CN109507579A CN201811480245.3A CN201811480245A CN109507579A CN 109507579 A CN109507579 A CN 109507579A CN 201811480245 A CN201811480245 A CN 201811480245A CN 109507579 A CN109507579 A CN 109507579A
Authority
CN
China
Prior art keywords
changeover program
load ratio
bridging switch
ratio bridging
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811480245.3A
Other languages
Chinese (zh)
Other versions
CN109507579B (en
Inventor
许渊
毕建刚
袁帅
郑建
弓艳朋
常文治
杜非
王广真
付德慧
杨宁
何文林
郑鸣
郑一鸣
李旭
赵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201811480245.3A priority Critical patent/CN109507579B/en
Publication of CN109507579A publication Critical patent/CN109507579A/en
Application granted granted Critical
Publication of CN109507579B publication Critical patent/CN109507579B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3271Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
    • G01R31/3272Apparatus, systems or circuits therefor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01HMEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
    • G01H17/00Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the preceding groups
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3271Testing of circuit interrupters, switches or circuit-breakers of high voltage or medium voltage devices
    • G01R31/3275Fault detection or status indication

Abstract

The present invention provides a kind of load ratio bridging switch changeover program on-line checking diagnostic method, include the following steps: to measure original on-line vibration data;The envelope curve of the original on-line vibration data is calculated, and the envelope curve is defined as to the original fingerprint of load ratio bridging switch vibration;Calculate the original fingerprint changeover program feature vector, X;Measure on-line vibration data to be diagnosed;The envelope curve of the on-line vibration data to be diagnosed is calculated, and the envelope curve is defined as to the follow-up severed finger line of load ratio bridging switch vibration;Calculate the follow-up severed finger line changeover program feature vector Y;Calculate related coefficient A;According to the related coefficient A and diagnosis criterion, judge load ratio bridging switch changeover program with the presence or absence of abnormal.Load ratio bridging switch changeover program on-line checking diagnostic method provided by the invention, realizes the purpose of on-line checking.

Description

Load ratio bridging switch changeover program on-line checking diagnostic method
Technical field
The present invention relates to electrical testing technical fields, especially load ratio bridging switch changeover program on-line checking diagnosis side Method.
Background technique
OLTC (On Load Tap Changer, load ratio bridging switch) is that extra-high voltage direct-current transmission is essential important Equipment, major function are to be operated by pressure regulation in the case where not interrupt load electric current and maintain converter valve DC voltage permanent Fixed and compensation AC system voltage change, is maintained at optimum operation range for the Trigger Angle of converter valve, avoids making because of voltage fluctuation It is latched at commutation failure even direct current.By taking ± 800kV two-terminal direct current transmission system as an example, averagely there are 48 to be installed on daily and change OLTC inside rheology executes more than 500 pressure regulation operations, acts frequently, and effect is great, and OLTC reliability service supplies electric system Electric safety is most important.
Switching switch is the core of OLTC, and whether each contact changeover program is correctly to OLTC operational safety in handoff procedure It plays a decisive role, and fastener loosening, spring breakage, contact are bad etc. abnormal will have a direct impact to handoff procedure. It is accurate and reliable that OLTC failure is diagnosed by detection switching sequence.Direct current detection method is switching sequence detection method generally acknowledged at present, Have become OLTC type approval test, delivery test and overhaul test must examine item.Direct current detection method need to dismantle OLTC when testing, only It can carry out offline.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of load ratio bridging switch changeover program on-line checking diagnostic method, Time-series rules can be switched over online.
The present invention provides a kind of load ratio bridging switch changeover program on-line checking diagnostic methods, include the following steps:
1) after transformer puts into operation, under operation, vibration data when load ratio bridging switch movement is measured, and should Data definition is original on-line vibration data;
2) envelope curve of the original on-line vibration data is calculated, and the envelope curve is defined as load ratio bridging switch The original fingerprint of vibration;
3) the original fingerprint changeover program feature vector, X is calculated;
4) when transformer station high-voltage side bus needs to diagnose for a period of time load ratio bridging switch changeover program with the presence or absence of exception afterwards, becoming Under depressor operating status, under test condition identical with step 1), vibration data when load ratio bridging switch movement is measured, and It is on-line vibration data to be diagnosed by the data definition;
5) envelope curve of the on-line vibration data to be diagnosed is calculated, and the envelope curve is defined as loaded tap-off and is opened Close the follow-up severed finger line of vibration;
6) the follow-up severed finger line changeover program feature vector Y is calculated;
7) the original fingerprint changeover program feature vector, X and the follow-up severed finger line changeover program feature vector Y are calculated Related coefficient A;
8) according to the related coefficient A and diagnosis criterion, judge load ratio bridging switch changeover program with the presence or absence of abnormal.
Further, in the step 3), the original fingerprint changeover program feature vector, X is vibrated by load ratio bridging switch The zero pole point time coordinate value of original fingerprint feature wave crest is constituted;In the step 6), the follow-up severed finger line changeover program is special Sign vector Y is made of the zero pole point time coordinate value of load ratio bridging switch vibration follow-up severed finger line feature wave crest.
Further, in the step 3), the original fingerprint changeover program feature vector, X=(x1, x2, x3, x4, x5, X6), wherein x2 is the corresponding time coordinate value of first wave crest pole, and x5 is to sit the amplitude maximum wave crest pole corresponding time Scale value, x1 are the corresponding time coordinate value of previous zero point of first wave crest pole, and x3 is the latter of first wave crest pole The corresponding time coordinate value of a zero point, x4 are the corresponding time coordinate value of previous zero point of amplitude maximum wave crest pole, and x6 is The corresponding time coordinate value of the latter zero point of amplitude maximum wave crest pole;In the step 6), the follow-up severed finger line switching Performance of program vector Y=(y1, y2, y3, y4, y5, y6), wherein y2 is the corresponding time coordinate value of first wave crest pole, y5 For the corresponding time coordinate value of amplitude maximum wave crest pole, y1 is to sit the previous zero point corresponding time of first wave crest pole Scale value, y3 are the corresponding time coordinate value of the latter zero point of first wave crest pole, and y4 is before amplitude maximum wave crest pole The corresponding time coordinate value of one zero point, y6 are the corresponding time coordinate value of the latter zero point of amplitude maximum wave crest pole.
Further, in the step 7), the calculation method of the related coefficient A is as follows:
Wherein, LRxyFor the original fingerprint changeover program feature vector, X and the follow-up severed finger line changeover program feature to Measure the normalized covariance of Y.
Further, in the step 8), the diagnosis criterion are as follows:
If A >=2, then load ratio bridging switch changeover program is normal;
If 2 > A >=1, then there are slight abnormalities for load ratio bridging switch changeover program;
If A < 1, then there are severely subnormals for load ratio bridging switch changeover program.
Load ratio bridging switch changeover program on-line checking diagnostic method provided by the invention, original on-line vibration data and to On-line vibration data are diagnosed compared to pair, related coefficient A is obtained, determines according to related coefficient A as a result, realizing the mesh of on-line checking 's.Due to using transformer OLTC changeover program and OLTC on-line vibration data envelopment curvilinear characteristic wave crest (first wave crest and Amplitude maximum wave crest) sequential correlation characteristic, when changeover program is normal, OLTC on-line vibration data envelopment curvilinear characteristic wave crest Time interval is essentially identical, and when changeover program exception, the time interval of OLTC on-line vibration data envelopment curvilinear characteristic wave crest becomes Change larger, feature wave crest can be used as judge the whether correct effective parameter of load ratio bridging switch changeover program online.It uses The related coefficient of OLTC on-line vibration data envelopment curvilinear characteristic vector judges load ratio bridging switch changeover program shape as online The criterion of state, have live strong operability, need not powers failure, accuracy of judgement, be quick on the draw, can quantify to judge, is easy to implement etc. Advantage.The present invention can be widely applied in Faults of On-Load Tap-changer in Transformer inline diagnosis.
Detailed description of the invention
Fig. 1 is the flow chart of load ratio bridging switch changeover program on-line checking diagnostic method of the present invention;
Fig. 2 is the schematic diagram of the envelope curve of original on-line vibration data of the invention;
Fig. 3 is the envelope curve schematic diagram of on-line vibration data to be diagnosed of the invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
The present invention provides a kind of load ratio bridging switch changeover program on-line checking diagnostic methods, and the present invention is according to OLTC The feature wave crest of on-line vibration data envelopment curve judges whether load ratio bridging switch changeover program state is normal online, switches journey When sequence is normal, the time interval of OLTC on-line vibration data envelopment curvilinear characteristic wave crest is essentially identical, when changeover program exception, The time interval of OLTC on-line vibration data envelopment curvilinear characteristic wave crest changes greatly, therefore the present invention is based on OLTC on-line vibrations The changeover program on-line checking diagnostic method of data envelopment curvilinear characteristic wave crest is, according to the on-line vibration measured under the same terms Data calculate the envelope curve of original on-line vibration data and the envelope curve of on-line vibration data to be diagnosed, and have obtained carrying and divide Connect switch vibration original fingerprint and load ratio bridging switch vibration follow-up severed finger line, then calculate original fingerprint changeover program feature to Amount and follow-up severed finger line changeover program feature vector calculate the related coefficient of two feature vectors, right according to the size of related coefficient According to diagnosis criterion, judge load ratio bridging switch changeover program with the presence or absence of abnormal.Specifically, as shown in Figure 1, including following step It is rapid:
1) after transformer puts into operation, under operation, vibration data when load ratio bridging switch movement is measured, and should Data definition is original on-line vibration data;
2) envelope curve of the original on-line vibration data is calculated, and the envelope curve is defined as load ratio bridging switch The original fingerprint of vibration;
The calculation method of envelope curve are as follows:
S (n)=x2(n) (3000) w, (1)
Wherein, S (n) is envelope curve data, and x (n) is the data sequence of original on-line vibration data, and w (3000) is window A length of 3000 Hamming window sequence;
3) the original fingerprint changeover program feature vector, X is calculated;
X=(x1, x2, x3, x4, x5, x6), as shown in Fig. 2, the method for calculating original fingerprint changeover program feature vector, X It is:
X2 is the corresponding time coordinate value of first wave crest pole;
X5 is the corresponding time coordinate value of amplitude maximum wave crest pole;
X1 is the corresponding time coordinate value of previous zero point of first wave crest pole;
X3 is the corresponding time coordinate value of the latter zero point of first wave crest pole;
X4 is the corresponding time coordinate value of previous zero point of amplitude maximum wave crest pole;
X6 is the corresponding time coordinate value of the latter zero point of amplitude maximum wave crest pole;
4) when transformer station high-voltage side bus needs to diagnose for a period of time load ratio bridging switch changeover program with the presence or absence of exception afterwards, becoming Under depressor operating status, under test condition identical with step 1), vibration data when load ratio bridging switch movement is measured, and It is on-line vibration data to be diagnosed by the data definition;
5) envelope curve of the on-line vibration data to be diagnosed is calculated, and the envelope curve is defined as loaded tap-off and is opened The follow-up severed finger line of vibration is closed, wherein the calculation method of envelope curve is identical as step 2), and details are not described herein again;
6) the follow-up severed finger line changeover program feature vector Y is calculated;
Calculate follow-up severed finger line changeover program feature vector Y=(y1, y2, y3, y4, y5, y6), as shown in figure 3, calculate to The method of diagnosis fingerprint changeover program feature vector Y is:
Y2 is the corresponding time coordinate value of first wave crest pole;
Y5 is the corresponding time coordinate value of amplitude maximum wave crest pole;
Y1 is the corresponding time coordinate value of previous zero point of first wave crest pole;
Y3 is the corresponding time coordinate value of the latter zero point of first wave crest pole;
Y4 is the corresponding time coordinate value of previous zero point of amplitude maximum wave crest pole;
Y6 is the corresponding time coordinate value of the latter zero point of amplitude maximum wave crest pole;
7) the original fingerprint changeover program feature vector, X and the follow-up severed finger line changeover program feature vector Y are calculated Related coefficient A;
Specifically, the calculation method of related coefficient A are as follows:
Calculate the standard variance D of original fingerprint changeover program feature vector, XxWith follow-up severed finger line changeover program feature vector The standard variance D of Yy:
Wherein, N is characterized the length of vector data sequence, and value N=6, X (k) are original fingerprint changeover program feature The kth element of vector X, Y (k) are the kth element of follow-up severed finger line changeover program feature vector Y;
Calculate the covariance C of original fingerprint changeover program feature vector, X and follow-up severed finger line changeover program feature vector Yxy:
Calculate original fingerprint changeover program feature vector, X and the normalization association of follow-up severed finger line changeover program feature vector Y Variance LRxy:
Calculate related coefficient A:
8) according to the related coefficient A and diagnosis criterion, it is abnormal to judge that load ratio bridging switch changeover program whether there is, Wherein, the diagnosis criterion are as follows:
If A >=2, then load ratio bridging switch changeover program is normal;
If 2 > A >=1, then there are slight abnormalities for load ratio bridging switch changeover program;
If A < 1, then there are severely subnormals for load ratio bridging switch changeover program.
The scope of protection of the present invention is not limited to this.Those skilled in the art are made equivalent on the basis of the present invention Substitution or transformation, it is within the scope of the present invention.Protection scope of the present invention is subject to claims.

Claims (5)

1. a kind of load ratio bridging switch changeover program on-line checking diagnostic method, which comprises the steps of:
1) after transformer puts into operation, under operation, vibration data when load ratio bridging switch movement is measured, and by the data It is defined as original on-line vibration data;
2) envelope curve of the original on-line vibration data is calculated, and the envelope curve is defined as load ratio bridging switch vibration Original fingerprint;
3) the original fingerprint changeover program feature vector, X is calculated;
4) when transformer station high-voltage side bus needs to diagnose for a period of time load ratio bridging switch changeover program with the presence or absence of exception afterwards, in transformer Under operating status, under test condition identical with step 1), vibration data when load ratio bridging switch movement is measured, and should Data definition is on-line vibration data to be diagnosed;
5) envelope curve of the on-line vibration data to be diagnosed is calculated, and the envelope curve is defined as load ratio bridging switch vibration Dynamic follow-up severed finger line;
6) the follow-up severed finger line changeover program feature vector Y is calculated;
7) phase of the original fingerprint changeover program feature vector, X and the follow-up severed finger line changeover program feature vector Y is calculated Relationship number A;
8) according to the related coefficient A and diagnosis criterion, judge load ratio bridging switch changeover program with the presence or absence of abnormal.
2. load ratio bridging switch changeover program on-line checking diagnostic method as described in claim 1, which is characterized in that the step It is rapid 3) in, the original fingerprint changeover program feature vector, X by the original fingerprint feature wave crest zero pole point time coordinate value It constitutes;In the step 6), the follow-up severed finger line changeover program feature vector Y is by the zero of the follow-up severed finger line feature wave crest Pole time coordinate value is constituted.
3. load ratio bridging switch changeover program on-line checking diagnostic method as claimed in claim 2, which is characterized in that the step It is rapid 3) in, original fingerprint changeover program feature vector, X=(x1, x2, x3, x4, x5, the x6), wherein x2 be first wave crest The corresponding time coordinate value of pole, x5 are the corresponding time coordinate value of amplitude maximum wave crest pole, and x1 is first wave crest pole The corresponding time coordinate value of previous zero point, x3 be first wave crest pole the corresponding time coordinate value of the latter zero point, X4 is the corresponding time coordinate value of previous zero point of amplitude maximum wave crest pole, and x6 is the latter of amplitude maximum wave crest pole The corresponding time coordinate value of zero point;In the step 6), the follow-up severed finger line changeover program feature vector Y=(y1, y2, y3, Y4, y5, y6), wherein y2 is the corresponding time coordinate value of first wave crest pole, and y5 is that amplitude maximum wave crest pole is corresponding Time coordinate value, y1 are the corresponding time coordinate value of previous zero point of first wave crest pole, and y3 is first wave crest pole The corresponding time coordinate value of the latter zero point, y4 be amplitude maximum wave crest pole the corresponding time coordinate of previous zero point Value, y6 are the corresponding time coordinate value of the latter zero point of amplitude maximum wave crest pole.
4. load ratio bridging switch changeover program on-line checking diagnostic method as described in claim 1, which is characterized in that the step It is rapid 7) in, the calculation method of the related coefficient A is as follows:
Wherein, LRxyFor the original fingerprint changeover program feature vector, X and the follow-up severed finger line changeover program feature vector Y Normalized covariance.
5. load ratio bridging switch changeover program on-line checking diagnostic method as described in claim 1, which is characterized in that the step It is rapid 8) in, the diagnosis criterion are as follows:
If A >=2, then load ratio bridging switch changeover program is normal;
If 2 > A >=1, then there are slight abnormalities for load ratio bridging switch changeover program;
If A < 1, then there are severely subnormals for load ratio bridging switch changeover program.
CN201811480245.3A 2018-12-05 2018-12-05 On-load tap-changer switching program on-line detection and diagnosis method Active CN109507579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811480245.3A CN109507579B (en) 2018-12-05 2018-12-05 On-load tap-changer switching program on-line detection and diagnosis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811480245.3A CN109507579B (en) 2018-12-05 2018-12-05 On-load tap-changer switching program on-line detection and diagnosis method

Publications (2)

Publication Number Publication Date
CN109507579A true CN109507579A (en) 2019-03-22
CN109507579B CN109507579B (en) 2022-09-20

Family

ID=65751682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811480245.3A Active CN109507579B (en) 2018-12-05 2018-12-05 On-load tap-changer switching program on-line detection and diagnosis method

Country Status (1)

Country Link
CN (1) CN109507579B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112444577A (en) * 2020-11-17 2021-03-05 广东电网有限责任公司电力科学研究院 Method and system for evaluating switching state of vacuum on-load tap-changer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998618A (en) * 2012-11-20 2013-03-27 中国电力科学研究院 Transformer on-load tap-changer fault diagnosis method based on vibration characteristics
KR20140041982A (en) * 2012-09-25 2014-04-07 한국전력공사 Apparatus for watching fault of on load tap changer
CN108229382A (en) * 2017-12-29 2018-06-29 广州供电局有限公司 Vibration signal characteristics extracting method, device, storage medium and computer equipment
CN108490345A (en) * 2018-03-26 2018-09-04 盐城博鸣信息科技有限公司 A kind of fault simulation diagnostic method of converter power transformer tap switch
CN108845250A (en) * 2018-06-01 2018-11-20 国网江苏省电力有限公司南京供电分公司 The load ratio bridging switch fault recognition method extracted based on vibration signal characteristics

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140041982A (en) * 2012-09-25 2014-04-07 한국전력공사 Apparatus for watching fault of on load tap changer
CN102998618A (en) * 2012-11-20 2013-03-27 中国电力科学研究院 Transformer on-load tap-changer fault diagnosis method based on vibration characteristics
CN108229382A (en) * 2017-12-29 2018-06-29 广州供电局有限公司 Vibration signal characteristics extracting method, device, storage medium and computer equipment
CN108490345A (en) * 2018-03-26 2018-09-04 盐城博鸣信息科技有限公司 A kind of fault simulation diagnostic method of converter power transformer tap switch
CN108845250A (en) * 2018-06-01 2018-11-20 国网江苏省电力有限公司南京供电分公司 The load ratio bridging switch fault recognition method extracted based on vibration signal characteristics

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张伟政等: "小波奇异性检测诊断有载分接开关故障", 《高电压技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112444577A (en) * 2020-11-17 2021-03-05 广东电网有限责任公司电力科学研究院 Method and system for evaluating switching state of vacuum on-load tap-changer

Also Published As

Publication number Publication date
CN109507579B (en) 2022-09-20

Similar Documents

Publication Publication Date Title
EP2466322B1 (en) Method and apparatus for transformer diagnosis
CN104049171B (en) Open-circuit fault diagnosis method for staggered flyback type micro inverter
US20100088048A1 (en) Method And Device To Predict A State Of A Power System In The Time Domain
EP3723218A1 (en) Method and device for handling direct current arc
KR101135166B1 (en) A diagnostic device and a diagnostic method for circuit breaker
CN113533841A (en) Non-invasive detection method for power of high-voltage isolating switch driving motor
CN102646545A (en) Medium-voltage circuit breaker for online monitoring of mechanical characteristics
CN108872728A (en) Utilize the trouble-shooter of the electrical equipment of intelligent socket
CN102918618B (en) Transformer inrush current suppression apparatus
CN109507579A (en) Load ratio bridging switch changeover program on-line checking diagnostic method
CN109856530A (en) A kind of load ratio bridging switch on-line monitoring method for diagnosing faults
Tang et al. Contact force monitoring and its application in vacuum circuit breakers
CN109061356A (en) A kind of detection method and device of distribution transformer operational taps
CN109884436B (en) Online monitoring method for power capacitor complete equipment
JP4937205B2 (en) Power quality evaluation system
CN103869202A (en) Transformer high-tension side phase-failure detection method and system
KR20210014877A (en) An On-line Monitoring Method and Its Device Using the Circuit Constants Measurement of Electric Power Equipment
CN110412452A (en) A kind of OLTC contact class on-line fault diagnosis method based on chaology and GA-Kmeans
CN210246611U (en) Three-phase voltage booster
CN113589024A (en) Method and device for rapidly detecting single set of abnormal alternating voltage measurement of redundant system
Feizifar et al. A new algorithm for detecting failure to clear mode of circuit breakers using fundamental frequency component of voltage signals
US20230063811A1 (en) Circuit breakers with notification and reporting capability
JP2003202357A (en) Method and apparatus for insulation monitoring
CN202650951U (en) Medium-voltage circuit breaker having mechanical characteristic on-line monitoring function
KR100927462B1 (en) The switchgear with diagnostic equipment for circuit breaker and method for diagnosing switchgear

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant