CN109524139A - A kind of real-time device performance monitoring method based on equipment working condition variation - Google Patents
A kind of real-time device performance monitoring method based on equipment working condition variation Download PDFInfo
- Publication number
- CN109524139A CN109524139A CN201811236384.1A CN201811236384A CN109524139A CN 109524139 A CN109524139 A CN 109524139A CN 201811236384 A CN201811236384 A CN 201811236384A CN 109524139 A CN109524139 A CN 109524139A
- Authority
- CN
- China
- Prior art keywords
- data
- equipment
- model
- real
- measuring point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/04—Safety arrangements
- G21D3/06—Safety arrangements responsive to faults within the plant
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/001—Computer implemented control
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- High Energy & Nuclear Physics (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention belongs to nuclear power plant equipment belief system device performance monitoring technical fields, and in particular to a kind of real-time device performance monitoring method based on equipment working condition variation.Object of the present invention is to by big data analysis method, obtain the dynamic threshold for being able to reflect equipment status parameter to large number of equipment history data, the deficiency of existing equipment parameter fixed threshold setting is made up.The invention mainly comprises step 1: data acquisition;Step 2: data prediction;Step 3: feature extraction;Step 4: module training;Step 5: iteration optimization model;Step 6: model application.The present invention establishes the prediction to measuring point variation tendency and future time instance numerical value by mathematical modeling, establishes the judgement for whether meeting measuring point data variation moving law in the past, the judgement that meets situation of the founding mathematical models to measuring point current data.
Description
Technical field
The invention belongs to nuclear power plant equipment belief system device performance monitoring technical fields, and in particular to one kind is based on setting
The real-time device performance monitoring method of standby operating condition variation.
Background technique
One of the important content of nuclear power plant equipment reliability management is exactly to carry out equipment to the important key equipment of nuclear power station
Performance monitoring, and real-time device performance monitoring is a kind of most common mode of device performance monitoring, real-time device performance monitoring
It is exactly the fault mode and phenomenon of bonding apparatus, chooses the parameter for being actually able to reflect equipment state, such as: temperature, pressure, stream
Amount, voltage, vibration, electric current, oil level, oil etc. are set by it being arranged corresponding alarm, early warning value (i.e. threshold value) to realize
Standby real-time monitoring, monitoring parameters meet or exceed threshold value, that is, alarm are generated, to remind engineer to need to pay close attention to, check that this sets
Standby virtual condition, confirmation equipment whether there is failure, and take necessary measure according to actual needs, to prevent the equipment straight
The normal operation for influencing power station is connect, in order to avoid cause power station non-programmed halt shutdown or other operation consequences.
The threshold value of real-time device performance monitoring at present is arranged, usually by engineer according to operation alarming value, the relevant technologies
Standard, specification etc. are formulated, or are determined according to engineer experience, using fixed threshold set-up mode.With power station unit
Operating status variation, monitoring parameters are larger in the difference of the various operating statuses of unit, are unable to the practical shape of real reaction equipment
State, the pre-/alarm sometimes, pre-/alarm cannot be generated in time, be not necessarily to generate pre-/alarm sometimes, produced pre-/alarm instead,
Interference is caused to the work of engineer.For this purpose, the threshold value of dynamic change is to equipment real-time energy according to the operating status of unit
Monitoring just becomes especially important.
Summary of the invention
The equipment real-time energy monitoring method based on dynamic threshold that it is an object of that present invention to provide a kind of, to large number of equipment
History data obtains the dynamic threshold for being able to reflect equipment status parameter by big data analysis method, makes up existing set
The deficiency of standby parameter fixed threshold setting enables Facilities Engineer to carry out accurately real-time monitoring to each parameter of equipment
Accurately confirm equipment state, and then accurately carries out equipment fault diagnosis.
The technical solution of the invention is as follows:
1. step 1: data acquisition includes the following steps:
Step 1: user is by the measuring point in measuring point coding, measuring point title, instrument keyword query real-time data base,
Export measuring point data;
Step 2: the historic defects information of collecting device, the Historical Monitoring report of equipment;
Step 3: being saved, being deleted to the measuring point found, the routine operations such as transform sequence.
2. step 2: data prediction includes the following steps:
Step 1: carrying out exceptional value lookup, the scope of period, including ocean temperature, environment temperature, humidity;It adopts
With the correlation analysis of linear single order, the correlation analysis of measuring point and the establishment of weight are realized, reject the ginseng of completely no correlation
Number;Rules Filtering, the error that eliminating system is generated by uncertain factor;Screened using trend, reject mutation, it is irregular fluctuation,
The period of substantial deviation floor data;Fixed threshold range is defined, it is made to be bonded operating condition completely;Start and stop rule is set;
Step 2: model pre-warning effect detection screens defect information according to (2) step in the first step;Retain
The information of early warning judgement can be carried out by Parameters variation;History parameters are extracted, the analog detection of model is carried out;According to testing result
To optimize and revise the algorithm of model;
Step 3: being determined whether to ignore the outlier according to field conditions and historical record by operator, simultaneously
Operator carries out the adjustment of data time interval according to the situation of abnormal point;If judging, abnormal point is caused by measuring instrumentss failure,
Then the data are deleted, a stepping row data missing values of going forward side by side are automatically replenished;If judging, abnormal point for equipment fault, is mentioned
The outlier is taken, further analysis processing is remained;
Step 4: shortage of data value caused by ignoring to abnormal data in above-mentioned third step is automatically replenished, before missing
Data measured value afterwards, setting take most dirty data automatically to fill or be averaged and fill function.
3. step 3: feature extraction includes the following steps:
Step 1: according to the design data of equipment, supervision document, drawing delimit parameter area, herein within the scope of carry out
Parameter is chosen, including equipment design parameter, equipment safety characterisitic parameter, equipment running status parameter;
Step 2: handled by the step (1) in data prediction by parameter normalization, take deviation percent or
Unified two kinds of methods of percentage are completed, the determination of Lai Shixian weight;Operator can suitably be adjusted parameters weighting
To verify validity, the correctness of model;
4. step 4: module training includes the following steps:
Step 1: the equipment for there is historical failure data, using machine learning and data mining based on data-driven
Algorithm is modeled, once actual monitoring data fit model alarming value, system make device failure alert automatically, and according to building
When mould determine fault mode automatic prompt equipment fault type, while can also according to model automatic Prediction failure occur when
Between, and make prompt;
Step 2: the equipment of not historical failure data is operated normally data using history and is built to carry out machine learning
Mould, the model are the sections of a normal operation, and beyond operating normally, then system makes unit exception warning automatically.
5. step 5: iteration optimization model includes the following steps:
Step 1: according to the defect information reported by mistake and failed to report, repeated data pretreatment is generated in model actual moving process
In step (1), step (3), execute optimize and revise model calculating dynamic threshold range, if model generate wrong report, sieve again
The time segment limit of the historical data under similar operating condition is selected, or adjusts the bound of dynamic threshold range according to the actual situation;
Step 2: adjusting the range, quantity, weight of modeling parameters according to the early warning effect in model actual moving process
Realize the effect of simplified model;
6. step 6: model application includes the following steps:
Step 1: the dynamic threshold model that big data analysis is obtained puts into application;
Step 2: system becomes automatically according to the time model of inside configuration in conjunction with the variation of historical failure or abnormal data
Gesture, the time that prediction failure occurs form anticipation trend curve, device failure alert or abnormal warning, including yellow or more
Rank automatically forms event log and issues mail and prompting message automatically.
The present invention has the beneficial effect that compared with prior art
1. equipment early warning: finding that the recessive abnormal and unit performance of unit that traditional monitoring means can not be found is bad early
The slight change of change.It can decompose design parameter for unit exception, indicate the difference between abnormal parameters value and history optimal value
Away from.-- trend group
2. device performance monitoring is analyzed: by the dynamic threshold of real-time monitoring mechanical seal correlation measuring point, and to history
The visualization of the comparison of optimum operating condition is presented, and makes equipment performance operation trend and Long-term change trend very clear, while providing equipment
The development trend of following a period of time.-- dynamic threshold envelope
3. equipment trend prediction: pointing out equipment performance cracking inflection point, find that the state of measuring point trend deviates early, pass through and be
Statistics calculates the time point that pre- measurement equipment concrete position will fail.-- alarm is estimated
4. device exception information tracks: abnormal development trend is tracked, by counting the association measuring point of unit exception and different
The frequency often occurred forms systemic anomalous event.-- event analysis
Detailed description of the invention
Fig. 1 is a kind of real-time device performance monitoring method flow chart based on equipment working condition variation
Specific embodiment
In the following with reference to the drawings and specific embodiments to a kind of real-time device performance monitoring method based on equipment working condition variation
It is described in detail:
The present invention calculates to illustrate that the technical solution, target are by big with the dynamic threshold of three factory owner's pump mechanical sealing of the Qin
Data mode excavates the personalized threshold value under equipment difference operating status, while carrying out intensity grade setting to dynamic threshold,
For the subsequent requirement for meeting device performance monitoring dynamic management under different operating statuses.By mathematical modeling, establish to measuring point
The judgement for whether meeting measuring point data variation moving law in the past established, is built for the prediction of variation tendency and future time instance numerical value
The vertical judgement that meets situation of the mathematical model to measuring point current data.
One, data acquire:
1. user is surveyed by the measuring point in measuring point coding, measuring point title, instrument keyword query real-time data base, export
Point data;
2. the historic defects information of collecting device, the Historical Monitoring report of equipment;
3. routine operations such as pair measuring point found is saved, deleted, transform sequences.
Two, data prediction:
1. carrying out exceptional value lookup, the scope of period, including ocean temperature, environment temperature, humidity;Using linear
The correlation analysis of single order realizes the correlation analysis of measuring point and the establishment of weight, rejects the parameter of completely no correlation;Rule
Screening, the error that eliminating system is generated by uncertain factor;It is screened using trend, rejects mutation, irregular fluctuation, substantial deviation
The period of floor data;Fixed threshold range is defined, it is made to be bonded operating condition completely;Start and stop rule is set;
Wherein, the dependency analysis process of measuring point is as follows: pushing away at any time since covariance feature can embody two measuring points
The relative variability degree of shifting and direction, therefore using covariance numerical value as measuring point correlation judgment basis.In view of different surveys
The data dimension of point is different, and the variance product using the two is normalized covariance numerical value.So related coefficient has following spy
Point: 1. related coefficient numerical values reciteds represent the power of linearly related degree between two measuring points between [0,1];2. related
Coefficient symbols it is positive and negative, represent correlativity between measuring point and belong to positive correlation or negatively correlated.Related coefficient calculation formula are as follows:
2. model pre-warning effect detection screens defect information according to (2) step in the first step;Reservation can lead to
Cross the information that Parameters variation carries out early warning judgement;History parameters are extracted, the analog detection of model is carried out;Come according to testing result excellent
Change the algorithm of adjustment model;
3. being determined whether to ignore the outlier, while operator according to field conditions and historical record by operator
The adjustment of data time interval is carried out according to the situation of abnormal point;If judging, abnormal point is caused by measuring instrumentss failure, to this
Data are deleted, and a stepping row data missing values of going forward side by side are automatically replenished;If judging, for equipment fault, it is different to extract this for abnormal point
Constant value point remains further analysis processing;
4. due in step (2) abnormal data ignore caused by shortage of data value be automatically replenished, according to missing front and back data
Measured value, setting take most dirty data automatically to fill or be averaged and fill function.
Three, feature extraction:
1. according to the design data of equipment, supervision document, drawing delimit parameter area, herein within the scope of carry out parameter choosing
It takes, including equipment design parameter, equipment safety characterisitic parameter, equipment running status parameter;
2. handling by the step (1) in data prediction by parameter normalization, deviation percent or unified hundred are taken
Than two kinds methods are divided to complete, the determination of Lai Shixian weight;Operator can suitably could be adjusted to verify to parameters weighting
Validity, the correctness of model;
Four, module training:
1. for there is the equipment of historical failure data, using based on data-driven machine learning and data mining algorithm into
Row modeling, once actual monitoring data fit model alarming value, system makes device failure alert automatically, and according to true when modeling
Fixed fault mode automatic prompt equipment fault type, while the time that can be also occurred according to model automatic Prediction failure, and make
It prompts out;
2. pair not equipment of historical failure data, data are operated normally using history to carry out machine learning modeling, it should
Model is the section of a normal operation, and beyond operating normally, then system makes unit exception warning automatically.
Five, iteration optimization model:
1. the step according to the defect information reported by mistake and failed to report is generated in model actual moving process, in repeated data pretreatment
Suddenly (1), step (3) execute the dynamic threshold range for optimizing and revising model calculating, if model generates wrong report, screen again similar
The time segment limit of historical data under operating condition, or the bound of dynamic threshold range is adjusted according to the actual situation;
2. the range, quantity, weight for adjusting modeling parameters realize letter according to the early warning effect in model actual moving process
Change the effect of model;
Six, model application:
The dynamic threshold model that big data analysis is obtained, in Chinese Nuclear Power equipment reliability management system (ERDB)
It is monitored in three factory, the Qin, 8 main pump device performance monitorings, the time model that system is configured automatically according to inside, in conjunction with history event
The variation tendency of barrier or abnormal data, the time that prediction failure may occur, and form anticipation trend curve, device failure alert
Or abnormal warning, including yellow and the above rank, it automatically forms event log and issues mail and ERDB prompting message automatically.
Claims (6)
1. a kind of real-time device performance monitoring method based on equipment working condition variation, it is characterised in that: including step 1: data are adopted
Collection;Step 2: data prediction;Step 3: feature extraction;Step 4: module training;Step 5: iteration optimization model;Step
Six: model application;Wherein, the step two: data prediction includes the following steps:
Step 1: carrying out exceptional value lookup, the scope of period, including ocean temperature, environment temperature, humidity;Using line
Property single order correlation analysis, realize the correlation analysis of measuring point and the establishment of weight, reject the parameter of completely no correlation;Rule
It then screens, the error that eliminating system is generated by uncertain factor;Screened using trend, reject mutation, irregular fluctuation, it is serious partially
Period from floor data;Fixed threshold range is defined, it is made to be bonded operating condition completely;Start and stop rule is set;
Step 2: model pre-warning effect detection screens defect information according to (2) step in the first step;Reservation can lead to
Cross the information that Parameters variation carries out early warning judgement;History parameters are extracted, the analog detection of model is carried out;Come according to testing result excellent
Change the algorithm of adjustment model;
Step 3: being determined whether to ignore the outlier according to field conditions and historical record by operator, operate simultaneously
Member carries out the adjustment of data time interval according to the situation of abnormal point;If judging, abnormal point is caused by measuring instrumentss failure, right
The data are deleted, and a stepping row data missing values of going forward side by side are automatically replenished;If judging abnormal point for equipment fault, extracting should
Outlier remains further analysis processing;
Step 4: shortage of data value caused by ignoring to abnormal data in above-mentioned third step is automatically replenished, according to missing front and back number
Factually measured value, setting take most dirty data automatically to fill or be averaged and fill function.
2. a kind of real-time device performance monitoring method based on equipment working condition variation as described in claim 1, it is characterised in that:
The step one: data acquisition includes the following steps:
Step 1: user passes through the measuring point in measuring point coding, measuring point title, instrument keyword query real-time data base, export
Measuring point data;
Step 2: the historic defects information of collecting device, the Historical Monitoring report of equipment;
Step 3: being saved, being deleted to the measuring point found, the routine operations such as transform sequence.
3. a kind of real-time device performance monitoring method based on equipment working condition variation as described in claim 1, it is characterised in that:
The step three: feature extraction includes the following steps:
Step 1: according to the design data of equipment, supervision document, drawing delimit parameter area, herein within the scope of carry out parameter
It chooses, including equipment design parameter, equipment safety characterisitic parameter, equipment running status parameter;
Step 2: handle by the step (1) in data prediction by parameter normalization, deviation percent or uniformly is taken
Percentage two kinds of methods are completed, the determination of Lai Shixian weight;Operator can suitably could be adjusted to test to parameters weighting
Validity, the correctness of model of a syndrome.
4. a kind of real-time device performance monitoring method based on equipment working condition variation as described in claim 1, it is characterised in that:
The step four: module training includes the following steps:
Step 1: for there is the equipment of historical failure data, using based on data-driven machine learning and data mining algorithm
It is modeled, once actual monitoring data fit model alarming value, system make device failure alert automatically, and when according to modeling
Determining fault mode automatic prompt equipment fault type, while the time that can be also occurred according to model automatic Prediction failure, and
Make prompt;
Step 2: the equipment of not historical failure data is operated normally data using history to carry out machine learning modeling, is somebody's turn to do
Model is the section of a normal operation, and beyond operating normally, then system makes unit exception warning automatically.
5. a kind of real-time device performance monitoring method based on equipment working condition variation as described in claim 1, it is characterised in that:
The step five: iteration optimization model includes the following steps: step 1: according to wrong report is generated in model actual moving process
With the defect information failed to report, repeated data pretreatment in step (1), step (3), execute optimize and revise model calculating dynamic
Threshold range screens the time segment limit of the historical data under similar operating condition, or according to practical feelings if model generates wrong report again
The bound of condition adjustment dynamic threshold range;
Step 2: the range, quantity, weight for adjusting modeling parameters are realized according to the early warning effect in model actual moving process
The effect of simplified model.
6. a kind of real-time device performance monitoring method based on equipment working condition variation as described in claim 1, it is characterised in that:
The step six: model application includes the following steps:
Step 1: the dynamic threshold model that big data analysis is obtained puts into application;
Step 2: time model of the system automatically according to inside configuration, in conjunction with historical failure or the variation tendency of abnormal data, in advance
The time that failure occurs is surveyed, anticipation trend curve, device failure alert or abnormal warning, including yellow and the above rank are formed,
It automatically forms event log and issues mail and prompting message automatically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811236384.1A CN109524139B (en) | 2018-10-23 | 2018-10-23 | Real-time equipment performance monitoring method based on equipment working condition change |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811236384.1A CN109524139B (en) | 2018-10-23 | 2018-10-23 | Real-time equipment performance monitoring method based on equipment working condition change |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109524139A true CN109524139A (en) | 2019-03-26 |
CN109524139B CN109524139B (en) | 2023-06-13 |
Family
ID=65772354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811236384.1A Active CN109524139B (en) | 2018-10-23 | 2018-10-23 | Real-time equipment performance monitoring method based on equipment working condition change |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109524139B (en) |
Cited By (52)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110265165A (en) * | 2019-06-18 | 2019-09-20 | 中广核核电运营有限公司 | Nuclear power vessel temp adjusting method, device, computer equipment and storage medium |
CN110263949A (en) * | 2019-06-21 | 2019-09-20 | 安徽智寰科技有限公司 | Merge the data processing method and system of machine mechanism and intelligent algorithm system |
CN110427689A (en) * | 2019-07-29 | 2019-11-08 | 大唐国际发电股份有限公司北京高井热电厂 | Combustion engine unit group of planes monitoring, diagnosing method based on new information technology |
CN110471401A (en) * | 2019-08-30 | 2019-11-19 | 盈盛智创科技(广州)有限公司 | A kind of prediction technique, device and the equipment of transmission equipment exception |
CN110487315A (en) * | 2019-08-28 | 2019-11-22 | 广东核电合营有限公司 | A kind of analysis system and method for instrument drift |
CN110531649A (en) * | 2019-07-22 | 2019-12-03 | 中国船舶重工集团公司第七一九研究所 | A kind of ocean nuclear power platform numerical value operational system and O&M method |
CN110609530A (en) * | 2019-09-23 | 2019-12-24 | 厦门华夏国际电力发展有限公司 | Data mining method and system for realizing working condition optimization based on DCS system edge |
CN110781220A (en) * | 2019-09-20 | 2020-02-11 | 江苏欣皓测试技术有限公司 | Fault early warning method and device, storage medium and electronic equipment |
CN111068230A (en) * | 2019-12-30 | 2020-04-28 | 中祖建设安装工程有限公司 | Fire-fighting facility maintenance method and system |
CN111077886A (en) * | 2019-12-31 | 2020-04-28 | 上海申铁信息工程有限公司 | Station fault real-time monitoring system |
CN111222239A (en) * | 2020-01-04 | 2020-06-02 | 华北理工大学 | Blast furnace ironmaking data standardization processing method and system |
CN111241683A (en) * | 2020-01-14 | 2020-06-05 | 济南浪潮高新科技投资发展有限公司 | Equipment working condition fault prediction method and system based on dynamic time warping |
CN111290371A (en) * | 2020-03-05 | 2020-06-16 | 深圳知路科技有限公司 | Method and device for remote diagnosis of Internet of things equipment and electronic equipment |
CN111291239A (en) * | 2020-03-11 | 2020-06-16 | 格力电器(合肥)有限公司 | Unit testing method, device, equipment and storage medium |
CN111339074A (en) * | 2020-02-24 | 2020-06-26 | 深圳市名通科技股份有限公司 | Threshold generation method, device, equipment and storage medium |
CN111383784A (en) * | 2020-02-27 | 2020-07-07 | 中广核核电运营有限公司 | Error correction monitoring method and device for intelligent pressure vessel measuring system |
CN111766815A (en) * | 2020-07-14 | 2020-10-13 | 上海威派格智慧水务股份有限公司 | Operation monitoring system of water affair equipment |
CN111766514A (en) * | 2020-06-19 | 2020-10-13 | 南方电网调峰调频发电有限公司 | Data analysis method for equipment detection points |
CN111883277A (en) * | 2020-07-29 | 2020-11-03 | 中国广核电力股份有限公司 | Nuclear power station safety credible state monitoring system based on physical disconnection |
CN111930782A (en) * | 2020-08-11 | 2020-11-13 | 南京国电南自轨道交通工程有限公司 | Two historical data sampling methods based on threshold value |
CN112000715A (en) * | 2020-08-24 | 2020-11-27 | 江苏徐工信息技术股份有限公司 | Algorithm for counting working state of equipment based on real-time working condition of equipment |
CN112101634A (en) * | 2020-08-21 | 2020-12-18 | 河南中烟工业有限责任公司 | Fault equipment prediction method for defective products |
CN112102593A (en) * | 2020-09-18 | 2020-12-18 | 浙江浙能长兴发电有限公司 | Pre-alarm technology application for guaranteeing operation safety based on real-time data self-learning model of thermal power plant production |
CN112185050A (en) * | 2020-09-25 | 2021-01-05 | 珠海格力电器股份有限公司 | Security level confirmation method and device and fire fighting system |
CN112284440A (en) * | 2020-08-03 | 2021-01-29 | 泉州装备制造研究所 | Sensor data deviation self-adaptive correction method |
CN112447308A (en) * | 2019-08-30 | 2021-03-05 | 海南核电有限公司 | Early warning system for avoiding shutdown and shutdown of unit |
CN112687407A (en) * | 2020-12-28 | 2021-04-20 | 山东鲁能软件技术有限公司 | Nuclear power station main pump state monitoring and diagnosing method and system |
CN113238530A (en) * | 2021-04-25 | 2021-08-10 | 中国核电工程有限公司 | Monitoring system display function design method and system, verification method and display method |
CN113313407A (en) * | 2021-06-16 | 2021-08-27 | 上海交通大学 | Enterprise power utilization behavior identification method and device |
CN113433864A (en) * | 2021-07-07 | 2021-09-24 | 普天鸿雁物联网技术有限公司 | Control method and device of intelligent socket, storage medium and processor |
CN113504423A (en) * | 2021-07-13 | 2021-10-15 | 许昌许继软件技术有限公司 | Primary equipment online monitoring data trend prediction method and device |
WO2021238013A1 (en) * | 2020-05-26 | 2021-12-02 | 南方电网调峰调频发电有限公司 | Adaptive test method for intelligent prediction algorithm for analog measurement value |
CN113741362A (en) * | 2021-08-17 | 2021-12-03 | 中海石油气电集团有限责任公司 | Method, system, medium, and computing device for optimizing operation of liquefied natural gas receiving station |
CN113806351A (en) * | 2021-11-19 | 2021-12-17 | 国能信控互联技术有限公司 | Abnormal value processing method and device for power generation data of thermal power generating unit |
CN113837289A (en) * | 2021-09-26 | 2021-12-24 | 创新奇智(重庆)科技有限公司 | Model training method, fault prediction method and device and electronic equipment |
CN113983543A (en) * | 2021-10-11 | 2022-01-28 | 河北工大科雅能源科技股份有限公司 | Method, device, terminal and storage medium for control of circulation pump of heating power station |
CN114064760A (en) * | 2021-11-18 | 2022-02-18 | 广州泰禾大数据服务有限公司 | Multi-dimensional early warning analysis and judgment method for data |
CN114338458A (en) * | 2021-12-24 | 2022-04-12 | 山石网科通信技术股份有限公司 | Data security detection method and device |
US11378491B2 (en) * | 2020-04-03 | 2022-07-05 | Itt Manufacturing Enterprises Llc | Bearing frame monitoring system |
CN114819679A (en) * | 2022-05-06 | 2022-07-29 | 京东科技信息技术有限公司 | Customer service session quality inspection method and device |
CN114897225A (en) * | 2022-04-22 | 2022-08-12 | 清能艾科(深圳)能源技术有限公司 | Accident prediction method and device for drilling operation, electronic device and storage medium |
CN114915542A (en) * | 2022-04-28 | 2022-08-16 | 远景智能国际私人投资有限公司 | Data abnormity warning method, device, equipment and storage medium |
CN114973619A (en) * | 2022-05-27 | 2022-08-30 | 北京嘉联优控科技有限公司 | Industrial instrument alarm management method and device, electronic equipment and storage medium |
CN115018143A (en) * | 2022-05-31 | 2022-09-06 | 深圳信息职业技术学院 | Method and system for predicting shutdown time of nuclear power station |
CN115423158A (en) * | 2022-08-17 | 2022-12-02 | 贵州北盘江电力股份有限公司光照分公司 | Predictive analysis method and system for data trend of hydroelectric generating set |
CN115909678A (en) * | 2022-11-07 | 2023-04-04 | 浙江中控技术股份有限公司 | Equipment parameter early warning method and device and storage medium |
CN116845936A (en) * | 2023-09-01 | 2023-10-03 | 华夏天信智能物联股份有限公司 | Intelligent control method of flywheel energy storage device |
CN116956200A (en) * | 2023-09-19 | 2023-10-27 | 山东辉瑞管业有限公司 | Irrigation pipe production real-time detection system based on machine learning |
CN117455151A (en) * | 2023-10-24 | 2024-01-26 | 成都愿景仿视科技有限公司 | Equipment fault prediction system and method |
CN117892249A (en) * | 2024-03-15 | 2024-04-16 | 宁波析昶环保科技有限公司 | Intelligent operation and maintenance platform early warning system |
CN118392255A (en) * | 2024-07-01 | 2024-07-26 | 四川奥凸科技有限公司 | Method, system and equipment for monitoring operation condition of electromechanical equipment of water plant |
CN118551329A (en) * | 2024-07-29 | 2024-08-27 | 中谷能源装备(江苏)有限公司 | Cryogenic hydrogen storage tank tightness detection system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070179746A1 (en) * | 2006-01-30 | 2007-08-02 | Nec Laboratories America, Inc. | Automated Modeling and Tracking of Transaction Flow Dynamics For Fault Detection in Complex Systems |
CN104102773A (en) * | 2014-07-05 | 2014-10-15 | 山东鲁能软件技术有限公司 | Equipment fault warning and state monitoring method |
US20140365179A1 (en) * | 2013-06-11 | 2014-12-11 | Ypf Sociedad Anonima | Method and Apparatus for Detecting and Identifying Faults in a Process |
CN104573850A (en) * | 2014-12-18 | 2015-04-29 | 湖南大唐先一科技有限公司 | Method for evaluating state of thermal power plant equipment |
CN106650154A (en) * | 2016-12-30 | 2017-05-10 | 中核核电运行管理有限公司 | Nuclear power conventional island equipment reliability monitoring method based on thermal performance index |
-
2018
- 2018-10-23 CN CN201811236384.1A patent/CN109524139B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070179746A1 (en) * | 2006-01-30 | 2007-08-02 | Nec Laboratories America, Inc. | Automated Modeling and Tracking of Transaction Flow Dynamics For Fault Detection in Complex Systems |
US20140365179A1 (en) * | 2013-06-11 | 2014-12-11 | Ypf Sociedad Anonima | Method and Apparatus for Detecting and Identifying Faults in a Process |
CN104102773A (en) * | 2014-07-05 | 2014-10-15 | 山东鲁能软件技术有限公司 | Equipment fault warning and state monitoring method |
CN104573850A (en) * | 2014-12-18 | 2015-04-29 | 湖南大唐先一科技有限公司 | Method for evaluating state of thermal power plant equipment |
CN106650154A (en) * | 2016-12-30 | 2017-05-10 | 中核核电运行管理有限公司 | Nuclear power conventional island equipment reliability monitoring method based on thermal performance index |
Cited By (69)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110265165A (en) * | 2019-06-18 | 2019-09-20 | 中广核核电运营有限公司 | Nuclear power vessel temp adjusting method, device, computer equipment and storage medium |
CN110263949A (en) * | 2019-06-21 | 2019-09-20 | 安徽智寰科技有限公司 | Merge the data processing method and system of machine mechanism and intelligent algorithm system |
CN110263949B (en) * | 2019-06-21 | 2021-08-31 | 安徽智寰科技有限公司 | Data processing method and system fusing machine mechanism and artificial intelligence algorithm system |
CN110531649A (en) * | 2019-07-22 | 2019-12-03 | 中国船舶重工集团公司第七一九研究所 | A kind of ocean nuclear power platform numerical value operational system and O&M method |
CN110427689A (en) * | 2019-07-29 | 2019-11-08 | 大唐国际发电股份有限公司北京高井热电厂 | Combustion engine unit group of planes monitoring, diagnosing method based on new information technology |
CN110427689B (en) * | 2019-07-29 | 2024-01-26 | 大唐国际发电股份有限公司北京高井热电厂 | Method for monitoring and diagnosing gas turbine unit group based on new information technology |
CN110487315A (en) * | 2019-08-28 | 2019-11-22 | 广东核电合营有限公司 | A kind of analysis system and method for instrument drift |
CN110487315B (en) * | 2019-08-28 | 2021-09-28 | 广东核电合营有限公司 | System and method for analyzing instrument drift |
CN110471401A (en) * | 2019-08-30 | 2019-11-19 | 盈盛智创科技(广州)有限公司 | A kind of prediction technique, device and the equipment of transmission equipment exception |
CN112447308A (en) * | 2019-08-30 | 2021-03-05 | 海南核电有限公司 | Early warning system for avoiding shutdown and shutdown of unit |
CN110781220A (en) * | 2019-09-20 | 2020-02-11 | 江苏欣皓测试技术有限公司 | Fault early warning method and device, storage medium and electronic equipment |
CN110609530A (en) * | 2019-09-23 | 2019-12-24 | 厦门华夏国际电力发展有限公司 | Data mining method and system for realizing working condition optimization based on DCS system edge |
CN111068230A (en) * | 2019-12-30 | 2020-04-28 | 中祖建设安装工程有限公司 | Fire-fighting facility maintenance method and system |
CN111077886A (en) * | 2019-12-31 | 2020-04-28 | 上海申铁信息工程有限公司 | Station fault real-time monitoring system |
CN111222239A (en) * | 2020-01-04 | 2020-06-02 | 华北理工大学 | Blast furnace ironmaking data standardization processing method and system |
CN111241683A (en) * | 2020-01-14 | 2020-06-05 | 济南浪潮高新科技投资发展有限公司 | Equipment working condition fault prediction method and system based on dynamic time warping |
CN111339074A (en) * | 2020-02-24 | 2020-06-26 | 深圳市名通科技股份有限公司 | Threshold generation method, device, equipment and storage medium |
CN111339074B (en) * | 2020-02-24 | 2023-05-05 | 深圳市名通科技股份有限公司 | Threshold generation method, device, equipment and storage medium |
CN111383784A (en) * | 2020-02-27 | 2020-07-07 | 中广核核电运营有限公司 | Error correction monitoring method and device for intelligent pressure vessel measuring system |
CN111290371B (en) * | 2020-03-05 | 2021-08-10 | 深圳知路科技有限公司 | Method and device for remote diagnosis of Internet of things equipment and electronic equipment |
CN111290371A (en) * | 2020-03-05 | 2020-06-16 | 深圳知路科技有限公司 | Method and device for remote diagnosis of Internet of things equipment and electronic equipment |
CN111291239A (en) * | 2020-03-11 | 2020-06-16 | 格力电器(合肥)有限公司 | Unit testing method, device, equipment and storage medium |
CN111291239B (en) * | 2020-03-11 | 2023-10-10 | 格力电器(合肥)有限公司 | Method, device, equipment and storage medium for testing unit |
US11378491B2 (en) * | 2020-04-03 | 2022-07-05 | Itt Manufacturing Enterprises Llc | Bearing frame monitoring system |
WO2021238013A1 (en) * | 2020-05-26 | 2021-12-02 | 南方电网调峰调频发电有限公司 | Adaptive test method for intelligent prediction algorithm for analog measurement value |
CN111766514A (en) * | 2020-06-19 | 2020-10-13 | 南方电网调峰调频发电有限公司 | Data analysis method for equipment detection points |
CN111766815A (en) * | 2020-07-14 | 2020-10-13 | 上海威派格智慧水务股份有限公司 | Operation monitoring system of water affair equipment |
CN111883277A (en) * | 2020-07-29 | 2020-11-03 | 中国广核电力股份有限公司 | Nuclear power station safety credible state monitoring system based on physical disconnection |
CN112284440B (en) * | 2020-08-03 | 2022-06-14 | 泉州装备制造研究所 | Sensor data deviation self-adaptive correction method |
CN112284440A (en) * | 2020-08-03 | 2021-01-29 | 泉州装备制造研究所 | Sensor data deviation self-adaptive correction method |
CN111930782A (en) * | 2020-08-11 | 2020-11-13 | 南京国电南自轨道交通工程有限公司 | Two historical data sampling methods based on threshold value |
CN111930782B (en) * | 2020-08-11 | 2024-03-15 | 南京国电南自轨道交通工程有限公司 | Two historical data sampling methods based on threshold value |
CN112101634A (en) * | 2020-08-21 | 2020-12-18 | 河南中烟工业有限责任公司 | Fault equipment prediction method for defective products |
CN112000715A (en) * | 2020-08-24 | 2020-11-27 | 江苏徐工信息技术股份有限公司 | Algorithm for counting working state of equipment based on real-time working condition of equipment |
CN112102593A (en) * | 2020-09-18 | 2020-12-18 | 浙江浙能长兴发电有限公司 | Pre-alarm technology application for guaranteeing operation safety based on real-time data self-learning model of thermal power plant production |
CN112185050A (en) * | 2020-09-25 | 2021-01-05 | 珠海格力电器股份有限公司 | Security level confirmation method and device and fire fighting system |
CN112687407A (en) * | 2020-12-28 | 2021-04-20 | 山东鲁能软件技术有限公司 | Nuclear power station main pump state monitoring and diagnosing method and system |
CN112687407B (en) * | 2020-12-28 | 2022-05-17 | 山东鲁能软件技术有限公司 | Nuclear power station main pump state monitoring and diagnosing method and system |
CN113238530A (en) * | 2021-04-25 | 2021-08-10 | 中国核电工程有限公司 | Monitoring system display function design method and system, verification method and display method |
CN113313407A (en) * | 2021-06-16 | 2021-08-27 | 上海交通大学 | Enterprise power utilization behavior identification method and device |
CN113433864A (en) * | 2021-07-07 | 2021-09-24 | 普天鸿雁物联网技术有限公司 | Control method and device of intelligent socket, storage medium and processor |
CN113504423A (en) * | 2021-07-13 | 2021-10-15 | 许昌许继软件技术有限公司 | Primary equipment online monitoring data trend prediction method and device |
CN113741362A (en) * | 2021-08-17 | 2021-12-03 | 中海石油气电集团有限责任公司 | Method, system, medium, and computing device for optimizing operation of liquefied natural gas receiving station |
CN113741362B (en) * | 2021-08-17 | 2023-12-22 | 中海石油气电集团有限责任公司 | Liquefied natural gas receiving station operation optimization method, system, medium and computing equipment |
CN113837289A (en) * | 2021-09-26 | 2021-12-24 | 创新奇智(重庆)科技有限公司 | Model training method, fault prediction method and device and electronic equipment |
CN113837289B (en) * | 2021-09-26 | 2024-03-19 | 创新奇智(重庆)科技有限公司 | Model training method, fault prediction device and electronic equipment |
CN113983543A (en) * | 2021-10-11 | 2022-01-28 | 河北工大科雅能源科技股份有限公司 | Method, device, terminal and storage medium for control of circulation pump of heating power station |
CN114064760B (en) * | 2021-11-18 | 2022-12-13 | 广州泰禾大数据服务有限公司 | Multi-dimensional early warning analysis and judgment method for data |
CN114064760A (en) * | 2021-11-18 | 2022-02-18 | 广州泰禾大数据服务有限公司 | Multi-dimensional early warning analysis and judgment method for data |
CN113806351A (en) * | 2021-11-19 | 2021-12-17 | 国能信控互联技术有限公司 | Abnormal value processing method and device for power generation data of thermal power generating unit |
CN114338458A (en) * | 2021-12-24 | 2022-04-12 | 山石网科通信技术股份有限公司 | Data security detection method and device |
CN114897225A (en) * | 2022-04-22 | 2022-08-12 | 清能艾科(深圳)能源技术有限公司 | Accident prediction method and device for drilling operation, electronic device and storage medium |
CN114915542A (en) * | 2022-04-28 | 2022-08-16 | 远景智能国际私人投资有限公司 | Data abnormity warning method, device, equipment and storage medium |
CN114819679A (en) * | 2022-05-06 | 2022-07-29 | 京东科技信息技术有限公司 | Customer service session quality inspection method and device |
CN114973619A (en) * | 2022-05-27 | 2022-08-30 | 北京嘉联优控科技有限公司 | Industrial instrument alarm management method and device, electronic equipment and storage medium |
CN114973619B (en) * | 2022-05-27 | 2023-06-13 | 北京嘉联优控科技有限公司 | Alarm management method and device for industrial instrument equipment, electronic equipment and storage medium |
CN115018143A (en) * | 2022-05-31 | 2022-09-06 | 深圳信息职业技术学院 | Method and system for predicting shutdown time of nuclear power station |
CN115423158A (en) * | 2022-08-17 | 2022-12-02 | 贵州北盘江电力股份有限公司光照分公司 | Predictive analysis method and system for data trend of hydroelectric generating set |
CN115909678A (en) * | 2022-11-07 | 2023-04-04 | 浙江中控技术股份有限公司 | Equipment parameter early warning method and device and storage medium |
CN116845936B (en) * | 2023-09-01 | 2023-11-21 | 华夏天信智能物联股份有限公司 | Intelligent control method of flywheel energy storage device |
CN116845936A (en) * | 2023-09-01 | 2023-10-03 | 华夏天信智能物联股份有限公司 | Intelligent control method of flywheel energy storage device |
CN116956200B (en) * | 2023-09-19 | 2023-11-24 | 山东辉瑞管业有限公司 | Irrigation pipe production real-time detection system based on machine learning |
CN116956200A (en) * | 2023-09-19 | 2023-10-27 | 山东辉瑞管业有限公司 | Irrigation pipe production real-time detection system based on machine learning |
CN117455151A (en) * | 2023-10-24 | 2024-01-26 | 成都愿景仿视科技有限公司 | Equipment fault prediction system and method |
CN117455151B (en) * | 2023-10-24 | 2024-09-20 | 成都愿景仿视科技有限公司 | Equipment fault prediction system and method |
CN117892249A (en) * | 2024-03-15 | 2024-04-16 | 宁波析昶环保科技有限公司 | Intelligent operation and maintenance platform early warning system |
CN117892249B (en) * | 2024-03-15 | 2024-05-31 | 宁波析昶环保科技有限公司 | Intelligent operation and maintenance platform early warning system |
CN118392255A (en) * | 2024-07-01 | 2024-07-26 | 四川奥凸科技有限公司 | Method, system and equipment for monitoring operation condition of electromechanical equipment of water plant |
CN118551329A (en) * | 2024-07-29 | 2024-08-27 | 中谷能源装备(江苏)有限公司 | Cryogenic hydrogen storage tank tightness detection system |
Also Published As
Publication number | Publication date |
---|---|
CN109524139B (en) | 2023-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109524139A (en) | A kind of real-time device performance monitoring method based on equipment working condition variation | |
CN108460144B (en) | Coal equipment fault early warning system and method based on machine learning | |
CN108241343A (en) | A kind of intelligent plant management platform system | |
CN104573850A (en) | Method for evaluating state of thermal power plant equipment | |
CN110414155A (en) | A kind of detection of fan part temperature anomaly and alarm method with single measuring point | |
CN104677997B (en) | A kind of transformer oil chromatographic on-line monitoring differentiation method for early warning | |
CN110414154A (en) | A kind of detection of fan part temperature anomaly and alarm method with double measuring points | |
CN108981796B (en) | Five-in-one hydraulic mechanical fault diagnosis method | |
CN118214168B (en) | Real-time state monitoring method for power distribution circuit | |
CN109741927A (en) | The equipment fault of miniature transformer production line and potential defective products intelligent predicting system | |
CN114692875B (en) | Construction method of GIS knowledge graph for fault diagnosis | |
CN105975797A (en) | Product early-fault root cause recognition method based on fuzzy data processing | |
CN112288298B (en) | On-line data-based health condition evaluation method for desulfurization system | |
CN115265635B (en) | Industrial machine vision detection management system based on data analysis | |
CN109816191A (en) | The qualitative forecasting method and its system of Multi-workstation System | |
CN114781476A (en) | Fault analysis system and method for measuring equipment | |
CN115455358A (en) | Electrical parameter trend early warning and fault diagnosis method based on nonlinear regression model | |
CN113806969A (en) | Compressor unit health prediction method based on time domain data correlation modeling | |
CN117560300B (en) | Intelligent internet of things flow prediction and optimization system | |
CN109299201B (en) | Power plant production subsystem abnormity monitoring method and device based on two-stage clustering | |
CN117371990B (en) | Hydropower plant tool intelligent management platform based on Internet of things | |
CN117591949A (en) | Equipment abnormality identification method, equipment and medium | |
CN105302476B (en) | A kind of reliability data online acquisition for nuclear power plant equipment analyzes storage system and its storage method | |
CN115859068B (en) | Environment information sensing method and system for intelligent water conservancy architecture | |
CN116628869A (en) | Analysis method for fault propagation mechanism of numerical control machine tool based on transfer entropy theory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |