Prior art keywords
safety belt
pipeline
suspension device
arm
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811550802.4A
Other languages
Chinese (zh)
Inventor
李晨
杨乐乐
王炎生
穆祥
姚峰
洪赞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Installation Engineering Co Ltd filed Critical China Construction Fourth Bureau Installation Engineering Co Ltd
Priority to CN201811550802.4A priority Critical patent/CN109518983A/en
Publication of CN109518983A publication Critical patent/CN109518983A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3276Arrangements on buildings for connecting safety-lines

Abstract

The invention discloses it is a kind of prevent construction when falling from high altitude method and device, the present invention is to make safety belt suspension device using pipeline through-wall hole reserved when construction;Before the operation that ascend a height, first floor or wall are pierced by from pipeline through-wall hole from floor top surface or next room by safety belt suspension device, safety belt is buckled on the annulus of safety belt suspension device when construction, to prevent construction personnel from the accident of falling at high altitude occurs, it is ensured that personnel safety.What be can be convenient after the device of the invention operation extracts out from upper layer floor or next room by seat belt hanger, can repeat to be used in turn, working security both can be improved, will not cause waste of material, improve construction efficiency, increase economic benefit.

Description

A kind of method and equipment therefor of falling from high altitude when preventing construction
Technical field
The present invention relates to it is a kind of prevent construction when falling from high altitude method and equipment therefor, belong to construction high-altitude Technical field of safety protection.
Background technique
In the construction later period, such as electromechanical installation of rain pipe, air conditioner condensation water pipe is carried out, when, often it is related to Operation is carried out using double ladder or other ascending platforms close to floor edge or periphery in building.Although the operation is in room It is interior, but due to closing on Architectural fringes, surrounding wall and ceiling can not find suitable safety belt hitch point again, slightly also easily send out accidentally Raw the accident of falling at high altitude, security risk are very big.
Current way is that the wall and ceiling around setting are used to hang safety by the way that expansion bolt fixation is some The fixed point of band.The way of the prior art, after construction, it is also necessary to remove temporary fastening device, demolishing process also compares It is cumbersome, it is time-consuming to take material.
Summary of the invention
The object of the present invention is to provide it is a kind of prevent construction when falling from high altitude method and equipment therefor, with system Make the repeatable safety belt suspension device being used in turn, using the hole pipe wall-through hole reserved when construction, as safety Band hitch point, had both ensured working security, has been also convenient for removing, to solve the deficiencies in the prior art.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of method of falling from high altitude when preventing construction of the invention, this method is to utilize pipeline reserved when construction Wall-through hole makes safety belt suspension device;Before the operation that ascend a height, first hanged from floor top surface or next room by safety belt Hang device is pierced by floor or wall from pipeline through-wall hole, and safety belt is buckled on the annulus of safety belt suspension device by when construction, with Prevent construction personnel from the accident of falling at high altitude occurs, it is ensured that personnel safety.
In preceding method, the safety belt suspension device is T-shaped structure weldment, and all weld seams are all made of the two-sided company of being fully welded It connects;The vertical bar of T-shaped structure is pierced by floor or wall from pipeline through-wall hole, and the cross-arm of T-shaped structure is stuck in the top opening in pipeline through-wall hole Or side port.
In preceding method, vertical bar one end of the safety belt suspension device is equipped with the annulus for safety harness, annulus Maximum outside diameter according to the internal diameter in pipeline through-wall hole determine, it is ensured that annulus can be smoothly pierced by from pipeline through-wall hole.
In preceding method, the length of the cross-arm must should meet will not draw under any state from pipeline through-wall hole Out.
A kind of safety belt suspension device for the above method of the invention, including cross-arm and hanger;The whole shape of hanger Shape is T-type, and hanger is that the hot rolled circular steel for being 12mm with whole diameter is bent;Hanger lower end is bent into circular ring structure, in circle Two round steel are bent into vertical parallel section at ring docking;Two round steel are being bent 90 degree to both sides respectively with cross-arm junction At horizontal segment;The horizontal section length of two round steel is equal.
In previous security band suspension arrangement, the vertical parallel segment length A of the hanger is not less than floor or thickness of wall body;Water Flat segment length B is not less than 0.25 times of cross-arm length L.
In previous security band suspension arrangement, the cross-arm is that 40mm × 40mm × 4mm rolls equal leg angle product;Cross-arm is long Degree L is that twice of pipeline through-wall hole aperture D adds 200mm.
By adopting the above-described technical solution, the present invention is compared with prior art: the present invention cleverly utilizes original structure The seat belt hanger of pre-production is passed through pipeline through-wall hole from a upper floor or next room by preserved pipeline hole through walls, The slave upper floor that on annulus that safety belt system hangs over seat belt hanger, can will be can be convenient after operation in construction operation Plate or next room extract seat belt hanger out, improve working security, improve construction efficiency, increase economic effect Benefit.
Detailed description of the invention
Fig. 1 is method schematic diagram of the invention;
Fig. 2 is structural schematic diagram of the invention;
Fig. 3 is provided with the structural schematic diagram of gag lever post.
In the figure, it is marked as 1- cross-arm, 2- hanger, 3- annulus, vertical parallel section of 4-, 5- horizontal segment, 6- pipeline through-wall hole, 7- Floor or wall, 8- gag lever post.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
The method of a kind of falling from high altitude when preventing construction of the invention, as shown in Figure 1: for the company of seeing in Fig. 1 Binding structure has done local cutting to cross-arm, not two cross-arms, and two be the cross-arm of an entirety.This method is applied using building The pipeline through-wall hole 6 that working hour is reserved makes safety belt suspension device;Before the operation that ascend a height, first from floor top surface or every Safety belt suspension device is pierced by floor or wall 7 from pipeline through-wall hole 6 by wall room, and safety belt is buckled in safety belt and hanged by when construction On the annulus 3 of hang device, to prevent construction personnel from the accident of falling at high altitude occurs, it is ensured that personnel safety.Safety belt suspension device is T Shape structure welding part, all weld seams, which are all made of, two-sided is fully welded connection;The vertical bar of T-shaped structure from pipeline through-wall hole 6 be pierced by floor or The cross-arm 1 of wall 7, T-shaped structure is stuck in the top opening or side port in pipeline through-wall hole 6.Vertical bar one end of safety belt suspension device is equipped with For the annulus 3 of safety harness, the maximum outside diameter d of annulus 3 is determined according to pipeline through-wall hole aperture D, it is ensured that annulus can be smoothly It is pierced by from pipeline through-wall hole 6.The length L of cross-arm must should meet will not pull out under any state from pipeline through-wall hole 6.
For a kind of safety belt suspension device of the invention of the above method, as shown in Figure 1, including cross-arm 1 and hanger 2. As shown in Fig. 2, the global shape of hanger 2 is T-type, hanger 2 is that the hot rolled circular steel for being 12mm with whole diameter is bent;Hanger 2 lower ends are bent into 3 structure of annulus, and two round steel are bent into vertical parallel section 4 at 3 docking of annulus;With 1 junction of cross-arm Two round steel are bent 90 degree into horizontal segment 5 to both sides respectively;5 equal length of horizontal segment of two round steel.The vertical of hanger 2 is put down 4 length A of row section is not less than 7 thickness of floor or wall;5 length B of horizontal segment is not less than 0.25 times of cross-arm length L.Cross-arm 1 is 40mm × 40mm × 4mm rolls equal leg angle product;Cross-arm length L is that twice of pipeline through-wall hole aperture D adds 200mm.
Embodiment
This example is fully welded mode using bilateral between cross-arm 1 and hanger 2 and connects as shown in Figure 1, including cross-arm 1 and hanger 2, Vertical parallel section 4 of hanger 2 uses the two-sided mode that is fully welded to connect cross-arm 1 as 40mm × 40mm × 4mm hot rolling equal angle steel;It is horizontal The length L of load 1 is that twice of pipeline through-wall hole aperture D adds 200mm.If pipeline through-wall hole 6 is rectangle, D should be rectangle Catercorner length.To prevent safety belt suspension device from pulling from 6 side of pipeline through-wall hole, the hot rolling that hanger 2 is diameter 12mm is round Steel is bent;The global shape of hanger 2 is T-type.2 lower part of hanger is 3 structure of annulus, and the maximum outside diameter of annulus 3 is less than pipeline The aperture D of wall-through hole 6.It is vertical parallel section 4 in the middle part of hanger 2, is horizontal segment 5 at the top of hanger 2, horizontal segment 5 and cross-arm 1 welds. When welding, the horizontal segment 5 of hanger 2 is preferably welded on the interior angle of angle steel, can increase welding surface, improves soldering reliability.Pipeline is worn When porthole 6 is larger, as shown in figure 3, can on cross-arm 1 or hanger 2 welded limiting bar 8, prevent cross-arm 1 in pipeline through-wall hole 6 It significantly shakes, keeps stability of the safety belt suspension device in pipeline through-wall hole 6, prevent from pulling.

Claims (7)

1. a kind of method of falling from high altitude when preventing construction, it is characterised in that: this method is using reserved when construction Pipeline through-wall hole, make safety belt suspension device;Before the operation that ascend a height, it will first pacify from floor top surface or next room Full band suspension arrangement is pierced by floor or wall from pipeline through-wall hole, and safety belt is buckled in the annulus of safety belt suspension device by when construction On, to prevent construction personnel from the accident of falling at high altitude occurs, it is ensured that personnel safety.
2. method according to claim 1, it is characterised in that: the safety belt suspension device is T-shaped structure weldment, is owned Weld seam, which is all made of, two-sided is fully welded connection;The vertical bar of T-shaped structure is pierced by floor or wall, the cross-arm of T-shaped structure from pipeline through-wall hole It is stuck in the top opening or side port in pipeline through-wall hole.
3. method according to claim 2, it is characterised in that: vertical bar one end of the safety belt suspension device is equipped with for connecting The annulus of safety belt is connect, the maximum outside diameter of annulus is determined according to the internal diameter in pipeline through-wall hole, it is ensured that annulus can smoothly be worn from pipeline Porthole is pierced by.
4. method according to claim 3, it is characterised in that: the length of the cross-arm must should meet under any state It will not be pulled out from pipeline through-wall hole.
5. a kind of safety belt suspension device for Claims 1 to 4 any claim the method, including cross-arm (1) and Hanger (2);It is characterized by: the global shape of hanger (2) is T-type, hanger (2) is the hot rolled circular steel for being 12mm with whole diameter It bends;Hanger (2) lower end is bent into annulus (3) structure, is bent into two round steel at annulus (3) docking vertical parallel Section (4);Two round steel are being bent 90 degree at horizontal segment (5) to both sides respectively with cross-arm (1) junction;The level of two round steel Section (5) equal length.
6. safety belt suspension device according to claim 5, it is characterised in that: vertical parallel section (4) of the hanger (2) are long It spends A and is not less than floor or wall (7) thickness;Horizontal segment (5) length B is not less than 0.25 times of cross-arm length L.
7. safety belt suspension device according to claim 5, it is characterised in that: the cross-arm (1) is 40mm × 40mm × 4mm Roll equal leg angle product;Cross-arm length L is that twice of pipeline through-wall hole aperture D adds 200mm.
CN201811550802.4A 2018-12-18 2018-12-18 A kind of method and equipment therefor of falling from high altitude when preventing construction Pending CN109518983A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811550802.4A CN109518983A (en) 2018-12-18 2018-12-18 A kind of method and equipment therefor of falling from high altitude when preventing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811550802.4A CN109518983A (en) 2018-12-18 2018-12-18 A kind of method and equipment therefor of falling from high altitude when preventing construction

Publications (1)

Publication Number Publication Date
CN109518983A true CN109518983A (en) 2019-03-26

Family

ID=65796566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811550802.4A Pending CN109518983A (en) 2018-12-18 2018-12-18 A kind of method and equipment therefor of falling from high altitude when preventing construction

Country Status (1)

Country Link
CN (1) CN109518983A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202319A (en) * 2021-05-10 2021-08-03 中铁建工集团建筑安装有限公司 Life line for high-altitude operation of workshop and installation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037480A (en) * 1996-07-29 1998-02-10 Okabe Co Ltd Safety net hanging device in concrete structure
JPH11117539A (en) * 1997-10-08 1999-04-27 Kunimoto Co Ltd Safety net suspending metal fittings
KR20140040580A (en) * 2012-09-26 2014-04-03 주식회사 근하기공 Safety belt rack device for construction
CN204754266U (en) * 2015-06-29 2015-11-11 中国十九冶集团有限公司 A safe suspended structure for high altitude construction is built in room
CN105435391A (en) * 2015-12-28 2016-03-30 中冶建工集团有限公司 Safety belt hanging device
CN206987413U (en) * 2017-06-09 2018-02-09 湖州市第二建设工程有限公司 The suspension arrangement for high-altitude construction is built in a kind of room
CN208039885U (en) * 2018-03-22 2018-11-02 陕西建工第九建设集团有限公司 A kind of safety belt wall suspension arrangement
CN209397944U (en) * 2018-12-18 2019-09-17 中建四局安装工程有限公司 A kind of safety belt suspension device of falling from high altitude when preventing construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037480A (en) * 1996-07-29 1998-02-10 Okabe Co Ltd Safety net hanging device in concrete structure
JPH11117539A (en) * 1997-10-08 1999-04-27 Kunimoto Co Ltd Safety net suspending metal fittings
KR20140040580A (en) * 2012-09-26 2014-04-03 주식회사 근하기공 Safety belt rack device for construction
CN204754266U (en) * 2015-06-29 2015-11-11 中国十九冶集团有限公司 A safe suspended structure for high altitude construction is built in room
CN105435391A (en) * 2015-12-28 2016-03-30 中冶建工集团有限公司 Safety belt hanging device
CN206987413U (en) * 2017-06-09 2018-02-09 湖州市第二建设工程有限公司 The suspension arrangement for high-altitude construction is built in a kind of room
CN208039885U (en) * 2018-03-22 2018-11-02 陕西建工第九建设集团有限公司 A kind of safety belt wall suspension arrangement
CN209397944U (en) * 2018-12-18 2019-09-17 中建四局安装工程有限公司 A kind of safety belt suspension device of falling from high altitude when preventing construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202319A (en) * 2021-05-10 2021-08-03 中铁建工集团建筑安装有限公司 Life line for high-altitude operation of workshop and installation method
CN113202319B (en) * 2021-05-10 2022-05-20 中铁建工集团建筑安装有限公司 Life line for high-altitude operation of workshop and installation method

Similar Documents

Publication Publication Date Title
CN206987412U (en) A kind of building curtain wall construction anti-fall device
WO2017133245A1 (en) Support for rail
CN106836782A (en) A kind of scaffold wall connecting piece and curtain wall replacing options
CN106848938A (en) Cable testing bridge hanging installation method under a kind of High Altitude Platform
CN209397944U (en) A kind of safety belt suspension device of falling from high altitude when preventing construction
CN109518983A (en) A kind of method and equipment therefor of falling from high altitude when preventing construction
CN209227877U (en) Hood type ceiling system for steel structure truss roof system
CN207661221U (en) Air hose antidetonation suspension and support
CN105088979B (en) Demolition blasting method for large bridge
CN204164505U (en) Universal Joining clasp lifting device
CN210801543U (en) Antidetonation fire prevention ventilation pipe
CN209585577U (en) Buttress type triangular support bracket
CN204024097U (en) Skin safety net bracing frame
CN207436357U (en) Hook-hang type metallic plate suspended ceiling device can be opened
CN208105920U (en) A kind of Metro Deep Excavation construction safety belt hanging buckle system
CN105484509A (en) Tool type horizontal safety net and implementation method thereof
CN210152218U (en) Safety hanging basket suitable for high-altitude operation
CN205421955U (en) Cage that installation roofing furred ceiling board was used
CN211401836U (en) Air sampling pipe mounting structure
CN217420202U (en) Suspended ceiling suspender equipment for area color steel plate with air pressure
CN206888553U (en) Super High curtain wall faces the security protection system of empty construction
CN211974428U (en) Safety pocket net hook device and connecting structure thereof
WO2020181615A1 (en) Connecting structure of attaching lifting scaffold safety protection net and connecting method
CN204646911U (en) The unsettled hooping structure of lattice
CN214161835U (en) Movable hanging basket fire-connecting safety device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination