CN109543887A CN201811317649.0A CN201811317649A CN109543887A CN 109543887 A CN109543887 A CN 109543887A CN 201811317649 A CN201811317649 A CN 201811317649A CN 109543887 A CN109543887 A CN 109543887A
Authority
CN
China
Prior art keywords
flood
water level
water
day
season
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811317649.0A
Other languages
Chinese (zh)
Other versions
CN109543887B (en
Inventor
曹险峰
醋院科
李泽宏
伍志
肖鹏
李宏志
余玲
夏安宇
宋万礼
杨洪敏
李艳林
吴永琦
熊鲜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Province Source Electric Power Ltd Co
Original Assignee
Guizhou Province Source Electric Power Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Province Source Electric Power Ltd Co filed Critical Guizhou Province Source Electric Power Ltd Co
Priority to CN201811317649.0A priority Critical patent/CN109543887B/en
Publication of CN109543887A publication Critical patent/CN109543887A/en
Application granted granted Critical
Publication of CN109543887B publication Critical patent/CN109543887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Control Of Non-Electrical Variables (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of Water level trend control methods of daily regulation reservoir different times, the ratio of annual runoff volume is specially accounted for according to flood season runoff amount, daily regulation reservoir is divided into dry season, withered flood alternating phase, flood season and withered alternately 4 different times of phase of flood, Water level trend control is carried out respectively to 4 different times;High water level operation is kept with dry season daily regulation reservoir in Water level trend control process, the withered flood alternating phase is all of flood small before flood, water level keeps rationally high level simultaneously, flood season utilizes the multiple electricity of flood resource, the flood withered alternately phase utilizes the multiple electricity of autumn flood, to control target, the water level control range in each period is determined.The present invention improves daily regulation reservoir economic operation level, realizes and rationally utilizes flood resource.

Description

A kind of Water level trend control method of daily regulation reservoir different times
Technical field
The present invention relates to a kind of Water level trend control methods of daily regulation reservoir different times, belong to water conservancy and hydropower regulation skill Art field.
Background technique
After the completion of the general construction of hydropower stations, economical, societal benefits how are given full play to, improve enterprise to the maximum extent in electricity Competitiveness is new problem that each large watershed genco faces to power in the market.Under new power market reform environment, water power Enterprise faces the severe situation cut price, and situation of the water power in flood season " have water is just sent out, thermoelectricity is given way " has become history.It is seeking Water power source operation, power benefit is asked to maximize, during balance " amount " and " valence " relationship, optimizing scheduling of reservoir, economy Operation is just particularly important.
Summary of the invention
The purpose of the present invention is to provide a kind of Water level trend control methods of daily regulation reservoir different times, and day is adjusted Reservoir is divided into dry season, withered flood alternating phase, flood season and withered 4 different times of alternately phase of flood and carries out Water level trend control, improves Daily regulation reservoir economic operation level realizes and rationally utilizes flood resource.
In order to solve the above technical problems, The technical solution adopted by the invention is as follows:
A kind of Water level trend control method of daily regulation reservoir different times, comprising the following steps:
1) daily regulation reservoir is divided into 4 different times and carries out Water level trend control, 4 different times are respectively low water Phase, withered flood alternating phase, flood season and flood withered alternately phase;
2) Water Level Control in dry season is formulated;
3) Water Level Control of withered flood alternating phase is formulated;
4) Water Level Control in flood season is formulated;
5) Water Level Control of flood withered alternately phase is formulated.
In aforementioned step 1), the ratio of annual runoff volume is accounted for according to flood season runoff amount to determine dry season and flood season, Specifically, determining these moons if the ratio that the flood season runoff amount of continuous some months accounts for annual runoff volume is greater than 80% For flood season;Replaced phase and flood withered alternately phase for withered flood within flood season forward and backward one month, remaining month is dry season.
Flood season above-mentioned is 5-7 months.
In aforementioned step 2), the water level control target in the dry season are as follows: dry season daily regulation reservoir keeps high water level Operation;
Control method are as follows: do not abandon water according to sending out line interruption 24 hours, determine water level control range;
Specific water level calculation method are as follows:
Reservoir inflow is rounded the average value of the average annual flow in dry season and single month maximum value is respectively calculated, and obtains To Incoming water quantity;Line interruption is sent out for 24 hours in power station, guarantees that certain ecological flow does not abandon water with station service, according to the ecological flow Amount, obtains outbound water, and then calculates control water level maximum value;
In aforementioned step 3), the control target of the withered flood alternating phase are as follows: all of flood small before flood, while water level Keep rationally high level;
Control method are as follows: comprehensively consider, 1) occur flood when, do not abandon water within chance district flood 1 day 1 year one;2) when without flood, Power station is sent out line interruption 1 day and does not abandon water, determines water level control range with the two influence factors;
Specific water level calculation method are as follows:
A, when for flood occurs, the case where not abandoning water in chance district flood 1 day 1 year one,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood takes magnanimity on the 1st as Incoming water quantity on the 1st to obtain the 1 year one flood design value met;Hair stream is packed in conjunction with water power Amount calculates full shampoo amount on the 1st, and then calculates control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of withered flood alternating this month of phase, obtains Incoming water quantity on the 1st;Send out route in power station It interrupts 1 day, guarantee that certain ecological flow does not abandon water with station service, according to the ecological flow, calculate full shampoo amount on the 1st, Jin Erji Calculate control water level;
It is final to determine the minimum for being gradually down to control water level calculated by high water level in withered flood alternating phase water level control.
In aforementioned step 4), the control target in the flood season are as follows: utilize the multiple electricity of flood resource;
Control method are as follows: comprehensively consider, 1) daily regulation reservoir by chance flood 1 day 5 years one do not abandoned water;2) when without flood, electricity Submitting of standing does not abandon water in line interruption 1 day;3) when without flood, 1 unit is lost for water is not abandoned within 1 day, these three influence factors determine water Position control range;
Circular are as follows:
A, not the case where not abandoning water for chance flood 1 day 5 years one,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood takes magnanimity on the 1st as Incoming water quantity on the 1st to obtain the 5 years one flood design values met;Hair stream is packed in conjunction with water power Amount calculates full shampoo amount on the 1st, and then calculates control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow is rounded the average annual flow in flood season, and Incoming water quantity on the 1st is calculated;
Line interruption 1 day is sent out in power station, band station service guarantees that certain ecological flow does not abandon water, according to the ecological flow, Outbound water on the 1st is calculated, and then calculates control water level;
C, when for no flood, 1 unit loses standby the case where not abandoning water in 1 day,
Reservoir inflow is rounded the average annual flow in flood season, and Incoming water quantity on the 1st is calculated;
It is standby to consider further that 1 unit loses, remaining unit completely sends out calculating, does not abandon water within 1 day, calculates 1 according to the metered flow of unit Day full shampoo amount, and then calculate control water level;
It is final to determine that dry season water level controls the water level maximum value calculated under three kinds of influence factors.
In aforementioned step 5), the control target of the flood withered alternately phase is: utilizing the multiple electricity of autumn flood;
Control method are as follows: comprehensively consider, 1) daily regulation reservoir by chance flood 1 day 1 year one do not abandoned water;2) when without flood, electricity Submitting of standing does not abandon water in line interruption 1 day, determines water level control range with the two influence factors;
Specific water level calculation method are as follows:
A, not the case where by chance flood 1 day 1 year one water not being abandoned for daily regulation reservoir,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood takes magnanimity on the 1st as Incoming water quantity on the 1st to obtain the 1 year one flood design value met;Hair stream is packed in conjunction with water power Amount calculates full shampoo amount on the 1st, and then calculates control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of flood withered alternately this month of phase, and Incoming water quantity on the 1st is calculated;
Line interruption 1 day is sent out in power station, band station service guarantees that certain ecological flow does not abandon water, according to the ecological flow, Full shampoo amount on the 1st is calculated, and then calculates control water level;
It is final to determine the peak for being gradually raised to control water level calculated by low water level in the withered alternately phase water level of flood.
Ecological flow above-mentioned is by environmental protection administration's requirement value.
Advantageous effects of the invention:
1) the method for the present invention is used, daily regulation reservoir economic operation level is improved, realizes energy-saving;
2) the method for the present invention is used, realizes and rationally utilizes flood resource;
3) the method for the present invention is used, while it is horizontal to also improve power station operation management.
Specific embodiment
The invention will be further described below.Following embodiment is only used for clearly illustrating technical side of the invention Case, and not intended to limit the protection scope of the present invention.
The present invention provides a kind of Water level trend control method of daily regulation reservoir different times, comprising the following steps:
1) 4 different times of daily regulation reservoir point carry out Water level trend control, and respectively dry season, withered flood replaces phase, flood Phase, flood withered alternately phase.According to the water regime in basin, the ratio of annual runoff volume is accounted in conjunction with flood season runoff amount to determine low water Phase and flood season, specifically, determining if the ratio that the flood season runoff amount of continuous some months accounts for annual runoff volume is greater than 80% For flood season, flood season here is generally 5-7 months.After determining flood season, replaced phase and the withered friendship of flood for withered flood within flood season forward and backward one month For the phase, remaining month is dry season.
Such as: the northern basin Pan Jiang generally annual June enters the flood season, and general December enters dry season, is provided according to 1 year runoff Material is it is found that account for the 84% of annual runoff volume to 11 monthly runoffs June.Then when carrying out analysis of the invention, dry season is chosen Replace that the phase is May, flood season be November in June-, the flood withered alternately phase is December for April January next year to next year, withered flood.Furong River Basin is entered the flood season annual April, and October in April-is flood season, according to 1 year Streamflow Data it is found that flood season runoff amount accounts for annual runoff 80% or more of total amount.So choose dry season be 2 month of December to next year, withered flood alternating the phase be March, flood season be April extremely October, flood withered alternately phase are November.
2) Water Level Control in dry season is formulated.
Dry season is the prime time that daily regulation reservoir keeps high water level operation, reduces water consumption rate, can be according to upstream regulation The good reservoir storage of performance puts adjusting, rationally controls the operating water level of daily regulation reservoir, can under the premise of guaranteeing safety, not abandoning water Operating water level is raised as far as possible, is realized energy-saving.
So the control target in dry season is: dry season daily regulation reservoir keeps high water level operation.
Control method are as follows: consider that submitting does not abandon water in line interruption 24 hours and determines water level control range.
Specific water level calculation method are as follows:
Reservoir inflow is rounded the average value of the average annual flow in dry season and single month maximum value is respectively calculated, electricity It stands and sends out line interruption for 24 hours, guarantee that certain ecological flow does not abandon water with station service.
For example, the average value of the average annual flow in some hydropower station entire dry season is 53.3m3/ s, maximum value is within single month 95.8m3/ s, ecological flow then in the case of two kinds, are by the control water level of mean value calculation by environmental protection administration's requirement value 883.57m is 882.25m by the control water level of maximum value calculation, final to determine that dry season water level control is no more than 883.57m. As a result such as table 1.
The control water level calculated result in 1 some hydropower station dry season of table
3) Water Level Control of withered flood alternating phase is formulated.
The withered flood alternating phase is that annual-storage reservoir water level disappears substantially and drops down onto reduced levels, has biggish regulating space, adjusts day Reservoir can make full use of small flood before flood, while water level can maintain reasonable higher position.
So the control target of withered flood alternating phase is: all of flood small before flood, while water level is kept rationally compared with Gao Shui It is flat.
Control method are as follows: when comprehensively considering 1) generation flood, do not abandon water in chance district flood 1 day 1 year one;2) when without flood, Power station is sent out line interruption 1 day and does not abandon water, determines water level control range with the two influence factors.
Specific water level calculation method are as follows:
When for flood occurs, the case where not abandoning water in chance district flood 1 day 1 year one,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood (chance design flood in 1 year one), takes magnanimity on the 1st as Incoming water quantity on the 1st.Flow rate calculation 1 day full hair is completely being sent out in conjunction with power station Water finally calculates water level.
When for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of withered flood alternating this month of phase, then calculates Incoming water quantity on the 1st.Send out line in power station Road is interrupted for 24 hours, and band station service guarantees that certain ecological flow calculates water amount of power generating, then calculates water level.In the present invention, the ecological flow Amount is by environmental protection administration's requirement value.
For example, some hydropower station, being inquired into obtain 1 year one chance flood at dam site magnanimity on the 1st is 0.47 hundred million m3, then storage water on the 1st Amount is 47,000,000 m3, it is 200m that flow is completely sent out in power station3/ s, then full shampoo amount on the 1st is 17,280,000 m3, then obtaining net Incoming water quantity is 29720000 m3, it is 872.61m that water level, which is finally calculated,.The power station, withered flood alternating phase average annual flow is 54.8m3/ s, Then Incoming water quantity on the 1st is 4,730,000 m3, power station sends out line interruption for 24 hours, guarantees 7m with station service3The ecological flow of/s is then sent out on the 1st Electric water is 600,000 m3, it is 883.52m that water level, which is finally calculated,.It is final determine withered flood alternating phase water level control gradually by 883.52m being down to 872.61m operation.As a result such as table 2.
The control water level calculated result of 2 some hydropower station of table withered flood alternating phase
4) Water Level Control in flood season is formulated.
Flood using it is bad be disaster, making good use of is resource, and how flood resource is used in by power station well Power generation is then one of the center of gravity of Hydropower Enterprise ' work.If reservoir reduces water consumption rate and raising of water level to covet in flood season Operation may face a large amount of abandoning water;It is uneconomical if abandoning water in order to prevent and being chronically at low water level operation, it can not achieve Maximizing the benefits.
Daily regulation during flood period reservoir main task is to abandon water, multiple electricity less under the premise that security is guaranteed, while to keep phase To more reasonable water level, water consumption rate is taken into account.
So the control target in flood season is: utilizing the multiple electricity of flood resource.
Control method are as follows: comprehensively consider 1) daily regulation reservoir and by chance flood 1 day 5 years one do not abandoned water;2) when without flood, power station It sends out line interruption 1 day and does not abandon water;3) when without flood, 1 unit is lost for water is not abandoned within 1 day, and three kinds of situations determine water level control model It encloses.
Circular are as follows:
Not the case where not abandoning water for chance flood 1 day 5 years one,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood (chance design flood in 1 year one), takes magnanimity on the 1st as Incoming water quantity on the 1st.Flow rate calculation 1 day full hair is completely being sent out in conjunction with power station Water finally calculates water level.
When for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow is rounded the average annual flow in flood season, then calculates Incoming water quantity on the 1st.Send out line interruption in power station For 24 hours, band station service guarantees that certain ecological flow calculates full shampoo amount on the 1st, then calculates water level.In the present invention, the ecological flow By environmental protection administration's requirement value.
When for no flood, 1 unit loses standby the case where not abandoning water in 1 day,
Reservoir inflow is rounded the average annual flow in flood season, then calculates Incoming water quantity on the 1st.It is standby to consider that 1 unit loses, Remaining unit completely sends out calculating, does not abandon within 1 day water, and the metered flow of single machine presses design parameter value.
5) Water Level Control of flood withered alternately phase is formulated.
Flood withered alternately phase, annual-storage reservoir water level are stored to higher level, and regulating space is relatively small, therefore daily regulation reservoir Must be taken into consideration prevents autumn flood from abandoning water, while also suitably higher level to be kept to run, and reduces water consumption rate.
So the control target of flood withered alternately phase is: utilizing the multiple electricity of autumn flood.
Control method are as follows: comprehensively consider 1) daily regulation reservoir and by chance flood 1 day 1 year one do not abandoned water;2) when without flood, power station It sends out line interruption 1 day and does not abandon water, two factors determine water level control range.
Specific water level calculation method are as follows:
Not the case where by chance flood 1 day 1 year one water is not abandoned for daily regulation reservoir,
According to the P=20% frequencies above flood achievement that hydrological data provides, inquire into P=99%'s by III type curve of P- Flood (chance design flood in 1 year one), takes magnanimity on the 1st as Incoming water quantity on the 1st.Flow rate calculation 1 day full hair is completely being sent out in conjunction with power station Water finally calculates water level.It is consistent with withered flood alternating phase results of measuring.
When for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of flood withered alternately this month of phase, then calculates Incoming water quantity on the 1st.Send out line in power station Road is interrupted for 24 hours, and band station service guarantees that ecological flow calculates full shampoo amount on the 1st, then calculates water level.In the present invention, the ecological flow Amount is by environmental protection administration's requirement value.
For example, some hydropower station, being inquired into obtain 1 year one chance flood at dam site magnanimity on the 1st is 0.47 hundred million m3, then storage water on the 1st Amount is 47,000,000 m3, it is 200m that flow is completely sent out in power station3/ s, then full shampoo amount on the 1st is 17,280,000 m3, then obtaining net Incoming water quantity is 29720000 m3, it is 872.61m that water level, which is finally calculated,.The power station, the withered alternately phase average annual flow of flood is 133.4m3/ s, Then Incoming water quantity on the 1st is 11,530,000 m3, power station sends out line interruption for 24 hours, guarantees 7m with station service3The ecological flow of/s, then 1 day Full shampoo amount is 600,000 m3, it is 881.09m that water level, which is finally calculated,.It is final to determine in the withered alternately phase water level of flood by 872.61m Gradually it is raised to 881.09m operation.As a result such as table 3.
The control water level calculated result of 3 some hydropower station flood of table withered alternately phase
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of Water level trend control method of daily regulation reservoir different times, which comprises the following steps:
1) daily regulation reservoir is divided into 4 different times and carries out Water level trend controls, 4 different times are respectively dry season, withered Flood replaces phase, flood season and flood withered alternately phase;
2) Water Level Control in dry season is formulated;
3) Water Level Control of withered flood alternating phase is formulated;
4) Water Level Control in flood season is formulated;
5) Water Level Control of flood withered alternately phase is formulated.
2. a kind of Water level trend control method of daily regulation reservoir different times according to claim 1, which is characterized in that In the step 1), the ratio of annual runoff volume is accounted for determine dry season and flood season according to flood season runoff amount, specifically, if The ratio that the flood season runoff amount of continuous some months accounts for annual runoff volume is greater than 80%, then determines these moons for flood season;Flood season Replace phase and flood withered alternately phase for withered flood within forward and backward one month, remaining month is dry season.
3. a kind of Water level trend control method of daily regulation reservoir different times according to claim 2, which is characterized in that The flood season is 5-7 months.
4. a kind of Water level trend control method of daily regulation reservoir different times according to claim 1, which is characterized in that In the step 2, the water level control target in the dry season are as follows: dry season daily regulation reservoir keeps high water level operation;
Control method are as follows: do not abandon water according to sending out line interruption 24 hours, determine water level control range;
Specific water level calculation method are as follows:
Reservoir inflow is rounded the average value of the average annual flow in dry season and single month maximum value is respectively calculated, and is entered Library water;Line interruption is sent out for 24 hours in power station, guarantees that certain ecological flow does not abandon water with station service, according to the ecological flow, obtains To outbound water, and then calculate control water level maximum value.
5. a kind of Water level trend control method of daily regulation reservoir different times according to claim 1, which is characterized in that In the step 3), the control target of the withered flood alternating phase are as follows: all of flood small before flood, while water level keeps rationally high It is horizontal;
Control method are as follows: comprehensively consider, 1) occur flood when, do not abandon water within chance district flood 1 day 1 year one;2) when without flood, power station It sends out line interruption 1 day and does not abandon water, determine water level control range with the two influence factors;
Specific water level calculation method are as follows:
A, when for flood occurs, the case where not abandoning water in chance district flood 1 day 1 year one,
According to the frequencies above flood achievement of P=20% that hydrological data provides, the flood of P=99% is inquired by III type curve of P-, from And the 1 year one flood design value met is obtained, take magnanimity on the 1st as Incoming water quantity on the 1st;Hair flow rate calculation 1 is packed in conjunction with water power Day full shampoo amount, and then calculate control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of withered flood alternating this month of phase, obtains Incoming water quantity on the 1st;Send out line interruption in power station 1 day, band station service guarantee that certain ecological flow does not abandon water, according to the ecological flow, calculate full shampoo amount on the 1st, and then calculate Control water level;
It is final to determine the minimum for being gradually down to control water level calculated by high water level in withered flood alternating phase water level control.
6. a kind of Water level trend control method of daily regulation reservoir different times according to claim 1, which is characterized in that In the step 4), the control target in the flood season are as follows: utilize the multiple electricity of flood resource;
Control method are as follows: comprehensively consider, 1) daily regulation reservoir by chance flood 1 day 5 years one do not abandoned water;2) when without flood, power station is sent Do not abandon water within line interruption 1 day out;3) when without flood, 1 unit is lost for water is not abandoned within 1 day, these three influence factors determine water level control Range processed;
Circular are as follows:
A, not the case where not abandoning water for chance flood 1 day 5 years one,
According to the frequencies above flood achievement of P=20% that hydrological data provides, the flood of P=99% is inquired by III type curve of P-, from And the 5 years one flood design values met are obtained, take magnanimity on the 1st as Incoming water quantity on the 1st;Hair flow rate calculation 1 is packed in conjunction with water power Day full shampoo amount, and then calculate control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow is rounded the average annual flow in flood season, and Incoming water quantity on the 1st is calculated;
Line interruption is sent out 1 day in power station, band station service guarantees that certain ecological flow does not abandon water, according to the ecological flow, calculates 1 Day outbound water, and then calculate control water level;
C, when for no flood, 1 unit loses standby the case where not abandoning water in 1 day,
Reservoir inflow is rounded the average annual flow in flood season, and Incoming water quantity on the 1st is calculated;
It is standby to consider further that 1 unit loses, remaining unit completely sends out calculating, does not abandon water within 1 day, calculates 1 completely according to the metered flow of unit Shampoo amount, and then calculate control water level;
It is final to determine that dry season water level controls the water level maximum value calculated under three kinds of influence factors.
7. a kind of Water level trend control method of daily regulation reservoir different times according to claim 1, which is characterized in that In the step 5), the control target of the flood withered alternately phase is: utilizing the multiple electricity of autumn flood;
Control method are as follows: comprehensively consider, 1) daily regulation reservoir by chance flood 1 day 1 year one do not abandoned water;2) when without flood, power station is sent It does not abandon water within line interruption 1 day out, determines water level control range with the two influence factors;
Specific water level calculation method are as follows:
A, not the case where by chance flood 1 day 1 year one water not being abandoned for daily regulation reservoir,
According to the frequencies above flood achievement of P=20% that hydrological data provides, the flood of P=99% is inquired by III type curve of P-, from And the 1 year one flood design value met is obtained, take magnanimity on the 1st as Incoming water quantity on the 1st;Hair flow is packed in conjunction with water power, calculates 1 Day full shampoo amount, and then calculate control water level;
B, when for no flood, the case where not abandoning water, is sent out in power station line interruption 1 day,
Reservoir inflow takes the average annual flow of flood withered alternately this month of phase, and Incoming water quantity on the 1st is calculated;
Line interruption is sent out 1 day in power station, band station service guarantees that certain ecological flow does not abandon water, according to the ecological flow, calculates 1 Day full shampoo amount, and then calculate control water level;
It is final to determine the peak for being gradually raised to control water level calculated by low water level in the withered alternately phase water level of flood.
8. a kind of Water level trend control method of daily regulation reservoir different times according to claim 4,5,6 or 7, special Sign is that the ecological flow is by environmental protection administration's requirement value.
CN201811317649.0A 2018-11-07 2018-11-07 A kind of Water level trend control method of daily regulation reservoir different times Active CN109543887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811317649.0A CN109543887B (en) 2018-11-07 2018-11-07 A kind of Water level trend control method of daily regulation reservoir different times

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811317649.0A CN109543887B (en) 2018-11-07 2018-11-07 A kind of Water level trend control method of daily regulation reservoir different times

Publications (2)

Publication Number Publication Date
CN109543887A true CN109543887A (en) 2019-03-29
CN109543887B CN109543887B (en) 2019-10-11

Family

ID=65844536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811317649.0A Active CN109543887B (en) 2018-11-07 2018-11-07 A kind of Water level trend control method of daily regulation reservoir different times

Country Status (1)

Country Link
CN (1) CN109543887B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102855393A (en) * 2012-08-14 2013-01-02 贵州乌江水电开发有限责任公司 Method and system for measuring and calculating hydroenergy utilization improvement rate of cascaded hydropower stations
CN102867222A (en) * 2012-08-14 2013-01-09 贵州乌江水电开发有限责任公司 Method and device for measuring and calculating checking power and stored power of power station
JP2015125665A (en) * 2013-12-27 2015-07-06 株式会社日立製作所 Water system planning apparatus and water system planning method
CN105243438A (en) * 2015-09-23 2016-01-13 天津大学 Multi-year regulating storage reservoir optimal scheduling method considering runoff uncertainty
CN105787589A (en) * 2016-02-26 2016-07-20 黄河勘测规划设计有限公司 Optimum control method for carry-over storage drought limitation water level and dedicated control system
CN106920001A (en) * 2017-01-19 2017-07-04 贵州黔源电力股份有限公司 A kind of Cascade Reservoirs Real time optimal dispatch and Benefit Evaluation Method
CN106920030A (en) * 2017-01-19 2017-07-04 贵州黔源电力股份有限公司 A kind of Cascade Reservoirs are avoided the peak hour Optimization Scheduling
CN107274302A (en) * 2017-07-06 2017-10-20 大连理工大学 It is a kind of transprovincially to interconnect the long-term combined adjusting peak dispatching method of GROUP OF HYDROPOWER STATIONS
CN107423258A (en) * 2017-06-30 2017-12-01 华电电力科学研究院 Energy utilization improvement rate innovatory algorithm and step power station scheduling benefit evaluation system
CN108695902A (en) * 2018-05-08 2018-10-23 华中科技大学 A kind of Cascade Reservoirs ecology-mutual feedback regulation and control method of power generation dynamic

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102855393A (en) * 2012-08-14 2013-01-02 贵州乌江水电开发有限责任公司 Method and system for measuring and calculating hydroenergy utilization improvement rate of cascaded hydropower stations
CN102867222A (en) * 2012-08-14 2013-01-09 贵州乌江水电开发有限责任公司 Method and device for measuring and calculating checking power and stored power of power station
JP2015125665A (en) * 2013-12-27 2015-07-06 株式会社日立製作所 Water system planning apparatus and water system planning method
CN105243438A (en) * 2015-09-23 2016-01-13 天津大学 Multi-year regulating storage reservoir optimal scheduling method considering runoff uncertainty
CN105787589A (en) * 2016-02-26 2016-07-20 黄河勘测规划设计有限公司 Optimum control method for carry-over storage drought limitation water level and dedicated control system
CN106920001A (en) * 2017-01-19 2017-07-04 贵州黔源电力股份有限公司 A kind of Cascade Reservoirs Real time optimal dispatch and Benefit Evaluation Method
CN106920030A (en) * 2017-01-19 2017-07-04 贵州黔源电力股份有限公司 A kind of Cascade Reservoirs are avoided the peak hour Optimization Scheduling
CN107423258A (en) * 2017-06-30 2017-12-01 华电电力科学研究院 Energy utilization improvement rate innovatory algorithm and step power station scheduling benefit evaluation system
CN107274302A (en) * 2017-07-06 2017-10-20 大连理工大学 It is a kind of transprovincially to interconnect the long-term combined adjusting peak dispatching method of GROUP OF HYDROPOWER STATIONS
CN108695902A (en) * 2018-05-08 2018-10-23 华中科技大学 A kind of Cascade Reservoirs ecology-mutual feedback regulation and control method of power generation dynamic

Also Published As

Publication number Publication date
CN109543887B (en) 2019-10-11

Similar Documents

Publication Publication Date Title
CN104063808B (en) Trans-provincial power transmission cascade hydropower station group peak-shaving dispatching two-phase search method
CN107038151B (en) Energy storage control-based cascade optimization scheduling graph drawing method and scheduling method
CN104376412A (en) High energy-consuming enterprise peak regulation control method used in new energy power generation mode
CN110232585A (en) A kind of depth peak regulation market cost allocation method and system
CN110942212B (en) Cascade reservoir operation coefficient-based cascade reservoir optimal operation method
CN103205950B (en) Reservoir control method for guaranteeing water supply safety of downstream river-converged lakes
CN108596417A (en) A kind of step reservoir flood-water resources utilization method based on storage capacity penalty method
CN109167367A (en) Power station load dynamic adjusting method based on unilateral matching mechanisms
CN104156893A (en) Peak and valley time period calculation method based on virtual energy-storage technology
CN109543887B (en) A kind of Water level trend control method of daily regulation reservoir different times
Mukhammadiev et al. Assessment of investment technologies for use of hydro-accumulating stations on intermediate channels of irrigation systems and water reservoirs
CN103955773A (en) Hydropower water release and additional issue transaction management method and system
CN104701859B (en) It is applied to the generating set idle output distribution method of power plant AVC system
CN116402282A (en) Reservoir water level regulating and controlling method and system based on water balance
CN103545817B (en) A kind of cascaded hydropower stations automatic power generation control method
CN109492905A (en) A kind of controllable resources control method based on purchase of electricity transfer
CN109117592B (en) Virtual reservoir model and virtual reservoir water level calculation method
CN101831887B (en) Determining method of effective reservoir storage capacity meeting requirements of human and ecology
CN109272229B (en) Power station deviation electric quantity calculation method based on virtual reservoir
CN112862225B (en) Lake storage regulation excavation-based water shortage area cross-space-time scheduling method and system
Salevid Market requirements for pumped storage profitability: Expected costs and modelled price arbitrage revenues, including a case study of Juktan
Bing et al. Study on the influence of reservoir dispatch of the upper Yangtze river on the runoff control
Vítek et al. The role of pumped storage power plants in the power system operation
Ju et al. Optimal Short-term Operation of Wind-PV-Hydro-Thermal System With Cascade Reservoirs Considering Shiftable Loads
Mchayk et al. Hydropeaking mitigation with re‐regulation reservoirs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant