CN109538190A - Rod-pumped well roofbolt stress method for early warning - Google Patents

Rod-pumped well roofbolt stress method for early warning Download PDF

Info

Publication number
CN109538190A
CN109538190A CN201710870117.9A CN201710870117A CN109538190A CN 109538190 A CN109538190 A CN 109538190A CN 201710870117 A CN201710870117 A CN 201710870117A CN 109538190 A CN109538190 A CN 109538190A
Authority
CN
China
Prior art keywords
stress
rod
early warning
roofbolt
threshold value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710870117.9A
Other languages
Chinese (zh)
Other versions
CN109538190B (en
Inventor
张丁涌
冯庆伟
孙凯
张伟
衣军
冯虎
张江
徐伟凝
韩春芝
郑裕庆
刘晓冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Xianhe Oil Production Plant
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Xianhe Oil Production Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shengli Oilfield Co Xianhe Oil Production Plant filed Critical China Petroleum and Chemical Corp
Priority to CN201710870117.9A priority Critical patent/CN109538190B/en
Publication of CN109538190A publication Critical patent/CN109538190A/en
Application granted granted Critical
Publication of CN109538190B publication Critical patent/CN109538190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/008Monitoring of down-hole pump systems, e.g. for the detection of "pumped-off" conditions
    • E21B47/009Monitoring of walking-beam pump systems

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The present invention provides a kind of rod-pumped well roofbolt stress method for early warning, which includes: step 1, acquires oil well associated production parameter;Step 2, maximum reduced stress is calculated according to oil well associated production parameter;Step 3, maximum reduced stress is judged and is alarmed according to the roofbolt stress early-warning parameters that Early-warning Model is arranged;Step 4, administrative staff are disposed rod-pumped well after receiving warning message, it is made to return to normal production.The rod-pumped well roofbolt stress method for early warning combines roofbolt calculation method for stress with the four change systems at scene, realizes the intelligent early-warning function to pumping unit roofbolt stress, to reduce the generation of the disconnected well of lying of bar.

Description

Rod-pumped well roofbolt stress method for early warning
Technical field
The present invention relates to Oil-Gas Field Development Engineering technical fields, especially relate to a kind of rod-pumped well roofbolt stress early warning Method.
Background technique
Sucker rod pumping is most important oil production method during oil field development, and the disconnected well of lying of bar is to lead to rod pumped well It lies the most important factor of well, accounts for the 30.2% of total failed well number.
The effect that rod string is corroded by asymmetric cyclic loading and well liquid, failure mode are mainly shown as that fatigue is disconnected It splits or fatigue corrosion fracture.No matter which kind of failure mode, the disconnected substantially reduced stress of bar is greater than allowable stress.And it converts and answers Power major influence factors have two o'clock: first is that production load is excessive, oil well paraffinication unreasonable mainly due to operating condition, back pressure are excessively high Factor, leading to reduced stress is more than that allowable stress generation bar is disconnected.Second is that being influenced by burn into eccentric wear factor, sucker rod cross section subtracts Small, corresponding reduced stress becomes larger, until overstressing production causes bar disconnected.
Four change systems obtained popularity and application in recent years, the system using sensor, network implementations to pumping unit The real-time acquisition and transmission of the parameters such as well polished rod load, liquid measure, pressure, electric current, voltage.Depending merely on the four changes system cannot achieve bar The function of disconnected early warning, therefore a kind of roofbolt stress method for early warning is urgently developed, realize the function of the disconnected early warning of bar.
Summary of the invention
Roofbolt calculation method for stress is combined with the four change systems at scene the object of the present invention is to provide a kind of, realization pair The intelligent early-warning function of pumping unit roofbolt stress, to reduce the pre- police of rod-pumped well roofbolt stress of the generation of the disconnected well of lying of bar Method.
The purpose of the present invention can be achieved by the following technical measures: rod-pumped well roofbolt stress method for early warning, the oil pumping Motor-pumped well roofbolt stress method for early warning includes: step 1, acquires oil well associated production parameter;Step 2, joined according to oil well associated production Number calculates maximum reduced stress;Step 3, maximum reduced stress is judged and is reported according to the roofbolt stress early-warning parameters of setting It is alert;Step 4, administrative staff are disposed rod-pumped well after receiving warning message, it is made to return to normal production.
The purpose of the present invention can be also achieved by the following technical measures:
In step 1, the oil well associated production parameter of acquisition includes sucker rod maximum load, minimum load, and sucker rod is horizontal Sectional area.
In step 2, maximum reduced stress calculation formula are as follows:
In formula, fr--- --- sucker rod cross-sectional area;Pmax----maximum polished rod load;Pmin----minimum polished rod load.
In step 3, roofbolt stress early-warning parameters include allowable stress limiting threshold value and maximum reduced stress value.
In step 3, bar will be repaired according to sucker rod frequency of usage and is divided into one to level Four, in combination with the corruption of each well Erosion, eccentric wear, pit shaft situation set new bar and repair the different allowable stress limiting threshold values of bar.
In step 3, the limiting threshold value of new bar is 100MPa, and the limiting threshold value that level-one repairs bar is 95MPa, second level reparation The limiting threshold value of bar is 90MPa, and the limiting threshold value that three-level repairs bar is 85MPa, and the limiting threshold value that level Four repairs bar is 80MPa, Have a well of burn into eccentric wear situation, limiting threshold value multiplied by 0.8-1.0 coefficient.
In step 3, sucker rod breaks risk in the case where being lower than limiting threshold value there are still bar, therefore three-level early warning is arranged Mechanism carries out different grades of early warning according to the degree of reduced stress close to limiting threshold value.
In step 3, level-one early warning be > limiting threshold value 70%, coping mechanism be encryption observation;Second level early warning is > pole The 80% of threshold value is limited, coping mechanism is to be pre-processed, including adjust manufacturing parameter, hot-washing wax remover load down;Three-level early warning is > The 90% of limiting threshold value, coping mechanism are hard stop, analysis and improvement.
In step 3, be arranged maximum reduced stress persistently rise, ascendant trend early warning.
In step 3, it sets in 6 hour period, reduced stress persistently rises, and early warning or within 48 hours conversion are answered Fluctuation rises then early warning.
Rod-pumped well roofbolt stress method for early warning in the present invention, on the basis of researching and analysing rod parting essence, For innovation and application with the reduced stress calculation formula of correction, building oil pumping stress in the bar method for early warning establishes grading forewarning system mechanism, real Now to the monitoring and early warning of oil pumping stress in the bar.This method establishes Early-warning Model by four change systems, first from source database reality When extract sucker rod maximum load, minimum load, using formula calculate sucker rod real-time reduced stress.Then early warning mould is used The decision logics such as the threshold value, the trend that set in type judge reduced stress, carry out early warning after noting abnormalities.Administrative staff's root Corresponding improvement countermeasure is taken according to warning level, so that sucker rod stress state restores normal.
Detailed description of the invention
Fig. 1 is the flow chart of a specific embodiment of rod-pumped well roofbolt stress method for early warning of the invention;
Fig. 2 is the schematic diagram of Early-warning Model set interface in a specific embodiment of the invention;
Fig. 3 is the schematic diagram of the Early-warning Model after being arranged in a specific embodiment of the invention.
Specific embodiment
To enable above and other objects, features and advantages of the invention to be clearer and more comprehensible, preferably implementation is cited below particularly out Example, and cooperate shown in attached drawing, it is described in detail below.
As shown in FIG. 1, FIG. 1 is the flow charts of rod-pumped well roofbolt stress method for early warning of the invention.
Step 101: four change system acquisition oil well associated production parameter, and are transmitted to multi-parameter Early-warning Model.One In embodiment, the oil well associated production parameter of acquisition includes sucker rod maximum load, minimum load, sucker rod cross-sectional area.
Step 102: multi-parameter Early-warning Model calculates maximum reduced stress according to associated production parameter.Specific formula for calculation is such as Under:
-1]≥σc
In formula, [σ-1] ----allowable stress;σc----reduced stress;σaThe stress amplitude of ----pulsating stress;
fr--- --- sucker rod cross-sectional area;Pmax----maximum polished rod load;Pmin----minimum polished rod load;
Finally derive maximum reduced stress formula:
Step 103: multi-parameter early warning software sentences maximum reduced stress according to the roofbolt stress Early-warning Model of setting Break and alarms.Early-warning Model is provided that
(1) early-warning parameters are arranged
Early warning title: overstressing early warning
Judging index: maximum reduced stress
Determined type: threshold value/trend
Decision logic: threshold value (super allowable stress 90%, super allowable stress 80%, super allowable stress 70%), trend (continue Rising, ascendant trend etc.).
(2) determination method and standard
1. calculating maximum reduced stress: changing big data platform using four, extract real-time sucker rod maximum load, minimum carry Lotus calculates maximum reduced stress in real time using maximum reduced stress formula.
2. setting decision logic:
First is that setting allowable stress limiting threshold value.In one embodiment, for all using H grade pumping rod (nickel-molybdenum steel), The maximum permissible stress 100MPa of new bar.What it is in view of live practical application is mostly to repair bar, in given threshold according to oil pumping Bar frequency of usage will repair bar and be divided into one to level Four.In combination with each well burn into eccentric wear, pit shaft situations such as, setting is respective Allowable stress limiting threshold value, realize " one value of a well ", specifically see the table below:
The selection of 1 allowable stress limiting threshold value of table
Sucker rod is breaking risk lower than limiting value there are still bar, therefore three-level early warning mechanism is arranged, and is connect according to reduced stress The degree of near limit threshold value carries out different grades of early warning.Oil recovery administrative staff take corresponding control measures according to warning level (such as adjusting ginseng, hot-washing wax remover) reduces oil pumping stress in the bar in time, and prevention bar is disconnected to be occurred.
2 stress warning level of table
Second is that the maximum reduced stress of setting persistently rises, ascendant trend early warning, design parameter is depending on specific oil well conditions. Such as: setting 6 hour period in, reduced stress persistently rise then early warning or within 48 hours reduced stress fluctuation rise it is then pre- It is alert.
Step 104: administrative staff are disposed rod-pumped well after receiving warning message, it is made to return to normal production.
In one embodiment, Fig. 2 is the interface for carrying out Early-warning Model setting, at this interface, inputs the ginseng such as pound sign, threshold value Number, to establish the Early-warning Model of a well.Fig. 3 is the Early-warning Model for establishing certain mouthful of well completed.

Claims (10)

1. rod-pumped well roofbolt stress method for early warning, which is characterized in that the rod-pumped well roofbolt stress method for early warning includes:
Step 1, oil well associated production parameter is acquired;
Step 2, maximum reduced stress is calculated according to oil well associated production parameter;
Step 3, maximum reduced stress is judged and is alarmed according to the roofbolt stress early-warning parameters that Early-warning Model is arranged;
Step 4, administrative staff are disposed rod-pumped well after receiving warning message, it is made to return to normal production.
2. rod-pumped well roofbolt stress method for early warning according to claim 1, which is characterized in that in step 1, acquisition Oil well associated production parameter includes sucker rod maximum load, minimum load, sucker rod cross-sectional area.
3. rod-pumped well roofbolt stress method for early warning according to claim 1, which is characterized in that in step 2, maximum folding Calculate Stress calculation formula are as follows:
In formula, fr--- --- sucker rod cross-sectional area;Pmax----maximum polished rod load;Pmin----minimum polished rod load.
4. rod-pumped well roofbolt stress method for early warning according to claim 1, which is characterized in that in step 3, roofbolt is answered Power early-warning parameters include allowable stress limiting threshold value and maximum reduced stress value.
5. rod-pumped well roofbolt stress method for early warning according to claim 4, which is characterized in that in step 3, according to pumping Beam hanger frequency of usage will repair bar and be divided into one to level Four, and burn into eccentric wear, pit shaft situation in combination with each well set new bar With the different allowable stress limiting threshold values for repairing bar.
6. rod-pumped well roofbolt stress method for early warning according to claim 5, which is characterized in that in step 3, new bar Limiting threshold value is 100MPa, and the limiting threshold value that level-one repairs bar is 95MPa, and the limiting threshold value that second level repairs bar is 90MPa, three-level The limiting threshold value for repairing bar is 85MPa, and the limiting threshold value that level Four repairs bar is 80MPa, there is the well of burn into eccentric wear situation, the limit Threshold value multiplied by 0.8-1.0 coefficient.
7. rod-pumped well roofbolt stress method for early warning according to claim 4, which is characterized in that in step 3, sucker rod Break risk in the case where being lower than limiting threshold value there are still bar, therefore three-level early warning mechanism is set, according to reduced stress close to pole The degree for limiting threshold value carries out different grades of early warning.
8. rod-pumped well roofbolt stress method for early warning according to claim 7, which is characterized in that in step 3, level-one is pre- Police is > limiting threshold value 70%, coping mechanism is encryption observation;Second level early warning is > limiting threshold value 80%, coping mechanism be into Row pretreatment, including adjustment manufacturing parameter, hot-washing wax remover load down;Three-level early warning is > limiting threshold value 90%, coping mechanism is Hard stop, analysis and improvement.
9. rod-pumped well roofbolt stress method for early warning according to claim 4, which is characterized in that in step 3, setting is most Big reduced stress persistently rises, ascendant trend early warning.
10. rod-pumped well roofbolt stress method for early warning according to claim 9, which is characterized in that in step 3, setting 6 In period hour, reduced stress persistently rises then early warning or within 48 hours reduced stress fluctuation rising then early warning.
CN201710870117.9A 2017-09-22 2017-09-22 Stress early warning method for rod string of pumping well Active CN109538190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710870117.9A CN109538190B (en) 2017-09-22 2017-09-22 Stress early warning method for rod string of pumping well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710870117.9A CN109538190B (en) 2017-09-22 2017-09-22 Stress early warning method for rod string of pumping well

Publications (2)

Publication Number Publication Date
CN109538190A true CN109538190A (en) 2019-03-29
CN109538190B CN109538190B (en) 2022-04-01

Family

ID=65830727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710870117.9A Active CN109538190B (en) 2017-09-22 2017-09-22 Stress early warning method for rod string of pumping well

Country Status (1)

Country Link
CN (1) CN109538190B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4483188A (en) * 1983-04-18 1984-11-20 Fmc Corporation Method and apparatus for recording and playback of dynagraphs for sucker-rod wells
US20070020110A1 (en) * 2005-06-29 2007-01-25 Weatherford/Lamb, Inc. Method for estimating pump efficiency
CN101305187A (en) * 2005-10-13 2008-11-12 井泵技术有限公司 System and method for optimizing down-hole fluid yield
US20110011581A1 (en) * 2009-07-14 2011-01-20 Halliburton Energy Services, Inc. System and Method for Servicing a Wellbore
CN103678927A (en) * 2013-12-20 2014-03-26 中国石油天然气集团公司 Thermal production well casing tubular column total strain calculating method
CN103726795A (en) * 2012-10-15 2014-04-16 代文姣 Design method for strength of casing string
CN104749021A (en) * 2015-03-03 2015-07-01 中国石油天然气股份有限公司 Intensity calibration method for ultra-high-strength sucker rod string
EP2963234A1 (en) * 2014-07-01 2016-01-06 Weatherford/Lamb, Inc. Stress calculations for sucker rod pumping systems

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4483188A (en) * 1983-04-18 1984-11-20 Fmc Corporation Method and apparatus for recording and playback of dynagraphs for sucker-rod wells
US20070020110A1 (en) * 2005-06-29 2007-01-25 Weatherford/Lamb, Inc. Method for estimating pump efficiency
CN101305187A (en) * 2005-10-13 2008-11-12 井泵技术有限公司 System and method for optimizing down-hole fluid yield
US20110011581A1 (en) * 2009-07-14 2011-01-20 Halliburton Energy Services, Inc. System and Method for Servicing a Wellbore
CN103726795A (en) * 2012-10-15 2014-04-16 代文姣 Design method for strength of casing string
CN103678927A (en) * 2013-12-20 2014-03-26 中国石油天然气集团公司 Thermal production well casing tubular column total strain calculating method
EP2963234A1 (en) * 2014-07-01 2016-01-06 Weatherford/Lamb, Inc. Stress calculations for sucker rod pumping systems
CN104749021A (en) * 2015-03-03 2015-07-01 中国石油天然气股份有限公司 Intensity calibration method for ultra-high-strength sucker rod string

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李青等: "《机械采油技术管理方法》", 31 December 1994, 石油工业出版社 *
王启尧: "八面河油田空心抽油杆柱断脱原因及对策", 《江汉石油职工大学学报》 *
罗凯伦: "抽油杆断脱原因分析及预防方法探讨", 《石化技术》 *
赵廷峰等: "抽油杆柱磨损分析与安全性评价", 《石油机械》 *

Also Published As

Publication number Publication date
CN109538190B (en) 2022-04-01

Similar Documents

Publication Publication Date Title
Sørensen Reliability-based calibration of fatigue safety factors for offshore wind turbines
CN104156599B (en) A kind of accelerated life test loading spectrum considering many mechanism determines method
CN109060497A (en) It is a kind of to consider the Analysis of Fatigue method lower than fatigue limit load
CN104976139B (en) A kind of mechanical equipment state diagnostic method based on Gauss model
CN109165407A (en) A kind of predictor method for the mechanical component fatigue crack service life
CN103837777B (en) Electric power system electricity quality evaluation method and system
CN110826203A (en) Method for evaluating fatigue life of connecting bolt of top cover of water turbine and monitoring system
CN109470549A (en) Increasing material manufacturing material P-S-N curve characterizes method and its application
CN112784347B (en) Cable-stayed bridge cable force reliability evaluation method based on bridge tower deformation and considering cable breakage
CN104405597B (en) Doorframe, doorframe unit, the manufacture method of doorframe and the blower fan pylon of blower fan pylon
CN109538190A (en) Rod-pumped well roofbolt stress method for early warning
CN105488572B (en) Power distribution equipment health state evaluation method
CN110533325A (en) The decision-making technique and system of relay protection device repair time
CN104050300A (en) Risk assessment method, device and system for power grid running method
CN105243478B (en) A kind of Hydropower Unit deterioration appraisal procedure based on bathtub failure curve
CN103471840B (en) Box beam vertical bending test mechanism
CN107545123A (en) Consider the lifting decelerator dynamic reliability method under a variety of uncertainties
CN112699483B (en) Airplane structure DFR analysis method based on damage equivalent conversion
CN108710946A (en) The human factors analysis balancing method of deepwater riser system risk-based maintenance decision optimization
CN105421865A (en) Determining method for displacement of power transmission line angle steel tower
Dissanayake et al. Reliability index for structural health monitoring of aging bridges
CN116049958A (en) Historical building structure monitoring data anomaly diagnosis and repair system
CN115511156A (en) Main transformer overload early warning method and system based on load prediction
CN110093632A (en) Online digitlization electrolytic cell health degree evaluates calculation method
CN108343843A (en) A kind of oil-gas pipeline defect repair determination method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant