CN109551128A - A kind of automatic production line of steel framework - Google Patents

A kind of automatic production line of steel framework Download PDF

Info

Publication number
CN109551128A
CN109551128A CN201811650705.2A CN201811650705A CN109551128A CN 109551128 A CN109551128 A CN 109551128A CN 201811650705 A CN201811650705 A CN 201811650705A CN 109551128 A CN109551128 A CN 109551128A
Authority
CN
China
Prior art keywords
production line
spot welding
equipment
welding
steel framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811650705.2A
Other languages
Chinese (zh)
Inventor
吴忠江
黄金
龙洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Perfect Technology Co Ltd
Original Assignee
Shenzhen Perfect Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Perfect Technology Co Ltd filed Critical Shenzhen Perfect Technology Co Ltd
Priority to CN201811650705.2A priority Critical patent/CN109551128A/en
Publication of CN109551128A publication Critical patent/CN109551128A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/36Removing material
    • B23K26/38Removing material by boring or cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/70Auxiliary operations or equipment
    • B23K26/702Auxiliary equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/02Carriages for supporting the welding or cutting element
    • B23K37/0252Steering means

Abstract

The present invention relates to steel framework manufacture fields, provide a kind of automatic production line of steel framework.The automatic production line of the steel framework include: track, realize whole production line material cycling logistics system and along the track setting six stations.First station is equipped with the cutting for carrying out cutting stock to raw material and equips, second station is equipped with the spot welding equipment for being laid with material and carrying out spot welding, it is standby that 3rd station is equipped with being welded entirely for progress integral solder, 4th station is equipped with the attachment welding jig of welded attachment, 5th station is equipped with the overturning for overturning soldered product and equips, and the 6th station is equipped with the temporary equipment of material of temporary product.Equipment on above-mentioned six stations replaces the process operation for being accomplished manually product respectively, improves the stability of production efficiency and product quality.

Description

A kind of automatic production line of steel framework
[technical field]
The present invention relates to steel framework manufacture field, in particular to a kind of automatic production line of steel framework.
[background technique]
In current industrial production, there are the products of a large amount of steel framework assembly, welding.Currently, steel framework Production process are as follows: after human weld's frock clamp, manual handling, laying, clamping workpiece product to be welded, by manually Lai Realize the welding of product.By manually realizing the assembly of steel framework, in welding process, Product jointing precision is completely by operator Qualification is responsible for degree and is determined, is unable to ensure the quality stability of product, at the same by the way of human weld efficiency compared with It is low, it is unfavorable for the raising of production capacity, is unfavorable for improving the competitiveness of enterprise.
[summary of the invention]
In order to solve the above-mentioned technical problem, the embodiment of the present invention provides a kind of automation of the steel framework of high production efficiency Production line.
The embodiment of the present invention solves its technical problem using following technical scheme: providing a kind of automatic metaplasia of steel framework Producing line, comprising:
1, a kind of automatic production line of steel framework characterized by comprising
Track;
Along six stations of track setting, the first station is equipped with the cutting for carrying out cutting stock to raw material and equips, the Two stations are equipped with the spot welding equipment for being laid with material and carrying out spot welding, and 3rd station is standby equipped with being welded entirely for integral solder is carried out, the Four stations are equipped with the attachment welding jig of welded attachment, and the 5th station is equipped with the overturning for overturning material and equips, and the 6th station is set There is the temporary equipment of the material of temporary material;
Logistics system, the logistics system is for the material cycling between six stations.
Optionally, the cutting equipment is set to one end of the track, and the cutting equipment includes the first support frame, feeding Robot and laser cutting device;
The feeding robot and the laser cutting device are all set on first support frame, the feeding machine People can be mobile relative to support frame as described above;
The feeding robot is used to grab material to first support frame, and the laser cutting device is for cutting Cut material.
Optionally, the spot welding equipment includes the second support frame, laying machine people and spot welding robot;
The laying machine people and the spot welding robot are all set on second support frame, the laying machine people It is mobile can be respectively relative to second support frame per capita with the spot welding machine;
The laying machine people is used to for material being layed in second support frame, and the spot welding robot is used for object Material carries out spot welding.
Optionally, described be welded entirely standby includes third support frame, Quan Han robot and welding platform;
The Quan Han robot and the welding platform are set on the third support frame, and the Quan Han robot can phase Mobile for the third support frame, the welding platform can be rotated relative to the third support frame;
The Quan Han robot for welding material entirely, and the welding platform is for placing, overturning material.
Optionally, the attachment welding jig is equipped with workbench, and the workbench is welded for material with attachment Process.
Optionally, the overturning equipment includes overturning seat, cover board and flip body;
The cover board and the overturning seat are rotatablely connected, and the flip body is set on the cover board, the flip body and institute Stating cover board can rotate relative to the overturning seat together;
The flip body is for overturning the material being horizontally arranged to vertical state.
Optionally, the temporary equipment of the material includes stock frame, the stock frame bottom be equipped with idler wheel;The stock Frame is for storing material, and the idler wheel is for driving the stock frame mobile.
Optionally, the logistics system includes AGV transfer trolley and revolution trolley;
The revolution trolley can be moved along the track;
The AGV transfer trolley and the revolution trolley are used for the material cycling of whole production line.
Optionally, the revolution trolley includes pedestal and scaling platform;
The pedestal is set on the track, and the pedestal can be moved along the track;
The scaling platform is set on the pedestal, and the scaling platform can be flexible to the two sides of the pedestal, described to stretch The telescopic direction of contracting platform is vertical with the track;
The scaling platform is for forking material to the pedestal.
Optionally, pass through the AGV transfer trolley transfer material between the cutting equipment and spot welding equipment;
The AGV transfer trolley is for transferring load to the material cut at the spot welding equipment.
Compared with prior art, the track in the present embodiment be set to first station and the 6th station it Between, for the material transportation of whole production line, the material cycling between each station, above-mentioned six works are realized by logistics system Equipment on position replaces the process operation for being accomplished manually product respectively, improves the stability of production efficiency and product quality.
[Detailed description of the invention]
One or more embodiments are illustrated by corresponding attached drawing, these exemplary illustrations not structure The restriction of pairs of embodiment, the element with same reference numbers label is expressed as similar element in attached drawing, unless there are special It declares, composition does not limit the figure in attached drawing.
Fig. 1 is a kind of structural schematic diagram of the automatic production line of present invention steel framework that wherein an embodiment provides;
Fig. 2 is the structure of the track of the automatic production line of steel framework shown in FIG. 1 and the revolution trolley of first state Schematic diagram;
Fig. 3 is the structural schematic diagram of the revolution trolley of track shown in Fig. 2 and the second state;
Fig. 4 is the structural schematic diagram of the cutting equipment of the automatic production line of steel framework shown in FIG. 1;
Fig. 5 is the structural schematic diagram of the spot welding equipment of the automatic production line of steel framework shown in FIG. 1;
Fig. 6 is the standby structural schematic diagram that is welded entirely of the automatic production line of steel framework shown in FIG. 1;
Fig. 7 is the structural schematic diagram of the attachment welding jig of the automatic production line of steel framework shown in FIG. 1;
Fig. 8 is the structural schematic diagram of the overturning equipment of the automatic production line of steel framework shown in FIG. 1;
Fig. 9 is the structural schematic diagram of the material storage equipment of the automatic production line of steel framework shown in FIG. 1.
[specific embodiment]
To facilitate the understanding of the present invention, in the following with reference to the drawings and specific embodiments, the present invention will be described in more detail. It should be noted that be expressed " being fixed on " another element when element, it can directly on the other element or therebetween There may be one or more elements placed in the middle.When an element is expressed " connection " another element, it, which can be, directly connects It is connected to another element or there may be one or more elements placed in the middle therebetween.Term used in this specification is " vertical ", " horizontal ", "left", "right", "inner", "outside" and similar statement for illustrative purposes only.
Unless otherwise defined, technical and scientific term all used in this specification is led with technology of the invention is belonged to The normally understood meaning of the technical staff in domain is identical.It is specific to be intended merely to description for used term in the description of the invention Embodiment purpose, be not intended to limitation the present invention.Term "and/or" used in this specification includes one or more phases Any and all combinations of the listed item of pass.
In addition, as long as technical characteristic involved in invention described below difference embodiment is not constituted each other Conflict can be combined with each other.
Referring to Fig. 1, Fig. 1 is a kind of automatic production line 100 of present invention steel framework that wherein an embodiment provides Structural schematic diagram.A kind of automatic production line 100 of steel framework includes: workspace 10, is realized in whole production line The logistics system 20 of product turnover is set on the workspace 10 there are six station, and the first station is located at the head of the workspace 10 End, first station are equipped with the cutting equipment 30 of cutting stock, and second station is equipped with the spot welding equipment 40 for carrying out spot welding, third Station is equipped with the complete of progress integral solder and is welded for 50, and the 4th station is equipped with the attachment welding jig 60 of welded attachment, the 5th work Position is equipped with the overturning equipment 70 for overturning soldered product, and the 6th station is equipped with the temporary equipment 80 of material of temporary product. It is understood that the quantity changeable of the station in actual production, according to the different demands of processing finished product, in post-processing Technique in the process is not exactly the same, such as the station settable seven, need to only meet process requirements.
The workspace 10 is equipped with track 11, and one end of the track 11 is set to the head end of the workspace 10, described The other end of track 11 is set to the tail end of the workspace 10.Above-mentioned six stations are arranged along the track 11, the track 11 are used for the Product transport of whole production line.
Please referring to together is the knot of the revolution trolley 22 of the track 11 and extended state refering to Fig. 2 and Fig. 3, Fig. 2 Structure schematic diagram, Fig. 3 are the structural schematic diagram of the revolution trolley 22 of the track 11 and contraction state.The logistics system 20 Including AGV transfer trolley 21 and revolution trolley 22, the AGV transfer trolley 21 is used between the first station and the second station Material transfer.The revolution trolley 22 can be moved along the track 11, and the revolution trolley 22 realizes whole production line Product turnover.
The revolution trolley 22 includes pedestal 220, and the pedestal 220 is set on the track 11, passes through the power such as motor Equipment can drive the pedestal 220 to move along the track 11.The pedestal 220 is equipped with base rail 222, and the pedestal is led The quantity of rail 222 is two, and two base rails 222 are arranged in parallel and vertical with the track 11.The bottom Seat guide rail 222 is equipped with scaling platform 224, and the quantity of the scaling platform 22 is two, each described scaling platform 224 is It is corresponding with a base rail 222.With on the base rail 222, described stretch is put down for the installation of scaling platform 224 Platform 224 can be along the base rail 222 to two Slideslips of the pedestal 220.Two scaling platforms 224 are respectively to institute The lateral expansion for stating pedestal 220 forks square steel 200, then shrinks to the inside of the pedestal 220, and square steel 200 is moved to the bottom On seat 220, the power-equipment drives the revolution trolley 22 of contraction state to be moved to next station, reaches next work After position, two scaling platforms 224 stretch outward respectively, and square steel 200 is placed in designated position.
Referring to Fig. 4, Fig. 4 is the structural schematic diagram of the cutting equipment 30.The cutting equipment 30 is set to the work The head end in area 10, the quantity of the cutting equipment 30 are two, and two cutting equipments 30 are set on the workspace 10 Head end, and two cutting equipments 30 are located at the opposite two sides of the track 11.
The cutting equipment 30 includes the first support frame 31, feeding robot 32 and laser cutting device 33.Described first It is set on support frame 31 there are two supporting guide 310, two supporting guides 310 are set to same level and are parallel to each other.Two Feeding robot 32 is equipped between a supporting guide 310, the both ends of the feeding robot 32 are connected to two institutes It states on supporting guide 310, the feeding robot 32 can be vertically moved along the supporting guide 310.The feeding robot 32 Including feeding guide rail 320 and reclaimer robot 322, the reclaimer robot 322 is set on the feeding guide rail 320, described to take Expect that manipulator 322 can be along 320 transverse shifting of feeding guide rail.Square steel laying is additionally provided between two supporting guides 310 Frame 312 and cutting equipment guide rail 314, the square steel are laid with frame 312 and the cutting equipment guide rail 314 and lead set on the feeding 320 lower section of rail.The cutting equipment guide rail 314 is equipped with the laser cutting device 33, and the laser cutting device 33 can edge 314 transverse shifting of cutting equipment guide rail.
One end of first support frame 31 is placed with unprocessed square steel 200, and the reclaimer robot 322 is moved to finger Crawl square steel 200 is set in positioning, and square steel 200 is placed in the square steel and is laid on frame 312, and the laser cutting device 33 is by square steel 200 are cut by laser, then are grabbed the square steel 200 of well cutting by the reclaimer robot 322 and be placed into AGV in order and move It carries on trolley 21, the square steel 200 of well cutting is transported to next station by the AGV transfer trolley 21.
Referring to Fig. 5, Fig. 5 is the structural schematic diagram of spot welding equipment 40.The spot welding equipment 40 is set to the cutting 30 one end far from 10 head end of workspace are equipped, the quantity of the spot welding equipment 40 is six, three spot welding equipments 40 are set to the side of the track 11, and spot-welding equipment 40 described in the other three is set to the opposite other side of the track.
The spot welding equipment 40 includes the second support frame 41, laying machine people 42 and spot welding robot 43.Described second Support 41 includes support base 410 and platform framework 412, and the quantity of the support base 410 is two, two branch support groups Seat 410 is respectively arranged on the opposite two sides of platform framework 412 and is parallel to each other.The support base 410 includes the first guide rail 4100, the both ends of the second guide rail 4102 and two columns, first guide rail 4100 and the second guide rail 4102 respectively with two The column connection, first guide rail 4100 are set to the upper end of the column, and second guide rail 4102 is set to the column Middle part, i.e., described first guide rail 4100 be set to second guide rail 4102 top.The platform framework 412 is set to two institutes It states between support base 410, and the platform framework 412 is set to 4102 lower section of the second guide rail.On the platform framework 412 Equipped with spot welding platform 414, the spot welding platform 414 is equipped with electromagnet, and the spot welding platform 414 can inhale square steel 200 after being powered It is attached and fixed.Laying machine people 42 is equipped between two support bases 410, the both ends of the laying machine people 42 connect respectively It is connected on first guide rail 4100 in two support bases 410, the laying machine people 42 can lead along described first Rail 4100 vertically moves.The laying machine people 42 includes being laid with guide rail 420 and laying manipulator 422, the laying manipulator 422 are set on the laying guide rail 420, and the laying manipulator 422 can be along 420 transverse shifting of laying guide rail.Two institutes It states and is additionally provided with spot welding robot 43 between support base 410, the both ends of the spot welding robot 43 are connected to described in two On second guide rail 4102 in support base 410, the spot welding robot 43 can be along the longitudinal shifting of second guide rail 4102 It is dynamic.The spot welding robot 43 includes spot welding guide rail 430 and spot welding manipulator 432, and the spot welding manipulator 432 is set to the point It welds on guide rail 430, the spot welding manipulator 432 can be along 430 transverse shifting of spot welding guide rail.
The laying machine people 42 identifies the square steel 200 of well cutting on AGV transfer trolley 21, the laying manipulator 422 It grabs the square steel 200 of well cutting and is laid with to the designated position on the spot welding platform 414, the spot welding platform 414 is powered will The absorption of square steel 200 is fixed, then carries out spot welding to square steel 200 by the spot welding robot 43, and the square steel 200 of well cutting is connected into For the square steel 200 of frame structure, the square steel 200 for putting the frame structure being soldered is transported to next station by the revolution trolley 22.
Referring to Fig. 6, Fig. 6 be it is described be welded entirely standby 50 structural schematic diagram.It is described to be welded standby 50 entirely set on the spot welding The one end of equipment 40 far from the cutting equipment 30, standby 50 quantity of being welded entirely is six, and three described to be welded standby 50 entirely Set on the side of the track 11, be welded standby 50 other sides opposite set on the track 11 entirely described in the other three.
Described be welded entirely for 50 includes third support frame 51, Quan Han robot 52 and welding platform.The third support frame 51 are equipped with cross slide way 510, and the quantity of the cross slide way 510 is three, and three cross slide ways 510 are set to same water Plane and parallel to each other.The Quan Han robot 52 is connected with three cross slide ways 510, the Quan Han robot 52 It can be moved along the cross slide way 510.The Quan Han robot 52 welds manipulator 522 including full weldering guide rail 520 and entirely, described complete Weldering guide rail 520 is connected with described three cross slide ways 510, and the full weldering guide rail 520 can be horizontal along the cross slide way 510 To movement.The full weldering manipulator 522 is set to the full weldering guide rail 520, and the full weldering manipulator 522 can be led along the full weldering Rail 520 vertically moves.The welding platform 53, the quantity of the welding platform 53 are equipped between three cross slide ways 510 Be two, a welding platform 53 be set to side the cross slide way 510 and the intermediate cross slide way 510 it Between, another described welding platform 53 be set to the other side the cross slide way 510 and the intermediate cross slide way 510 it Between, two welding platforms 53 are set to sustained height plane, and two welding platforms 53 are set to the full weldering guide rail 520 lower sections.The welding platform is equipped with front cover plate 530 and reverse side cover board 532, the front cover plate 530 and the reverse side Cover board 532 connects, and the square steel 200, the front cover can be laid between the front cover plate 530 and the reverse side cover board 532 Either of which between plate 530 and the reverse side cover board 532 can be relative to another overturning.The front cover plate 530 and institute It states reverse side cover board 532 to connect by rotating device with the third support frame 51, the front cover plate 530 and the reverse side cover board 532 can rotate around pivot center relative to the third support frame 51 together.
When the Quan Han robot 52 welds the square steel 200, the square steel 200 is horizontal positioned.The turnover Trolley 22 by the square steel 200 of frame structure that point is soldered be transported to the front cover plate 530 of a welding platform 53 with Between the reverse side cover board 532, the front cover plate 530 is flipped up opening, and the full weldering manipulator 522 is to the square steel 200 carry out positive welding, and the soldered square steel 200 in front need to place cooling, the front cover plate 530 after the completion of cooling It closes, the front cover plate 530 drives the soldered square steel 200 in front to overturn 180 together with the reverse side cover board 532 Degree, the overturning of reverse side cover board 532 are opened, and the full weldering manipulator 522 carries out reverse side welding, front and back sides to the square steel 200 The soldered square steel 200 transfers load to next station by revolution trolley 22.Two welding platforms 53 share one The full weldering manipulator 522 is welded, described after the square steel 200 in a welding platform 53 completes front welding In the time that square steel 200 is cooling, overturns, the square steel 200 of the full weldering manipulator 522 another welding platform 53 It is welded.
Referring to Fig. 7, Fig. 7 is the structural schematic diagram of the attachment welding jig 60.The attachment welding jig 60 is set to Described standby 50 one end far from spot welding equipment 40 that are welded entirely, the quantity of the attachment welding jig 60 is four, two institutes The side that attachment welding jig 60 is set to the track 11 is stated, other two described attachment welding jig 60 is set to the track 11 The opposite other side.
The attachment welding jig 60 is equipped with workbench 61, and the workbench 61 is fixed on the workspace 10.Week Turn trolley 22 and the square steel 200 being soldered entirely is transported to the workbench 61, carries out square steel 200 on the workbench 61 and hang The welding of the attachmentes such as assembling structure, supplementary structure.Since the complexity that square steel 200 and above-mentioned attachment weld is higher, using automatic Change the higher cost of welding and be not easy to realize, thus realize using human weld by the way of the placement of above-mentioned attachment, position and Welding.The soldered square steel 200 of attachment is transported to next station by revolution trolley.
Referring to Fig. 8, Fig. 8 is the structural schematic diagram of the overturning equipment 70.The overturning equipment 70 is set to the work Tail end far from the cutting equipment 30 in area 10, the overturning equipment 70 are set to the side of the guide rail 11.The overturning dress Standby 70 include overturning seat 71, cover board 72 and flip body 73.Vertical stand there are two being set on the overturning seat 71, two vertical stand Two sides of the overturning seat 71 and parallel to each other are respectively arranged on, the two sides of the cover board 72 are rotated with two vertical stand respectively Connection, the cover board 72 can be rotated around pivot center relative to the overturning seat 71, and the cover board 72, which is equipped with, can accommodate the side The container of steel 200.The quantity of the flip body 73 is three, and three flip bodies 73 are parallel to each other and both with respect to described Cover board 72 is vertically arranged.The flip body 73 is equipped with clamping groove, and the cover board 72 is contained in the clamping groove, the overturning Body 73 and the cover board 72 can be rotated relative to the overturning seat 71 together.
The soldered square steel 200 of attachment be it is horizontal positioned, the revolution trolley 22 transfers load to the square steel 200 In container on the cover board 72, the horizontal positioned square steel 200 is turned by vertical shape by the overturning equipment 70 The square steel 200 of state, vertical state is transported to next station by bottom roller rotation.
Referring to Fig. 9, Fig. 9 is the structural schematic diagram for storing the temporary equipment 80 of material of the full square steel 200.The material Storage equipment 80 includes stock frame 81, and the stock frame is equipped with several placing grooves 82, and the square steel 200 completed the process is deposited It is put in the placing groove 82.The bottom of the stock frame 81 is equipped with idler wheel, and the idler wheel can drive the stock frame 81 mobile.
The material storage equipment 80 is docked with overturning equipment 70, is turned into vertical shape by overturning equipment 70 The square steel 200 of state transfers load on the material storage equipment 80, unified after the 80 full material of storage of material storage equipment It is transported to warehouse.
It is understood that in an embodiment of the present invention, the AGV transfer trolley 21, the revolution trolley 22 and on Stating the quantity respectively equipped on six stations can increase or reduce according to actual needs, and actual demand quantity can be according to work The material cycling efficiency of factory determines.
It should be noted that square steel 200 in embodiments of the present invention is merely illustrative of the technical solution of the present invention, it is practical Rapidoprint be not limited in square steel, such as rapidoprint is steel pipe, reinforcing bar.
Compared with prior art, the track 11 in the present embodiment be set to first station and the 6th station it Between, for the material transportation of whole production line, the AGV transfer trolley and the revolution trolley realize the object between each station Material turnover, uses the reclaimer robot 322, the laying manipulator 422, the spot welding manipulator 432, the full welding machine tool Hands 522 etc. are mechanical to replace manual work, completes the series of process such as cutting stock, spot welding, full weldering, attachment welding, overturning discharging Process improves the stability of production efficiency and product quality.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;At this It under the thinking of invention, can also be combined between the technical characteristic in above embodiments or different embodiment, step can be with It is realized with random order, and there are many other variations of different aspect present invention as described above, for simplicity, they do not have Have and is provided in details;Although the present invention is described in detail referring to the foregoing embodiments, the ordinary skill people of this field Member is it is understood that it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of skill Art feature is equivalently replaced;And these are modified or replaceed, each reality of the present invention that it does not separate the essence of the corresponding technical solution Apply the range of a technical solution.

Claims (10)

1. a kind of automatic production line of steel framework characterized by comprising
Track;
Along six stations of track setting, the first station is equipped with the cutting for carrying out cutting stock to raw material and equips, the second work Position is equipped with the spot welding equipment for being laid with material and carrying out spot welding, and 3rd station is equipped with standby, the 4th work that is welded entirely for carrying out integral solder Position is equipped with the attachment welding jig of welded attachment, and the 5th station is equipped with the overturning for overturning material and equips, and the 6th station is equipped with temporary The temporary equipment of the material of storage material;
Logistics system, the logistics system is for the material cycling between six stations.
2. the automatic production line of steel framework according to claim 1, which is characterized in that the cutting equipment is set to institute One end of track is stated, the cutting equipment includes the first support frame, feeding robot and laser cutting device;
The feeding robot and the laser cutting device are all set on first support frame, and the feeding robot can It is mobile relative to support frame as described above;
The feeding robot is used to grab material to first support frame, and the laser cutting device is used for cut substrate Material.
3. the automatic production line of steel framework according to claim 1, which is characterized in that spot welding equipment includes the Two support frames, laying machine people and spot welding robot;
The laying machine people and the spot welding robot are all set on second support frame, the laying machine people and institute The second support frame movement can be respectively relative to by stating spot welding machine per capita;
The laying machine people is used to material being layed in second support frame, the spot welding robot be used for material into Row spot welding.
4. the automatic production line of steel framework according to claim 1, which is characterized in that described be welded entirely standby includes the Three support frames, Quan Han robot and welding platform;
The Quan Han robot and the welding platform are set on the third support frame, and the Quan Han robot can be relative to The third support frame is mobile, and the welding platform can be rotated relative to the third support frame;
The Quan Han robot for welding material entirely, and the welding platform is for placing, overturning material.
5. the automatic production line of steel framework according to claim 1, which is characterized in that on the attachment welding jig Equipped with workbench, the workbench carries out welding sequence for material and attachment.
6. the automatic production line of steel framework according to claim 1, which is characterized in that the overturning equipment includes turning over Swivel base, cover board and flip body;
The cover board and the overturning seat are rotatablely connected, and the flip body is set on the cover board, the flip body and the lid Plate can be rotated relative to the overturning seat together;
The flip body is for overturning the material being horizontally arranged to vertical state.
7. the automatic production line of steel framework according to claim 1, which is characterized in that the temporary equipment of the material Including stock frame, the stock frame bottom be equipped with idler wheel;The stock frame is for storing material, and the idler wheel is for driving institute It is mobile to state stock frame.
8. the automatic production line of steel framework described in -7 any one according to claim 1, which is characterized in that the logistics System includes AGV transfer trolley and revolution trolley;
The revolution trolley can be moved along the track;
The AGV transfer trolley and the revolution trolley are used for the material cycling of whole production line.
9. the automatic production line of steel framework according to claim 8, which is characterized in that the revolution trolley includes bottom Seat and scaling platform;
The pedestal is set on the track, and the pedestal can be moved along the track;
The scaling platform is set on the pedestal, and the scaling platform can be flexible to the two sides of the pedestal, described flexible flat The telescopic direction of platform is vertical with the track;
The scaling platform is for forking material to the pedestal.
10. the automatic production line of steel framework according to claim 9, which is characterized in that the cutting equipment and institute It states between spot welding equipment through the AGV transfer trolley transfer material;
The AGV transfer trolley is for transferring load to the material cut at the spot welding equipment.
CN201811650705.2A 2018-12-31 2018-12-31 A kind of automatic production line of steel framework Pending CN109551128A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811650705.2A CN109551128A (en) 2018-12-31 2018-12-31 A kind of automatic production line of steel framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811650705.2A CN109551128A (en) 2018-12-31 2018-12-31 A kind of automatic production line of steel framework

Publications (1)

Publication Number Publication Date
CN109551128A true CN109551128A (en) 2019-04-02

Family

ID=65872171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811650705.2A Pending CN109551128A (en) 2018-12-31 2018-12-31 A kind of automatic production line of steel framework

Country Status (1)

Country Link
CN (1) CN109551128A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110270771A (en) * 2019-07-02 2019-09-24 广西建工集团第五建筑工程有限责任公司 A kind of semi-automatic production line and processing method for the processing of box steel member
CN110315226A (en) * 2019-08-07 2019-10-11 重庆市灵龙自动化设备有限公司 One leaf spring feeding and assembly device
CN110900027A (en) * 2019-11-26 2020-03-24 中建钢构有限公司 H-shaped steel production line
CN110900181A (en) * 2019-11-19 2020-03-24 衡橡科技股份有限公司 Automatic production line for upper plate and lower plate of spherical bridge support

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006015551A1 (en) * 2006-03-31 2007-10-04 Hartmut Pabst Processing installation for welding workpieces comprises a row of welding stations and/or stations for machining, a transport system for transporting workpieces, a welding device and a clamping device for the welding device
CN103231901A (en) * 2013-04-19 2013-08-07 杭州凯尔达机器人科技股份有限公司 Workpiece conveying method for cantilever crane production line
CN106735723A (en) * 2015-11-25 2017-05-31 中国国际海运集装箱(集团)股份有限公司 Container door panel production system
CN107953045A (en) * 2017-12-25 2018-04-24 宁夏力成电气集团有限公司 Box-type substation robot automation Flexible Welding Line and production technology
CN108127286A (en) * 2018-01-11 2018-06-08 上海振华重工(集团)股份有限公司 A kind of abnormity Chong Bang plates robot automatic welding method
CN108817698A (en) * 2018-07-24 2018-11-16 江西普热斯勒先进成型技术有限公司 Full-automatic uncoiling is cut by laser production line
CN108817747A (en) * 2018-07-04 2018-11-16 苏州市嘉益通智能设备科技有限公司 Shelf factory reinforcing rib laminate automatic loading/unloading and its welding streamline
CN209491449U (en) * 2018-12-31 2019-10-15 深圳市合尔为科技有限公司 A kind of automatic production line of steel framework

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006015551A1 (en) * 2006-03-31 2007-10-04 Hartmut Pabst Processing installation for welding workpieces comprises a row of welding stations and/or stations for machining, a transport system for transporting workpieces, a welding device and a clamping device for the welding device
CN103231901A (en) * 2013-04-19 2013-08-07 杭州凯尔达机器人科技股份有限公司 Workpiece conveying method for cantilever crane production line
CN106735723A (en) * 2015-11-25 2017-05-31 中国国际海运集装箱(集团)股份有限公司 Container door panel production system
CN107953045A (en) * 2017-12-25 2018-04-24 宁夏力成电气集团有限公司 Box-type substation robot automation Flexible Welding Line and production technology
CN108127286A (en) * 2018-01-11 2018-06-08 上海振华重工(集团)股份有限公司 A kind of abnormity Chong Bang plates robot automatic welding method
CN108817747A (en) * 2018-07-04 2018-11-16 苏州市嘉益通智能设备科技有限公司 Shelf factory reinforcing rib laminate automatic loading/unloading and its welding streamline
CN108817698A (en) * 2018-07-24 2018-11-16 江西普热斯勒先进成型技术有限公司 Full-automatic uncoiling is cut by laser production line
CN209491449U (en) * 2018-12-31 2019-10-15 深圳市合尔为科技有限公司 A kind of automatic production line of steel framework

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110270771A (en) * 2019-07-02 2019-09-24 广西建工集团第五建筑工程有限责任公司 A kind of semi-automatic production line and processing method for the processing of box steel member
CN110315226A (en) * 2019-08-07 2019-10-11 重庆市灵龙自动化设备有限公司 One leaf spring feeding and assembly device
CN110900181A (en) * 2019-11-19 2020-03-24 衡橡科技股份有限公司 Automatic production line for upper plate and lower plate of spherical bridge support
CN110900181B (en) * 2019-11-19 2022-02-15 衡橡科技股份有限公司 Automatic production line for upper plate and lower plate of spherical bridge support
CN110900027A (en) * 2019-11-26 2020-03-24 中建钢构有限公司 H-shaped steel production line
CN110900027B (en) * 2019-11-26 2023-09-29 中建钢构工程有限公司 H-shaped steel production line and production method

Similar Documents

Publication Publication Date Title
CN209491449U (en) A kind of automatic production line of steel framework
CN109551128A (en) A kind of automatic production line of steel framework
CN211588974U (en) Middle part groove welding production line
CN211168780U (en) Automatic assembly line
CN209491523U (en) A kind of automatic production line of wall assemblies
US20220339750A1 (en) Cell and method for operating a cell of at least two linked horizontal machining centers
CN114918585B (en) Welding system for pallet fork fixture of carrier
CN115488558A (en) Welding production line for standard knot
JP2020007079A (en) Self-propelled transport device
TWM630963U (en) Warehousing system
CN109590763A (en) A kind of automatic production line of wall assemblies
JPS62218305A (en) Lifting carriage for automobile body
CN214691528U (en) Wheel reversing mechanism of goods storage trolley
JPH03152007A (en) Travelling type input output crane
CN112775607A (en) Turnover device and turnover welding equipment
KR20220042647A (en) Palletizing robot
JP2005238358A (en) Pallet exchanger
JP5346681B2 (en) Member assembly apparatus and member assembly method
CN113173403B (en) Bent frame clamp, double clamps, carrying robot, improved type distiller's yeast bent block carrying production line and working method thereof
CN218461304U (en) Welding production line for standard knot
CN216444585U (en) Section bar stacking device
JP2010235212A (en) Traveling vehicle system
JPS6246521Y2 (en)
JPH08127405A (en) Automatic warehouse
CN210655176U (en) Quick turnover mechanism for plane positioning stacking table

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination