CN109515627A - A kind of container ship activity saddle and its installation method - Google Patents

A kind of container ship activity saddle and its installation method Download PDF

Info

Publication number
CN109515627A
CN109515627A CN201811268485.7A CN201811268485A CN109515627A CN 109515627 A CN109515627 A CN 109515627A CN 201811268485 A CN201811268485 A CN 201811268485A CN 109515627 A CN109515627 A CN 109515627A
Authority
CN
China
Prior art keywords
saddle
base bracket
body section
container ship
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811268485.7A
Other languages
Chinese (zh)
Other versions
CN109515627B (en
Inventor
彭桥
王兰
黄楚畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Wenchong Shipyard Co Ltd
Original Assignee
Guangzhou Wenchong Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Wenchong Shipyard Co Ltd filed Critical Guangzhou Wenchong Shipyard Co Ltd
Priority to CN201811268485.7A priority Critical patent/CN109515627B/en
Publication of CN109515627A publication Critical patent/CN109515627A/en
Application granted granted Critical
Publication of CN109515627B publication Critical patent/CN109515627B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Abstract

The present invention relates to a kind of container ship activity saddle and its installation methods, including cage body and multiple support frames, the cage body includes two saddle girders and Duo Gen connecting cross beam disposed in parallel, the more connecting cross beams are arranged and are parallel to each other along the length direction of the saddle girder, the both ends of the connecting cross beam are connect with two saddle girders respectively, the side of the cage body is equipped with multiple connection positions, one end of multiple support frames as described above is detachably connected by multiple connection positions with the cage body respectively, the other side of cage body is equipped with the guide-rail plate for being cooperatively connected with container, the guide-rail plate is arranged along the length direction of the saddle girder.A kind of container ship activity saddle and its installation method provided by the invention, it is designed by the structure to saddle and designs corresponding installation method, it may be implemented in setting in the cargo hold of same ship and load various sizes of container, to improve the diversity and flexibility of container ship delivery.

Description

A kind of container ship activity saddle and its installation method
Technical field
The present invention relates to the saddle installing areas of collection shipment, and in particular to a kind of container ship activity saddle and its installation side Method.
Background technique
With the development of all trades and professions, the requirement to transport service is higher and higher, and wherein Container Transport have it is undesirable The advantages that superiority in generation, especially Container Transport speed are fast, high financial profit, storage capacity are strong and handover is convenient, makes to collect Vanning is transported applicable cargo type and is continuously increased, and the volume of goods transported increases rapidly.
Currently, container ship is to fix saddle, therefore the long case container of ship delivery is only fixed one kind due to saddle Specification, the diversity of delivery and flexibility are poor, and with the variation in market, it is hoped that there will be can load for more and more shipowner companies The case ship of a variety of Container Dimensions, but due to the limitation of this body structure of ship, always without preferable solution.
Summary of the invention
The present invention provides a kind of container ship activity saddle and its installation methods, are designed by the structure to saddle And corresponding installation method is designed, it can be achieved that setting loads various sizes of container in the cargo hold of same ship, to mention The high diversity and flexibility of container ship delivery.
To achieve the above object, the present invention provides a kind of container ship activity saddles, including cage body and multiple Support, the cage body include two saddle girders and Duo Gen connecting cross beam disposed in parallel, the more connecting cross beam edges The length direction of the saddle girder arranges and is parallel to each other, the both ends of the connecting cross beam respectively with two saddle girders The side of connection, the cage body is equipped with multiple connection positions, and one end of multiple support frames as described above passes through multiple companies respectively It connects position to be detachably connected with the cage body, the other side of the cage body is equipped with for leading with what container was cooperatively connected Rail plate, the guide-rail plate are arranged along the length direction of the saddle girder.
Preferably, the connection position includes being respectively arranged at the eye plate group at the both ends of the connecting cross beam, described Eye plate group includes two and wears axis eye plate about the saddle girder is symmetrically arranged, support frame as described above include two groups with described in two The corresponding bracket of eye plate group, the bracket include two respectively with the connecting circular tube wearing axis eye plate described in two and connect.
Preferably, the more connecting cross beams are arranged along the equal spacing in length direction of the saddle girder, described Hanging ring is respectively equipped on the connecting cross beam at cage body both ends.
To realize above-mentioned identical purpose, the present invention also provides the installation sides of the container ship activity saddle described in one kind Method includes the following steps: that (1) marks center line and assembly waterline on body section;(2) along the assembly waterline in the ship Installation is corresponding with the connecting circular tube position of all support frames as described above in body segmentation and can be removable with the end of the connecting circular tube Unload the first connection structure of connection;(3) all support frames as described above are separated from the container ship activity saddle;(4) on edge The assembly waterline install on the body section with the cage body it is all described in wear axis eye plate position corresponding simultaneously It can be with the second connection structure for wearing axis eye plate and being detachably connected;(5) the container ship activity saddle is connect with described first Structure connects or connect the cage body with second connection structure.
Preferably, the step (1) specifically includes: the center line of the body section is marked with ceiling hammer, so Laser determination on the body section is a plurality of respectively with the assembly waterline of the central axis and in body section afterwards On mark a plurality of assembly waterline, recycle Pythagorean theorem to examine the verticality of the center line and the assembly waterline.
Preferably, the step (1) further includes the steps that setting calibration steel wire, the step of the setting calibration steel wire Suddenly it specifically includes: multiple groups mark post group is set on the body section, each mark post group includes two and is respectively perpendicular to the ship The mark post on the surface of body segmentation, the positioning plane that the surface using laser positioning apart from the body section is d, it is described fixed to guarantee Bit plane intersects with the mark post, and the mark post is marked on all mark posts and positions the intersection point of plane and is denoted as label Point is arranged a steel wire between two mark points of the mark post group described in every group and guarantees that steel wire is in straight condition.
Preferably, first connection structure includes first base bracket and the first bulkhead eye plate, and described first Pedestal bracket can be detachably connected with the end of the connecting circular tube, and the first bulkhead eye plate and the first base bracket connect It connects;Second connection structure includes second base bracket and the second bulkhead eye plate, and the second base bracket can be worn with described Axis eye plate is detachably connected, and the second bulkhead eye plate is connect with the second base bracket.
Preferably, when installing the first base bracket in step (2), in the first base bracket and hull Between segmented surface reserve 50mm machining allowance, respectively measurement be located at same described in assembly waterline on first base bracket away from It is denoted as h1, h2...hn with a distance from plane where the steel wire and respectively, measurement is located on assembly waterline described in same respectively Distance of the guide-rail plate apart from plane where the steel wire and be denoted as H1, H2...Hn respectively, measure guide pass apart from the hull The distance of segmented surface is simultaneously denoted as A, successively calculates h=(h1+h2+h3+...+hn)/n, H0=h-A, calculates described in any one piece The mowing surplus δ m=H0-Hm of first base bracket, wherein 1≤m≤n, according to calculated any one piece of first bottom of institute The mowing surplus of seat bracket carries out mowing to first base bracket.
Preferably, when installing the second base bracket in step (4), in the second base bracket and hull Between segmented surface reserve 50mm machining allowance, respectively measurement be located at same described in assembly waterline on second base bracket away from It is denoted as s1, s2...sn with a distance from plane where the steel wire and respectively, measurement is located on assembly waterline described in same respectively Distance of the guide-rail plate apart from plane where the steel wire and be denoted as S1, S2...Sn respectively, measure guide pass apart from the hull The distance of segmented surface is simultaneously denoted as B, successively calculates s=(s1+s2+s3+...+sn)/n, S0=s-B, calculates described in any one piece The mowing surplus δ m=S0-Sm of second base bracket, wherein 1≤m≤n, according to calculated any one piece of second bottom of institute The mowing surplus of seat bracket carries out mowing to second base bracket.
Preferably, in the step (1), using laser to body section the step of steel wire is calibrated in setting before Flatness carries out detection and carries out the margin of tolerance that correction guarantees the flatness of the body section to the flatness of body section It detects the straightness of wirerope after the setting steps for completing calibration steel wire for ± 4mm and guarantee is adjusted to its straightness Deflection≤2mm of the wirerope.
A kind of container ship activity saddle and its installation method provided by above-mentioned technical proposal, wherein cage body and branch Support can be detachably connected with the surface of body section where cargo hold, when needing to load the container of 40 rulers in cargo hold, Support frame as described above is connect with the surface of the cargo hold and keeps the cage body vertically arranged, then passes through the guide-rail plate Make the container of 40 rulers along cage body stacking in cargo hold with merging with the guide rail of the outer wall of the container of 40 rulers, when needing heap When the container of 45 ruler of pile, support frame as described above is separated from container ship activity saddle, and pass through the company of the cage body It connects position to connect with the surface of the cargo hold and keep the cage body vertically arranged, then passes through the guide-rail plate and 45 rulers The guide rail of the outer wall of container makes the container of 45 rulers along cage body stacking in cargo hold with merging.The present invention will be by that will support Frame is separated, to increase the spacing between two bulkheads of cargo hold, and then can place the container that dimensions is greater than 40 rulers, May be implemented in setting in the cargo hold of same ship and load various sizes of container, improve container ship delivery diversity and Flexibility.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of container ship activity saddle of the present invention;
Fig. 2 is the schematic diagram for marking center line on body section and assembling waterline;
Fig. 3 is the scheme of installation of the structure of container ship activity saddle when needing 40 ruler case of device;
Fig. 4 is the scheme of installation of the structure of container ship activity saddle when needing 45 ruler case of device;
Fig. 5 is the structural schematic diagram of body section after installing saddle;
Fig. 6 is the top view of Fig. 5.
Wherein: 1, connecting cross beam;2, hanging ring;3, guide-rail plate;4, block;5, axis eye plate is worn;6, the first connection structure;7, it leads Frame girder;8, connecting circular tube.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
As shown in Figure 1, being a kind of container ship activity saddle provided by the present invention, including cage body and multiple supports Frame, the cage body include two saddle girders 7 and Duo Gen connecting cross beam 1 disposed in parallel, more 1 edges of connecting cross beam The length direction of the saddle girder 7 arranges and is parallel to each other, the both ends of the connecting cross beam 1 respectively with two saddle masters Beam 7 connects, and the side of the cage body is equipped with multiple connection positions, and one end of multiple support frames as described above passes through multiple described respectively Connection position is detachably connected with the cage body, and the other side of the cage body is equipped with for being cooperatively connected with container Guide-rail plate 3, the guide-rail plate 3 are arranged along the length direction of the saddle girder 7.
Specifically, the cage body of container ship activity saddle and support frame provided by the present embodiment can be with cargo hold institutes It is detachably connected on the surface of body section, when needing to load the container of 40 rulers in cargo hold, by support frame as described above and institute The surface for stating cargo hold connects and keeps the cage body vertically arranged, then passes through the container of the ruler of guide-rail plate 3 and 40 The guide rail of outer wall make the container of 40 rulers along cage body stacking in cargo hold with merging, when the container for needing 45 ruler of stacking When, support frame as described above is separated from container ship activity saddle, and pass through the connection position of the cage body and the cargo hold Surface connect and keep the cage body vertically arranged, then pass through the outer wall of the container of the ruler of guide-rail plate 3 and 45 Guide rail with merge make the container of 45 rulers along cage body stacking in cargo hold.The present invention by the way that support frame is separated, thus The spacing between two bulkheads of cargo hold is increased, and then container of the dimensions greater than 40 rulers can be placed, it can be achieved that same Setting loads various sizes of container in the cargo hold of one ship, improves the diversity and flexibility of container ship delivery.
In the present embodiment, the connection position includes being respectively arranged at the eye plate group at the both ends of the connecting cross beam 1, the eye Board group includes two and wears axis eye plate 5 about the saddle girder 7 is symmetrically arranged, support frame as described above include two groups with described in two The corresponding bracket of eye plate group, the bracket includes two respectively with the connecting circular tube 8 wearing axis eye plate 5 described in two and connect, described Connecting circular tube 8 is connect with the axis eye plate 5 of wearing by shaft hole matching, in addition, can pass through when needing the container of 45 ruler of stacking The axis eye plate 5 of wearing is connect with the surface of the cargo hold.
Further, as shown in Figure 1, the more connecting cross beams 1 are set along the equal spacing in length direction of the saddle girder 7 It sets, hanging ring 2 is respectively equipped on the connecting cross beam 1 at the cage body both ends, it is convenient that container ship activity saddle is hung Dress, the lower end of the saddle girder 7 are equipped with the block 4 being used to support.
The present embodiment additionally provides the installation method of container ship activity saddle described in one kind, includes the following steps: (1) Center line and assembly waterline are marked on body section;(2) it installs and owns on the body section along the assembly waterline 8 position of connecting circular tube of support frame as described above is corresponding and can connect with first that the end of the connecting circular tube 8 is detachably connected Structure 6;(3) all support frames as described above are separated from the container ship activity saddle;(4) along the assembly waterline in institute State on body section install with the cage body it is all described in wear 5 position of axis eye plate it is corresponding and can with wear axis eye plate 5 can Second connection structure of dismantling connection;(5) the container ship activity saddle connect with first connection structure 6 or by institute Cage body is stated to connect with second connection structure.
Specifically, as shown in Fig. 2, in the present embodiment, the step (1) is specifically included: marking the hull with ceiling hammer The center line of segmentation, then laser on the body section determine it is a plurality of respectively with the assembly water of the central axis Line simultaneously marks a plurality of assembly waterline on body section, and Pythagorean theorem is recycled to examine the center line and the assembly water The verticality of line, so, it is ensured that the installation accuracy of container ship activity saddle.In addition, in the present embodiment, the step (1) Further include the steps that the step of steel wire is calibrated in setting, and steel wire is calibrated in the setting specifically includes: being arranged on the body section Multiple groups mark post group, each mark post group include two mark posts for being respectively perpendicular to the surface of the body section, utilize laser positioning The positioning plane that surface apart from the body section is d guarantees that the positioning plane intersects with the mark post, all described The mark post is marked on mark post and is positioned the intersection point of plane and is denoted as mark point, two mark points of the mark post group described in every group Between be arranged and a steel wire and guarantee that steel wire is in straight condition, specifically, as shown in figure 5, on the surface of the body section 4 mark post groups are set, wherein three mark post groups are located at positioned at the upper, middle and lower of body section lateral surfaces, separately One mark post group is located at position of center line, wherein the mark post uses 14a channel steel, in the present embodiment, with ceiling hammer or with vertically Whether in the same vertical plane laser check the center line on two cross wall surfaces, deviation≤1mm, otherwise according to having pre-installed saddle one The center line in face is crossed.
Further, first connection structure 6 includes first base bracket and the first bulkhead eye plate, the first base Bracket can be detachably connected with the end of the connecting circular tube 8, and the first bulkhead eye plate is connect with the first base bracket; Second connection structure includes second base bracket and the second bulkhead eye plate, and the second base bracket can wear axis eye with described Plate 5 is detachably connected, and the second bulkhead eye plate is connect with the second base bracket.In the present embodiment, installation in step (2) When the first base bracket, 50mm machining allowance is reserved between the first base bracket and body section surface, respectively Measurement is located at the first base bracket on assembly waterline described in same apart from the distance of plane where the steel wire and remembers respectively For h1, h2...hn, measurement is located at the guide-rail plate 3 on assembly waterline described in same apart from plane where the steel wire respectively Distance is simultaneously denoted as H1, H2...Hn respectively, measures distance of the guide pass apart from the body section surface and is denoted as A, successively calculates H=(h1+h2+h3+...+hn)/n, H0=h-A calculates the mowing surplus δ m=H0- of any one piece of first base bracket Hm, wherein 1≤m≤n, according to the calculated any one piece first base bracket mowing surplus to first base bracket Carry out mowing.In addition, when the second base bracket is installed in step (4), in the second base bracket and body section table 50mm machining allowance is reserved between face, measurement is located at described in the second base bracket distance on assembly waterline described in same respectively The distance of plane where steel wire is simultaneously denoted as s1, s2...sn respectively, and measurement is located at the guide rail on assembly waterline described in same respectively Distance of the plate 3 apart from plane where the steel wire is simultaneously denoted as S1, S2...Sn respectively, measures guide pass apart from the body section The distance on surface is simultaneously denoted as B, successively calculates s=(s1+s2+s3+...+sn)/n, S0=s-B, calculates any one piece described second The mowing surplus δ m=S0-Sm of pedestal bracket, wherein 1≤m≤n, according to the calculated any one piece of second base elbow of institute The mowing surplus of plate carries out mowing to second base bracket.Through the above steps, respectively to first base bracket and second base The surplus of bracket carries out mowing, guarantees in the container of the container or 45 rulers of installing 40 rulers, the plane of the guide-rail plate 3 Degree.
Further, in the step (1), body section is put down using laser the step of steel wire is calibrated in setting before Face degree carries out detection and the margin of tolerance for carrying out the flatness of the correction guarantee body section to the flatness of body section is ± 4mm detects the straightness of wirerope and is adjusted guarantee institute to its straightness after the setting steps for completing calibration steel wire Deflection≤2mm of wirerope is stated, in this way, can further improve in the container of the container or 45 rulers of installing 40 rulers, institute State the flatness of guide-rail plate 3.
In addition, in the present embodiment, the construction technology process of the body section and container ship activity saddle are as follows: production collection Vanning ship activity saddle → factory's detection is carried out back to the container ship activity saddle, can be worn with guaranteeing every connecting circular tube 8 Bracket of the axis success → installation for connecting with 40 ruler casees → by the connecting circular tube 8 of container ship activity saddle is all from saddle sheet → bracket for connecting with 45 ruler casees is installed → is separated on body removes the movable saddle of 45 ruler casees → by the bracket of 40/45 ruler case Be welded and fixed → coating → lifting hull point is carried out respectively to all parts of body section and container ship activity saddle Section → lift-on lift-off container-ship activity saddle.Above-mentioned steps are due to being not necessarily to the company of separating when installing the bracket for connecting with 40 ruler casees Round tube 8 is connect, whole installation process only needs the connecting circular tube 8 to container ship activity saddle to disassemble once, in this way, processing can be improved Efficiency, save the cost.Further, due to the limitation in Ship Structure, container ship activity saddle is made directly on hull It has difficulties, the production to container ship activity saddle is completed by the fabrication stage in body section in the present embodiment, it can Facilitate the production of container ship activity saddle.
The installation method of container ship activity saddle provided by above-mentioned technical proposal, wherein cage body and support frame are equal It can be detachably connected with the surface of body section where cargo hold, it, will be described when needing to load the container of 40 rulers in cargo hold Support frame connect with the surface of the cargo hold and keeps the cage body vertically arranged, then passes through the guide-rail plate 3 and 40 The guide rail of the outer wall of the container of ruler makes the container of 40 rulers along cage body stacking in cargo hold with merging, when needing stacking 45 When the container of ruler, support frame as described above is separated from container ship activity saddle, and pass through the connection position of the cage body It is connect with the surface of the cargo hold and keeps the cage body vertically arranged, then pass through the collection of the ruler of guide-rail plate 3 and 45 The guide rail of the outer wall of vanning makes the container of 45 rulers along cage body stacking in cargo hold with merging.The present invention is by by support frame It separates, to increase the spacing between two bulkheads of cargo hold, and then the container that dimensions is greater than 40 rulers can be placed, it can Realize that setting loads various sizes of container in the cargo hold of same ship, improves the diversity and spirit of container ship delivery Activity.
In the description of the present invention, it should be noted that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second ", " third " are used for description purposes only, and it should not be understood as instruction or dark Show relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these are improved and replacement Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of container ship activity saddle, which is characterized in that including cage body and multiple support frames, the cage body packet Two saddle girders and Duo Gen connecting cross beam disposed in parallel are included, the more connecting cross beams are along the length side of the saddle girder To arranging and being parallel to each other, the both ends of the connecting cross beam are connect with two saddle girders respectively, the cage body Side is equipped with multiple connection positions, and one end of multiple support frames as described above respectively can by multiple connection positions and the cage body Dismantling connection, the other side of the cage body are equipped with the guide-rail plate for being cooperatively connected with container, and the guide-rail plate is along institute State the length direction setting of saddle girder.
2. container ship activity saddle according to claim 1, which is characterized in that the connection position includes being respectively arranged at The eye plate group at the both ends of the connecting cross beam, the eye plate group include two and wear axis eye about the saddle girder is symmetrically arranged Plate, support frame as described above include two groups of brackets corresponding with two eye plate groups, the bracket including two respectively with two institutes State the connecting circular tube for wearing the connection of axis eye plate.
3. container ship activity saddle according to claim 1, which is characterized in that the more connecting cross beams are led described in The equal spacing in length direction of frame girder is arranged, and is respectively equipped with hanging ring on the connecting cross beam at the cage body both ends.
4. the installation method of container ship activity saddle described in a kind of any one of claim 1-3, which is characterized in that packet It includes following steps: (1) marking center line and assembly waterline on body section;(2) along the assembly waterline in the hull point It installs corresponding with the connecting circular tube position of all support frames as described above in section and can detachably connect with the end of the connecting circular tube The first connection structure connect;(3) all support frames as described above are separated from the container ship activity saddle;(4) along described Assembly waterline install on the body section with the cage body it is all described in wear axis eye plate position corresponding and can be with Wear the second connection structure that axis eye plate is detachably connected;(5) by the container ship activity saddle and first connection structure The cage body is connect by connection with second connection structure.
5. the installation method of container ship activity saddle according to claim 4, which is characterized in that step (1) tool Body includes: the center line that the body section is marked with ceiling hammer, and then laser determines a plurality of difference on the body section The a plurality of assembly waterline is marked with the assembly waterline of the central axis and on body section, recycles that hook stock fixed Reason examines the verticality of the center line and the assembly waterline.
6. the installation method of container ship activity saddle according to claim 5, which is characterized in that the step (1) is also Include the steps that the step of steel wire is calibrated in setting, and steel wire is calibrated in the setting specifically includes: being arranged on the body section more Group mark post group, each mark post group includes two mark posts for being respectively perpendicular to the surface of the body section, using laser positioning away from The positioning plane that surface from the body section is d guarantees that the positioning plane intersects with the mark post, in all marks Mark the mark post on bar and position the intersection point of plane and be denoted as mark point, two mark points of the mark post group described in every group it Between be arranged and a steel wire and guarantee that steel wire is in straight condition.
7. the installation method of container ship activity saddle according to claim 6, which is characterized in that the first connection knot Structure includes first base bracket and the first bulkhead eye plate, and the first base bracket can be detachable with the end of the connecting circular tube Connection, the first bulkhead eye plate are connect with the first base bracket;Second connection structure includes second base bracket With the second bulkhead eye plate, the second base bracket can be detachably connected with the axis eye plate of wearing, the second bulkhead eye plate with The second base bracket connection.
8. the installation method of container ship activity saddle according to claim 7, which is characterized in that installation in step (2) When the first base bracket, 50mm machining allowance is reserved between the first base bracket and body section surface, respectively Measurement is located at the first base bracket on assembly waterline described in same apart from the distance of plane where the steel wire and remembers respectively For h1, h2...hn, respectively measurement be located at guide-rail plate on assembly waterline described in same apart from plane where the steel wire away from From and be denoted as H1, H2...Hn respectively, measure distance of the guide pass apart from the body section surface and be denoted as A, successively calculate h =(h1+h2+h3+...+hn)/n, H0=h-A calculates the mowing surplus δ m=H0- of any one piece of first base bracket Hm, wherein 1≤m≤n, according to the calculated any one piece first base bracket mowing surplus to first base bracket Carry out mowing.
9. the installation method of container ship activity saddle according to claim 7, which is characterized in that installation in step (4) When the second base bracket, 50mm machining allowance is reserved between the second base bracket and body section surface, respectively Measurement is located at the second base bracket on assembly waterline described in same apart from the distance of plane where the steel wire and remembers respectively For s1, s2...sn, respectively measurement be located at guide-rail plate on assembly waterline described in same apart from plane where the steel wire away from From and be denoted as S1, S2...Sn respectively, measure distance of the guide pass apart from the body section surface and be denoted as B, successively calculate s =(s1+s2+s3+...+sn)/n, S0=s-B calculates the mowing surplus δ m=S0- of any one piece of second base bracket Sm, wherein 1≤m≤n, according to the calculated any one piece second base bracket mowing surplus to second base bracket Carry out mowing.
10. the installation method of container ship activity saddle according to claim 6, which is characterized in that the step (1) In, detect and to the plane of body section using flatness of the laser to body section the step of steel wire is calibrated in setting before Degree carries out correction and guarantees that the margin of tolerance of the flatness of the body section is ± 4mm, in the setting steps for completing calibration steel wire Afterwards, it detects the straightness of wirerope and is adjusted the deflection≤2mm for guaranteeing the wirerope to its straightness.
CN201811268485.7A 2018-10-29 2018-10-29 Movable guide frame of container ship and mounting method thereof Active CN109515627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811268485.7A CN109515627B (en) 2018-10-29 2018-10-29 Movable guide frame of container ship and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811268485.7A CN109515627B (en) 2018-10-29 2018-10-29 Movable guide frame of container ship and mounting method thereof

Publications (2)

Publication Number Publication Date
CN109515627A true CN109515627A (en) 2019-03-26
CN109515627B CN109515627B (en) 2020-12-18

Family

ID=65772965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811268485.7A Active CN109515627B (en) 2018-10-29 2018-10-29 Movable guide frame of container ship and mounting method thereof

Country Status (1)

Country Link
CN (1) CN109515627B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661271A (en) * 2020-06-14 2020-09-15 陈盼 Cargo compartment guide rail test box device for container ship
CN113525601A (en) * 2021-08-10 2021-10-22 中集船舶海洋工程设计研究院有限公司 Telescopic guide rail frame mechanism and container ship cargo hold
CN114954795A (en) * 2022-07-28 2022-08-30 菏泽广泰耐磨制品股份有限公司 Anti-collision structure of ship container
CN115214848A (en) * 2022-07-21 2022-10-21 广州文冲船厂有限责任公司 Ship cargo hold and container ship

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5360091A (en) * 1976-11-10 1978-05-30 Hitachi Zosen Corp Method of mounting cell guide for containe ship
DE2823782A1 (en) * 1978-05-31 1979-12-06 Orenstein & Koppel Ag Container ship with folding decks - has pivoted deck plates mounted in vertical supports acting as locating guides for containers
JPS59230885A (en) * 1983-06-10 1984-12-25 Mitsui Eng & Shipbuild Co Ltd Shell guide device for ship
US4671418A (en) * 1983-05-04 1987-06-09 Eisen- Und Drahtwerk Erlau Aktiengesellschaft Apparatus for lashing goods
DE19708824A1 (en) * 1997-03-05 1998-09-10 Sec Ship S Equipment Centre Br Stacking standard containers on flat floor
US20050220573A1 (en) * 2004-03-31 2005-10-06 Benedict Charles E Automated shipboard material handling and storage system
CN201291990Y (en) * 2008-11-28 2009-08-19 大连船舶重工集团有限公司 Guide rails for containership
CN101885368A (en) * 2010-03-29 2010-11-17 扬帆集团股份有限公司 Method for manufacturing and installing guide rail in container ship cargo hold
KR20130053199A (en) * 2011-11-15 2013-05-23 삼성중공업 주식회사 Structure for guide of container
CN205256582U (en) * 2015-11-26 2016-05-25 上海佳豪船舶工程设计股份有限公司 Internal trade transportation container ship
CN207617921U (en) * 2017-10-27 2018-07-17 江苏大津重工有限公司 Movable container shipload cabin guide rail rack device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5360091A (en) * 1976-11-10 1978-05-30 Hitachi Zosen Corp Method of mounting cell guide for containe ship
DE2823782A1 (en) * 1978-05-31 1979-12-06 Orenstein & Koppel Ag Container ship with folding decks - has pivoted deck plates mounted in vertical supports acting as locating guides for containers
US4671418A (en) * 1983-05-04 1987-06-09 Eisen- Und Drahtwerk Erlau Aktiengesellschaft Apparatus for lashing goods
JPS59230885A (en) * 1983-06-10 1984-12-25 Mitsui Eng & Shipbuild Co Ltd Shell guide device for ship
DE19708824A1 (en) * 1997-03-05 1998-09-10 Sec Ship S Equipment Centre Br Stacking standard containers on flat floor
US20050220573A1 (en) * 2004-03-31 2005-10-06 Benedict Charles E Automated shipboard material handling and storage system
CN201291990Y (en) * 2008-11-28 2009-08-19 大连船舶重工集团有限公司 Guide rails for containership
CN101885368A (en) * 2010-03-29 2010-11-17 扬帆集团股份有限公司 Method for manufacturing and installing guide rail in container ship cargo hold
CN101885368B (en) * 2010-03-29 2013-03-27 扬帆集团股份有限公司 Method for manufacturing and installing guide rail in container ship cargo hold
KR20130053199A (en) * 2011-11-15 2013-05-23 삼성중공업 주식회사 Structure for guide of container
CN205256582U (en) * 2015-11-26 2016-05-25 上海佳豪船舶工程设计股份有限公司 Internal trade transportation container ship
CN207617921U (en) * 2017-10-27 2018-07-17 江苏大津重工有限公司 Movable container shipload cabin guide rail rack device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661271A (en) * 2020-06-14 2020-09-15 陈盼 Cargo compartment guide rail test box device for container ship
CN113525601A (en) * 2021-08-10 2021-10-22 中集船舶海洋工程设计研究院有限公司 Telescopic guide rail frame mechanism and container ship cargo hold
CN115214848A (en) * 2022-07-21 2022-10-21 广州文冲船厂有限责任公司 Ship cargo hold and container ship
CN115214848B (en) * 2022-07-21 2023-06-20 广州文冲船厂有限责任公司 Ship cargo hold and container ship
CN114954795A (en) * 2022-07-28 2022-08-30 菏泽广泰耐磨制品股份有限公司 Anti-collision structure of ship container

Also Published As

Publication number Publication date
CN109515627B (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN109515627A (en) A kind of container ship activity saddle and its installation method
CN105383642B (en) A kind of vertical guide rail erecting and welding method
CN101885368B (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN107264723B (en) A kind of installation method of lateral thruster
CN105155497B (en) A kind of jack up lifting platform lowering or hoisting gear and its manufacturing process
CN107498269A (en) A kind of large-scale ship reception chamber manufacture method suitable for dry type ship railway carriage or compartment room
CN203212229U (en) Crane with at least one crane beam
CN110182303B (en) General assembly method of rudder horn
CN107825083A (en) A kind of wedge bracket structure construction technology
US20210138600A1 (en) Assembly apparatus
CN102848091A (en) Ship double bottom block assembly welding technology
CN102626841A (en) Automatic welding fixture of subway train obverse-reverse side roofs
CN106223303A (en) A kind of ship booster supporting compartment installation method
CN105540429B (en) A kind of crane girder and its processing method
CN105905261A (en) Vertical general assembly jig frame for container ship lashing bridge
CN110789684A (en) Method for assembling large deck machinery body base
CN110481701A (en) A kind of installation and adjustment method of hatchcover bearing part
CN101332861B (en) Manufacture and installation process of backplane of pump tower for liquefied natural gas ship
CN106078227B (en) Mobile crimping C-type steel molding machine based on BIM
CN101417695B (en) Guide rail for container ship and erection method thereof
CN212330336U (en) Crossbeam structure and have its lathe
CN114455026A (en) Ship body section slipway large folding method
CN211490227U (en) Monorail vehicle frame assembly welding positioning tool
CN206047448U (en) A kind of car floor lower tray welding tooling with bottom girder fixed structure
CN103354852A (en) Frame for a drying section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant