CN109537990A - A kind of guardrail of Construction of Civil Engineering atomizing de-dusting - Google Patents

A kind of guardrail of Construction of Civil Engineering atomizing de-dusting Download PDF

Info

Publication number
CN109537990A
CN109537990A CN201811444638.9A CN201811444638A CN109537990A CN 109537990 A CN109537990 A CN 109537990A CN 201811444638 A CN201811444638 A CN 201811444638A CN 109537990 A CN109537990 A CN 109537990A
Authority
CN
China
Prior art keywords
tube
fixed
guardrail
dusting
atomizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811444638.9A
Other languages
Chinese (zh)
Other versions
CN109537990B (en
Inventor
刘书贤
左潇宇
路沙沙
白春
刘书会
王琪
聂伟
张春华
梁天宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201811444638.9A priority Critical patent/CN109537990B/en
Publication of CN109537990A publication Critical patent/CN109537990A/en
Application granted granted Critical
Publication of CN109537990B publication Critical patent/CN109537990B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/04Fixed devices, e.g. permanently- installed flushing means

Abstract

The present invention provides a kind of guardrail of Construction of Civil Engineering atomizing de-dusting, is related to technical field of civil engineering.The guardrail includes tube connection device and atomizing de-dusting guardrail;Tube connection device is embedded in underground, including water-main, and water-main top is fixedly connected with vertical tube, and vertical tube top is fixed with transverse tube, and transverse tube is connected with vertical tube, and transverse tube one end is fixedly connected with connection hose, and the connection hose other end is pierced by ground surface;Atomizing de-dusting guardrail is fixed on ground surface, including two pedestals, and support tube is respectively fixed on two pedestals, is fixed with upper lateral tube and lower transverse tubule in parallel between two support tubes;Several levers are vertically and fixedly provided between upper lateral tube and lower transverse tubule, two support tube tops are respectively fixed with fog-spray nozzle, and lower transverse tubule bottom end is fixed with water inlet pipe and the first pull rod.The guardrail of Construction of Civil Engineering atomizing de-dusting provided by the invention can prevent water inlet pipe to spray water with hose junction is connect, effectively avoid water resource and largely waste.

Description

A kind of guardrail of Construction of Civil Engineering atomizing de-dusting
Technical field
The present invention relates to technical field of civil engineering more particularly to a kind of guardrails of Construction of Civil Engineering atomizing de-dusting.
Background technique
Guardrail is primarily used for the facility of the protection and protection of civil engineering facility;Currently, having many energy in terms of guardrail Other beneficial effects are provided well;Increasingly severe especially for present air pollution, some present guardrails have had The effect of atomizing de-dusting purification.But since guardrail is installed to the more place of people's vehicle mostly, so being easy to be collided by locomotive It arrives, this makes the connection between atomizing de-dusting guardrail and water inlet line be easy to loosen, so as to cause water inlet pipe and atomizing de-dusting guardrail Connection hose junction water spray, cause water resource and largely waste.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above shortcomings of the prior art, provide a kind of Construction of Civil Engineering use The guardrail of atomizing de-dusting realizes the effective protection to civil engineering facility.
In order to solve the above technical problems, the technical solution used in the present invention is: a kind of Construction of Civil Engineering spray drop The guardrail of dirt, including tube connection device and atomizing de-dusting guardrail;
The tube connection device is embedded in underground, the water-main including placement parallel to the ground, the water-main upper wall Outside is fixedly connected with vertical tube, and the vertical tube is connected with water-main, and the vertical tube top is fixed with transverse tube, the transverse tube with Vertical tube is connected, and the transverse tube is closed at one end, and the other end is fixedly connected with connection hose, and the connection hose other end is pierced by Ground surface, the transverse tube upper wall outside are fixed with casing, and described sleeve pipe two sides are symmetrically fixed with baffle, described sleeve pipe top and ground Flush is fixed with cross bar and retaining ring in the vertical tube, and the cross bar is arranged below retaining ring, and the cross bar upper end is fixed with Vertical bar, the vertical bar top pass through retaining ring and protrude into transverse tube and be fixedly connected with transverse tube inner roof wall, the circular shaft heart of the vertical bar and The circular shaft heart of vertical tube is on the same line, and sliding has rubber disc on the vertical bar, between the rubber disc and transverse tube inner roof wall It is fixed with spring, the spring pocket is fixed with pull rod on vertical bar on the rubber disc top surface, the pull rod top penetrates cross Tube top wall protrudes into casing and penetrates cannula tip and is fixedly connected with limited block, and the limited block is arranged above ground surface;
The atomizing de-dusting guardrail is fixed on ground surface;Including two pedestals, two pedestals pass through screw respectively It is fixedly connected with the ground, support tube is respectively fixed on two pedestals, be fixed with upper lateral tube between two support tubes in parallel under Transverse tube, the upper lateral tube and lower transverse tubule axial line are vertically arranged with two support tube axis lines respectively, the upper lateral tube and lower cross Be vertically and fixedly provided with several levers between pipe, inside the lower transverse tubule be connected inside two support tubes, described two Stay tube top is respectively fixed with fog-spray nozzle, and the lower transverse tubule bottom end is fixed with water inlet pipe and the first pull rod, the water inlet pipe setting With connect hose relative position, and be connected inside lower transverse tubule, the water inlet pipe is pierced by ground surface one with hose is connect End is fixedly connected, and first pull rod bottom end is fixed with block, and the block top surface is bonded with the lower surface of limited block one end.
Preferably, described sleeve pipe is used to be welded and fixed and be connect with transverse tube.
Preferably, the outer diameter of the rubber disc is consistent with vertical tube internal diameter.
Preferably, the pull rod and casing roof and transverse tube junction are designed with sealing ring.
The beneficial effects of adopting the technical scheme are that a kind of Construction of Civil Engineering spray provided by the invention The guardrail of mist depositing dust, due to the setting of rubber disc, when locomotive collides guardrail, and connection hose connects loosening with water inlet, gear Block also can generate displacement with guardrail, and such block is not bonded with limited block, thus due under the active force of spring, rubber disc It can be embedded in vertical tube and be bonded with retaining ring top surface, to realize closing vertical tube, water cannot be flowed by vertical tube in such water-main It connects in hose, so that water inlet pipe be prevented to spray water with hose junction is connect, effectively avoids water resource and largely waste.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the guardrail of Construction of Civil Engineering atomizing de-dusting provided in an embodiment of the present invention;
Fig. 2 is a kind of working principle signal of guardrail of Construction of Civil Engineering atomizing de-dusting provided in an embodiment of the present invention Figure.In figure, 1, water-main;2, vertical tube;3, cross bar;4, retaining ring;5, transverse tube;6, casing;7, vertical bar;8, rubber disc;9, spring; 10, pull rod;10-1, the first pull rod;11, limited block;12, baffle;13, hose is connected;14, pedestal;15, upper lateral tube;16, lower cross Pipe;17, support tube;18, lever;19, fog-spray nozzle;20, screw;21, water inlet pipe;22, block.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
A kind of guardrail of Construction of Civil Engineering atomizing de-dusting, as shown in Figure 1, including tube connection device and atomizing de-dusting Guardrail;
The tube connection device is embedded in underground;Water-main 1 including placement parallel to the ground, on the water-main 1 It is fixedly connected with vertical tube 2 on the outside of wall, the vertical tube 2 is connected with water-main 1, and 2 top of vertical tube is fixed with transverse tube 5, institute It states transverse tube 5 to be connected with vertical tube 2, the transverse tube 5 is closed at one end, and the other end is fixedly connected with connection hose 13, the connection 13 other end of hose is pierced by ground surface, uses welding manner to be fixed with casing 6,6 two sides of described sleeve pipe on the outside of 5 upper wall of transverse tube It is symmetrically fixed with baffle 12,6 top of described sleeve pipe is concordant with ground surface, and cross bar 3 and retaining ring 4 are fixed in the vertical tube 2, described Cross bar 3 is arranged below retaining ring 4, and 3 upper end of cross bar is fixed with vertical bar 7, and 7 top of vertical bar passes through retaining ring 4 and protrudes into cross It is fixedly connected in pipe 5 with 5 inner roof wall of transverse tube, the circular shaft heart of the vertical bar 7 and the circular shaft heart of vertical tube 2 are on the same line, institute Stating sliding on vertical bar 7 has rubber disc 8, and spring 9,9 sets of the spring are fixed between 5 inner roof wall of the rubber disc 8 and transverse tube On vertical bar 7, pull rod 10 is fixed on 8 top surface of rubber disc, 10 top of pull rod penetrates 5 roof of transverse tube and protrudes into casing 6 Interior and penetrate 6 top of casing and be fixedly connected with limited block 11, the limited block 11 is arranged above ground surface;The rubber disc 8 Outer diameter it is consistent with 2 internal diameter of vertical tube;The pull rod 10 is designed with sealing ring with 6 roof of casing and 5 junction of transverse tube.
The atomizing de-dusting guardrail is fixed on ground surface;Including two pedestals 14, two pedestals 14 pass through respectively Screw 20 is fixedly connected with the ground, and support tube 17 is respectively fixed on two pedestals 14, is fixed in parallel between two support tubes 17 There are upper lateral tube 15 and lower transverse tubule 16, the upper lateral tube 15 and 16 axial line of lower transverse tubule are vertical with two 17 axial lines of support tube respectively Setting, is vertically and fixedly provided with several levers 18 between the upper lateral tube 15 and lower transverse tubule 16,16 inside of lower transverse tubule with two It is connected inside support tube 17, described two 17 tops of support tube are respectively fixed with fog-spray nozzle 19,16 bottom end of lower transverse tubule Be fixed with water inlet pipe 21 and the first pull rod 10-1, the setting of water inlet pipe 21 with connect hose relative position, and and lower transverse tubule It is connected inside 16, the water inlet pipe 21 is fixedly connected with connecting hose 13 and be pierced by ground surface one end, the first pull rod 10- 1 bottom end is fixed with block 22, and 22 top surface of block is bonded with the lower surface of 11 one end of limited block.
The working principle of the guardrail of Construction of Civil Engineering atomizing de-dusting of the invention as shown in Fig. 2, specifically: the present invention Construction of Civil Engineering atomizing de-dusting guardrail in use, atomizing de-dusting guardrail is passed through the fixed peace of screw 20 first Dress on the ground, is then connected the water inlet pipe 21 on lower transverse tubule 16 with transverse tube 5 by connecting hose 13 again, after connecting, Limited block 11 is up pulled, 11 bottom end side of limited block is pulled to and is placed on 22 top surface side of block, due to setting for spring 9 It sets, being bonded tightly with block 22 of limited block 11, pull rod 10 also will drive rubber while pulling limited block 11 up moves in this way Lacquer disk(-sc) 8 up moves, and when 11 bottom end of limited block is bonded with 22 top surface of block, rubber disc 8 can also slide into just on vertical bar 7 It is detached from vertical tube 2 to slide into transverse tube 5, so that the water in water-main 1 can be flowed into connection hose 13 by vertical tube 2, connect soft Water in pipe 13 passes through water inlet pipe 21 again and enters in lower transverse tubule 16, and the water in lower transverse tubule 16 passes through the spray of 17 the upper end of support tube again Mist head 19 is sprayed on road surface, to realize the effect of atomizing de-dusting.When atomizing de-dusting guardrail is collided by locomotive, atomizing de-dusting Lower transverse tubule 16 on guardrail also can generate displacement with atomizing de-dusting guardrail, so as to cause water inlet pipe 21 on 16 bottom end of lower transverse tubule with The connection connected between hose 13 loosens, meanwhile, the first pull rod 10-1 and block 22 of 16 lower end of lower transverse tubule can be also subjected to displacement, When block 22 is subjected to displacement in this way, block 22 and limited block 11 are not keeping fit-state, and limited block 11 can be because of the work of spring 9 It firmly moves down down, is bonded so that rubber disc 8 can be embedded in vertical tube 2 with 4 top surface of retaining ring, to realize closing vertical tube 2, in this way In water-main 1 water cannot by vertical tube 2 flow into connection hose in, thus prevent water inlet pipe 21 with connect 13 junction of hose Water spray, effectively avoids water resource and largely wastes.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify to technical solution documented by previous embodiment, or some or all of the technical features are equal Replacement;And these are modified or replaceed, model defined by the claims in the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (4)

1. a kind of guardrail of Construction of Civil Engineering atomizing de-dusting, it is characterised in that: including tube connection device and atomizing de-dusting Guardrail;
The tube connection device is embedded in underground;Water-main (1) including placement parallel to the ground, on the water-main (1) It is fixedly connected with vertical tube (2) on the outside of wall, the vertical tube (2) is connected with water-main (1), and vertical tube (2) top is fixed with Transverse tube (5), the transverse tube (5) are connected with vertical tube (2), and the transverse tube (5) is closed at one end, and the other end is fixedly connected with connection Hose (13), connection hose (13) other end are pierced by ground surface, are fixed with casing (6), institute on the outside of transverse tube (5) upper wall It states casing (6) two sides to be symmetrically fixed with baffle (12), described sleeve pipe (6) top surface is concordant with ground surface, fixed in the vertical tube (2) There are cross bar (3) and retaining ring (4), below retaining ring (4), cross bar (3) upper end is fixed with vertical bar (7) for cross bar (3) setting, Vertical bar (7) top passes through retaining ring (4) and protrudes into transverse tube (5) and is fixedly connected with transverse tube (5) inner roof wall, the vertical bar (7) The circular shaft heart and the circular shaft heart of vertical tube (2) be on the same line, sliding has rubber disc (8), the rubber on the vertical bar (7) It is fixed with spring (9) between disk (8) and transverse tube (5) inner roof wall, the spring (9) covers on vertical bar (7), the rubber disc (8) it is fixed on top surface pull rod (10), pull rod (10) top penetrates transverse tube (5) roof and protrudes into casing (6) and penetrate set Pipe (6) top is fixedly connected with limited block (11), and the limited block (11) is arranged above ground surface;
The atomizing de-dusting guardrail is fixed on ground surface;Including two pedestals (14), two pedestals (14) pass through respectively Screw (20) is fixedly connected with the ground, and is respectively fixed with support tube (17) on two pedestals (14), between two support tubes (17) Be fixed with upper lateral tube (15) and lower transverse tubule (16) in parallel, the upper lateral tube (15) and lower transverse tubule (16) axial line respectively with two branch Stay tube (17) axial line is vertically arranged, and is vertically and fixedly provided with several levers between the upper lateral tube (15) and lower transverse tubule (16) (18), it is connected inside lower transverse tubule (16) inside and two support tubes (17), described two support tube (17) tops point Be not fixed with fog-spray nozzle (19), lower transverse tubule (16) bottom end is fixed with water inlet pipe (21) and the first pull rod (10-1), it is described into Water pipe (21) setting with connect hose relative position, and be connected inside lower transverse tubule (16), the water inlet pipe (21) and Connection hose (13) is pierced by ground surface one end and is fixedly connected, and the first pull rod (10-1) bottom end is fixed with block (22), described Block (22) top surface is bonded with the lower surface of limited block (11) one end.
2. a kind of guardrail of Construction of Civil Engineering atomizing de-dusting according to claim 1, it is characterised in that: described sleeve pipe (6) it uses to be welded and fixed with transverse tube (5) and connect.
3. a kind of guardrail of Construction of Civil Engineering atomizing de-dusting according to claim 1, it is characterised in that: the rubber The outer diameter of disk (8) is consistent with vertical tube (2) internal diameter.
4. a kind of guardrail of Construction of Civil Engineering atomizing de-dusting according to claim 1, it is characterised in that: the pull rod (10) sealing ring is designed with casing (6) roof and transverse tube (5) junction.
CN201811444638.9A 2018-11-29 2018-11-29 Civil engineering construction is with guardrail of spraying dust fall Expired - Fee Related CN109537990B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811444638.9A CN109537990B (en) 2018-11-29 2018-11-29 Civil engineering construction is with guardrail of spraying dust fall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811444638.9A CN109537990B (en) 2018-11-29 2018-11-29 Civil engineering construction is with guardrail of spraying dust fall

Publications (2)

Publication Number Publication Date
CN109537990A true CN109537990A (en) 2019-03-29
CN109537990B CN109537990B (en) 2021-01-19

Family

ID=65851046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811444638.9A Expired - Fee Related CN109537990B (en) 2018-11-29 2018-11-29 Civil engineering construction is with guardrail of spraying dust fall

Country Status (1)

Country Link
CN (1) CN109537990B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055919A (en) * 2019-04-30 2019-07-26 中国二十二冶集团有限公司 Multifunctional protection handrail
CN110130720A (en) * 2019-05-23 2019-08-16 周国英 Construction fence
CN113684776A (en) * 2021-09-25 2021-11-23 浙江千木建设有限公司 Municipal road guardrail and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2080122U (en) * 1990-04-26 1991-07-03 黄坚 Automatic water saving valve when water cut-off
KR100653631B1 (en) * 2006-08-30 2006-12-06 주식회사 동호 Soundproofing walls for a road
CN205421104U (en) * 2016-03-22 2016-08-03 中力建设集团有限公司 Warning rail guard with anticollision and atomized water spray function
CN205474992U (en) * 2016-01-25 2016-08-17 鲲鳌建设有限公司 Municipal guardrail of spraying dust fall
CN207405542U (en) * 2017-09-04 2018-05-25 王兆林 A kind of highway barrier

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2080122U (en) * 1990-04-26 1991-07-03 黄坚 Automatic water saving valve when water cut-off
KR100653631B1 (en) * 2006-08-30 2006-12-06 주식회사 동호 Soundproofing walls for a road
CN205474992U (en) * 2016-01-25 2016-08-17 鲲鳌建设有限公司 Municipal guardrail of spraying dust fall
CN205421104U (en) * 2016-03-22 2016-08-03 中力建设集团有限公司 Warning rail guard with anticollision and atomized water spray function
CN207405542U (en) * 2017-09-04 2018-05-25 王兆林 A kind of highway barrier

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055919A (en) * 2019-04-30 2019-07-26 中国二十二冶集团有限公司 Multifunctional protection handrail
CN110130720A (en) * 2019-05-23 2019-08-16 周国英 Construction fence
CN113684776A (en) * 2021-09-25 2021-11-23 浙江千木建设有限公司 Municipal road guardrail and construction method thereof

Also Published As

Publication number Publication date
CN109537990B (en) 2021-01-19

Similar Documents

Publication Publication Date Title
CN109537990A (en) A kind of guardrail of Construction of Civil Engineering atomizing de-dusting
CN205677658U (en) Coal mine gas extraction pipeline deslagging, dedusting, the Trinity that discharges water device
CN201280902Y (en) Duster of drill
CN206917626U (en) Take out type gas prevention and gush out drilling hole dust collector device
CN201269106Y (en) Porthole dust catcher for down-hole hole drilling
CN202689980U (en) Drilling de-dusting device
CN211678424U (en) High-pressure spray head for petroleum field
CN108385571B (en) Side spraying device of washing and sweeping vehicle
CN208407379U (en) A kind of municipal works spray head of watering cart
CN105569721A (en) Air-spray linkage type annular jetting dust-removal system for mining
CN104879158A (en) Dry type drilled hole orifice dust elimination and noise reduction device and implementation method thereof
CN210858621U (en) Orifice dust collecting device
CN205136936U (en) Blowout preventer of pipeline pipeline purging
CN209549027U (en) A kind of mineral water-jet deduster
CN107823986A (en) A kind of colliery blasting dust arrester
CN203175599U (en) Wind-water linkage spraying dust settling device
CN206934807U (en) A kind of greasy dirt connecting tube for being coated with self-cleaning coat
CN109603495B (en) Foam treatment system for overflow pipe of absorption tower and application method of foam treatment system
CN201635683U (en) Gas drilling dust falling device
CN208227967U (en) A kind of water-saving water spraying control device of novel garden greening
CN209613719U (en) Cleaning plant in a kind of pipeline
CN206346774U (en) A kind of mine automatic dustfall device
CN208619152U (en) A kind of wind power ganged dedusting of self-rotary tunneling boring is spraying
CN203334703U (en) Water curtain dust-removing device for demolition blasting of building
CN209596807U (en) A kind of bitumen flue gas spray column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210119

Termination date: 20211129