Wind electricity blade removes auxiliary material tool
Technical field
The present invention relates to a kind of wind electricity blades to remove auxiliary material tool.
Background technique
In megawatt production process of grade blade industrialization, after the completion of precuring, the auxiliary material of paving requires to remove;It is going
During except auxiliary material, need for diversion pipe and other auxiliary materials to be separately packaged.Firstly, when doing auxiliary material, can by diversion pipe with
Flow-guiding screen sticks together, secondly, solidification is irrigated, finally, all auxiliary materials can be all cleaned out, no after the completion of precuring
It will do it class with auxiliary material to be packaged.It, will with the tool of saw or wallpaper knife etc since diversion pipe and flow-guiding screen need separately to be packaged
Diversion pipe and flow-guiding screen separate, and are to draw material to ground, so as to cause cumbersome, complex procedures, safety coefficient every time
Low, elapsed time is long.
Summary of the invention
The purpose of the invention is to overcome existing above-mentioned deficiency, the present invention provides a kind of wind electricity blade and goes auxiliary material
Tool.
The present invention is achieved by the following technical solutions:
A kind of wind electricity blade removes auxiliary material tool comprising scoop tube, adjustable plate and push rod, the push rod are removably attachable to
The top of the scoop tube, the scoop tube have the perforative material path in left and right, and the left and right ends of the scoop tube are respectively provided with feed end
And blade has been issued in adjustable side, the bottom of the feed end, the adjustable plate is liftably connected to the adjustable side and is used for
Adjust the size of the material path.
Further, it further includes having pin shaft and two support bases that the wind electricity blade, which removes auxiliary material tool, two supports
Seat interval is arranged and is connected to the top of the scoop tube, and two support bases are equipped with connecting hole, and the push rod includes to push away
Bar body and connecting rod, the bottom of the putter body are connected to the connecting rod, and the both ends of the connecting rod pass through institute respectively
It states pin shaft and is connected to two connecting holes.
Further, sliding slot has been issued in the front and rear sides of the adjustable side, and the sliding slot is along the height side of the scoop tube
To being extended, the front and rear sides of the adjustable plate are slidedly arranged on two sliding slots respectively.
Further, the push rod further includes having several handle portions, several described handle portions are connected to described
The front and rear sides of putter body, and the handle portion extends protrusion along the radial direction of the putter body.
Further, blade has been issued in the front and rear sides and top of the feed end, and the blade is continuously uninterrupted
Ground is surrounded on the feed end.
Further, the scoop tube is rectangular tube.
The beneficial effects of the present invention are: the diversion pipe that can adjust different size by adjustable plate is led to by material path
Crossing promotion push rod makes diversion pipe directly will open diversion pipe and flow-guiding screen shovel by material path to realize, and reduce artificial behaviour
Make, it is time saving and energy saving, operational safety is improved, and reduce the wind electricity blade production cycle.Meanwhile push rod can be dismantled with scoop tube and be separated
It places, reduces the occupied space that wind electricity blade removes auxiliary material tool.
Detailed description of the invention
Fig. 1 is that the wind electricity blade of the embodiment of the present invention removes the structural schematic diagram of auxiliary material tool.
Description of symbols:
Scoop tube 1
Material path 11
Feed end 12
Adjustable side 13
Push rod 2
Putter body 21
Connecting rod 22
Handle portion 23
Adjustable plate 3
Support base 4
Pin shaft 5
Specific embodiment
The explanation of following embodiment be with reference to attached drawing, can be to the specific embodiment implemented to the example present invention.
As shown in Figure 1, present embodiment discloses a kind of wind electricity blades to remove auxiliary material tool, which removes auxiliary material kit
Scoop tube 1, push rod 2 and adjustable plate 3 are included, push rod 2 is removably attachable to the top of scoop tube 1.Wind electricity blade goes auxiliary material tool needing
It wants in use, push rod 2 to be connected to the top of scoop tube 1;Wind electricity blade go auxiliary material tool using complete after, by push rod 2 with
It dismantles separated between scoop tube 1, reduces wind electricity blade and go the occupied space of auxiliary material tool.
Scoop tube 1 has the perforative material path 11 in left and right, and the left and right ends of scoop tube 1 are respectively provided with feed end 12 and adjustable side
13, blade has been issued in the bottom of feed end 12.Wind electricity blade goes auxiliary material tool going auxiliary material in use, diversion pipe will first be perfused
End has done to have some, and is then inserted into scoop tube 1 end that diversion pipe is perfused by feed end 12, enforces push rod 2,
So that scoop tube 1 makes perfusion diversion pipe that will sequentially pass through feed end 12, material path 11 and adjustable side by preceding implementation, by blade
13, realization perfusion diversion pipe is separated with flow-guiding screen.It does not need manually to go to cut with saw or knife, saves many times, reduce people
Work operation, it is time saving and energy saving, it reduces the wind electricity blade production cycle, and improve operational safety.
Adjustable plate 3 is liftably connected to adjustable side 13 and the size for adjusting material path 11.Adjustable plate 3 can adjusted
Lifting moving on end 13 is saved, so as to adjust the size of material path 11, so that perfusion diversion pipe of different specifications and sizes can
Enough across adjustable side 13.Meanwhile diversion pipe is perfused when passing through adjustable side 13, adjustable plate 3 is placed on the top of perfusion diversion pipe
Certain downward active force can be applied to perfusion diversion pipe, prevent perfusion diversion pipe from being tilted when separated, improve safe operation
Property.
It further includes having pin shaft 5 and two support bases 4 that wind electricity blade, which removes auxiliary material tool, and two intervals of support base 4 are arranged and connect
It is connected to the top of scoop tube 1, two support bases 4 are equipped with connecting hole, and push rod 2 includes putter body 21 and connecting rod 22, push rod
The bottom of ontology 21 is connected to connecting rod 22, and the both ends of connecting rod 22 pass through pin shaft 5 respectively and are connected to two connecting holes.Push rod 2
When connection is installed between scoop tube 1, the both ends of connecting rod 22 are each passed through to the connecting hole of two support bases 4, are used again later
Pin shaft 5 achieves a fixed connection, so that the both ends of connecting rod 22 are connected on two support bases 4, it is easy for assemble or unload, and tie
Structure is simple.Wherein, pin shaft 5 can be split pin and straight pin.
Sliding slot has been issued in the front and rear sides of adjustable side 13, and sliding slot is extended along the short transverse of scoop tube 1, adjustable plate 3
Front and rear sides be slidedly arranged on two sliding slots respectively.The two sides of adjustable plate 3 are liftable to be slidedly arranged in two sliding slots, and adjustable plate is convenient for
3 lift adjustment, and structure is simple.
Blade has been issued in the front and rear sides and top of feed end 12, and blade is uninterruptedly surrounded on feed end
12.Separating for perfusion diversion pipe and flow-guiding screen is realized by blade.Wherein, scoop tube 1 is rectangular tube.
Push rod 2 further includes having several handle portions 23, several handle portions 23 are connected to the front and back of putter body 21
Two sides, and handle portion 23 extends protrusion along the radial direction of putter body 21.Apply active force by handle portion 23 convenient for people to exist
Time saving and laborsaving on push rod 2, convenient and quick, safety coefficient is high.