CN109537601A - A kind of foundation pit supporting construction and its construction method based on campshed and inner support - Google Patents

A kind of foundation pit supporting construction and its construction method based on campshed and inner support Download PDF

Info

Publication number
CN109537601A
CN109537601A CN201811350510.6A CN201811350510A CN109537601A CN 109537601 A CN109537601 A CN 109537601A CN 201811350510 A CN201811350510 A CN 201811350510A CN 109537601 A CN109537601 A CN 109537601A
Authority
CN
China
Prior art keywords
foundation pit
fender
fender pile
observation
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811350510.6A
Other languages
Chinese (zh)
Inventor
李翠霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Juan
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811350510.6A priority Critical patent/CN109537601A/en
Publication of CN109537601A publication Critical patent/CN109537601A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of foundation pit supporting construction and its construction method based on campshed and inner support, including multiple fender piles being vertically arranged, multiple fender piles include symmetrically arranged first fender pile and the second fender pile two-by-two, two first fender piles and two the second fender piles are hollow structure, and inserted block is equipped in two the first fender piles and two the second fender piles, two first fender piles are equipped with the strip gab that setting is matched with inserted block with the downside side wall of two the second fender piles, strip gab setting is run through in one end of multiple inserted blocks, and the other end of multiple inserted blocks is connect by telescopic device with the inside of the first fender pile and the second fender pile respectively.The present invention can make fender pile more go deep into bottom of foundation ditch, improve the bonding strength of fender pile and foundation pit, and have slope deforming observation program, and real-time monitoring reduces the probability of accident generation.

Description

A kind of foundation pit supporting construction and its construction method based on campshed and inner support
Technical field
The present invention relates to foundation pit construction technical field more particularly to a kind of foundation pit supporting constructions based on campshed and inner support And its construction method.
Background technique
Pattern foundation pit supporting structure is the safety to guarantee Underground Construction and foundation pit surrounding environment, to foundation pit side-wall and peripheral ring Supporting and retaining system, reinforcing and the safeguard measure that border uses.Foundation pit supporting project is a temporary project, and the safety stock of design relatively can be small A bit, but it is related with provincialism.Its feature of different zones geological conditions is not also identical.Foundation pit supporting project be again geotechnical engineering, The subject that Structural Engineering and construction technology cross one another is the system engineering of Various Complex factor reciprocal effect, is theoretically Wait the complex art subject of development;
The embedded more letter of the fender pile of existing foundation pit supporting construction and its construction method based on campshed and inner support Single, the connection of fender pile and bottom of foundation ditch is not sufficiently stable, and lacks slope deforming observation program, and accident rate is high, thus we It proposes a kind of to solve the above problems based on the foundation pit supporting construction and its construction method of campshed and inner support.
Summary of the invention
The purpose of the present invention is to solve problems of the prior art, and the one kind proposed is based on campshed and interior branch The foundation pit supporting construction and its construction method of support.
To achieve the goals above, present invention employs following technical solutions:
A kind of foundation pit supporting construction based on campshed and inner support, it is multiple described including multiple fender piles being vertically arranged Fender pile includes symmetrically arranged first fender pile and the second fender pile two-by-two, and two first fender piles and two second prevent Fender pile is hollow structure, and inserted block is equipped in two the first fender piles and two the second fender piles, and two described first anti- Fender pile be equipped with the downside side wall of two the second fender piles matched with inserted block setting strip gab, the one of multiple inserted blocks End is arranged through strip gab, and the other end of multiple inserted blocks is anti-by telescopic device and the first fender pile and second respectively The inside of fender pile connects, and two first fender pile side side walls opposite with two the second fender piles are fixedly connected to water The limit plate of flat setting, is equipped with horizontally disposed retaining-plate, institute between two first fender piles and two the second fender piles The surface that retaining-plate is located at multiple limit plates is stated, and retaining-plate is equipped with the screw thread locking bar for matching setting with limit plate to a, Multiple screw thread locking bars run through retaining-plate and are threadedly coupled with retaining-plate, and multiple screw thread locking bars run through limit plate, And the thread groove that setting is matched with screw thread locking bar is equipped on multiple limit plates.
Preferably, multiple telescopic devices include horizontally disposed threaded rod, one end point of multiple threaded rods It is not rotatablely connected with the inner wall of the first fender pile and the second fender pile, and the other end of multiple threaded rods extends through the first protection The setting of the side wall of stake and the second fender pile, is arranged that there are two symmetrically arranged nuts, and each spiral shell on multiple threaded rods Push rod is rotatably connected on mother, the other end of multiple push rods passes through the fixed company of upside side wall of link block and inserted block It connects, multiple push rods are rotatablely connected with link block.
Preferably, multiple to be fixedly connected on first fender pile and the inserted block outside two the second fender piles Circular cone.
Preferably, the two sides side wall of multiple inserted blocks is equipped with the opposite mounting groove that is open, and multiple mounting grooves Bottom wall pass through multiple springs and be fixedly connected with mounting blocks, be fixedly connected to pulley on each mounting blocks.
Preferably, the downside side wall of multiple limit plates slidably connects the first sliding lock block, and the first slide lock Block is arranged through screw thread locking bar.
Preferably, the second slide lock is slidably connected on the outer wall of multiple first fender piles and the second fender pile Block, and multiple second sliding lock blocks run through threaded rod setting.
Foundation ditch construction method based on campshed and inner support, comprising the following steps:
(1) pit earthwork excavates: being required according to soil property, reasonably selects sloping coefficient slope, dug out and transport outside the earthwork all , it digs to stopping at projected depth cutting the earth, finally using artificial clear base, when excavation, requires that progress should be layered according to pattern foundation pit supporting structure, Live conjunction measuring personnel measure the absolute altitude of shoveling at any time, and the earthwork is avoided to backbreak, and excavation of foundation pit finishes, and should carry out pricker spy comprehensively, Then check of foundation subsoil can be carried out with relevant departments such as prospecting, design, owner, management;
(2) foundation pit support plan: to prevent foundation pit crater wall slope failure, it is necessary to which slope retaining is carried out by following to foundation pit walls Scheme carries out, and is embedded to fender pile → addition limit plate → reinforcement protection stake → inspection → examination → continuation earth excavation;
(3) supporting construction is with earth excavation: supporting construction intersects synchronous carry out with earth excavation: it is deep that earthmoving machinery excavates control Work surface height is no more than 1.0m, and every layer of excavation height is not greater than 0.5m when chance soil layer is poor, and spacing accordingly adjusts, to upper one After the completion of operation, the excavation of next work surface can be carried out, forbids to backbreak in advance, the work surface excavated must immediate support envelope It closes, such as because the work surface that a variety of causes excavates is unable to immediate support, then mechanical earth excavation must organize backfill closed operation in time Face, in case work surface exposure duration is too long and causes dangerous situation;
(4) slope deforming observation program:
1) foundation pit top of the slope sedimentation deformation is observed: it is arranged along foundation pit periphery, to monitor the deformation of excavation slope, in the middle part of periphery, Layout points are answered at external corner, are arranged along foundation pit periphery, and part observation point should be laid in important building, on structures and important pipeline Position, and the quantity and arrangement of adjustable observation point according to actual needs;
2) observe process: settlement observation point is buried before construction, every to excavate one layer of observation once, daily after the completion of excavation Observation is primary, and observation is primary every three days after displacement and settlement stability, and observation in every seven days is primary after supporting construction reaches design strength, If it was found that deformation is abnormal or when meeting heavy rain, heavy rain, Ying Jiami observation frequency should carry out information feedback to monitoring result in time, Designer and related administrative staff should be notified when found the abnormal situation, in time so as to guide constructing or handling convenient for timely;
(5) it drainage sunk well: to prevent etch of the leakage of surface water to retaining wall scholar's body, is set in the vertical retaining wall of foundation pit surrounding Drainage hole is set, draining pitch of holes determines that in the construction process, drainage hole should be added immediately by rises occur according to field condition;
(6) foundation pit later maintenance: in the construction process, it should be noted that hole sapwood material and mechanical preloading are forbidden to drain to crater wall With the immersion foundation pit surrounding soil body, surface water is avoided to flow into foundation pit, when constructing basement, forbids to stop the disconnected power supply to draw water, to prevent Rising of groundwater level is made, and at heavy losses, subsequent construction unit should be with base pit dewatering work close fit, it is ensured that safety guarantees entire Engineering construction is gone on smoothly, and must not be backbreak under the conditions of former support system, and it is excessive to be otherwise likely to result in foundation pit deformation, even There is bigger dangerous situation, brings safe mass hidden danger to engineering, Ying Jiaqiang deformation observation works, and one after the completion of excavation of foundation pit In a month, Ying Jiami observation point increases observation frequency, the building retaining wall section within the scope of 2 times of foundation depths need to make it is horizontal with The deformation observation of vertical both direction.
It is had the beneficial effect that in the present invention:
1, rotation threaded rod is able to drive two nuts and moves toward one another, to drive two push rods that link block is pushed to transport downwards It is dynamic, enable the insertion bottom of foundation ditch that inserted block is more deep, screw thread rod locking can be guaranteed threaded rod work by the second sliding lock block Make the stabilization of state;
2, the installation of circular cone is capable of increasing the pressure on inserted block surface, and inserted block is enable more to be easily plugged into the bottom of foundation pit In portion's soil;
3, pulley can slide on the inner wall of the first fender pile and the second fender pile, keep the motion state of inserted block more steady Fixed, screw thread locking bar is threadedly coupled with limit plate, can guarantee retaining-plate and the first fender pile and the second fender pile connection status Stablize, screw fastening rod locking can be guaranteed the stabilization of screw thread locking bar working condition by the first sliding lock block;
4, observation adjustment persistently is carried out to earth excavation situation, observes foundation pit top of the slope sedimentation deformation, prevents engineering thing Therefore.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the foundation pit supporting construction based on campshed and inner support proposed by the present invention;
Fig. 2 is a kind of overlooking structure diagram of the foundation pit supporting construction based on campshed and inner support proposed by the present invention;
Fig. 3 is the structural schematic diagram in Fig. 1 at A.
In figure: 1 first fender pile, 2 second fender piles, 3 inserted blocks, 4 limit plates, 5 retaining-plates, 6 screw thread locking bars, 7 threaded rods, 8 nuts, 9 push rods, 10 link blocks, 11 circular cones, 12 mounting grooves, 13 springs, 14 mounting blocks, 15 pulleys, 16 first sliding lock blocks, 17 second sliding lock blocks.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-3, a kind of foundation pit supporting construction based on campshed and inner support, including multiple protection being vertically arranged Stake, multiple fender piles include symmetrically arranged first fender pile 1 and the second fender pile 2 two-by-two, two the first fender piles 1 and two Second fender pile 2 is hollow structure, and inserted block 3 is equipped in two the first fender piles 1 and two the second fender piles 2, and two First fender pile 1 is equipped with the strip gab that setting is matched with inserted block 3 with the downside side wall of two the second fender piles 2, multiple to insert Strip gab setting is run through in one end of block 3, and the other end of multiple inserted blocks 3 passes through telescopic device and the first fender pile respectively 1 and second fender pile 2 inside connection, it is equal on multiple inserted blocks 3 being located at outside the first fender pile 1 and two the second fender piles 2 It is fixedly connected with circular cone 11, the installation of circular cone 11 is capable of increasing the pressure on 3 surface of inserted block, enables inserted block 3 more easily Insertion foundation pit bottom soil in;
Multiple telescopic devices include horizontally disposed threaded rod 7, one end of multiple threaded rods 7 respectively with the first fender pile 1 and second fender pile 2 inner wall rotation connection, and the other end of multiple threaded rods 7 extends through the first fender pile 1 and second anti- The side wall of fender pile 2 is arranged, and is arranged that there are two symmetrically arranged nuts 8 on multiple threaded rods 7, and rotates on each nut 8 It is connected with push rod 9, the other end of multiple push rods 9 passes through link block 10 and is fixedly connected with the upside side wall of inserted block 3, multiple push rods 9 are rotatablely connected with link block 10, and it is sliding that second is slidably connected on the outer wall of multiple first fender piles 1 and the second fender pile 2 Dynamic closing piece 17, and multiple second sliding lock blocks 17 are arranged through threaded rod 7, rotation threaded rod 7 is able to drive two 8 phases of nut To movement, to drive two push rods 9 that link block 10 is pushed to move downward, enable the insertion foundation pit bottom that inserted block 3 is more deep Portion, the second sliding lock block 17 can lock threaded rod 7, guarantee the stabilization of 7 working condition of threaded rod;
Two the first fender piles 1 are fixedly connected to horizontally disposed with two opposite side side walls of the second fender pile 2 Limit plate 4, is equipped with horizontally disposed retaining-plate 5 between two the first fender piles 1 and two the second fender piles 2, retaining-plate 5 is located at The surface of multiple limit plates 4, and retaining-plate 5 is equipped with the screw thread locking bar 6 for matching setting with limit plate 4 to a, multiple screw threads Locking bar 6 is threadedly coupled through retaining-plate 5 and with retaining-plate 5, and multiple screw thread locking bars 6 run through limit plate 4, and multiple limit plates The thread groove that setting is matched with screw thread locking bar 6 is equipped on 4, it is sliding that the downside side wall of multiple limit plates 4 slidably connects first Dynamic closing piece 16, and the first sliding lock block 16 is arranged through screw thread locking bar 6, it is opposite that the two sides side wall of multiple inserted blocks 3 is equipped with opening Mounting groove 12, and the bottom wall of multiple mounting grooves 12 passes through multiple springs 13 and is fixedly connected with mounting blocks 14, each mounting blocks Pulley 15 is fixedly connected on 14, pulley 15 can slide on the inner wall of the first fender pile 1 and the second fender pile 2, make to insert The motion state of block 3 is more stable, and screw thread locking bar 6 is threadedly coupled with limit plate 4, can guarantee retaining-plate 5 and the first fender pile 1 And the stabilization of 2 connection status of the second fender pile, the first sliding lock block 16 can lock screw thread locking bar 6, guarantee 6 work of screw thread locking bar Make the stabilization of state;
Foundation ditch construction method based on campshed and inner support, comprising the following steps:
(1) pit earthwork excavates: being required according to soil property, reasonably selects sloping coefficient slope, dug out and transport outside the earthwork all , it digs to stopping at projected depth cutting the earth, finally using artificial clear base, when excavation, requires that progress should be layered according to pattern foundation pit supporting structure, Live conjunction measuring personnel measure the absolute altitude of shoveling at any time, and the earthwork is avoided to backbreak, and excavation of foundation pit finishes, and should carry out pricker spy comprehensively, Then check of foundation subsoil can be carried out with relevant departments such as prospecting, design, owner, management;
(2) foundation pit support plan: to prevent foundation pit crater wall slope failure, it is necessary to which slope retaining is carried out by following to foundation pit walls Scheme carries out, and is embedded to fender pile → addition limit plate → reinforcement protection stake → inspection → examination → continuation earth excavation;
(3) supporting construction is with earth excavation: supporting construction intersects synchronous carry out with earth excavation: it is deep that earthmoving machinery excavates control Work surface height is no more than 1.0m, and every layer of excavation height is not greater than 0.5m when chance soil layer is poor, and spacing accordingly adjusts, to upper one After the completion of operation, the excavation of next work surface can be carried out, forbids to backbreak in advance, the work surface excavated must immediate support envelope It closes, such as because the work surface that a variety of causes excavates is unable to immediate support, then mechanical earth excavation must organize backfill closed operation in time Face, in case work surface exposure duration is too long and causes dangerous situation;
(4) slope deforming observation program:
1) foundation pit top of the slope sedimentation deformation is observed: it is arranged along foundation pit periphery, to monitor the deformation of excavation slope, in the middle part of periphery, Layout points are answered at external corner, are arranged along foundation pit periphery, and part observation point should be laid in important building, on structures and important pipeline Position, and the quantity and arrangement of adjustable observation point according to actual needs;
2) observe process: settlement observation point is buried before construction, every to excavate one layer of observation once, daily after the completion of excavation Observation is primary, and observation is primary every three days after displacement and settlement stability, and observation in every seven days is primary after supporting construction reaches design strength, If it was found that deformation is abnormal or when meeting heavy rain, heavy rain, Ying Jiami observation frequency should carry out information feedback to monitoring result in time, Designer and related administrative staff should be notified when found the abnormal situation, in time so as to guide constructing or handling convenient for timely;
(5) it drainage sunk well: to prevent etch of the leakage of surface water to retaining wall scholar's body, is set in the vertical retaining wall of foundation pit surrounding Drainage hole is set, draining pitch of holes determines that in the construction process, drainage hole should be added immediately by rises occur according to field condition;
(6) foundation pit later maintenance: in the construction process, it should be noted that hole sapwood material and mechanical preloading are forbidden to drain to crater wall With the immersion foundation pit surrounding soil body, surface water is avoided to flow into foundation pit, when constructing basement, forbids to stop the disconnected power supply to draw water, to prevent Rising of groundwater level is made, and at heavy losses, subsequent construction unit should be with base pit dewatering work close fit, it is ensured that safety guarantees entire Engineering construction is gone on smoothly, and must not be backbreak under the conditions of former support system, and it is excessive to be otherwise likely to result in foundation pit deformation, even There is bigger dangerous situation, brings safe mass hidden danger to engineering, Ying Jiaqiang deformation observation works, and one after the completion of excavation of foundation pit In a month, Ying Jiami observation point increases observation frequency, the building retaining wall section within the scope of 2 times of foundation depths need to make it is horizontal with The deformation observation of vertical both direction.
In the present invention, when being constructed, excavation of foundation pit is carried out, multiple first fender piles 1 and multiple first are prevented Fender pile 2 is placed in bottom of foundation ditch, is inserted into inserted block 3 and circular cone 11 in soil, and rotation threaded rod 7 is able to drive two 8 phases of nut To movement, to drive two push rods 9 that link block 10 is pushed to move downward, enable the insertion foundation pit bottom that inserted block 3 is more deep After portion, the first fender pile 1 and the second fender pile 2 are embedded, retaining-plate 5 is placed on multiple limit plates 4, screw thread locking bar is used 6 lock limit plate 4 and retaining-plate 5.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of foundation pit supporting construction based on campshed and inner support, including multiple fender piles being vertically arranged, which is characterized in that Multiple fender piles include symmetrically arranged first fender pile (1) and the second fender pile (2) two-by-two, two first protection Stake (1) and two the second fender piles (2) are hollow structure, and two the first fender piles (1) and two the second fender piles (2) are interior It is equipped with inserted block (3), the downside side wall of two first fender piles (1) and two the second fender piles (2) is equipped with and inserted block (3) strip gab of matching setting, one end of multiple inserted blocks (3) are run through strip gab and are arranged, and multiple inserted blocks (3) The other end is connect by telescopic device with the inside of the first fender pile (1) and the second fender pile (2) respectively, and two described first Fender pile (1) and two opposite side side walls of the second fender pile (2) are fixedly connected to horizontally disposed limit plate (4), and two Horizontally disposed retaining-plate (5) are equipped between a first fender pile (1) and two the second fender piles (2), the retaining-plate (5) it is located at the surface of multiple limit plates (4), and retaining-plate (5) is equipped with the screw fastening for matching setting with limit plate (4) to a Bar (6), multiple screw thread locking bars (6) are threadedly coupled through retaining-plate (5) and with retaining-plate (5), multiple screw fastenings Bar (6) runs through limit plate (4), and the thread groove that setting is matched with screw thread locking bar (6) is equipped on multiple limit plates (4).
2. a kind of foundation pit supporting construction based on campshed and inner support according to claim 1, which is characterized in that Duo Gesuo Stating telescopic device includes horizontally disposed threaded rod (7), one end of multiple threaded rods (7) respectively with the first fender pile (1) and the inner wall of the second fender pile (2) is rotatablely connected, and the other end of multiple threaded rods (7) extends through the first fender pile (1) And second fender pile (2) side wall setting, be arranged that there are two symmetrically arranged nut (8) on multiple threaded rods (7), and It is rotatably connected to push rod (9) on each nut (8), the other end of multiple push rods (9) passes through link block (10) and inserts The upside side wall of block (3) is fixedly connected, and multiple push rods (9) are rotatablely connected with link block (10).
3. a kind of foundation pit supporting construction based on campshed and inner support according to claim 1, which is characterized in that Duo Gewei In being fixedly connected to circular cone (11) on first fender pile (1) inserted block (3) external with two the second fender piles (2).
4. a kind of foundation pit supporting construction based on campshed and inner support according to claim 1, which is characterized in that Duo Gesuo The two sides side wall for stating inserted block (3) is equipped with the opposite mounting groove (12) that is open, and the bottom wall of multiple mounting grooves (12) is logical It crosses multiple springs (13) to be fixedly connected with mounting blocks (14), is fixedly connected to pulley (15) on each mounting blocks (14).
5. a kind of foundation pit supporting construction based on campshed and inner support according to claim 1, which is characterized in that Duo Gesuo The downside side wall for stating limit plate (4) slidably connects the first sliding lock block (16), and the first sliding lock block (16) runs through screw thread Locking bar (6) setting.
6. a kind of foundation pit supporting construction and its construction method based on campshed and inner support according to claim 2, special Sign is, slidably connects the second sliding lock block on the outer wall of multiple first fender piles (1) and the second fender pile (2) (17), and multiple second sliding lock blocks (17) are arranged through threaded rod (7).
7. the foundation ditch construction method based on campshed and inner support, which comprises the following steps:
(1) pit earthwork excavates: being required according to soil property, reasonably selects sloping coefficient slope, digging out the earthwork, all outward transport appears on the scene, and digs Stop cutting the earth to projected depth, finally using artificial clear base, when excavation requires that progress should be layered according to pattern foundation pit supporting structure, and scene is matched The absolute altitude that survey crew measures shoveling at any time is closed, avoids the earthwork from backbreaking, excavation of foundation pit finishes, and should carry out pricker spy comprehensively, then can Check of foundation subsoil is carried out with relevant departments such as prospecting, design, owner, management;
(2) foundation pit support plan: to prevent foundation pit crater wall slope failure, it is necessary to slope retaining be carried out to foundation pit walls and press following scheme It carries out, is embedded to fender pile → addition limit plate → reinforcement protection stake → inspection → examination → continuation earth excavation;
(3) supporting construction is with earth excavation: supporting construction intersects synchronous carry out with earth excavation: earthmoving machinery, which excavates, controls deep operation Face height is no more than 1.0m, and every layer of excavation height is not greater than 0.5m when chance soil layer is poor, and spacing accordingly adjusts, to a upper operation After the completion, the excavation that can carry out next work surface is forbidden to backbreak in advance, the necessary immediate support closing of the work surface excavated, such as Because the work surface that a variety of causes excavates is unable to immediate support, then mechanical earth excavation must organize backfill closed operation face in time, with It is too long and cause dangerous situation to exempt from work surface exposure duration;
(4) slope deforming observation program:
1) foundation pit top of the slope sedimentation deformation is observed: being arranged along foundation pit periphery, to monitor the deformation of excavation slope, periphery middle part, external corner Layout points are answered at place, are arranged along foundation pit periphery, and part observation point should be laid in important building, on structures and important pipeline position It sets, and the quantity and arrangement of adjustable observation point according to actual needs;
2) observe process: settlement observation point is buried before construction, every to excavate one layer of observation once, observation daily after the completion of excavating Once, once, observation in every seven days is primary after supporting construction reaches design strength, if sending out for observation every three days after displacement and settlement stability When now deformation is abnormal or meets heavy rain, heavy rain, Ying Jiami observation frequency should carry out information feedback to monitoring result in time, discovery Designer and related administrative staff should be notified when abnormal conditions, in time so as to guide constructing or handling convenient for timely;
(5) to prevent etch of the leakage of surface water to retaining wall scholar's body, row drainage sunk well: is set in the vertical retaining wall of foundation pit surrounding Water hole, draining pitch of holes determine that in the construction process, drainage hole should be added immediately by rises occur according to field condition;
(6) foundation pit later maintenance: in the construction process, it should be noted that hole sapwood material and mechanical preloading are forbidden to drain and soak to crater wall The foundation pit surrounding soil body is steeped, surface water is avoided to flow into foundation pit, when constructing basement, forbids to stop the disconnected power supply to draw water, to prevent water level Rise is made, and at heavy losses, subsequent construction unit should be with base pit dewatering work close fit, it is ensured that safety guarantees entire engineering Going on smoothly for construction, must not backbreak under the conditions of former support system, it is excessive otherwise be likely to result in foundation pit deformation, or even occur Bigger dangerous situation brings safe mass hidden danger to engineering, and Ying Jiaqiang deformation observation works, and one month after the completion of excavation of foundation pit Interior, Ying Jiami observation point increases observation frequency, the building retaining wall section within the scope of 2 times of foundation depths need to make it is horizontal with it is vertical The deformation observation of both direction.
CN201811350510.6A 2018-11-14 2018-11-14 A kind of foundation pit supporting construction and its construction method based on campshed and inner support Withdrawn CN109537601A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811350510.6A CN109537601A (en) 2018-11-14 2018-11-14 A kind of foundation pit supporting construction and its construction method based on campshed and inner support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811350510.6A CN109537601A (en) 2018-11-14 2018-11-14 A kind of foundation pit supporting construction and its construction method based on campshed and inner support

Publications (1)

Publication Number Publication Date
CN109537601A true CN109537601A (en) 2019-03-29

Family

ID=65847101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811350510.6A Withdrawn CN109537601A (en) 2018-11-14 2018-11-14 A kind of foundation pit supporting construction and its construction method based on campshed and inner support

Country Status (1)

Country Link
CN (1) CN109537601A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726628A (en) * 2020-12-28 2021-04-30 冯国艳 Movable inner supporting device for foundation pit supporting

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207531472U (en) * 2017-11-15 2018-06-26 河北果实农业科技有限公司 A kind of Paris polyphylla planting greenhouse frame
CN108265725A (en) * 2016-12-30 2018-07-10 北京市地质工程公司 Drawknot stake supporting and the construction method of basement process
CN207959012U (en) * 2018-01-09 2018-10-12 石伟宏 A kind of long-span bridge girder construction for building
CN207974128U (en) * 2018-03-08 2018-10-16 洛阳城市建设勘察设计院有限公司 A kind of slope retaining structure using high-strength light foam soil

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265725A (en) * 2016-12-30 2018-07-10 北京市地质工程公司 Drawknot stake supporting and the construction method of basement process
CN207531472U (en) * 2017-11-15 2018-06-26 河北果实农业科技有限公司 A kind of Paris polyphylla planting greenhouse frame
CN207959012U (en) * 2018-01-09 2018-10-12 石伟宏 A kind of long-span bridge girder construction for building
CN207974128U (en) * 2018-03-08 2018-10-16 洛阳城市建设勘察设计院有限公司 A kind of slope retaining structure using high-strength light foam soil

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
白双有: "浅析建筑基坑支护施工技术", 《中华民居》 *
魏锋: "基坑施工及质量控制", 《科技传播》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726628A (en) * 2020-12-28 2021-04-30 冯国艳 Movable inner supporting device for foundation pit supporting

Similar Documents

Publication Publication Date Title
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN103321260B (en) Interval boring cuts stake inclination correction method
CN109898520A (en) A kind of heavy wall construction method
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN105780779A (en) Externally arranged, compacted and grouted Larsen steel sheet pile composite retaining structure and use method thereof
CN102454167A (en) Construction method for large ultra-deep well
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN109577365A (en) A kind of pile formula drainage anchor rod barrier wall structure and its construction method
CN108661073A (en) A kind of barrier wall structure and its construction method
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN201762702U (en) Drilling secant pile
CN208934002U (en) A kind of barrier wall structure
CN108755702B (en) Soft soil foundation pit reinforcing treatment method with higher underground water level
CN109537601A (en) A kind of foundation pit supporting construction and its construction method based on campshed and inner support
CN113026757A (en) Rapid excavation and support construction method for complex stratum pipe-jacking comprehensive well
CN105113529A (en) Aid-sedimentation construction method for open caisson engineering in dense round gravel layer or gravel layer
CN104831742B (en) The Method on Dewatering of Foundation Pit that adjacent two layers low pressure water layer is not cut off by water barrier
CN111287205A (en) Deep multi-stage dynamic foundation pit dewatering system and dewatering method thereof
CN107965173B (en) Transformer substation with integrated foundation structure and method for preventing non-uniform settlement of transformer substation
CN213448534U (en) Sealing and lowering combined pressure-bearing water control system
CN204435321U (en) A kind of steam power station water intaking open channel
CN103866779A (en) Construction method of water stopping surrounding and protecting structure of soft soil foundation building foundation pit
CN206034466U (en) Foundation ditch or basic groove precipitation system for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210219

Address after: 230000 Room 405, building 9, No.1 Park Road, 652 Changjiang West Road, Shushan District, Hefei City, Anhui Province

Applicant after: Wang Juan

Address before: Xiamen Institute of technology, No. 600, Ligong Road, Jimei District, Xiamen City, Fujian Province, 361021

Applicant before: Li Cuixia

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20190329

WW01 Invention patent application withdrawn after publication