unit 200 being arranged on bracket 20.It is further preferred that bracket 20 is formed with a receiving Chamber is fixed with a shell, for putting the cue circuit 306 of control unit 200 and live prompt unit 302, to protect control The cue circuit 306 of unit 200 and live prompt unit 302.
The monitoring framework of intelligent anchor bolt, as shown in Figure 4 and Figure 5, intelligent anchor bolt of the invention are described from electric part below Including a pretightning force early warning mechanism, being formed by monitoring system includes signal acquisition unit 100, and control unit 200 prompts single Member 300, control unit 200 include power supply 308, amplifying circuit 303, analog to digital conversion circuit 304 and microcontroller 305, and stress passes Sensor includes the bridge circuit that multiple strain ga(u)ges 121 form, and power supply 308 provides excitation power supply, electric bridge to the bridge circuit The circuit output voltage signal faint lower than 5mV is enlarged into analog voltage signal, analog voltage signal warp through amplifying circuit 303 Analog to digital conversion circuit 304 is crossed, analog signal is converted to digital signal and is sent to microcontroller 305,305 pairs of numbers of microcontroller Signal is filtered, and is rejected interference signal, is filtered out effective digital signal, according to the corresponding relationship of digital signal and stress, meter Calculate the practical pressure born of sensor;Then the practical pressure born of sensor is pre-tightened force threshold with anchor bolt to compare, is sentenced Whether disconnected intelligence anchor bolt working condition is normal.
The course of work of strain ga(u)ge is described in detail by attached drawing 6 and attached drawing 7 as follows.
Strain ga(u)ge 121 is a kind of current sensing element, it is made of substrate, sensitive grid, coating and electrode.Substrate Positioned at lower layer, middle layer is sensitive grid, and upper layer is coating, and electrode is located at device one end.Base material is phenolic aldehyde, and sensitive grid is Alloy.When strain ga(u)ge 121 is attached to testee, measured object dignity changes with stress and generates deformation, strain ga(u)ge Deformation occurs together with sensitive grid for 121 substrates, is eventually exhibited as resistance value and changes.
Calculate that stress value is demarcated by resistance-strain deformation.Calibration principle is with process as shown in fig. 6, resistance is answered Become meter RX to connect with fixed value resistance R1, apply voltage value U0 to series circuit, then two resistance intermediate voltage values are U1, U1= U0* [R1/ (RX+R1)].Voltage U1 is faint analog signal, and amplified voltage is N*U1, then is become through analog to digital conversion circuit For digital voltage value M.
Tool is generated using proof force and applies known pressure F to gasket 12, through the above process, signal processing circuit microcontroller It is digital voltage value M that device 305, which calculates result,.Since resistance value and stress value are linear change, two number of general measure Value can establish stress F and digital voltage value M relationship, as shown in fig. 7, first is the corresponding digital voltage of maximal force F1 Value M1, then measure the corresponding digital voltage value M2 of a minimum value F2.One stress F and digital voltage value can be described by two o'clock Relationship straight line between M.After stress straight line is established, stress F is finished with the foundation of digital voltage value M relationship, signal processing electricity Road can calculate absolute stress value F according to digital voltage value M.
It is to be noted that axial change with radial measurements is opposite when power increases or reduces.Gasket 12 is born 121 length of axial direction strain ga(u)ge shortens when pressure increases, and resistance value RX becomes smaller, by formula U1=U0* [R1/ (RX+R1)] Know that U1 value increases, is eventually exhibited as M increase.Gasket 12 bears to collapse facing radially towards center when pressure and show as expanding, radial Strain ga(u)ge Tensile, resistance value RX become larger, and know that U1 value becomes smaller by formula U1=U0* [R1/ (RX+R1)], final to show For M reduction.It is axial equal it can be inferred that stress changes with radial variations by detection when anchor bolt stress changes greatly.
When microcontroller 305 judges that the practical pressure born of the sensor is greater than the anchor bolt and pre-tightens force threshold maximum Value, microcontroller 305 issue overload prompt to prompt unit 300;It is born when microcontroller 305 judges that the sensor is practical Pressure thinks that pretightning force is reduced when pre-tightening force threshold minimum value lower than the anchor bolt, the microcontroller is to the prompt unit 300 issue loosening prompt.
In order to effectively prompt engineering staff to understand the state of anchor bolt in real time, the suggestion device 30 in the present embodiment includes existing Field prompt unit 302 and remote terminal prompt unit, it is possible thereby to realize the far and near monitoring of anchor bolt axial pre tightening force, greatly It ensure that the convenience of safety and control processing.Live prompt unit 302 preferably sounding device and/or light emitting device (under Also with 302 calibration sounding devices and light emitting device in text), in this way when live prompt unit 302 receives overload or loosens pre- Different sound and/or different light can be issued when alert signal.Typical sounding device can select buzzer 302, micro- Controller 305 can be according to overload or loosening control buzzer 302 issues different sound, and light emitting device can be sending not The luminescent device 302 of same color, different color of light is issued when receiving different standby signals, is issued when such as overload prompts Feux rouges issues blue light when loosening prompt.And the remote terminal host of remote terminal prompt unit, it can be computer, mobile phone, IPAD, the terminal devices such as Intelligent bracelet, controllers can carry out control operation according to prompt on end host, avoid overhauling Personnel carry out site examining and repairing, very convenient.
Specifically, referring to attached an example practical application shown in Fig. 3.As shown in figure 3, the intelligent anchor bolt of the present embodiment usually with Anchored mode, which will need to be fixed on the steel plate in cast concrete base 54, to be implemented to fix, and anchor bolt seat 11 is deep into cast concrete base 5, It can be specifically embedded in advance in concreting, the anchor bolt seat 10 and half of screw 11 of anchor bolt are just solid after the concrete has set It is scheduled in cast concrete base 5, it is tight by nut 13 that another part screw rod of anchor bolt passes through the hole for being fixed steel plate 4 and gasket 12 Gu gasket 12 is tightly attached on steel plate 4 by nut 13 and generates pretightning force at this time, usual situation fixes one by several anchor bolts Steel plate 4 is fixed by a fixed point of several anchor bolts to steel plate 4.If loosening or mistake occur for one of anchor bolt When tight, gasket 12 can deformation occurs, and strain gauge 121 can collect the deformation of gasket 12 and the deformation is sent to control Judging result is sent to live prompt unit 302 and remote terminal prompt unit again by unit 200 processed, control unit 200, is issued Prompt information.Specific judgement and prompting mode are repeated no more referring to above description.
It further illustrates, for the steel plate 4 fixed using intelligent anchor bolt, if necessary to multiple intelligent anchor bolts, it is not necessary to Whole anchor bolts is all used into intelligent anchor bolt.It can be one, two or 3.Certainly not be cost consideration, 4 be also can With.
In this way, intelligence anchor bolt according to the present invention, can not only monitor the pretightning force of anchor bolt in real time and can issue and mention Show information, engineering staff can the convenient and efficient and anchor bolt that efficiently notes abnormalities, carry out checking that excluding hidden danger avoids occurring in time Danger, the technical solution of the application greatly improve the security performance and reliability of anchor bolt, at the same greatly saved maintenance at This.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any One or more embodiment or examples in can be combined in any suitable manner.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention by appended claims and its equally limit that the above description is only a preferred embodiment of the present invention and , it is not intended to restrict the invention, for those skilled in the art, the invention may be variously modified and varied.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in guarantor of the invention Within the scope of shield.

Claims (10)

1. a kind of intelligence anchor bolt, including anchor bolt seat, screw rod and nut, gasket and the bracket being connected on gasket, wherein described Gasket is set on the screw rod, between the anchor bolt seat and the nut, it is characterised in that: is set in the intelligence anchor bolt There is axial pre tightening force early warning mechanism, which includes signal acquisition unit, control unit and prompt unit, wherein Signal acquisition unit includes the strain gauge being arranged on the gasket, and the strain gauge is used to acquire the deformation of gasket And transmit a signal to control unit;The axial direction of described control unit anchor bolt according to the information discriminatory analysis of strain gauge Judging result is sent to the prompt unit whether in normal range by pretightning force, and the prompt unit includes and remote Journey prompt unit, the scene prompt unit setting is connect on the bracket and with described control unit wire communication, described The setting of remote prompts unit is connect in remote monitoring terminal with described control unit wireless telecommunications.
2. intelligence rivet bolt as described in claim 1, it is characterised in that: the strain gauge is arranged in the gasket, packet Include the first deformation acquisition device that the axis in the gasket is set up and in the second deformation of the gasket being radially arranged Acquisition device, the first deformation acquisition device acquire the gasket in the deformation axially occurred;The second deformation acquisition dress The acquisition gasket is set in the deformation radially occurred.
3. intelligence anchor bolt as claimed in claim 2 is it is characterized by: the first deformation acquisition device and second deformation Acquisition device is strain ga(u)ge, the multiple strain ga(u)ges composition bridge circuit being provided on the gasket.
4. intelligence anchor bolt according to claim 3, it is characterised in that: draw from the gasket and acquired with first deformation The signal cable of device and the connection of the second deformation acquisition device, the signal cable are connected on the bracket by the bracket Described control unit.
5. intelligence anchor bolt according to claim 4, it is characterised in that: the bracket is formed with an accommodating chamber or is fixed with one Shell, for putting described control unit and live prompt unit scene prompt unit.
6. it is according to claim 5 intelligence anchor bolt, it is characterised in that: it is described scene prompt unit be sounding device and/or Person's light emitting device.
7. intelligence anchor bolt according to claim 1, it is characterised in that: further include power supply, described control unit includes amplification Circuit, analog to digital conversion circuit and microcontroller, the strain gauge include the bridge circuit of multiple strain ga(u)ge compositions, institute It states power supply and provides excitation power supply to the bridge circuit, bridge output voltage signal is enlarged into analog voltage through the amplifying circuit Signal, the analog voltage signal pass through analog-digital conversion circuit as described, analog signal are converted to digital signal and is sent to described Microcontroller, the microcontroller calculate the practical pressure born of sensor according to digital signal;Then sensor reality The pressure of receiving pre-tightens force threshold with anchor bolt and compares, and judges whether intelligent anchor bolt working condition is normal.
8. intelligence anchor bolt according to claim 7, it is characterised in that: born when microcontroller judges that the sensor is practical Pressure be greater than the anchor bolt pretightning force threshold maximum value, the microcontroller to the prompt unit issue overload prompt;When Microcontroller judges to think pretightning force when the practical pressure born of the sensor pre-tightens force threshold minimum value lower than the anchor bolt It reduces, the microcontroller is issued to the prompt unit loosens prompt.
9. intelligence anchor bolt according to claim 7, it is characterised in that: overload/loosening that the prompt unit is issued mentions Show including indicator light issue alarm signal and remote monitoring terminal host alarm signal.
10. a kind of steel plate support construction with intelligent anchor bolt uses the described in any item intelligence of at least one claim 1-9 Energy anchor bolt is fixed on support object.
CN201910036916.5A 2019-01-15 2019-01-15 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt Pending CN109556770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910036916.5A CN109556770A (en) 2019-01-15 2019-01-15 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910036916.5A CN109556770A (en) 2019-01-15 2019-01-15 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt

Publications (1)

Publication Number Publication Date
CN109556770A true CN109556770A (en) 2019-04-02

Family

ID=65873156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910036916.5A Pending CN109556770A (en) 2019-01-15 2019-01-15 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt

Country Status (1)

Country Link
CN (1) CN109556770A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109990809A (en) * 2019-04-24 2019-07-09 南宁职业技术学院 The intelligent monitoring device and monitoring method of shipping qualifying examination spare tyre replacement project
CN110243505A (en) * 2019-07-10 2019-09-17 法施达科技有限公司 A kind of pressure sensor washer
CN111005749A (en) * 2019-12-31 2020-04-14 法施达(大连)实业集团有限公司 Anchor bolt fastening state monitoring system and method based on block chain
CN111005750A (en) * 2019-12-31 2020-04-14 法施达(大连)实业集团有限公司 Tunnel anchor bolt drawing monitoring system and method based on block chain
CN112393837A (en) * 2020-11-25 2021-02-23 三一汽车起重机械有限公司 Monitoring method and monitoring device for wheel bolt and vehicle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020189365A1 (en) * 2001-06-19 2002-12-19 Blakesley Patrick B. Seat belt tension sensor
EP1980712A1 (en) * 2007-04-13 2008-10-15 Lipsker & Partners Engineering Services (1975) Ltd Load cell for ground anchors
CN205670357U (en) * 2016-05-30 2016-11-02 北京天诚盛业科技有限公司 A kind of ELECTRONIC SCREWS Apparatus and system
CN205907593U (en) * 2016-07-18 2017-01-25 深圳市市政设计研究院有限公司 Intelligence lead core rubber support , monitoring support and intelligent support system
CN107063540A (en) * 2017-04-17 2017-08-18 安徽福淮矿山科技有限公司 A kind of anchor pole rope intelligent early-warning stressometer and its method of testing
CN209326843U (en) * 2019-01-15 2019-08-30 法智达(北京)科技有限公司 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020189365A1 (en) * 2001-06-19 2002-12-19 Blakesley Patrick B. Seat belt tension sensor
EP1980712A1 (en) * 2007-04-13 2008-10-15 Lipsker & Partners Engineering Services (1975) Ltd Load cell for ground anchors
CN205670357U (en) * 2016-05-30 2016-11-02 北京天诚盛业科技有限公司 A kind of ELECTRONIC SCREWS Apparatus and system
CN205907593U (en) * 2016-07-18 2017-01-25 深圳市市政设计研究院有限公司 Intelligence lead core rubber support , monitoring support and intelligent support system
CN107063540A (en) * 2017-04-17 2017-08-18 安徽福淮矿山科技有限公司 A kind of anchor pole rope intelligent early-warning stressometer and its method of testing
CN209326843U (en) * 2019-01-15 2019-08-30 法智达(北京)科技有限公司 A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109990809A (en) * 2019-04-24 2019-07-09 南宁职业技术学院 The intelligent monitoring device and monitoring method of shipping qualifying examination spare tyre replacement project
CN109990809B (en) * 2019-04-24 2023-11-14 南宁职业技术学院 Intelligent monitoring device and monitoring method for replacement project of spare tire in freight qualification test
CN110243505A (en) * 2019-07-10 2019-09-17 法施达科技有限公司 A kind of pressure sensor washer
CN111005749A (en) * 2019-12-31 2020-04-14 法施达(大连)实业集团有限公司 Anchor bolt fastening state monitoring system and method based on block chain
CN111005750A (en) * 2019-12-31 2020-04-14 法施达(大连)实业集团有限公司 Tunnel anchor bolt drawing monitoring system and method based on block chain
CN112393837A (en) * 2020-11-25 2021-02-23 三一汽车起重机械有限公司 Monitoring method and monitoring device for wheel bolt and vehicle

Similar Documents

Publication Publication Date Title
CN109556770A (en) A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt
CN209326843U (en) A kind of intelligence anchor bolt and the steel plate support construction with the intelligence anchor bolt
GB2465577A (en) Monitoring device for a wind turbine
CN110285955B (en) Device and method for detecting loosening of bolts and nuts of top cover of water turbine unit
CN106092437B (en) A kind of small-sized piezoelectric dynamic force sensor caliberating mechanism
CN107764424A (en) A kind of cable intermediate joint temperature rise on-Line Monitor Device and method based on temperature difference method
CN109870627A (en) Submarine cable fault alarm and diagnostic method based on distributed fiber optic temperature strain and vibration monitoring data
CN110285913A (en) Bolt capable of detecting axial force of bolt and detection method thereof
CN107916774A (en) Intelligent interpolation type, the adjustable scaffold base of stress can be surveyed
CN110953233A (en) Stud structure capable of accurately measuring pressure in real time
CN205374579U (en) Transmission line is electrified to be detected and range unit
CN111174662B (en) Displacement sensing device and application thereof
CN110671989B (en) Control system based on bridge jacking intelligence double displacement sensor
CN209638179U (en) A kind of intelligence anchor bolt
CN111059123A (en) Bolt structure capable of measuring pressure and intensity of pressure in real time
CN109595240A (en) A kind of intelligence anchor bolt
CN108533591A (en) A kind of intelligent bolt that can monitor connection strain
CN110057872A (en) A kind of cable fracture of wire monitoring method based on detection self inductance effect inductance
CN107219033B (en) Assembled anchor dynamometer and application method
CN212721349U (en) Deep foundation pit displacement detection alarm device
CN110375791A (en) Bridge security monitoring method based on optical fiber sensing technology
CN111595234B (en) Intelligent diagnosis device and method for yield of pole material of power transmission tower structure
KR101631152B1 (en) Measuring system of seismic vibration and evaluation method seismic performance of switch board using the same
KR102058382B1 (en) Method for monitoring damage to structures and system for thereof
CN209639752U (en) A kind of wall body slit comprehensive monitoring early warning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication