CN109555119A - Slow setting knot prestressing cast pile and method for resistance to plucking - Google Patents

Slow setting knot prestressing cast pile and method for resistance to plucking Download PDF

Info

Publication number
CN109555119A
CN109555119A CN201811514508.8A CN201811514508A CN109555119A CN 109555119 A CN109555119 A CN 109555119A CN 201811514508 A CN201811514508 A CN 201811514508A CN 109555119 A CN109555119 A CN 109555119A
Authority
CN
China
Prior art keywords
slow setting
steel
setting knot
vertical bar
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811514508.8A
Other languages
Chinese (zh)
Other versions
CN109555119B (en
Inventor
杨学林
祝文畏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Province Institute of Architectural Design and Research
Original Assignee
Zhejiang Province Institute of Architectural Design and Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Province Institute of Architectural Design and Research filed Critical Zhejiang Province Institute of Architectural Design and Research
Priority to CN201811514508.8A priority Critical patent/CN109555119B/en
Publication of CN109555119A publication Critical patent/CN109555119A/en
Application granted granted Critical
Publication of CN109555119B publication Critical patent/CN109555119B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of slow setting knot prestressing cast piles and method for resistance to plucking, including steel reinforcement cage, several reinforcing bars and several slow setting knot presstressed reinforcing steels on steel reinforcement cage;Each reinforcing bar and each slow setting knot presstressed reinforcing steel extend along the direction of axis line of steel reinforcement cage, the slow setting knot presstressed reinforcing steel includes casing and several prestress steel hank knottings in casing, retarded adhesive prestressed binder is filled between casing and each prestress steel hank knotting, every slow setting knot presstressed reinforcing steel lower end is equipped with pre-stressed anchorage body;Each reinforcing bar and each slow setting knot presstressed reinforcing steel are connect with cushion cap.The present invention has low cost, and construction is easy, resistance to plucking and the strong feature of anti-floating ability.

Description

Slow setting knot prestressing cast pile and method for resistance to plucking
Technical field
The present invention relates to basement anti-floating technical fields, are perfused more particularly, to a kind of slow setting knot prestressing force for resistance to plucking Stake and method.
Background technique
With the continuous development of urban construction, the utilization of the underground space is constantly promoted, and multi-storey basement is more and more, basis Embedding deeper and deeper, Housing Project uses two layers of basement, and items in commerce is commonplace using three layers and the above basement.In east Portion coastal area, rich groundwater, for flood season level often in grade position, basement anti-floating problem is severe.Above-mentioned area Basement need that uplift pile is arranged.Due to the needs of durability, uplift pile must carry out the Checking Computation of Cracks under water buoyancy effect. The uplift pile amount of reinforcement of multi-storey basement is often 2-4 times of compressive pile amount of reinforcement at present.
Water is abundant in bored concrete pile working environment, often containing the microelement that is corrosive in water and soil, under water buoyancy effect, Concrete belt joint working, and underground engineering rigging can not be replaced, and Non-cohesive Prestressing Force Technology is such as used, and prestressing force head undermines mistake Effect probability is big, and there are great risks for engineering;And common prestressing technique is unable to satisfy the time requirement of excavation of foundation pit.
Summary of the invention
Goal of the invention of the invention is the big deficiency of engineering difficulty in order to overcome uplift pile cost in the prior art high, Provide a kind of slow setting knot prestressing cast pile and method for resistance to plucking.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of slow setting knot prestressing cast pile for resistance to plucking, including steel reinforcement cage, several reinforcing bars on steel reinforcement cage With several slow setting knot presstressed reinforcing steels;Each reinforcing bar and each slow setting knot presstressed reinforcing steel prolong along the direction of axis line of steel reinforcement cage It stretches, the slow setting knot presstressed reinforcing steel includes casing and several prestress steel hank knottings in casing, and casing is answered in advance with each item Retarded adhesive prestressed binder is filled between power steel wire, every slow setting knot presstressed reinforcing steel lower end is equipped with prestress anchoraging Body;Each reinforcing bar and each slow setting knot presstressed reinforcing steel are connect with cushion cap.
To overcome multi-storey basement cobalt hole pouring pile using practical difficulty present in prestressing technique, the present invention is in reinforcing bar A plurality of slow setting knot presstressed reinforcing steel is set in cage, is separated concrete and retarded adhesive prestressed steel wire by casing, while pre- Stress steel wire surface applies slow setting knot adhesive, and after concrete curing, prestress steel hank knotting is still within free movement state, Tensioning can be carried out after excavation of foundation pit;Referred to simultaneously using the solidification mechanical property that several months~several years of slow setting knot adhesive is not waited Mark gradually solidifies after the completion of tensioning to ensure effective bonding between steel wire and concrete, low cost of the present invention, and construction is held Easily, resistance to plucking and anti-floating ability are strong.
Preferably, cushion cap includes enclosing framework of steel reinforcement and casting in the casting concrete enclosed on framework of steel reinforcement;Cushion cap Top view be in rectangle or triangle.
Preferably, each prestress steel hank knotting upper end of the slow setting knot presstressed reinforcing steel is stretched out except casing, slow setting Knot presstressed reinforcing steel upper end is connect with prestressing force pull end anchorage;Prestressing force pull end anchorage includes being set to slow setting knot presstressed reinforcing steel The anchor slab of each prestress steel hank knotting upper end, the collet set on every prestress steel hank knotting upper end, each item set on anchor slab lower part Cushion cover on prestress steel hank knotting, the spiral reinforcement on cushion cover.
Preferably, further include support base, the support base includes the cushion block of triangular pyramid and 3 piece three on cushion block Angular plate, 3 pieces of triangular plate upper end rotation connections, is connected between 3 pieces of triangular plate upper ends and cushion block upper end by rope, 3 pieces Triangular plate lower end is contacted with cushion block lower edge.
Support base is used for strutting steel reinforcement cage lower part, makes each reinforcing bar and each slow setting knot presstressed reinforcing steel outward by a small margin It bends, after casting concrete, the breakout capacity of entire bored concrete pile can be improved.
Preferably, further include reamer, reamer includes disk and vertical bar, vertical bar upper end stretch out disk upper surface it Outside, vertical bar lower part is equipped with arc scraper, and arc scraper and vertical bar are rotatablely connected, and disk is equipped with first motor, and vertical bar upper end is set There is ring gear, the gear connecting with first motor is engaged with ring gear, and vertical bar is equipped with the micro electric for driving arc scraper to rotate Machine, micromotor and first motor are electrically connected with the controller.
A method of for the slow setting knot prestressing cast pile of resistance to plucking, include the following steps:
(6-1) carries out the pore-forming operation of each bored concrete pile;
(6-2) places steel reinforcement cage in the hole of each bored concrete pile, and each reinforcing bar is fixed on each steel reinforcement cage and each item is slow Condense presstressed reinforcing steel;
(6-3) forms bored concrete pile in each steel reinforcement cage upper concrete;
(6-4) digs the foundation pit of basement around each bored concrete pile;
(6-5) is poured concrete cushion in foundation pit;
Each reinforcing bar is fixedly connected by (6-6) with cushion cap, is opened to each slow setting knot presstressed reinforcing steel of each bored concrete pile After drawing anchoring, each slow setting knot presstressed reinforcing steel is fixedly connected with cushion cap;
(6-7) completes the casting of cushion cap concrete.
Preferably, further include support base, the support base includes the cushion block of triangular pyramid and 3 piece three on cushion block Angular plate, 3 pieces of triangular plate upper end rotation connections, is connected between 3 pieces of triangular plate upper ends and cushion block upper end by rope, 3 pieces Triangular plate lower end is contacted with cushion block lower edge;It further include reamer, reamer includes disk and vertical bar, and circle is stretched out in vertical bar upper end Except disk upper surface, vertical bar lower part is equipped with arc scraper, and arc scraper and vertical bar are rotatablely connected, and disk is equipped with first motor, Vertical bar upper end is equipped with ring gear, and the gear connecting with first motor is engaged with ring gear, and vertical bar is equipped with for driving arc scraper to revolve The micromotor turned, micromotor and first motor are electrically connected with the controller;Step (6-2) is replaced by following steps:
Vertical bar is put into each hole, makes disk cover on hole, controller controls minitype motor driving arc scraper and erects Angle between bar increases, and control first motor drives vertical bar rotation, so that hole lower part be made to become diameter greater than hole upper diameter Expand section;
A support base is placed in each bored concrete pile using rope, steel reinforcement cage is placed in each hole, in steel reinforcement cage Under pressure effect, 3 pieces of triangular plates are along cushion block slide downward, until 3 pieces of triangular plate upper ends and cushion block upper-end contact, 3 piece three Angular plate access aperture is expanded in section, and 3 pieces of triangular plate lower parts, which enter, expands in section, and the reinforcing bar and slow setting knot of steel reinforcement cage lower part are pre- Stress rib, which is imported into, to be expanded in section.
Therefore, the invention has the following beneficial effects: after concrete curing, prestress steel hank knotting, which is still within, to be move freely State can carry out tensioning after excavation of foundation pit;The solidification mechanical property not waited using several months~several years of slow setting knot adhesive simultaneously Energy index, gradually solidifies after the completion of tensioning to ensure effective bonding between steel wire and concrete;Low cost, construction are held Easily, resistance to plucking and anti-floating ability are strong.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of steel reinforcement cage of the invention;
Fig. 2 is a kind of cross-sectional structure schematic diagram at the A-A of Fig. 1;
Fig. 3 is a kind of cross-sectional view of prestressing force pull end anchorage of the invention;
Fig. 4 is a kind of cross-sectional view of cushion cap of the invention;
Fig. 5 is a kind of structural schematic diagram of reamer of the invention;
Fig. 6 is that support base of the invention removes a kind of structural schematic diagram after one piece of triangular plate.
In figure: steel reinforcement cage 1, reinforcing bar 2, slow setting knot presstressed reinforcing steel 3, cushion cap 4, anchor slab 5, collet 6, cushion cover 7, spiral reinforcement 8, Support base 9, disk 10, prestressing force pull end anchorage 11, reamer 12, casing 31, prestress steel hank knotting 32, pre-stressed anchorage body 33, enclose framework of steel reinforcement 41, cushion block 91, triangular plate 92, vertical bar 101, arc scraper 102, first motor 103, ring gear 104, Gear 105.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and detailed description.
Embodiment 1
Embodiment as shown in Figure 1, Figure 2, Figure 3, Figure 4 is a kind of slow setting knot prestressing cast pile for resistance to plucking, including Steel reinforcement cage 1, a plurality of reinforcing bar 2 and several slow setting knot presstressed reinforcing steels 3 on steel reinforcement cage;Each reinforcing bar and each slow setting knot are pre- Stress rib extends along the direction of axis line of steel reinforcement cage, and slow setting knot presstressed reinforcing steel includes casing 31 and several in casing Prestress steel hank knotting 32 is filled with retarded adhesive prestressed binder, every slow setting knot between casing and each prestress steel hank knotting Presstressed reinforcing steel lower end is equipped with pre-stressed anchorage body 33;Each reinforcing bar and each slow setting knot presstressed reinforcing steel are connect with cushion cap 4.
Cushion cap includes enclosing framework of steel reinforcement 41 and casting in the casting concrete enclosed on framework of steel reinforcement;The top view of cushion cap In rectangle or triangle.
As shown in figure 3, each prestress steel hank knotting upper end of slow setting knot presstressed reinforcing steel is stretched out except casing, slow setting knot is pre- Stress rib upper end is connect with prestressing force pull end anchorage 11;Prestressing force pull end anchorage includes set on each of slow setting knot presstressed reinforcing steel The anchor slab 5 of prestress steel hank knotting upper end, the collet 6 set on every prestress steel hank knotting upper end, each item set on anchor slab lower part Cushion cover 7 on prestress steel hank knotting, the spiral reinforcement 8 on cushion cover.
A method of for the slow setting knot prestressing cast pile of resistance to plucking, include the following steps:
(6-1) carries out the pore-forming operation of each bored concrete pile;
(6-2) places steel reinforcement cage in the hole of each bored concrete pile, and each reinforcing bar is fixed on each steel reinforcement cage and each item is slow Condense presstressed reinforcing steel;
(6-3) forms bored concrete pile in each steel reinforcement cage upper concrete;
(6-4) digs the foundation pit of basement around each bored concrete pile;
(6-5) is poured concrete cushion in foundation pit;
Each reinforcing bar is fixedly connected by (6-6) with cushion cap, is opened to each slow setting knot presstressed reinforcing steel of each bored concrete pile After drawing anchoring, each slow setting knot presstressed reinforcing steel is fixedly connected with cushion cap;
(6-7) completes the casting of cushion cap concrete.
Embodiment 2
Embodiment 2 includes all structures and methods parts of embodiment 1, as shown in fig. 6, embodiment 2 further includes support base 9, support base includes that the cushion block 91 of triangular pyramid and 3 pieces of triangular plates, 92,3 pieces of triangular plate upper end rotations on cushion block connect It connects, is connected between 3 pieces of triangular plate upper ends and cushion block upper end by rope, 3 pieces of triangular plate lower ends are contacted with cushion block lower edge.
As shown in figure 5, further including reamer 12, reamer includes disk 10 and vertical bar 101, and vertical bar upper end is stretched out on disk Except surface, vertical bar lower part is equipped with arc scraper 102, and arc scraper and vertical bar are rotatablely connected, and disk is equipped with first motor 103, vertical bar upper end is equipped with ring gear 104, and the gear 105 connecting with first motor is engaged with ring gear, and vertical bar is equipped with for driving The micromotor of arc scraper rotation, micromotor and first motor are electrically connected with the controller.
The step of embodiment 1, (6-2) was replaced by following steps:
Vertical bar is put into each hole, makes disk cover on hole, controller controls minitype motor driving arc scraper and erects Angle between bar increases, and control first motor drives vertical bar rotation, so that hole lower part be made to become diameter greater than hole upper diameter Expand section;
A support base is placed in each bored concrete pile using rope, steel reinforcement cage is placed in each hole, in steel reinforcement cage Under pressure effect, 3 pieces of triangular plates are along cushion block slide downward, until 3 pieces of triangular plate upper ends and cushion block upper-end contact, 3 piece three Angular plate access aperture is expanded in section, and 3 pieces of triangular plate lower parts, which enter, expands in section, and the reinforcing bar and slow setting knot of steel reinforcement cage lower part are pre- Stress rib, which is imported into, to be expanded in section.
It should be understood that this embodiment is only used to illustrate the invention but not to limit the scope of the invention.In addition, it should also be understood that, After having read the content of the invention lectured, those skilled in the art can make various modifications or changes to the present invention, these etc. Valence form is also fallen within the scope of the appended claims of the present application.

Claims (7)

1. a kind of slow setting knot prestressing cast pile for resistance to plucking, characterized in that including steel reinforcement cage (1), on steel reinforcement cage Several reinforcing bars (2) and several slow setting knot presstressed reinforcing steels (3);Each reinforcing bar and each slow setting knot presstressed reinforcing steel are along steel reinforcement cage Direction of axis line extend, the slow setting knot presstressed reinforcing steel includes casing (31) and several prestress steel twists in casing Silk (32) is filled with retarded adhesive prestressed binder, every slow setting knot presstressed reinforcing steel between casing and each prestress steel hank knotting Lower end is equipped with pre-stressed anchorage body (33);Each reinforcing bar and each slow setting knot presstressed reinforcing steel are connect with cushion cap (4).
2. the slow setting knot prestressing cast pile according to claim 1 for resistance to plucking, characterized in that cushion cap includes enclosing steel Tendons skeleton (41) and cast in enclose framework of steel reinforcement on casting concrete;The top view of cushion cap is in rectangle or triangle.
3. the slow setting knot prestressing cast pile according to claim 1 for resistance to plucking, characterized in that the slow setting knot is answered in advance Each prestress steel hank knotting upper end of power muscle is stretched out except casing, slow setting knot presstressed reinforcing steel upper end and prestressing force pull end anchorage (11) it connects;Prestressing force pull end anchorage includes the anchor slab set on each prestress steel hank knotting upper end of slow setting knot presstressed reinforcing steel (5), the cushion cover set on the collet (6) of every prestress steel hank knotting upper end, on each prestress steel hank knotting of anchor slab lower part (7), the spiral reinforcement on cushion cover (8).
4. the slow setting knot prestressing cast pile according to claim 1 for resistance to plucking, characterized in that further include support base (9), the support base includes the cushion block (91) of triangular pyramid and 3 pieces of triangular plates (92) on cushion block, 3 pieces of triangular plates Upper end rotation connection, is connected between 3 pieces of triangular plate upper ends and cushion block upper end by rope, 3 pieces of triangular plate lower ends and cushion block Lower edge contact.
5. the slow setting knot prestressing cast pile according to claim 1 or 2 or 3 or 4 for resistance to plucking, characterized in that also wrap It includes reamer (12), reamer includes disk (10) and vertical bar (101), and vertical bar upper end is stretched out except disk upper surface, under vertical bar Portion is equipped with arc scraper (102), and arc scraper and vertical bar are rotatablely connected, and disk is equipped with first motor (103), and vertical bar upper end is set Have ring gear (104), the gear connecting with first motor (105) is engaged with ring gear, and vertical bar is equipped with for driving arc scraper to revolve The micromotor turned, micromotor and first motor are electrically connected with the controller.
6. a kind of method based on the slow setting knot prestressing cast pile described in claim 1 for resistance to plucking, characterized in that including Following steps:
(6-1) carries out the pore-forming operation of each bored concrete pile;
(6-2) places steel reinforcement cage in the hole of each bored concrete pile, and each reinforcing bar and each slow setting knot are fixed on each steel reinforcement cage Presstressed reinforcing steel;
(6-3) forms bored concrete pile in each steel reinforcement cage upper concrete;
(6-4) digs the foundation pit of basement around each bored concrete pile;
(6-5) is poured concrete cushion in foundation pit;
Each reinforcing bar is fixedly connected by (6-6) with cushion cap, carries out tensioning anchor to each slow setting knot presstressed reinforcing steel of each bored concrete pile Gu after, each slow setting knot presstressed reinforcing steel is fixedly connected with cushion cap;
(6-7) completes the casting of cushion cap concrete.
7. the method for the slow setting knot prestressing cast pile according to claim 6 for resistance to plucking, further includes support base, described Support base includes the cushion block of triangular pyramid and 3 pieces of triangular plates on cushion block, and 3 pieces of triangular plate upper ends are rotatablely connected, and 3 pieces It is connected between triangular plate upper end and cushion block upper end by rope, 3 pieces of triangular plate lower ends are contacted with cushion block lower edge;Further include Reamer, reamer include disk and vertical bar, and vertical bar upper end is stretched out except disk upper surface, and vertical bar lower part is equipped with arc scraper, Arc scraper and vertical bar are rotatablely connected, and disk is equipped with first motor, and vertical bar upper end is equipped with ring gear, the tooth connecting with first motor Wheel engage with ring gear, vertical bar equipped with for driving the micromotor of arc scraper rotation, micromotor and first motor with Controller electrical connection;It is characterized in that step (6-2) is replaced by following steps:
Vertical bar is put into each hole, makes disk cover on hole, controller control minitype motor driving arc scraper and vertical bar it Between angle increase, control first motor drives vertical bar rotation, so that it is swollen greater than hole upper diameter so that hole lower part is become diameter Big section;
A support base is placed in each bored concrete pile using rope, steel reinforcement cage is placed in each hole, in the pressure of steel reinforcement cage Under effect, 3 pieces of triangular plates are along cushion block slide downward, until 3 pieces of triangular plate upper ends and cushion block upper-end contact, 3 pieces of triangles Plate access aperture is expanded in section, and 3 pieces of triangular plate lower parts, which enter, expands in section, the reinforcing bar and slow setting knot prestressing force of steel reinforcement cage lower part Muscle, which is imported into, to be expanded in section.
CN201811514508.8A 2018-12-11 2018-12-11 Retarding and coagulating prestressed cast-in-place pile for resisting pulling and method Active CN109555119B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811514508.8A CN109555119B (en) 2018-12-11 2018-12-11 Retarding and coagulating prestressed cast-in-place pile for resisting pulling and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811514508.8A CN109555119B (en) 2018-12-11 2018-12-11 Retarding and coagulating prestressed cast-in-place pile for resisting pulling and method

Publications (2)

Publication Number Publication Date
CN109555119A true CN109555119A (en) 2019-04-02
CN109555119B CN109555119B (en) 2020-09-01

Family

ID=65869930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811514508.8A Active CN109555119B (en) 2018-12-11 2018-12-11 Retarding and coagulating prestressed cast-in-place pile for resisting pulling and method

Country Status (1)

Country Link
CN (1) CN109555119B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502807A (en) * 2021-06-15 2021-10-15 浙江省建筑设计研究院 Slow-setting prestressed filling pile reinforcement cage structure and sectional construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN103867130A (en) * 2014-03-26 2014-06-18 华东建筑设计研究院有限公司 Mechanical expanded bore pile drill bit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN103867130A (en) * 2014-03-26 2014-06-18 华东建筑设计研究院有限公司 Mechanical expanded bore pile drill bit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502807A (en) * 2021-06-15 2021-10-15 浙江省建筑设计研究院 Slow-setting prestressed filling pile reinforcement cage structure and sectional construction method thereof

Also Published As

Publication number Publication date
CN109555119B (en) 2020-09-01

Similar Documents

Publication Publication Date Title
US7707797B2 (en) Pile anchor foundation
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN103628504B (en) The method of attachment of a kind of pin-connected panel prefabricated reinforced concrete platform structure node under water
CN206289651U (en) A kind of offshore wind power foundation structure of single pile anchoring
CN104153287A (en) Segmental assembled concrete frame pier system with self-reset function and method
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CA2651259A1 (en) Post-tension pile anchor foundation and method therefor
CN101634144A (en) Anti-slide pile with vertical prestressed anchor cables adopting secondary grouting
JP3230883U (en) Combined single pile foundation structure for offshore wind power generation
CN105970993A (en) Underwater connection structure for precast piles and precast bearing platform, and construction method thereof
CN203821400U (en) Prestressing force supporting structure of foundation pit
CN109555119A (en) Slow setting knot prestressing cast pile and method for resistance to plucking
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN206512709U (en) A kind of prestressed-concrete pile connects system
CN210439324U (en) Prefabricated pier plate beam type foundation of lattice type concrete wind power tower
WO2015159205A1 (en) Device for the construction of platforms in water on foundation piles, and relative procedure.
CN103924676A (en) Prestressed connecting joint for concrete beam and circular steel pipe concrete column
CN207512620U (en) Pile foundation of bridge pier ruggedized construction
CN106703023B (en) A kind of four wing prefabricated pile of hydraulic paddle type mill and its construction method
CN110158633A (en) A kind of prefabricated pier plate girder type basis of lattice concrete air pylon
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN106836261B (en) Rock foundation structure suitable for power transmission line construction and construction method thereof
CN201512786U (en) Secondary grouting type anti-slide pile with vertical prestressed anchor cable
CN105673354B (en) Connection structure between concrete tower and steel tower tube
CN210975804U (en) Anchor rod or pile foundation steel reinforcement cage and anchor rod or pile foundation of preparation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant