CN109522023A - It is applicable in the system and method for rail traffic signal system field deployment and rollback - Google Patents
It is applicable in the system and method for rail traffic signal system field deployment and rollback Download PDFInfo
- Publication number
- CN109522023A CN109522023A CN201811226306.3A CN201811226306A CN109522023A CN 109522023 A CN109522023 A CN 109522023A CN 201811226306 A CN201811226306 A CN 201811226306A CN 109522023 A CN109522023 A CN 109522023A
- Authority
- CN
- China
- Prior art keywords
- file
- module
- terminal
- software
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/70—Software maintenance or management
- G06F8/71—Version control; Configuration management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Computer Security & Cryptography (AREA)
- Information Transfer Between Computers (AREA)
Abstract
The present invention relates to a kind of system and methods for being applicable in rail traffic signal system field deployment and rollback, the system includes document processing module, work station/central server control module, station server control module, node map module, information feedback module, logging modle and network module, the document processing module requires to operate single device or more equipment for file transmission and version information verification, the document processing module according to deployment or upgrading;The work station/central server control module is controlled for Windows terminal device, and to single device or more equipment operations, command synchronization is sent and feedback, is realized remote login, installation, upgrading, is restored, restarts.Compared with prior art, the invention has the following advantages that mitigating maintenance workload significantly, signal system update time is reduced, it is ensured that daily operation;The automation of urban rail track traffic signal solution is improved, intelligence degree improves the market competitiveness.
Description
Technical field
The present invention relates to field of urban rail, more particularly, to a kind of applicable rail traffic signal system field deployment
With the system and method for rollback.
Background technique
In current domestic city rail transportation operation, the key link that signal system is runed daily as guarantee, dimension
Shield upgrading has many restrictive conditions, and in order to not influence second day normal operation, signal system was upgraded and made by most cities
Industry is arranged in morning 00:00-4:00;Except train outbound, the processes such as pin point please be put, due to ensure to install the signal system of upgrading
It runs out of question, needs the reserved part time to carry out unloaded trial operation, then could formally run, when leaving signal system operation for
Between it is less;System upgrade process can be divided into pre-upgrade and formal upgrading, and wherein pre-upgrade will return back to operation version after testing
This, therefore pre-upgrade leaves the signal system activity duration for regard to shorter.
Signal system is a very important system in urban track traffic, and signal system is commander's Train Detection and Identification
Equipment, it is ensured that train realize security protection, automatic Pilot, automatically track, Automatic dispatching, for ensure driving safety and improve rail
Pipeline transportation system efficiency of operation plays key effect;ATS (automatic train monitor) is Urban Rail Transit Signal key
Subsystem, according to route length, ATS equipment has dozens to hundreds of device node operation different software;System deployment or upgrading
Failure, will directly affect carrying operation in second day, and to ensure that equipment correctly installs upgrading, signal system passes through existing to equipment at present
Field or certain management end Telnet every will install updating apparatus and be operated, it is ensured that equipment installation is correct;Operating equipment is more, makees
The industry time is short, security requirement is high;Field conduct personnel's fatiguability, error-prone, pressure is very big.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of applicable rail traffics
The system and method for signal system field deployment and rollback.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of system being applicable in rail traffic signal system field deployment and rollback, the system include document processing module,
Work station/central server control module, station server control module, node map module, information feedback module, record mould
Block and network module;
The document processing module is for file transmission and version information verification, and the document processing module is according to portion
Administration or upgrading require to operate single device or more equipment;
The work station/central server control module is controlled for Windows terminal device, to single device or sets more
Standby operation, command synchronization is sent and feedback, realizes remote login, installation, upgrading, restores, restarts;
The station server control module is controlled for Linux terminal equipment, to single device or more equipment operations, is referred to
Synchronous transmission and feedback are enabled, remote login is realized, installation, upgrading, restores, restarts;
The node map module is for reading network node and handling, as tool basic data;
The information feedback module is used to feed back operation and exception information with pictograph interface;
The logging modle is used to execute operation note and exception record, and journal file is written, inquired for operator,
Analysis;
The network module is monitored for Network status, provides network state information in real time.
A method of using the system for being applicable in rail traffic signal system field deployment and rollback, including it is following
Step:
Step 1, automatic Car Plate Reading System configuration node information obtain each device node address information, storage information, automatically
Reading, which need to be disposed or upgrade software data, to be matched, and is prepared as follow-up process;
Step 2 push relevant device node to deployment file, can carry out as needed to single, multiple equipment
Push;There are network or other abnormal conditions in document transmission process, and transmission service will terminate current transmission based on security doctrine,
Single node does not influence other normal nodes extremely and continues to transmit;
Step 3, successfully complete data transmission after, to each node device remote download deployment software and versions of data, and
It checks, it is ensured that software and data upload completely;
Step 4, data transfer, version has verified, and can remotely operate push order to each device node, carry out control note
Volume, starting and rollback;
Step 5, if any abnormal conditions, log is analyzed, all operation notes of log recording, network state and network
Transmit situation;
Step 6 terminates.
Preferably, using the system for signal system field deployment method specifically includes the following steps:
Step 1.1, all terminals of preparation will go up transmitting file, and each terminal document requires to put corresponding text well according to software module
Part;
Step 1.2 compresses all terminal documents;
Step 1.3 carries out upload corresponding document using File Transfer Protocol FTP;
Step 1.4 carries out code check, it is ensured that file uploads complete;If it is inconsistent, output error alarm is carried out, knot
Beam;If consistent, 1.5 are gone to step;
Step 1.5 decompress to remote terminal file;
Step 1.6 is downloaded remote terminal file software and version information;
Step 1.7, such as software and data version information are correct, then carry out step 8;Otherwise output error alarm, knot are carried out
Beam;
Step 1.8 is remotely operated and is started new disposing application program;
Step 1.9 terminates.
Preferably, the code in the step 1.4 is MD5 code.
Preferably, using the system for signal system scene retract method specifically includes the following steps:
Step 2.1 is operated in management end, is remotely closed each terminal system;
Step 2.2 is operated in management end, checks whether back space file goes to step in each terminal if each terminal exists
2.3, if not, going to step 2.7;
Step 2.3 downloads each terminal backoff FileVersion in management end;
Step 2.4 judges whether software and data version information are correct, if incorrect go to step 2.5, if correct turn
Step 2.6;
Step 2.5, version are incorrect, carry out output error alarm, terminate;
Step 2.6, version are correct, are remotely operated and started rollback application program, terminate;
Step 2.7 compresses all terminal documents in management end;
Step 2.8 carries out upload corresponding document using File Transfer Protocol;
MD5 code is generated in each remote terminal after step 2.9, upload, before uploading compared with management end generates MD5 code, really
File is protected to upload completely;If it is inconsistent, carrying out output error alarm, terminate;If consistent, 2.10 are gone to step;
Step 2.10 decompress to remote terminal file;
Step 2.11 is downloaded remote terminal file software and version information;
Step 2.12, such as software and data version information are correct, then carry out step 2.13;Otherwise output error announcement is carried out
It is alert, terminate;
Step 2.13 is remotely operated and is started rollback application program;
Step 2.14 terminates.
Preferably, the File Transfer Protocol of the step 2.8 is FTP.
Compared with prior art, the invention has the following advantages that
1, above scheme proposes the live method for rapidly mounting to the unified push of signal system, reduces urban track traffic
Signal system safeguards related work, improves field labor intensity, improves efficiency;
2, above scheme carries out carrying out all pushing files cryptographic check and version verification, it is ensured that file is correctly pushed to
Client, overcome existing file delivery means there may be file transmission it is imperfect, to influence system worked well;
3, above scheme realize all terminal devices are remotely operated, control is registered, retracts, is restarted, reduce
Operation difficulty reduces human operational error and leads;
4, city rail traffic signal system automation, intelligence degree are improved, product competitiveness in the market is improved.
Detailed description of the invention
Fig. 1 is signal system field deployment method for rapidly mounting flow chart of the invention;
Fig. 2 is signal system scene rollback method for rapidly mounting flow chart of the invention.
Specific embodiment
Technical solution in the embodiment of the present invention is carried out below clear, is fully described by, it is clear that described implementation
Example is a part of the embodiments of the present invention, rather than whole embodiments.Based on the embodiments of the present invention, ordinary skill
Personnel's every other embodiment obtained without making creative work all should belong to the model that the present invention protects
It encloses.
The principle of the present invention: a kind of single-ended push side for not increasing usually ATS grid load and machine loading is proposed
Method, its main feature is that single-ended installation, does not need to install client on each ATS node device;Support work station, server, work
The multiple hardwares equipment several operation systems such as control machine;Realize that multi-to-multi transmits and monitors transmission state and Network status in real time;It is real
Existing software pre-upgrade, the full button operation of rollback operation;Realize that software/data version information remotely decrypts verification.
A kind of system being applicable in rail traffic signal system field deployment and rollback, the system include document processing module,
Work station/central server control module, station server control module, node map module, information feedback module, record mould
Block and network module, the document processing module is for file transmission and version information verification, the document processing module
It requires to operate single device or more equipment according to deployment or upgrading;The work station/central server control module is used
It is controlled in Windows terminal device, to single device or more equipment operations, command synchronization is sent and feedback, realizes remote login, peace
It fills, upgrade, restore, restart;The station server control module is controlled for Linux terminal equipment, to single device or more
Equipment operation, command synchronization is sent and feedback, realizes remote login, installation, upgrading, restores, restarts;The node map mould
Block is for reading network node and handling, as tool basic data;The information feedback module is used for operation and exception
Information is fed back with pictograph interface;Log is written for executing operation note and exception record in the logging modle
File, for operator's inquiry, analysis;The network module is monitored for Network status, provides network state information in real time.
The method that the present invention uses the system for being applicable in rail traffic signal system field deployment and rollback, including with
Lower step:
Step 1, automatic Car Plate Reading System configuration node information obtain each device node address information, storage information;Automatically
Reading, which need to be disposed or upgrade software data, to be matched, and is prepared as follow-up process;
Step 2 push relevant device node to deployment file, can carry out as needed to single, multiple equipment
Push;There are network or other abnormal conditions in document transmission process, and transmission service will terminate current transmission based on security doctrine,
Single node does not influence other normal nodes extremely and continues to transmit;
Step 3 after successfully completing data transmission, to the software and versions of data of the deployment of each node device remote download, supplies
Operator checks, it is ensured that software and data upload completely;
Step 4, data transfer, version has verified, and can remotely operate push order to each device node, carry out control note
Volume, starting, retract etc.;
Step 5, if any abnormal conditions, operator can analyze log, all operation notes of log recording, network
Situations such as state, network transmission;
Step 6 terminates.
As shown in Figure 1, the method using the system for signal system field deployment Fast Installation specifically includes following step
It is rapid:
Step 1.1, all terminals of preparation will go up transmitting file, and each terminal document requires to put corresponding text well according to software module
Part;
Step 1.2 compresses all terminal documents, reduces network bandwidth, improves efficiency of transmission, when reducing transmission
Between;
Step 1.3 carries out upload corresponding document using File Transfer Protocol FTP;
Step 1.4, code compare, it is ensured that file uploads complete;If it is inconsistent, carrying out output error alarm, terminate;Such as
Fruit is consistent, goes to step 5;
Step 1.5 decompress to remote terminal file;
Step 1.6 is downloaded remote terminal file software and version information;
Step 1.7, such as software and data version information are correct, then carry out step 8;Otherwise output error alarm, knot are carried out
Beam;
Step 1.8 is remotely operated and is started new disposing application program;
Step 1.9 terminates.
As shown in Fig. 2, the method using the system for signal system scene rollback Fast Installation specifically includes following step
It is rapid:
Step 2.1 is operated in management end, is remotely closed each terminal system;
Step 2.2 is operated in management end, checks whether back space file goes to step in each terminal if each terminal exists
2.3, if not, going to step 2.7;
Step 2.3 downloads each terminal backoff FileVersion in management end;
Step 2.4 judges whether software and data version information are correct, if incorrect go to step 2.5, if correct turn
Step 2.6;
Step 2.5, version are incorrect, carry out output error alarm, terminate;
Step 2.6, version are correct, are remotely operated and started rollback application program, terminate;
Step 2.7 compresses all terminal documents in management end, reduces network bandwidth, improves efficiency of transmission, reduces
Transmission time;
Step 2.8 carries out upload corresponding document using File Transfer Protocol FTP;
MD5 code is generated in each remote terminal after step 2.9, upload, before uploading compared with management end generates MD5 code, really
File is protected to upload completely;If it is inconsistent, carrying out output error alarm, terminate;If consistent, 2.10 are gone to step;
Step 2.10 decompress to remote terminal file;
Step 2.11 is downloaded remote terminal file software and version information;
Step 2.12, such as software and data version information are correct, then carry out step 2.13;Otherwise output error announcement is carried out
It is alert, terminate;
Step 2.13 is remotely operated and is started rollback application program;
Step 2.14 terminates.
Signal system is a very important system in urban track traffic, and signal system is commander's Train Detection and Identification
Equipment, it is ensured that train realize security protection, automatic Pilot, automatically track, Automatic dispatching, for ensure driving safety and improve rail
Pipeline transportation system efficiency of operation plays key effect;Ensure that the correct rapid deployment of signal system application program or upgrading are very heavy
It wants;Therefore the technical program proposition ensures that data correctness has carried out secondary-confirmation, carries out first to upper transmitting file in local pipe
Reason end and remote terminal carry out generation MD5, and after more consistent, confirmation file uploads complete errorless;Then it is downloaded corresponding soft
Part and data version information reaffirm that the file of upload is correct;Furthermore the technical program is proposed to safety signal system remote
Rapid deployment, rollback installation method, significantly mitigation maintenance workload, reduce signal system update time, it is ensured that daily operation;
The automation of urban rail track traffic signal solution is improved, intelligence degree improves the market competitiveness.
Using the tool of this programme technological development, make in the deployment of multiple city rail traffic signal systems, escalation process
With such as the line of Shanghai 16, the peaceful day in Nanjing is intercity, the line of Chengdu 4, the Ningbo Line 1 second phase, No. 13 line second phases of Shanghai, Beijing Line 1
No. 4 transformation, Wuhan lines etc..
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace
It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right
It is required that protection scope subject to.
Claims (6)
1. a kind of system for being applicable in rail traffic signal system field deployment and rollback, which is characterized in that the system includes file
Processing module, work station/central server control module, station server control module, node map module, information feed back mould
Block, logging modle and network module;
The document processing module for file transmission and version information verification, the document processing module according to deployment or
Upgrading requires to operate single device or more equipment;
The work station/central server control module is controlled for Windows terminal device, is grasped to single device or more equipment
Make, command synchronization is sent and feedback, realizes remote login, installation, upgrading, restores, restarts;
The station server control module is controlled for Linux terminal equipment, and to single device or more equipment operations, instruction is same
Step is sent and feedback, realizes remote login, installation, upgrading, restores, restarts;
The node map module is for reading network node and handling, as tool basic data;
The information feedback module is used to feed back operation and exception information with pictograph interface;
The logging modle is written journal file, for operator's inquiry, divides for executing operation note and exception record
Analysis;
The network module is monitored for Network status, provides network state information in real time.
2. a kind of method using the system described in claim 1 for being applicable in rail traffic signal system field deployment and rollback,
Characterized by comprising the following steps:
Step 1, automatic Car Plate Reading System configuration node information obtain each device node address information, storage information, automatic to read
It need to dispose or upgrade software data and be matched, be prepared as follow-up process;
Step 2 push relevant device node to deployment file, can push as needed to single, multiple equipment;
, there are network or other abnormal conditions in document transmission process, and transmission service will terminate current transmission, single node based on security doctrine
Exception does not influence other normal nodes and continues to transmit;
Step 3 after successfully completing data transmission, to the software and versions of data of the deployment of each node device remote download, and checks,
It is complete to ensure that software and data upload;
Step 4, data transfer, version has verified, and can remotely operate to push to order and arrive each device node, progress control registration,
Starting and rollback;
Step 5, if any abnormal conditions, log is analyzed, all operation notes of log recording, network state and network transmission
Situation;
Step 6 terminates.
3. according to the method described in claim 2, it is characterized in that, the method for being used for signal system field deployment using the system
Specifically includes the following steps:
Step 1.1, all terminals of preparation will go up transmitting file, and each terminal document requires to put corresponding document well according to software module;
Step 1.2 compresses all terminal documents;
Step 1.3 carries out upload corresponding document using File Transfer Protocol FTP;
Step 1.4 carries out code check, it is ensured that file uploads complete;If it is inconsistent, carrying out output error alarm, terminate;Such as
Fruit is consistent, goes to step 1.5;
Step 1.5 decompress to remote terminal file;
Step 1.6 is downloaded remote terminal file software and version information;
Step 1.7, such as software and data version information are correct, then carry out step 8;Otherwise output error alarm is carried out, is terminated;
Step 1.8 is remotely operated and is started new disposing application program;
Step 1.9 terminates.
4. according to the method described in claim 3, it is characterized in that, the code in the step 1.4 is MD5 code.
5. according to the method described in claim 2, it is characterized in that, being used for the method that signal system scene retracts using the system
Specifically includes the following steps:
Step 2.1 is operated in management end, is remotely closed each terminal system;
Step 2.2 is operated in management end, checks back space file whether in each terminal, if the presence of each terminal, goes to step 2.3, such as
Fruit does not exist, and goes to step 2.7;
Step 2.3 downloads each terminal backoff FileVersion in management end;
Step 2.4 judges whether software and data version information are correct, if incorrect go to step 2.5, if correctly gone to step
2.6;
Step 2.5, version are incorrect, carry out output error alarm, terminate;
Step 2.6, version are correct, are remotely operated and started rollback application program, terminate;
Step 2.7 compresses all terminal documents in management end;
Step 2.8 carries out upload corresponding document using File Transfer Protocol;
MD5 code is generated in each remote terminal after step 2.9, upload, before uploading compared with management end generates MD5 code, it is ensured that literary
Part uploads complete;If it is inconsistent, carrying out output error alarm, terminate;If consistent, 2.10 are gone to step;
Step 2.10 decompress to remote terminal file;
Step 2.11 is downloaded remote terminal file software and version information;
Step 2.12, such as software and data version information are correct, then carry out step 2.13;Otherwise output error alarm, knot are carried out
Beam;
Step 2.13 is remotely operated and is started rollback application program;
Step 2.14 terminates.
6. according to the method described in claim 5, it is characterized in that, the File Transfer Protocol of the step 2.8 is FTP.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226306.3A CN109522023A (en) | 2018-10-19 | 2018-10-19 | It is applicable in the system and method for rail traffic signal system field deployment and rollback |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226306.3A CN109522023A (en) | 2018-10-19 | 2018-10-19 | It is applicable in the system and method for rail traffic signal system field deployment and rollback |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109522023A true CN109522023A (en) | 2019-03-26 |
Family
ID=65772159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811226306.3A Pending CN109522023A (en) | 2018-10-19 | 2018-10-19 | It is applicable in the system and method for rail traffic signal system field deployment and rollback |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109522023A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110171444A (en) * | 2019-05-31 | 2019-08-27 | 广州地铁集团有限公司 | A kind of remote monitoring system of mobile unit |
CN113479240A (en) * | 2021-08-19 | 2021-10-08 | 湖南中车时代通信信号有限公司 | Remote operation and maintenance system of urban rail signal system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009019672A1 (en) * | 2007-08-09 | 2009-02-12 | Mapflow Limited | A transport management system |
CN103347048A (en) * | 2013-06-08 | 2013-10-09 | 卡斯柯信号有限公司 | Automatic updating method of urban railway traffic signal system |
CN107770279A (en) * | 2017-10-31 | 2018-03-06 | 深圳市银河风云网络系统股份有限公司 | Remote upgrade method and system |
CN108565016A (en) * | 2018-04-27 | 2018-09-21 | 深圳市联新移动医疗科技有限公司 | A kind of medical treatment intelligent terminal software automatically updating method, terminal and storage medium |
-
2018
- 2018-10-19 CN CN201811226306.3A patent/CN109522023A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009019672A1 (en) * | 2007-08-09 | 2009-02-12 | Mapflow Limited | A transport management system |
CN103347048A (en) * | 2013-06-08 | 2013-10-09 | 卡斯柯信号有限公司 | Automatic updating method of urban railway traffic signal system |
CN107770279A (en) * | 2017-10-31 | 2018-03-06 | 深圳市银河风云网络系统股份有限公司 | Remote upgrade method and system |
CN108565016A (en) * | 2018-04-27 | 2018-09-21 | 深圳市联新移动医疗科技有限公司 | A kind of medical treatment intelligent terminal software automatically updating method, terminal and storage medium |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110171444A (en) * | 2019-05-31 | 2019-08-27 | 广州地铁集团有限公司 | A kind of remote monitoring system of mobile unit |
CN113479240A (en) * | 2021-08-19 | 2021-10-08 | 湖南中车时代通信信号有限公司 | Remote operation and maintenance system of urban rail signal system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102609281B (en) | Distributed software patch update method and system | |
CN109408084B (en) | Method and system for remotely upgrading energy storage BMS equipment through Internet | |
CN103577235A (en) | Software deploying method, deploying server, computer to be deployed and system | |
CN1953376A (en) | A system and method for updating remote software of wireless terminal equipment | |
CN110162334B (en) | Code management method, device and storage medium | |
CN103347048A (en) | Automatic updating method of urban railway traffic signal system | |
CN104394020A (en) | Automatic fault processing and safety control system and method for power information collection device | |
CN101442688A (en) | Method and system for updating intelligent network platform, controller and intelligent network platform equipment | |
CN109522023A (en) | It is applicable in the system and method for rail traffic signal system field deployment and rollback | |
CN102622550B (en) | Safe online patch check system facing terminal computers | |
EP3718043B1 (en) | Update of gateway in substation | |
CN111290351A (en) | Driver management method, system, computer equipment and storage medium | |
CN113993137B (en) | Monitoring system, method and device for configuration data, electronic equipment and medium | |
CN105472005B (en) | A kind of ground ATP equipment method for remote updating and system | |
CN105743695A (en) | Monitoring method and system based on IEC 104 protocol | |
CN104158906A (en) | Server agent manipulation system and manipulation method | |
CN114338353A (en) | Internet of things platform operation and maintenance method based on cloud edge cooperation | |
US11526282B2 (en) | Secure wireless dataloading using in-flight entertainment connectivity systems | |
CN114090050A (en) | Robot software remote automatic updating method, system and related products | |
CN114489750A (en) | Remote upgrading method and device | |
CN110727447A (en) | Automatic upgrading method and system for automatic train supervision system | |
CN112000540A (en) | Monitoring processing method, system, equipment and storage medium for distributed deployment products | |
CN111885116A (en) | Electronic map remote downloading method and system suitable for CBTC (communication based train control) system | |
CN110569047A (en) | method for remotely updating human-computer interface based on detachable communication module | |
CN111355598A (en) | Cloud platform power electrical configuration method based on Internet of things and intelligent cloud gateway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190326 |