CN109522159A - A kind of project management information standby system and its method - Google Patents

A kind of project management information standby system and its method Download PDF

Info

Publication number
CN109522159A
CN109522159A CN201811417714.7A CN201811417714A CN109522159A CN 109522159 A CN109522159 A CN 109522159A CN 201811417714 A CN201811417714 A CN 201811417714A CN 109522159 A CN109522159 A CN 109522159A
Authority
CN
China
Prior art keywords
information
project
unit
backup
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811417714.7A
Other languages
Chinese (zh)
Inventor
郑文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huashang Vocational College
Original Assignee
Guangzhou Huashang Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huashang Vocational College filed Critical Guangzhou Huashang Vocational College
Priority to CN201811417714.7A priority Critical patent/CN109522159A/en
Publication of CN109522159A publication Critical patent/CN109522159A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1448Management of the data involved in backup or backup restore
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/602Providing cryptographic facilities or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6218Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database

Abstract

The invention discloses a kind of project management information standby systems, belong to the processing technology field of project management information, it solves the problems, such as that gibberish can not be filtered in existing project management information backup procedure, the present invention includes: Database Unit, mobile terminal, recognition unit, control unit and display unit, the invalid information of project management information can be effectively filtered by controlling, characteristic information is obtained to be backed up, the present invention also provides the backup methods of above-mentioned project management information, so that the information after backup meets the requirement of system, information after backup is clear and complete, extraction is had access to conveniently, it provides convenience to the use of people, it is practical.

Description

A kind of project management information standby system and its method
Technical field
The invention belongs to the processing technology fields of project management information, specifically, it is standby to be related to a kind of project management information Part system and method.
Background technique
In existing projects, the processing of information is particularly important, is related to the confidential information and management of engineering Information etc., therefore, particularly important to the management of engineering information, especially information backup management avoids engineering information It loses and causes huge economic loss to people;
Chinese Patent Application No.: 201710139045.0, application publication number: CN 106970858A discloses a kind of engineering management Information backup method and system, its key points of the technical solution are that including the following steps: whether detection has by testing within a preset range The mobile terminal of card, if so, then sending connection request into mobile terminal;After establishing connection with mobile terminal, further to shifting Dynamic terminal sends the request of backup;After mobile terminal agrees to backup request, whether detection backup has newly-increased typing in region Data, if so, then entering next step;According to newly-increased logging data to form the log document in respective backup region in real time simultaneously It is sent in mobile terminal;Mobile terminal receives this log document and carries out stacking-type storage.Local terminal occur program exception, When collapse causes the project management information system to exit, due to preserving log document in mobile terminal, user only needed day Will document send back to local terminal again and replicates the logging data in log document again.
Although above-mentioned project management information backup method and system can be sent out again when system runs quickly and bursts by log document The information for obtaining and not completing backup is sent, but there is also following deficiencies for its use process:
Checking treatment can not be carried out to information after acquisition of information in above-mentioned project management information backup procedure, the information after backup is miscellaneous Disorderly without chapter, biggish inconvenience is brought in engineering management, people need during extraction or reading information after backup Think to screen out gibberish, workload is huge, there is practicability deficiency.
Summary of the invention
It solves the problems, such as
Aiming at the problem that can not filter gibberish in existing project management information backup procedure, the purpose of the present invention is to provide A kind of project management information standby system and its method, by information checking unit to treated letter in data backup procedure Breath carries out verification denoising, so that the information after backup is more suitable for the management of engineering project, extraction and tune convenient for later period people It reads, to solve the problems mentioned in the above background technology.
Technical solution
To achieve the above object, the invention provides the following technical scheme:
A kind of project management information standby system, comprising:
Database Unit, for storing engineering project information in project management, the engineering project information includes several Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction Same, project quality control situation, project account and project report administrative situation;
Mobile terminal is used to send backup application to system, and submits related engineering project information data;
Whether recognition unit has mobile terminal to send project management information backup application request to system for identification;
Control unit comprising information collection unit, information checking unit;Wherein:
Information collection unit is used to obtain the project management information sent by mobile terminal, and information includes engineering base Plinth characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, and remarks parameter is Specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, the burst of project Event information etc.;
Information checking unit, being used for above-mentioned project backup, to treated, information carries out format check, checking treatment in the process Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance Account and project report administrative situation detailed programs content information;
Display unit, be used to show described control unit complete backup after storage to engineering project information in Database Unit with And display data backup performance.
Preferably, the control unit further include: descriptive entry arranges single, project directory generation unit, job number Generation unit, in which:
Descriptive entry finishing unit is used to carry out induction-arrangement according to the information that information collection unit obtains, and acquisition, which meets, is The project of system backup request records require information, and is recorded according to project and the information that will acquire is required to carry out unification to each project It arranges;
Project directory generation unit, is used for that treated that each project carries out generates information mesh by descriptive entry finishing unit Record, directory information includes level-one title, second level title and three-level title;
Job number generation unit, is used for project directory generation unit treated that project carry out according to the requirement of setting System Number, generation belong to the particular item number conveniently having access to.
Preferably, the control unit further include: information copied cells and data transmission unit, in which:
Information copied cells are used to carry out the project information for meeting backup request after information checking cell processing to copy multiple System;
Data transmission unit, the project information after being used to replicate information copied cells carry out signal and are sent to Database Unit It is stored;
Preferably, further includes:
Data extracting unit is used to control unit and extracts the engineering project information in Database Unit have access to, mention The information taken includes project Global Information and contents of a project information.
Preferably, further includes:
Data updating unit is used to store in user data update to the Database Unit, and data updating unit obtains It is analyzed after the newest information once updated, by the newest information replace or supplement once updated to being stored on database In engineering information in unit 1;The data updating unit is to provide data base to for providing more personalized service Plinth.
Preferably, the mobile terminal by bluetooth, 3G, 4G or WIFI in real time with project management information standby system into Row connection, the mobile terminal is one of PC, mobile phone or tablet computer.
Above-mentioned project management information backup method, the specific steps are as follows:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4 In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7 Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2, And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
Beneficial effect
Compared with prior art, the beneficial effects of the present invention are:
1) above-mentioned project management information backup method can extract in mobile terminal effectively in project management information backup procedure The effective information of acquisition is backed up, and carries out denoising filtering to information, avoid information back-up complete after content it is in disorder, Rambling information generates, and improves information backup efficiency;
2) backup method effectively can carry out format check to the information of backup in backup procedure, avoid the information of backup The requirement for being unsatisfactory for project management information backup happens, so that the information of backup facilitates people to extract and have access to, gives people Use provide convenience;
3) above-mentioned backup method passes through ability after information cryptographic processing unit processing acquisition encrypted instruction in having access to information process It has access to, avoids the leakage of confidential information, improve the security performance of project management information;
4) above-mentioned backup method can be backed up according to the requirement of standby system, and the project management information of backup is completed, catalogue It is clear, and data can real-time update, facilitate people to have access to up-to-date information at any time, understand the latest developments of engineering management, it is practical Property is strong.
Detailed description of the invention
Fig. 1 is the functional block diagram of present system;
Fig. 2 is the flow chart of present system backup method.
In figure: 1, Database Unit;2, data extracting unit;3, data updating unit;4, control unit;41, information is received Collect unit;42, descriptive entry finishing unit;43, project directory generation unit;44, job number generation unit;45, information school Verification certificate member;46, information copied cells;47, data transmission unit;5, information cryptographic processing unit;6, recognition unit;7, mobile whole End;8, display unit.
Specific embodiment
Technical solution of the present invention is described in more detail With reference to embodiment.
Embodiment 1
Referring to Fig. 1, a kind of project management information standby system, comprising:
Database Unit 1, for storing engineering project information in project management, the engineering project information includes several Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction Same, project quality control situation, project account and project report administrative situation;
Mobile terminal 7 is used to send backup application to system, and submits related engineering project information data, and mobile terminal is logical It crosses bluetooth, 3G, 4G or WIFI to be attached with project management information standby system in real time, the mobile terminal is PC, mobile phone Or one of tablet computer;
Whether recognition unit 6 has mobile terminal 7 to send project management information backup application request to system for identification;
Control unit 4 comprising information collection unit 41, descriptive entry finishing unit 42, project directory generation unit 43, engineering Number generation unit 44, information checking unit 45, information copied cells 46 and data transmission unit 47;Wherein:
Information collection unit 41 is used to obtain the project management information sent by mobile terminal 7, and information includes engineering Foundation characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, remarks parameter The specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, project it is prominent Send out event information etc.;
Descriptive entry finishing unit 42 is used to carry out induction-arrangement according to the information that information collection unit 41 obtains, obtains symbol The project of collaboration system backup request records require information, and records the information for requiring will acquire according to project and carry out to each project It is unified to arrange;
Project directory generation unit 43, is used for that treated that each project carries out generation information by descriptive entry finishing unit 42 Catalogue, directory information include level-one title, second level title and three-level title;
Job number generation unit 44 is used for project directory generation unit 43 treated project and carries out requirement according to setting System Number is carried out, generation belongs to the particular item number conveniently having access to;
Information checking unit 45 is used for during above-mentioned project backup to treated information carries out format check, at verification Whether the information after reason meets backup format requirement, for example whether lacking project name, project number, person liable, project start-stop The projects such as time, performance Global Information and item types, item amount, Project contract, project quality control situation, project Account and project report administrative situation detailed programs content information;
Information copied cells 46 are used to copy the project information for meeting backup request after the processing of information checking unit 45 Duplication;
Data transmission unit 47, the project information after being used to replicate information copied cells 46 carry out signal and are sent to database Unit 1 is stored;
Display unit 8 is used to show that described control unit 4 to be completed storage after backing up and believed to engineering project in Database Unit 1 Breath and display data backup performance;
Embodiment 2
Referring to Fig. 1, a kind of project management information standby system, on the basis of embodiment 1, further includes:
Data extracting unit 2 is used to control unit 4 and extracts the engineering project information in Database Unit 1 have access to, The information of extraction includes project Global Information and contents of a project information;
Data updating unit 3 is used to store in user data update to the Database Unit 1, and data updating unit 3 obtains It is analyzed after taking the newest information once updated, by the newest information replace or supplement once updated to being stored on data In engineering information in library unit 1;The data updating unit 3 is to provide data to for providing more personalized service Basis.
A kind of project management information backup method, the specific steps are as follows:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4 In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7 Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2, And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of project management information standby system characterized by comprising
Database Unit, for storing engineering project information in project management, the engineering project information includes several Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction Same, project quality control situation, project account and project report administrative situation;
Mobile terminal is used to send backup application to system, and submits related engineering project information data;
Whether recognition unit has mobile terminal to send project management information backup application request to system for identification;
Control unit comprising information collection unit, information checking unit;Wherein:
Information collection unit is used to obtain the project management information sent by mobile terminal, and information includes engineering base Plinth characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, and remarks parameter is Specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, the burst of project Event information etc.;
Information checking unit, being used for above-mentioned project backup, to treated, information carries out format check, checking treatment in the process Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance Account and project report administrative situation detailed programs content information;
Display unit, be used to show described control unit complete backup after storage to engineering project information in Database Unit with And display data backup performance.
2. a kind of project management information standby system according to claim 1, which is characterized in that the control unit is also It include: that descriptive entry arranges list, project directory generation unit, job number generation unit, in which:
Descriptive entry finishing unit is used to carry out induction-arrangement according to the information that information collection unit obtains, and acquisition, which meets, is The project of system backup request records require information, and is recorded according to project and the information that will acquire is required to carry out unification to each project It arranges;
Project directory generation unit, is used for that treated that each project carries out generates information mesh by descriptive entry finishing unit Record, directory information includes level-one title, second level title and three-level title;
Job number generation unit, is used for project directory generation unit treated that project carry out according to the requirement of setting System Number, generation belong to the particular item number conveniently having access to.
3. a kind of project management information standby system according to claim 1, which is characterized in that the control unit is also It include: information copied cells and data transmission unit, in which:
Information copied cells are used to carry out the project information for meeting backup request after information checking cell processing to copy multiple System;
Data transmission unit, the project information after being used to replicate information copied cells carry out signal and are sent to Database Unit It is stored.
4. a kind of project management information standby system according to claim 1 to 3, which is characterized in that further include:
Data extracting unit is used to control unit and extracts the engineering project information in Database Unit have access to, mention The information taken includes project Global Information and contents of a project information.
5. a kind of project management information standby system according to claim 4, which is characterized in that further include:
Data updating unit is used to store in user data update to the Database Unit, and data updating unit obtains It is analyzed after the newest information once updated, by the newest information replace or supplement once updated to being stored on database In engineering information in unit 1;The data updating unit is to provide data base to for providing more personalized service Plinth.
6. a kind of project management information standby system according to claim 1, which is characterized in that the mobile terminal is logical It crosses bluetooth, 3G, 4G or WIFI to be attached with project management information standby system in real time, the mobile terminal is PC, mobile phone Or one of tablet computer.
7. a kind of project management information backup method a method according to any one of claims 1-3, which is characterized in that specific steps are such as Under:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4 In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7 Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2, And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
CN201811417714.7A 2018-11-26 2018-11-26 A kind of project management information standby system and its method Pending CN109522159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811417714.7A CN109522159A (en) 2018-11-26 2018-11-26 A kind of project management information standby system and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811417714.7A CN109522159A (en) 2018-11-26 2018-11-26 A kind of project management information standby system and its method

Publications (1)

Publication Number Publication Date
CN109522159A true CN109522159A (en) 2019-03-26

Family

ID=65793657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811417714.7A Pending CN109522159A (en) 2018-11-26 2018-11-26 A kind of project management information standby system and its method

Country Status (1)

Country Link
CN (1) CN109522159A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11120056A (en) * 1997-10-09 1999-04-30 Fuji Electric Co Ltd Saving and restoring method for project data
US20030023675A1 (en) * 1997-07-28 2003-01-30 Ouchi Norman Ken Workflow systems and methods for project management and information management
CN105530116A (en) * 2014-10-24 2016-04-27 中兴通讯股份有限公司 Virtual network backup and recovery method and corresponding device
CN106970858A (en) * 2017-03-09 2017-07-21 浙江中诚工程管理科技有限公司 A kind of project management information backup method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030023675A1 (en) * 1997-07-28 2003-01-30 Ouchi Norman Ken Workflow systems and methods for project management and information management
JPH11120056A (en) * 1997-10-09 1999-04-30 Fuji Electric Co Ltd Saving and restoring method for project data
CN105530116A (en) * 2014-10-24 2016-04-27 中兴通讯股份有限公司 Virtual network backup and recovery method and corresponding device
CN106970858A (en) * 2017-03-09 2017-07-21 浙江中诚工程管理科技有限公司 A kind of project management information backup method and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
柳文等: "基于Web的建筑工程项目动态管理系统设计", 《福建电脑》, no. 06, 1 June 2009 (2009-06-01), pages 113 - 141 *
范毅明等著: "《医用B超仪与超声多普勒系统》", vol. 1, 第二军医大学出版社, pages: 228 *

Similar Documents

Publication Publication Date Title
CN103595730B (en) A kind of ciphertext cloud storage method and system
Wolthusen Overcast: Forensic discovery in cloud environments
CN108536752A (en) A kind of method of data synchronization, device and equipment
CN101216832A (en) Data synchronization process and device
CN106503158A (en) Method of data synchronization and device
CN101610303A (en) Multi-medium data automatic backup method and system
CN107277152A (en) A kind of public cloud data safety backup system
CN102130993A (en) Mobile-terminal-based information-recording method and system
CN103336820A (en) Key data auditing method of information system
CN103490978A (en) Terminal, server and message monitoring method
CN103812679B (en) A kind of massive logs statistical analysis system and method
CN107291387B (en) A kind of disk cut-in method of double control disk array
CN106155838A (en) A kind of database back-up data restoration methods and device
CN103324867A (en) Terminal and application program management method
CN109670793A (en) A kind of method and device of the digital asset validity period processing based on block chain
CN112187898B (en) Data access system, method and device based on public security network
CN109522159A (en) A kind of project management information standby system and its method
CN110019527A (en) From library read method, relevant apparatus and equipment
EP4052129A1 (en) System and method for blockchain based backup and recovery
WO2020000198A1 (en) Block chain-based attendance system
US20120089849A1 (en) Cookie management system and method
CN103902919B (en) A kind of method and device recovering log-on message
CN110457529A (en) Post data processing method, device, computer equipment and storage medium
CN103440179B (en) The continuous store method of storage device configurations information
CN109726187A (en) A kind of adaptive authority control method and device towards Hadoop

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination