CN109544016A CN201811426397.5A CN201811426397A CN109544016A CN 109544016 A CN109544016 A CN 109544016A CN 201811426397 A CN201811426397 A CN 201811426397A CN 109544016 A CN109544016 A CN 109544016A
Authority
CN
China
Prior art keywords
unit
electricity
purchase
cogeneration
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811426397.5A
Other languages
Chinese (zh)
Other versions
CN109544016B (en
Inventor
马骥良
林文婷
李超杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN201811426397.5A priority Critical patent/CN109544016B/en
Publication of CN109544016A publication Critical patent/CN109544016A/en
Application granted granted Critical
Publication of CN109544016B publication Critical patent/CN109544016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6218Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
    • G06F21/6245Protecting personal data, e.g. for financial or medical purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/08Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with means for varying the tariff or changing the price
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/12Billing, invoicing, buying or selling transactions or other related activities, e.g. cost or usage evaluation

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • Accounting & Taxation (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Finance (AREA)
  • Bioethics (AREA)
  • Game Theory and Decision Science (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Medical Informatics (AREA)
  • Databases & Information Systems (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of, and the smart grid based on user demand dispatches system, including multiple subscriber units, multiple generator units, multiple cogeneration units, multiple boiler units and main power grid;The subscriber unit includes electrical equipment or electric appliance, photovoltaic generating module, wind power generation module, electric car;Cogeneration unit externally exports electric energy and external heat supply using natural gas as raw material, and the heat supply and power supply of cogeneration unit are located in feasible operation interval;Boiler unit is using natural gas as raw material, external heat supply.The invention also provides a kind of dispatching methods, for intelligence computation module by accelerating intelligent algorithm to select subscriber unit, generator unit, cogeneration unit, boiler unit, the purchase sale of electricity of main power grid and purchase gas strategy, each unit, main power grid carry out distributed purchase sale of electricity transaction, heat supply transactions through block catenary system.The present invention sets price driven mechanism, promotes the consumption of generation of electricity by new energy, and effectively increases the reliability of operation of power networks.

Description

A kind of smart grid scheduling system and dispatching method based on user demand
Technical field
The invention belongs to dispatching of power netwoks fields, and in particular to a kind of smart grid scheduling system and tune based on user demand Degree method.
Background technique
In recent years, as new energy power generation technology is grown rapidly, application is throughout to every family.Although increasingly More places starts to be laid out distributed new electricity generation system, but since the uncertain factors such as itself and weather, weather are closely related, It causes new energy power generation technology to there is significantly randomness, prestige is caused to the reliability service of power grid after in turn resulting in new-energy grid-connected The side of body;Since its randomness is big, fluctuation of service, generation of electricity by new energy is also not public receiving and consumption, abandons electricity and happens occasionally.Separately Outside, since user is to the opacity of power generation situation, cause user can not the reasonable arrangement electricity consumption time, when causing load end electricity consumption Between concentrate, biggish impact is caused to power grid.It can integrate and solve the above problems there are no technological means in the prior art.In addition, Traditional power grid is using the monitoring method of centralization, and not only unfavorable to its reliability operation, the power information needs of user are sent to Centralized supervisory and control equi be easy to cause privacy of user leakage problem.
It can be seen that there are users to concentrate electricity consumption, privacy of user leakage for the prior art, the electricity of generation of electricity by new energy is difficult for Masses receive and the technical problems such as consumption.
Summary of the invention
Present invention aim to address the above problems, provide a kind of smart grid scheduling system based on user demand, electricity Valence market allotment mechanism and payments mechanism pass through block catenary system and complete, and the electricity demand of each user uses heat demand amount And power generation measurer is measured or is predicted by intelligence instrument;By the distributed book keeping operation function of block chain module, or by intelligence The store function and information exchange function of energy computing module, record the acquired information of intelligence instrument, are based on these information, lead to Each distributed intelligence computing module is crossed by the super excess calculation of the surplus of each user's generated energy or demand and is sent to Each corresponding block chain metering units of user, while the power generation of each user and demand data being stored in and corresponding area In storage unit in block chain metering units, or directly above-mentioned data are stored in intelligence computation module, as local letter Breath.It can preferably protect that each user's is hidden while allowing power grid to make power supply, electric generation management in real time by this kind of mode Personal letter breath.Wherein, the network topology of each distributed intelligence computing module composition is connection.For a user, according to electricity Valence, combustion gas valence carry out power scheduling, consistent with generator unit, cogeneration unit interests dispatch action to take.
The technical scheme is that a kind of smart grid based on user demand dispatches system, including multiple users list First, multiple generator units, multiple cogeneration units and multiple boiler units, the subscriber unit, generator unit, cogeneration of heat and power Unit is connect with main power grid respectively, can be introduced from main power grid or be conveyed electric energy to it;The subscriber unit include electrical equipment or Electric appliance, intelligence instrument, photovoltaic generating module, wind power generation module, electric car, intelligence instrument measure subscriber unit generated energy and Electricity, the heat of consumption, and predict the electricity demand of user, heat demand amount;Cogeneration unit using natural gas as raw material, Externally output electric energy and external heat supply, the heat supply and power supply of cogeneration unit are located in feasible operation interval;Boiler unit Using natural gas as raw material, external heat supply.
The smart grid scheduling system based on user demand further includes calculating and memory module, is calculated and memory module Including multiple intelligence computation modules, the intelligence computation module is based on electricity price, combustion gas valence, conveying cost, distributed network, distribution The electricity that subscriber unit is bought or sold from main power grid is calculated likes, is bought from each cogeneration unit or boiler unit Heat, and purchase sale of electricity instruction, transmission of electricity instruction and heat supply instruction are formed, it sends corresponding unit to, is heated in subscriber unit without electricity Equipment is heated using centralized system, and the electricity that subscriber unit is bought is only used for non-heat demand, and the heat demand of subscriber unit passes through Boiler unit heat supply or cogeneration unit meet, the heating load and electricity bought from each cogeneration unit, from power generation Unit buys electricity, and heat is bought from boiler unit, in scheduling phase a few days ago, by intelligence computation module, select power purchase and Gas strategy is purchased, is guaranteed systematically with the maximized working method operation of economic interests;During real time execution, based on timesharing electricity Valence formulates the use period planning of electric appliance or electrical equipment for user, guarantees user with economic interests by intelligence computation module Maximized mode uses the time plan each electric appliance or electrical equipment.
A kind of dispatching method of the smart grid scheduling system based on user demand, the number of distributed intelligence computing module With equal, each intelligence computation of the sum of subscriber unit, generator unit, cogeneration unit, the number of boiler unit and main power grid The corresponding subscriber unit of module or generator unit or cogeneration unit or boiler unit or main power grid, and recognized by block chain It demonstrate,proves, the electricity transaction, heat supply between unit or between unit and main power grid carry out simultaneously record storage through block catenary system, logical Cross purchase electricity sales amount information between block catenary system acquiring unit or between unit and main power grid, heat information provision, thermoelectricity The purchase tolerance information of cogeneration unit, boiler unit;By each intelligence computation module composition distributed network, the distributed network pair The network topology answered is connection, communication of equal value between the intelligence computation module of connection;The heat demand of subscriber unit is by thermoelectricity Cogeneration unit, boiler unit supply, are preferentially supplied by cogeneration unit;In scheduling phase a few days ago, the intelligence computation module By accelerate intelligent algorithm select subscriber unit, generator unit, cogeneration unit, boiler unit, main power grid purchase sale of electricity and Purchase gas strategy, the acceleration intelligent algorithm specifically includes the following steps:
(1) the intelligence computation module respectively from block catenary system authenticate, obtain other intelligence computation modules calculating from Other users unit, generator unit, cogeneration unit, main power grid purchase of electricity information, purchase tolerance information and to other units or The electricity sales amount information of main power grid, the heat demand of subscriber unit;
(2) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount information, It calculates and stores corresponding collaborative parameters;
(3) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount information And the last resulting corresponding collaborative parameters of calculating, current corresponding electricity price and combustion gas valence, it calculates and stores corresponding purchase Information about power purchases tolerance information and electricity sales amount information;
(4) whether the difference of the purchase electricity sales amount, purchase tolerance that judge intelligence computation module twice adjacent calculation no more than sets Determine threshold value;
(4a) is if the purchase electricity sales amount of twice adjacent calculation, the difference of purchase tolerance are no more than given threshold, each intelligence meter Purchase electricity sales amount, the purchase tolerance information that module submits intelligence computation module to calculate to block catenary system are calculated, is executed step (5);
(4b) returns to step (1) if the purchase electricity sales amount of twice adjacent calculation or the difference for purchasing tolerance are more than given threshold;
(5) each subscriber unit, generator unit, cogeneration unit, boiler unit, main power grid are distributed from block catenary system Formula obtains its corresponding last time and calculates gained purchase of electricity information, purchases tolerance information and electricity sales amount information, and be based on the letter Breath carries out power generation and the production of heat supply thermal energy;
(6) each unit carries out distributed purchase sale of electricity transaction, heat supply transactions through block catenary system, carry out electricity supply, Heat supply.
The step (2) specifically includes the following steps:
(2a) successively numbers multiple subscriber units, multiple generator units, multiple cogeneration units, multiple boiler units The N that is 1,2 ... numbers main power grid for N+1, and wherein N is subscriber unit, generator unit, cogeneration unit, boiler unit The sum of number;Unit i, i=1,2 ... the N+1 that (2b) is i for number, when it is subscriber unit or generator unit or thermoelectricity connection When producing unit, the electricity collaborative parameters of its corresponding intelligence computation module i are iterated to calculate by following formula,
WhereinResulting collaborative parameters value, g are calculated for unit i kth timeiFor the current generated energy of unit i, diFor unit i Current power demand,The charge value that resulting unit i is sold to unit j is calculated for kth time,Gained is calculated for kth time The charge value sold to unit i of unit j, selected electricity collaborative parameters when calculating for the first timeInitial value
(2C) for unit i, when it is cogeneration unit or boiler unit, corresponding intelligence computation module i passes through Following formula iterates to calculate its heat collaborative parameters,
WhereinResulting heat collaborative parameters are calculated for kth time, h is the sum of the heat demand of each unit,For kth time The purchase tolerance of resulting unit i is iterated to calculate, wherein aiIt is imitated for corresponding cogeneration unit or the energy conversion of boiler unit Rate, the initial value of selected heat collaborative parameters when calculating for the first time
The step (3) specifically includes following steps,
(3a) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid,
Wherein pijIt is unit i or main power grid to unit j or the electricity price of main power grid sale of electricity;If unit i or unit j is boiler list Member, then pij=0;niThe gas price of natural gas, s are bought for unit iiTo purchase tolerance;
(3b) is updated for unit i, by its corresponding intelligence computation module i by following formula iteration
Wherein, argmin { } expression makes function in braces obtain the smallest corresponding xijAnd siValue, α, β be often system Number,The charge value that resulting unit i is sold to unit j is calculated for kth step, selected initial value when calculating for the first timeWith
It is related to the generator unit of solar power generation or wind-power electricity generation to the sale of electricity price p of other unit sales of electricityijLower than not It is related to the generator unit of solar power generation or wind-power electricity generation to the sale of electricity price p of other unit sales of electricityji
Beneficial effects of the present invention:
(1) information exchange, subscriber unit, generator unit, thermoelectricity are carried out by using block catenary system, intelligence computation module Cogeneration unit, boiler unit can carry out information exchange, thus its discovery and biography outwardly when failure occurs between any two It send and is more easier, to greatly enhance the reliability of power grid.Simultaneously as the state of unit can quickly be transferred to block chain System and corresponding intelligence computation module can carry out fault diagnosis using intelligence computation module faster, to accelerate event Hinder diagnosis efficiency, to enhance the reliability of power grid.Intelligence computation module can be sent in real time by network to faulty unit Instruction, for debugging so that power system restoration is normal, to accelerate trouble shooting procedure.
(2) dispatching method based on intelligence computation module, the purchase sale of electricity information of user, electricity consumption timetable is without useful in institute It is directly transmitted between family, to preferably protect the privacy of user.
(3) dispatching method based on intelligence computation module saves labor without the scheduling a few days ago of artificial progress electricity market Dynamic resource;
(4) effectively enhance the reliability of operation of power networks.Since user can be power generation end, electricity consumption end can be, it can also be with It is both power generation end and user terminal, so that the flexible dispatching of electric power can be realized, reduces conveying distance, power generation and power consumption efficiency obtain It is promoted.By the electrical allotment of electric system, the utilization efficiency of the energy can be improved.
(5) price driven, incentive mechanism are set, the consumption of generation of electricity by new energy is promoted.
(6) by intelligence computation module, power purchase and purchase can be selected under the premise of protecting user and power generation end data privacy Gas strategy, and period planning is used for user's formulation electric appliance, the cost and CO2 emission at power generation end are both reduced, is also made User participates in dispatching by reasonable arrangement electric appliance using the time simultaneously, further reaches to reduce and imitate to the technology that power grid impacts Fruit;Meanwhile the combination of both technological means also can rationally reduce the electric cost of user.I.e. by intelligence computation module come for Generate electricity end, heat supply end selection power purchase and purchase gas strategy, and uses period planning for user's formulation electric appliance, can play to power generation End, heat supply end, user bring economic benefit, and further enhance the technical effect of electric network reliability.
(7) using the intelligent accelerating algorithm selection power purchase and purchase gas strategy proposed in the present invention, it is ensured that entire decision The reliability of process.Although the power load of load side is time-varying in real-time electric power scheduling process, but as long as its variation speed Rate is lower than the calculating convergence rate proposed by the present invention for accelerating intelligent algorithm, when which can handle these in real time Varying duty, to ensure that the reliability of power scheduling process.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is physical connection schematic diagram of the invention.
Fig. 2 is information connection schematic diagram of the invention.
Fig. 3 is the flow diagram of dispatching method of the invention.
Specific embodiment
Embodiment one
As shown in Figure 1 and Figure 2, a kind of smart grid based on user demand dispatches system comprising: it is several to be with family The subscriber unit of unit, several generator units, several cogeneration units, several boiler modules;Subscriber unit, generator unit, Cogeneration unit is connect with main power grid respectively, can be introduced from main power grid or be conveyed electric energy to it.Wherein as unit of family Subscriber unit includes household electrical appliance, such as refrigerator, washing machine, dish-washing machine, electric light, television set, further includes intelligence instrument, photovoltaic hair Electric module, wind power generation module and electric car, intelligence instrument measure electricity, the heat of subscriber unit generated energy and consumption, and Predict electricity demand, the heat demand amount of user;Cogeneration unit can externally export electric energy and right using natural gas as raw material Outer heat supply, the heat supply and power supply of cogeneration unit are located in feasible operation interval;Boiler unit is right using natural gas as raw material Outer heat supply.
Smart grid scheduling system based on user demand further includes calculating and memory module, and calculating includes with memory module Several distributed computing modules, distributed computing module are used for based on electricity price, combustion gas valence, conveying cost, distributed network, distribution The electricity each bought or sold from regional power grid as the subscriber unit of unit using family is calculated likes, from each cogeneration of heat and power The heating load that unit or boiler unit are bought, and power purchase/transmission of electricity instruction and heat supply instruction are formed, send corresponding domestic consumer to Unit.Without electric heating equipment in domestic consumer's unit, heated using centralized system, wherein the electricity bought be only used for it is non-in family Heat demand, heat demand are met by boiler heat supplying or co-generation unit, the confession bought from each cogeneration unit Heat and electricity, buy heat from boiler unit, in scheduling phase a few days ago, by distributed computing module, select power purchase and Gas strategy is purchased, is guaranteed systematically with the maximized working method operation of economic interests;During real time execution, based on timesharing electricity Valence formulates the period planning that uses of electric appliance for user by distributed computing module, and guarantee user is maximized with economic interests Mode come plan each electric appliance use the time.Through the above scheme, the energy equilibrium of supply and demand of entire power grid is met.It is combined The energy of each user exceeds and is short of, and by distributed arithmetic, obtains optimum instruction, issues control instruction, control each use The power generation and transmission of electricity at family.
It include using family as several power generations of unit and electricity consumption module, several electricity generation modules, several cogenerations of heat and power in system Unit.Wherein using family to include household electrical appliance, such as refrigerator, washing machine, dish-washing machine etc. and can be again in the subscriber unit of unit Raw energy electricity generation module, such as photovoltaic generating module, wind power generation module etc..Cogeneration unit, can be right using natural gas as raw material Outer output electric energy and external heating and cooling, the heating and cooling of cogeneration unit and power supply are located in feasible operation interval, The waste heat that power generation waste heat, cooling supply generate both participates in the transaction of block chain, carries out electric-gas scheduling by block chain, promotes the energy Multiple dimensioned calling.When carrying out power scheduling, when electricity is inadequate, power scheduling is carried out according to following priority: first being met Then the power demand of strategic user meets the power demand of other users.
Preferably, equipped with thermomotor, photovoltaic, wind-power electricity generation, electric car and elastic load etc. in subscriber unit.
Preferably, further include carbon dioxide certification link in distributed computing module, and include titanium dioxide in optimization aim Carbon emission index can not only optimize cost control, can also promote making for clean energy resource by minimizing total economic indicator With.
As shown in figure 3, the dispatching method of the smart grid scheduling system employed in the present embodiment based on user demand, The number of distributed computing module and subscriber unit, generator unit, cogeneration unit, the number of boiler unit and main power grid it With equal, the corresponding subscriber unit of each intelligence computation module or generator unit or cogeneration unit or boiler unit or master Power grid, and authenticated by block chain, it is obtained from corresponding subscriber unit, generator unit, cogeneration unit from other use Family unit, generator unit, cogeneration unit, main power grid purchase of electricity information, purchase tolerance information and to other users unit, main electricity Net sells the information of electricity;By each distributed computing module composition distributed network, the corresponding network of the distributed network is opened up It flutters as connection, communication of equal value between the distributed computing module of connection.
In scheduling phase a few days ago, distributed computing module by accelerate intelligent algorithm select each subscriber unit, generator unit, The power purchase of cogeneration unit and purchase gas strategy, accelerate intelligent algorithm specifically includes the following steps:
(1) distributed computing module is authenticated from block chain respectively, from corresponding subscriber unit, generator unit, cogeneration of heat and power Obtained in unit previous step calculate it is resulting its from other users unit, generator unit, cogeneration unit, main power grid purchase of electricity Information purchases tolerance information and sells the electricity sales amount information of electricity, the heat demand of each user to other users unit, main power grid;
(2) each distributed computing module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount letter Breath, calculates and stores corresponding collaborative parameters.For each user, when generated energy is greater than user power utilization demand, collaboration ginseng Several values increases, and electric energy can externally be exported by representing it;When generated energy is less than user demand, which reduces, generation Table its can dissolve electric energy;
(3) each distributed computing module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount letter Breath and previous step calculate resulting corresponding collaborative parameters, and current corresponding electricity price is calculated and deposited using intelligent algorithm is accelerated Corresponding purchase of electricity information is stored up, tolerance information and electricity sales amount information are purchased;
(4) step (1)-(3) are repeated, until the resulting purchase of electricity information of twice adjacent calculation, purchase tolerance information and sale of electricity The difference measured between information is no more than given threshold;
(5) its is corresponding most for Distributed Acquisition from block catenary system for each subscriber unit, generator unit, cogeneration unit Once calculate resulting purchase of electricity information afterwards, purchase tolerance information and electricity sales amount information, and based on the information carry out power generation, The production of heat supply thermal energy;
(6) each unit carries out distributed purchase sale of electricity transaction, heat supply transactions through block catenary system, carry out electricity supply, Heat supply.Preferably.
Preferably, include following sub-step in step (2):
(2a) successively by subscriber unit, generator unit, cogeneration unit number be 1,2 ... N, by main power grid number be N+1, wherein N is the sum of subscriber unit, generator unit, cogeneration unit, the number of boiler unit;
(2b) is for unit i, when it is subscriber unit or generator unit or cogeneration unit, corresponding distribution Computing module i iterates to calculate its electricity collaborative parameters by following formula,
WhereinResulting collaborative parameters value, g are calculated for unit i kth timeiFor the current generated energy of unit i, diFor unit i Current power demand,The charge value that resulting unit i is sold to unit j is calculated for kth time,Gained is calculated for kth time The charge value sold to unit i of unit j, selected electricity collaborative parameters when calculating for the first timeInitial value
(2c) for unit i, when it is cogeneration unit or boiler unit, corresponding distributed computing module i is logical It crosses following formula and iterates to calculate its heat collaborative parameters,
WhereinResulting heat collaborative parameters are calculated for kth time, h is the sum of the heat demand of each unit,For kth time The purchase tolerance of resulting unit i is iterated to calculate, wherein aiIt is imitated for corresponding cogeneration unit or the energy conversion of boiler unit Rate, the initial value of selected heat collaborative parameters when calculating for the first time
It preferably, include following sub-step in step (3),
(3a) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid are as follows:
Wherein pijTo number the unit for being i or main power grid to the number unit for being j or the electricity price of main power grid sale of electricity;If number The unit that unit or number for i are j corresponds to boiler module, then pij=0;niFor the gas price for the unit that number is i, si To purchase tolerance;(3b) is updated for unit i, by its corresponding intelligence computation module i by following formula iteration
Wherein, argmin { } expression makes function in braces obtain the smallest corresponding xijAnd siValue, α, β be often system Number,The charge value that resulting unit i is sold to unit j is calculated for kth step, selected initial value when calculating for the first timeWith
Preferably, generator unit when being related to solar power generation unit or wind power generation unit is to other unit sales of electricity Sale of electricity price pijLower than the unit for not being related to solar power generation unit or wind power generation unit power generation to other unit sales of electricity Sale of electricity price pji
Preferably, collaborative parametersInitial value, collaborative parametersInitial value,Initial value andInitial value can be optional.
It preferably, will when each unit cannot all be connect with main power grid, cannot be introduced to main power grid or be conveyed electric energy to it Step (2a) substitution are as follows:
Subscriber unit, generator unit, cogeneration unit, boiler unit number are successively 1,2 by (2a1) ... N, wherein N is the sum of subscriber unit, generator unit, cogeneration unit, the number of boiler unit;
Step (3a) is substituted are as follows:
(3a1) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid are as follows:
Wherein pijTo number the unit for being i or main power grid to the number unit for being j or the electricity price of main power grid sale of electricity;If number The unit that unit or number for i are j corresponds to boiler module, then pij=0;niFor the gas price for the unit that number is i, si To purchase tolerance;In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show Beneficial effect:
(1) information exchange is carried out by using block catenary system, user is equivalent to energy subnet, can carry out between user Information exchange, thus its discovery and transmission outwardly are more easier when failure occurs, so that greatly enhance power grid can By property.Simultaneously as the state of user can quickly be transferred to block catenary system, failure can be carried out faster using the module Diagnosis, so that efficiency of fault diagnosis is accelerated, to enhance the reliability of power grid.Block catenary system or distributed computing module can Instruction is sent in real time to faulty user by network, for debugging so that power system restoration is normal, to accelerate event Hinder maintenance process.
(2) dispatching method by above-mentioned based on block catenary system, distributed computing module, the power generation letter of domestic consumer Breath, electricity consumption timetable need not directly transmit between all users, to preferably protect the privacy of user.
(3) dispatching method by above-mentioned based on block catenary system, distributed computing module, without artificial carry out electric power Labo r resources are saved in the scheduling a few days ago in market;
(4) effectively enhance the reliability of operation of power networks.Since user can be power generation end, electricity consumption end can be, it can also be with It is both power generation end and user terminal, for example has the home unit of renewable energy system, so that the spirit of electric power can be realized Scheduling living, reduces conveying distance, and power generation and power consumption efficiency get a promotion.By the electrical allotment of electric system, energy can be improved The utilization efficiency in source.
(5) price driven mechanism is set, the consumption of generation of electricity by new energy is promoted.
It (6), can be in protection user and the premise for the end data privacy that generates electricity by block catenary system, distributed computing module Under, power purchase and purchase gas strategy are selected, and use period planning for user's formulation electric appliance, both reduces the cost and two at power generation end Carbon emission is aoxidized, user is also made to participate in dispatching using the time by reasonable arrangement electric appliance simultaneously, further reaches reduction pair The technical effect of power grid impact;Meanwhile the combination of both technological means also can rationally reduce the electric cost of user.That is, logical Cross block catenary system, distributed computing module to select power purchase and purchase gas strategy for power generation end, heat supply end, and formulates electricity for user Device uses period planning, can play and bring economic benefit to power generation end, heat supply end, user, and further enhancing power grid can By the technical effect of property.
(7) using the acceleration intelligent algorithm selection power purchase of middle proposition of the invention and purchase gas strategy, it is ensured that entirely certainly The reliability of plan process.Although the power load of load side is time-varying in real-time electric power scheduling process, but as long as it changes Rate can be implemented to handle these lower than the calculating convergence rate proposed by the present invention for accelerating intelligent algorithm, the acceleration intelligent algorithm When varying duty, to ensure that the reliability of power scheduling process.
Embodiment two
As shown in Figure 1 and Figure 2, smart grid in the present embodiment based on user demand dispatches system comprising: it is several with Family is the subscriber unit of unit, several generator units, several cogeneration units, several boiler units, subscriber unit, power generation Unit, cogeneration unit, boiler unit are connect with main power grid respectively, can be introduced from main power grid or be conveyed electric energy to it.Wherein It include household electrical appliance in user as unit of family, such as refrigerator, washing machine, dish-washing machine, electric light, television set further include intelligence Energy instrument, photovoltaic generating module, wind power generation module and electric car, intelligence instrument measure subscriber unit generated energy and consumption Electricity, heat, and predict the electricity demand of user, heat demand amount;Cogeneration unit, can be external using natural gas as raw material Electric energy and external heat supply are exported, the heat supply and power supply of cogeneration unit are located in feasible operation interval;Boiler unit is with day Right gas is raw material, external heat supply.
Smart grid scheduling system based on user demand further includes calculating and memory module, and calculating includes with memory module Several intelligence computation modules, intelligence computation module is used for based on electricity price, combustion gas valence, conveying cost, wireless communication networks, distributed Ground calculates the electricity each bought or sold from regional power grid as the power generation of unit and power unit using family, from each thermoelectricity The heating load that cogeneration unit or boiler unit are bought, and power purchase/transmission of electricity instruction and heat supply instruction are formed, send corresponding family to Subscriber unit.It without electric heating equipment in domestic consumer's unit, is heated using centralized system, wherein the electricity bought is only used in family Non- heat demand, heat demand met by boiler heat supplying or co-generation unit, bought from each cogeneration of heat and power module Heating load and electricity, buy heat from boiler unit, in scheduling phase a few days ago, by intelligence computation module, select power purchase and Gas strategy is purchased, is guaranteed systematically with the maximized working method operation of economic interests;During real time execution, based on timesharing electricity Valence formulates the period planning that uses of electric appliance for user by intelligence computation module, and guarantee user is maximumlly square with economic interests Formula come plan each electric appliance use the time.
Through the above scheme, the energy equilibrium of supply and demand of entire power grid is met.It combines the energy of each user to exceed And shortcoming obtains optimum instruction by distributed arithmetic, issues control instruction, controls the power generation and transmission of electricity of each user.
When carrying out power scheduling, when electricity is inadequate, power scheduling is carried out according to following priority: first meeting strategy The power demand of property user, then meets the power demand of other users.
Preferably, equipped with thermomotor, photovoltaic, wind-power electricity generation, electric car and elastic load etc. in family.
Preferably, further include carbon dioxide certification link in intelligence computation module, and include carbon dioxide in optimization aim Discharge index can not only optimize cost control, can also promote making for clean energy resource by minimizing total economic indicator With.
As shown in figure 3, the dispatching method of the smart grid scheduling system used by the present embodiment based on user demand, intelligence Can computing module number and equal, the Mei Gezhi of the sum of subscriber unit, generator unit, cogeneration unit, the number of main power grid The corresponding subscriber unit of energy computing module or generator unit or cogeneration unit or boiler unit or main power grid, each intelligence meter Calculating module is wireless telecommunications connection, i.e., can transmit information by wireless telecommunications between any two intelligence computations module.A few days ago Scheduling phase, intelligence computation module is by accelerating intelligent algorithm to select each subscriber unit, each generator unit, each cogeneration unit Power purchase and purchase gas strategy, accelerate intelligent algorithm specifically includes the following steps:
(1) several computing modules pass through communication network from corresponding subscriber unit, generator unit, cogeneration of heat and power respectively Obtained in unit previous step calculate it is resulting its from other users unit, generator unit, cogeneration unit, main power grid purchase of electricity Information purchases tolerance information and sells the electricity sales amount information of electricity to other users unit, main power grid, and the heat of each subscriber unit needs It asks;
(2) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount information, It calculates and stores corresponding collaborative parameters;
(3) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount information And previous step calculates resulting corresponding collaborative parameters, current corresponding electricity price calculates and stores corresponding purchase of electricity information, Purchase tolerance information and electricity sales amount information;
(4) step (1)-(3) are repeated, until the resulting purchase of electricity information of twice adjacent calculation, purchase tolerance information and sale of electricity The difference measured between information is no more than given threshold;
(5) each subscriber unit, generator unit, cogeneration unit, the boiler unit distribution from intelligence computation module obtain It takes its corresponding last time to calculate resulting purchase of electricity information, purchases tolerance information and electricity sales amount information, and be based on the information Carry out power generation, the production of heat supply thermal energy;
(6) each subscriber unit, generator unit, cogeneration unit, boiler unit carry out electricity supply, heat supply.
Preferably, include following sub-step in step (2):
Subscriber unit, generator unit, cogeneration unit number are successively 1,2 by (2a) ... N;It is by main power grid number N+1;Wherein N is the sum of subscriber unit, generator unit, cogeneration unit, the number of boiler unit;
(2b) is for unit i, when it is subscriber unit or generator unit or cogeneration unit, corresponding distribution Computing module i iterates to calculate its electricity collaborative parameters by following formula,
WhereinResulting collaborative parameters value, g are calculated for unit i kth timeiFor the current generated energy of unit i, diFor unit i Current power demand,The charge value that resulting unit i is sold to unit j is calculated for kth time,Gained is calculated for kth time The charge value sold to unit i of unit j, selected electricity collaborative parameters when calculating for the first timeInitial value
(2c) for unit i, when it is cogeneration unit or boiler unit, corresponding distributed computing module i is logical It crosses following formula and iterates to calculate its heat collaborative parameters,
WhereinResulting heat collaborative parameters are calculated for kth time, h is the sum of the heat demand of each unit,For kth time The purchase tolerance of resulting unit i is iterated to calculate, wherein aiIt is imitated for corresponding cogeneration unit or the energy conversion of boiler unit Rate, the initial value of selected heat collaborative parameters when calculating for the first time
Preferably, include following sub-step in step (3):
(3a) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid are as follows:
Wherein pijTo number the unit for being i or main power grid to the number unit for being j or the electricity price of main power grid sale of electricity;If number The unit that unit or number for i are j corresponds to boiler module, then pij=0;niFor the gas price for the unit that number is i, si To purchase tolerance;(3b) is updated for unit i, by its corresponding intelligence computation module i by following formula iteration
Wherein, argmin { } expression makes function in braces obtain the smallest corresponding xijAnd siValue, α, β be often system Number,The charge value that resulting unit i is sold to unit j is calculated for kth step, selected initial value when calculating for the first timeWith
Preferably, it is related to the generator unit of solar power generation or wind-power electricity generation to the sale of electricity price p of other unit sales of electricityij Lower than not being related to the generator unit of solar power generation or wind-power electricity generation to the sale of electricity price p of other unit sales of electricityji
Preferably, electricity collaborative parametersInitial value, heat collaborative parametersInitial value,Initial value andInitial value can be optional.
It preferably, will when each unit cannot all be connect with main power grid, cannot be introduced from main power grid or be conveyed electric energy to it Step (2a) substitution are as follows:
Subscriber unit, generator unit, thermoelectron coproduction module number are successively 1,2 by (2a1) ... N, wherein N is user The sum of unit, generator unit, cogeneration unit, number of boiler unit;
Step (3a) is substituted are as follows:
(3a1) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid are as follows:
Wherein pijTo number the unit for being i or main power grid to the number unit for being j or the electricity price of main power grid sale of electricity;If number The unit that unit or number for i are j corresponds to boiler module, then pij=0;niFor the gas price for the unit that number is i, si To purchase tolerance;In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show Beneficial effect:
(1) by the information exchange between user, when failure occurs, its discovery and transmission outwardly are more easier, from And greatly enhance the reliability of power grid.Simultaneously as the state of user can quickly be transferred to intelligence computation module, this is utilized Module can carry out fault diagnosis faster, so that efficiency of fault diagnosis is accelerated, to enhance the reliability of power grid.
(2) labo r resources are saved without the scheduling a few days ago of artificial progress electricity market by above-mentioned dispatching method.
(3) effectively enhance the reliability of operation of power networks.Since user can be power generation end, electricity consumption end can be, it can also be with It is both power generation end and user terminal, for example has the family of renewable energy system, so that the flexible tune of electric power can be realized Degree, reduces conveying distance, and power generation and power consumption efficiency get a promotion.By the electrical allotment of electric system, the energy can be improved Utilization efficiency.
(4) price driven mechanism is set, the consumption of generation of electricity by new energy is promoted.
(5) by intelligence computation module, power purchase and purchase gas strategy may be selected, and formulate counting using the time for electric appliance for user It draws, both reduces the cost and CO2 emission at power generation end, also make user while passing through the use time of reasonable arrangement electric appliance It participates in dispatching, further reaches the technical effect for reducing and impacting to power grid;Meanwhile the combination of both technological means can also close Reason reduces the electric cost of user.That is, power purchase and purchase gas strategy are selected for power generation end, heat supply end by intelligence computation module, And period planning is used for user's formulation electric appliance, it can play and bring economic benefit, Yi Jijin to power generation end, heat supply end, user The technical effect of one step enhancing electric network reliability.
(6) using the acceleration intelligent algorithm selection power purchase of middle proposition of the invention and purchase gas strategy, it is ensured that entirely certainly The reliability of plan process.Although the power load of load side is time-varying in real-time electric power scheduling process, but as long as it changes Rate can be implemented to handle these lower than the calculating convergence rate proposed by the present invention for accelerating intelligent algorithm, the acceleration intelligent algorithm When varying duty, to ensure that the reliability of power scheduling process.

Claims (5)

1. a kind of smart grid based on user demand dispatches system, which is characterized in that including multiple subscriber units, multiple power generations Unit, multiple cogeneration units and multiple boiler units, the subscriber unit, generator unit, cogeneration unit respectively with Main power grid connection, can introduce from main power grid or convey electric energy to it;The subscriber unit includes electrical equipment or electric appliance, photovoltaic hair Electric module, wind power generation module, electric car;Cogeneration unit externally exports electric energy and externally supplies using natural gas as raw material Heat, the heat supply and power supply of cogeneration unit are located in feasible operation interval;Boiler unit is externally supplied using natural gas as raw material Heat;
The smart grid scheduling system based on user demand further includes calculating and memory module, and calculating includes with memory module Multiple intelligence computation modules, the intelligence computation module are based on electricity price, combustion gas valence, conveying cost, distributed network, in a distributed manner Calculate the electricity that subscriber unit is bought or sold from main power grid, the heat bought from each cogeneration unit or boiler unit Amount, and purchase sale of electricity instruction, transmission of electricity instruction and heat supply instruction are formed, it sends corresponding unit to, is set in subscriber unit without electricity heating It is standby, it is heated using centralized system, the electricity that subscriber unit is bought is only used for non-heat demand, and the heat demand of subscriber unit passes through pot Furnace unit heating or cogeneration unit meet, and the heating load and electricity bought from each cogeneration unit are single from power generation Member buys electricity, and heat is bought from boiler unit, selects power purchase and purchase by intelligence computation module in scheduling phase a few days ago Gas strategy guarantees systematically with the maximized working method operation of economic interests;During real time execution, based on timesharing electricity Valence formulates the use period planning of electric appliance or electrical equipment for user, guarantees user with economic interests by intelligence computation module Maximized mode uses the time plan each electric appliance or electrical equipment.
2. using the dispatching method of the smart grid scheduling system described in claim 1 based on user demand, which is characterized in that The number and subscriber unit, generator unit, cogeneration unit, boiler unit and main power grid of the distributed intelligence computing module The sum of number it is equal, the corresponding subscriber unit of each intelligence computation module or generator unit or cogeneration unit or boiler Unit or main power grid, and authenticated by block chain, electricity transaction, heat supply warp between unit or between unit and main power grid Block catenary system carries out and record storage, is sold by the purchase between block catenary system acquiring unit or between unit and main power grid Information about power, heat information provision, cogeneration unit, the purchase tolerance information of boiler unit;By each intelligence computation module composition Distributed network, the corresponding network topology of the distributed network are connection, of equal value logical between the intelligence computation module of connection Letter;The heat demand of subscriber unit is supplied by cogeneration unit, boiler unit, is preferentially supplied by cogeneration unit;
In scheduling phase a few days ago, the intelligence computation module is by accelerating intelligent algorithm to select subscriber unit, generator unit, thermoelectricity Cogeneration unit, boiler unit, main power grid purchase sale of electricity and purchase gas strategy, the acceleration intelligent algorithm specifically includes the following steps:
(1) the intelligence computation module respectively from block catenary system authenticate, obtain other intelligence computation modules calculating from other Subscriber unit, generator unit, cogeneration unit, main power grid purchase of electricity information purchase tolerance information and to other units or main electricity The electricity sales amount information of net, the heat demand of subscriber unit;
(2) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchases tolerance information and electricity sales amount information, calculates And store corresponding collaborative parameters;
(3) each intelligence computation module corresponds to the purchase of electricity information obtained based on it, purchase tolerance information and electricity sales amount information and Last time calculates resulting corresponding collaborative parameters, current corresponding electricity price and combustion gas valence, calculates and stores corresponding purchase of electricity Information purchases tolerance information and electricity sales amount information,
(4) whether the purchase electricity sales amount for judging intelligence computation module twice adjacent calculation, the difference for purchasing tolerance no more than set threshold Value;
(4a) is if the purchase electricity sales amount of twice adjacent calculation, the difference of purchase tolerance are no more than given threshold, each intelligence computation mould Block submits the purchase electricity sales amount of intelligence computation module calculating, purchase tolerance information to block catenary system, executes step (5);
(4b) returns to step (1) if the purchase electricity sales amount of twice adjacent calculation or the difference for purchasing tolerance are more than given threshold;
(5) each subscriber unit, generator unit, cogeneration unit, boiler unit, main the power grid distribution from block catenary system obtain Take its corresponding last time to calculate gained purchase of electricity information, purchase tolerance information and electricity sales amount information, and based on the information into Row power generation and the production of heat supply thermal energy;
(6) each subscriber unit, generator unit, cogeneration unit, boiler unit, main power grid carry out distributed through block catenary system Sale of electricity transaction, heat supply transactions are purchased, electricity supply, heat supply are carried out.
3. dispatching method according to claim 2, which is characterized in that the step (2) specifically includes the following steps:
Multiple subscriber units, multiple generator units, multiple cogeneration units, multiple boiler units number are successively 1 by (2a), 2 ... N number main power grid for N+1, and wherein N is subscriber unit, generator unit, cogeneration unit, the number of boiler unit The sum of;
Unit i, i=1,2 ... the N+1 that (2b) is i for number, when it is subscriber unit or generator unit or cogeneration of heat and power list When first, the electricity collaborative parameters of its corresponding intelligence computation module i are iterated to calculate by following formula,
WhereinResulting collaborative parameters value, g are calculated for unit i kth timeiFor the current generated energy of unit i, diFor working as unit i Preceding power demand,The charge value that resulting unit i is sold to unit j is calculated for kth time,Resulting list is calculated for kth time The charge value that first j is sold to unit i, selected electricity collaborative parameters when calculating for the first timeInitial value
(2C) for unit i, when it is cogeneration unit or boiler unit, corresponding intelligence computation module i passes through as follows Formula iterates to calculate its heat collaborative parameters,
WhereinResulting heat collaborative parameters are calculated for kth time, h is the sum of the heat demand of each unit,For kth time iteration The purchase tolerance of resulting unit i is calculated, wherein aiIt is first for corresponding cogeneration unit or the energy conversion efficiency of boiler unit The initial value of heat collaborative parameters is selected when secondary calculating
4. dispatching method according to claim 3, which is characterized in that
The step (3) specifically includes following steps,
(3a) establishes performance index function c according to current electricity price, combustion gas valence, for characterizing the investment consumption of power grid,
Wherein pijIt is unit i or main power grid to unit j or the electricity price of main power grid sale of electricity;If unit i or unit j is boiler unit, Then pij=0;niThe gas price of natural gas, s are bought for unit iiTo purchase tolerance;
(3b) is updated for unit i, by its corresponding intelligence computation module i by following formula iteration
Wherein, argmin { } expression makes function in braces obtain the smallest corresponding xijAnd siValue, α, β are constant coefficient, The charge value that resulting unit i is sold to unit j is calculated for kth step, selected initial value when calculating for the first timeWith
5. dispatching method according to claim 4, which is characterized in that be related to the power generation of solar power generation or wind-power electricity generation Sale of electricity price p of the unit to other unit sales of electricityijLower than be not related to the generator unit of solar power generation or wind-power electricity generation to its The sale of electricity price p of his unit sale of electricityji
CN201811426397.5A 2018-11-27 2018-11-27 Intelligent power grid dispatching system and method based on user demands Active CN109544016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811426397.5A CN109544016B (en) 2018-11-27 2018-11-27 Intelligent power grid dispatching system and method based on user demands

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811426397.5A CN109544016B (en) 2018-11-27 2018-11-27 Intelligent power grid dispatching system and method based on user demands

Publications (2)

Publication Number Publication Date
CN109544016A true CN109544016A (en) 2019-03-29
CN109544016B CN109544016B (en) 2021-07-06

Family

ID=65851621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811426397.5A Active CN109544016B (en) 2018-11-27 2018-11-27 Intelligent power grid dispatching system and method based on user demands

Country Status (1)

Country Link
CN (1) CN109544016B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969335A (en) * 2019-08-20 2020-04-07 中国科学技术大学 Distributed coordination method suitable for economic dispatching and demand response of smart power grid
CN112381410A (en) * 2020-11-16 2021-02-19 国网山东省电力公司莒县供电公司 Power management method and system based on Internet of things block chain
CN112396285A (en) * 2020-09-24 2021-02-23 浙江大学 Distributed data center computing power and energy source flow cooperative scheduling system and method
CN113241800A (en) * 2021-04-14 2021-08-10 中南大学 Intelligent power grid control system based on regional electricity prices and control method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2843788A2 (en) * 2013-08-16 2015-03-04 RWE Effizienz GmbH Method for operating a power plant system
WO2015031581A1 (en) * 2013-08-28 2015-03-05 Robert Bosch Gmbh System and method for energy asset sizing and optimal dispatch
CN104537435A (en) * 2014-12-18 2015-04-22 国家电网公司 Distributed power source optimizing configuration method based on user-side economic indexes
CN107402556A (en) * 2017-08-01 2017-11-28 华中科技大学 A kind of intelligent home control system and its control method based on clean energy resource
CN107612017A (en) * 2017-08-09 2018-01-19 广西电网有限责任公司电力科学研究院 Wind-electricity integration intelligent control system based on demand response and distributed energy storage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2843788A2 (en) * 2013-08-16 2015-03-04 RWE Effizienz GmbH Method for operating a power plant system
WO2015031581A1 (en) * 2013-08-28 2015-03-05 Robert Bosch Gmbh System and method for energy asset sizing and optimal dispatch
CN104537435A (en) * 2014-12-18 2015-04-22 国家电网公司 Distributed power source optimizing configuration method based on user-side economic indexes
CN107402556A (en) * 2017-08-01 2017-11-28 华中科技大学 A kind of intelligent home control system and its control method based on clean energy resource
CN107612017A (en) * 2017-08-09 2018-01-19 广西电网有限责任公司电力科学研究院 Wind-electricity integration intelligent control system based on demand response and distributed energy storage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
顾伟 等: "含分布式电源和可调负荷的售电公司优化调度模型", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969335A (en) * 2019-08-20 2020-04-07 中国科学技术大学 Distributed coordination method suitable for economic dispatching and demand response of smart power grid
CN112396285A (en) * 2020-09-24 2021-02-23 浙江大学 Distributed data center computing power and energy source flow cooperative scheduling system and method
CN112396285B (en) * 2020-09-24 2023-11-28 浙江大学 Collaborative scheduling system and method for distributed data center calculation force and energy source flow
CN112381410A (en) * 2020-11-16 2021-02-19 国网山东省电力公司莒县供电公司 Power management method and system based on Internet of things block chain
CN112381410B (en) * 2020-11-16 2022-09-23 国网山东省电力公司莒县供电公司 Power management method and system based on Internet of things block chain
CN113241800A (en) * 2021-04-14 2021-08-10 中南大学 Intelligent power grid control system based on regional electricity prices and control method thereof
CN113241800B (en) * 2021-04-14 2022-11-18 中南大学 Intelligent power grid control system based on regional electricity prices and control method thereof

Also Published As

Publication number Publication date
CN109544016B (en) 2021-07-06

Similar Documents

Publication Publication Date Title
Sarker et al. Progress on the demand side management in smart grid and optimization approaches
CN109544016A (en) A kind of smart grid scheduling system and dispatching method based on user demand
CN107563676A (en) Consider the source lotus coordinated operation dispatching method of Multiple Time Scales polymorphic type demand response
CN110378058A (en) A kind of method for building up for the electro thermal coupling microgrid optimal response model comprehensively considering reliability and economy
Wang et al. Bargaining-based energy trading market for interconnected microgrids
Wang et al. Transactive energy sharing in a microgrid via an enhanced distributed adaptive robust optimization approach
CN107330549A (en) Multi-energy complementary micro-grid energy management method containing multiagent
CN108173282A (en) A kind of consideration electricity turns gas operating cost integrated energy system Optimization Scheduling
CN110110913A (en) Large-scale garden integrated energy system energy source station Optimal Configuration Method
CN109598429A (en) A kind of island microgrid intelligent dispatching system and dispatching method
Amicarelli et al. Optimization algorithm for microgrids day-ahead scheduling and aggregator proposal
CN108335209A (en) A kind of distributed energy resource system including feed end index block chain
CN115204562B (en) Multi-energy sharing-based distributed collaborative optimization scheduling method and system for interconnected micro energy networks
CN116911533B (en) Multi-microgrid energy sharing method for regional comprehensive energy system
Celik et al. Coordinated energy management using agents in neighborhood areas with RES and storage
CN109347150A (en) A kind of distributed power generation scheduling system and dispatching method
CN109583753A (en) A kind of smart grid monitoring system and its control method based on region insider transaction
Li et al. A multicriteria optimal operation framework for a data center microgrid considering renewable energy and waste heat recovery: Use of balanced decision making
CN105226649B (en) One kind predicting improved provincial power network power generation dispatching optimization method based on bus load
CN109670838A (en) A kind of bypassing method and system of the risk trade of interconnection type energy resource system
Zhou et al. A fully-decentralized transactive energy management under distribution network constraints via peer-to-peer energy trading
CN110889778A (en) Electric energy value evaluation method based on network security constraint
Montanari et al. Real time market models and prosumer profiling
Zhu et al. Optimal Scheduling of Micro-Grid Multi-Energy System Considering Two-Dimensions Price-Based Demand Response
Huang et al. Transmission expansion planning for multienergy system with integrated demand response

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant