Prior art keywords
slurry
coal column
anchor cable
slip casting
air bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910006597.3A
Other languages
Chinese (zh)
Other versions
CN109505639B (en
Inventor
杨尚
宁建国
邱鹏奇
王俊
商和福
顾清恒
徐强
姜宁
茹文凯
郝嘉伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201910006597.3A priority Critical patent/CN109505639B/en
Publication of CN109505639A publication Critical patent/CN109505639A/en
Application granted granted Critical
Publication of CN109505639B publication Critical patent/CN109505639B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Abstract

The invention discloses a kind of gob side entry driving coal column hardened system and its application methods, belong to coal mine gob side entry driving support technology field.Anchor cable, inlet well, grouting monitoring device and slip casting machine are reinforced including coal column, it includes anchoring section, free segment and gangue stopping device that coal column, which reinforces anchor cable,;Anchoring section includes air bag, front fixed ring, rear portion fixed ring and injected hole, and front fixed ring and rear portion fixed ring are used for fixation balloon, and front fixed ring is located at the front end of air bag, and rear portion fixed ring is located at the rear end of air bag, and injected hole is located in the fixed ring of rear portion;Free segment includes steel strand wires, pallet, lockset and interior Grouting Pipe, and interior Grouting Pipe one end is connect with injected hole, and the other end is connect with grouting monitoring device, and air bag is arranged along steel strand wires length direction, and air bag is coated on the outer peripheral surface of steel strand wires.The present invention can unidirectionally carry out coal column reinforcing in gob side entry driving, improve the stability and bearing capacity of coal column.

Description

A kind of gob side entry driving coal column hardened system and its application method
Technical field
The invention belongs to coal mine gob side entry driving support technology fields, and in particular to a kind of gob side entry driving coal column hardened system and Its application method.
Background technique
With the raising of coal mining mechanization degree, the increasing of mine yield and mining depth, to coal mining rate and The requirement of stope drift active workings support technology is higher and higher, and the arrangement that traditional staying sets wider section coal pillar shield lane has been unable to meet It is required that.Staying thin coal pillar gob side entry driving is one of the effective ways for improving coal mining rate.Gob side entry driving is in upper curtate working face Mining influence caused by back production is stablized later along the tunnel of mined out area edge driving.Gob side entry driving technology has coal due to tunnel Recovery ratio is high, is easy many advantages, such as maintenance, gradually promotes and applies in the multiple mining areas in China in recent years, and thin coal pillar is dug along sky The important component of lane country rock, stability directly affect the stability of tunnel entirety, therefore need to reinforce branch to thin coal pillar Shield.
In existing technology, is reinforced for gob side entry driving coal column, carried out a series of technological improvements, such as: (1) CN201410150974.8 discloses a kind of gob side entry driving coal column anchor cable to wearing reinforcement means, although this method is using anchor cable to wearing Reinforcement technique can apply biggish anchor force to coal column, improve the support strength of coal column, ensure the steady in a long-term of coal column, but should Method need to be punched on coal column in advance after upper curtate is exploited and finished, install preset anchor cable, process is tedious, in addition mutually There are the reserved inaccuracy of width, error is larger to be will lead to can not carry out to wearing reinforcing lane coal column;(2) CN201710035988.9 is public A kind of two-way reinforcement means of gob side entry driving coal column has been opened, the two-way reinforcing of prearranged pillar is realized using swollen locking-type two-ended cables, and Construct in the side of prearranged pillar can complete, and can enhance the bearing capacity and stability of blind pass coal column, but in this method Swollen locking-type two-ended cables design comparison is complicated, can not understand the pressure dilated in pouch when slip casting in real time, and expand pouch and exist It before non-slip casting, is easy to be shriveled by goaf spoil, grouting difficulty causes the two-way reinforcing of coal column that can not carry out, in addition, broken in coal column When broken, this method can only reinforce coal column two sides, can not accomplish coal column internal reinforcement, cause the stability and bearing capacity of coal column It substantially reduces.
Summary of the invention
The purpose of the present invention is to provide a kind of gob side entry driving coal column hardened system and its application methods, can dig along sky Coal column reinforcing is unidirectionally carried out in lane, improves the stability and bearing capacity of coal column.
One of task of the invention is to provide a kind of gob side entry driving coal column hardened system, and which employs following technical sides Case:
A kind of gob side entry driving coal column hardened system, including coal column reinforce anchor cable, inlet well, grouting monitoring device and slip casting Machine, it is characterised in that:
It includes anchoring section, free segment and gangue stopping device that the coal column, which reinforces anchor cable,;
The anchoring section includes air bag, front fixed ring, rear portion fixed ring and injected hole, the front fixed ring and institute Rear portion fixed ring is stated for fixing the air bag, the front fixed ring is located at the front end of the air bag, the rear portion fixed ring Positioned at the rear end of air bag, the injected hole is located in the rear portion fixed ring;
The free segment includes steel strand wires, pallet, lockset and interior Grouting Pipe, described interior Grouting Pipe one end and the slip casting Hole connection, the other end are connect with the grouting monitoring device, and the air bag is arranged along steel strand wires length direction, the air bag It is coated on the outer peripheral surface of the steel strand wires;
The gangue stopping device includes cylinder, steel plate, spring, bolt and canvas, and the diameter of the cylinder and the steel twist The diameter of line is identical, and outer peripheral surface is evenly arranged four fixed connection apparatus, the cloth on the left of the cylinder on the left of the cylinder Vertical drilling is set, arranges cross drilling in middle position;Described steel plate one end is connect by bolt with the fixed connection apparatus; The spring is mounted in the cross drilling and vertical drilling, and the both ends of the spring is connect with steel plate, is contained inside the canvas There is iron wire, the canvas is fixed on the steel plate;
The slip casting machine include motor, slip casting steel pipe, control valve, slurry can, spiral pushing device, three-legged support, Pulp steel pipe and rotational speed governor, the slurry can are cylinder, and the motor is located at the top of slurry can, the slip casting steel Pipe is set to slurry can upper side, is arranged the control valve between the Grouting Pipe and slurry can, inside the slurry can The spiral pushing device is set, and the spiral pushing device includes central spindle and is fixedly arranged on central spindle side using its axis as rotary shaft edge Axial screw, which is advanced, extends to the helical blade of rear end from its front end, in the helical blade along with central spindle is closed is bonded, outer With slurry can shell is closed is bonded, a slot is correspondingly formed between the adjacent blade of helical blade and central spindle, entire helical blade is in axis Formation extends to the spiral of rear end face connection front/rear end from its front end face and leads matter slot on core, and the three-legged support is located at storage and starches Tank lower part, the pulp steel pipe is set to slurry can bottom, control valve is arranged between the pulp steel pipe and slurry can, described Rotational speed governor is arranged on slurry can surface.
As a preferred solution of the present invention, the grouting monitoring device is connect with the slip casting machine, described Grouting monitoring device includes main grouting pipe, and main inlet control valve, the main inlet control valve side are equipped on the main grouting pipe Be equipped with into slurry regulating valve, it is described into slurry regulating valve on be connected with pressure gauge one, the main inlet control valve other side is equipped with blowing Regulating valve, is connected with pressure gauge two in the blowing regulating valve, the main grouting pipe into slurry regulating valve side be slurry-feeding hole, institute It states slurry-feeding hole to connect with the grout outlet of the slip casting machine, blowing regulating valve side is slurry outlet, and the slurry outlet is connected with Slip casting hose.
Further, the coal column reinforces anchor cable arrangement are as follows: first row makes a call to three coal columns and reinforces anchor cable, and second row is beaten Two coal columns reinforce anchor cable, so recycle, and array pitch is 1.5m × 1.5m between the coal column reinforces anchor cable.
Further, the depth of the inlet well is the half of coal column.
Another task of the invention is to provide a kind of application method of above-mentioned gob side entry driving coal column hardened system, successively wrap Include following steps:
A, anchor cable drilling is drilled at the coal column of gob side entry driving goaf side, the depth of the anchor cable drilling is to penetrate coal column;
B, the coal column reinforcing anchor cable is drilled by the anchor cable penetrates coal column, the anchoring section of the coal column reinforcing anchor cable, Gangue stopping device is located in goaf, and the anchoring section that the coal column reinforces anchor cable is close to goaf side coal column wall;
C, the gangue stopping device is mounted in anchor cable drilling, and spring is in compressive state, and steel plate, canvas are tightly attached to air bag four In week, when gangue stopping device enters goaf, spring is flicked, and steel plate and canvas are opened therewith, forms the shape of " umbrella ", to play gear The firmly effect of goaf spoil;
D, the slip casting hose is connect with the slurry outlet, and the grout outlet is connect with the slurry-feeding hole;
E, start slip casting machine, so that slurry is reached suitable speed discharge by adjusting rotational speed governor, by slurry by infusing Starch monitoring device injection air bag in, during slip casting, observe pressure gauge one, two numerical value of pressure gauge, by adjust main inlet control valve, into Slurry regulating valve, blowing regulating valve close note when pressure gauge one, pressure gauge two reach specified value to control the flow of slurry Pulp grinder closes main inlet control valve, stops slip casting;
F, it is reinforced between anchor cable drilling in the coal column and is drilled with inlet well, the inlet well depth is coal column half, Slip casting is carried out to the inlet well by slip casting machine;
G, along tunnelling direction, coal column of successively constructing reinforces anchor cable, realizes that the coal column of entire working face is reinforced.
Advantageous effects brought by the present invention are as follows:
(1) present invention is different from the pre-buried anchor cable reinforcing mode of traditional gob side entry driving, but is added in tunnel using coal column Gu anchor cable reinforces coal column, realizes that two faces of coal column are constrained each other, limit its deformation;
(2) by inlet well slip casting into coal column, the integrality of coal column can be improved, solve traditional gob side entry driving coal The problem that column is broken, intensity is low improves the stability and bearing capacity of coal column entirety, effectively reduces roadway deformation;
(3) goaf spoil can effectively prevent by coal column reinforcing anchor cable gangue stopping device and pushes down or crush air bag, lead to Intracapsular pressure, balloon rupture excessive to prevent pressure can be understood in real time by crossing grouting monitoring device;
(4) auger device rotary speed is controlled by adjusting slip casting machine rotational speed governor, is adapted to the note of varying environment Slurry, can effectively adjust the speed of slip casting, lead to balloon rupture to prevent injection speed is too fast.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawing:
Fig. 1 is a kind of structural schematic diagram of gob side entry driving coal column hardened system of the present invention;
Fig. 2 is that coal column reinforces anchor cable, injected hole arrangement schematic diagram;
Fig. 3 is that coal column reinforces anchor cable compression schematic diagram;
Fig. 4 is that coal column reinforces anchor cable expanded schematic diagram;
Fig. 5 is that coal column reinforces anchor cable schematic cross-section;
Fig. 6 is gangue stopping device drilling arrangement schematic diagram;
Fig. 7 is grouting monitoring schematic device;
Fig. 8 is slip casting machine schematic diagram;
Fig. 9 is slip casting machine rotational speed governor schematic diagram;
In figure: the tunnel 1-;2- coal column;The goaf 3-;4- coal column reinforces anchor cable, 41- anchoring section, 411- air bag, before 412- Portion's fixed ring, the rear portion 413- fixed ring, 414- injected hole, 42- free segment, 421- steel strand wires, 422- slip casting hose, 423- support Disk, 424- lockset, 43- gangue stopping device, 431- high intensity cylinder, 4311- fixed connection apparatus, 4312- vertically drill, 4313- Cross drilling, 432- high-strength steel sheet, 433- bolt, 434- high-strength spring, 435- canvas;5- slip casting machine, 51- motor, 52- slip casting steel pipe, 53- control valve, 54- slurry can, 55- spiral pushing device, 551- central spindle, 552- helical blade, 56- tri- Foot support, 57- grout outlet, 58- rotational speed governor, 581- " NO " start key, 582- " OFF " stop key, 583- speed control key; 6- grouting monitoring device, the main grouting pipe of 61-, 62- slurry-feeding hole, 63- pressure gauge one, 64- into slurry regulating valve, 65- main inlet control valve, 66- pressure gauge two, 67- blowing regulating valve, 68- slurry outlet;7- inlet well.
Specific embodiment
The invention proposes a kind of gob side entry driving coal column hardened system and its application method, in order to make advantages of the present invention, Technical solution is clearer, clear, elaborates combined with specific embodiments below to the present invention.
The present invention, a kind of gob side entry driving coal column hardened system, including coal column reinforce anchor cable 4, inlet well 7, slip casting machine 5, Grouting monitoring device 6.As shown in Figure 1, Figure 2, coal column reinforces anchor cable arrangement are as follows: first row makes a call to three coal columns and reinforces anchor cable 4, second row makes a call to two coal columns and reinforces anchor cable 4, so recycles, and it is 1.5m × 1.5m that coal column, which reinforces 4 array pitch of anchor cable,.Inlet well 7 are drilled between the coal column reinforcing drilling of anchor cable 4, and 7 depth of inlet well is coal column half.
In conjunction with shown in Fig. 3-Fig. 6, it includes anchoring section 41 that coal column of the present invention, which reinforces anchor cable 4, free segment 42, gangue stopping device 43, Anchoring section 41 includes: air bag 411, front fixed ring 412, rear portion fixed ring 413, injected hole 414.Air bag 411 is using high-intensitive Rubber material, air bag 411 arrange that air bag 411 is coated on the outer peripheral surface of steel strand wires 421 along 421 length direction of steel strand wires.Front is solid Ring 412 and the rear portion fixed ring 413 are determined for fixation balloon 411, and front fixed ring 412 is located at 411 front end of air bag, and rear portion is solid Determine ring 413 and be located at 411 rear end of air bag, an injected hole is arranged in rear portion fixed ring 413.
Free segment 42 includes: steel strand wires 421, pallet 423, lockset 424, slip casting hose 422.421 specification of steel strand wires regards coal 2 fastening strength of column determines.Pallet 423 uses material to be stamped to form for high-strength steel sheet.Slip casting hose 422 is High Voltage hose, 422 one end of slip casting hose is connect with injected hole 414, and the other end is connect with 6 slurry outlet 68 of grouting monitoring device.
Gangue stopping device 43 includes: high-intensitive cylinder 431, high-strength steel sheet 432, high-strength spring 434, bolt 433, canvas 435.High-intensitive 431 length of cylinder is 30cm, and diameter is identical as 421 diameter of steel strand wires, at 431 left side 5cm, high-intensitive cylinder It sets outer peripheral surface and is evenly arranged four fixed connection apparatus 4311, vertically drill in high-intensitive 431 left side 10cm location arrangements of cylinder 4312, cross drilling 4313 is arranged in middle position.432 length of high-strength steel sheet be 35cm, width 5cm, with a thickness of 0.8cm, described 432 one end of high-strength steel sheet are connect by bolt 433 with the fixed connection apparatus 4311, the high strength steel There are four plate 432 is total.High-strength spring 434 is placed in cross drilling 4313 and vertical drilling 4312, and 434 liang of high-strength spring End connect with high-strength steel sheet 432, high-strength spring 434 be total to there are two.Contain high-intensitive iron wire, canvas 435 inside canvas 435 It is fixed on high-strength steel sheet 432.
Gangue stopping device 43 is connect with anchoring section 41 by the front fixed ring 412.
Slurry is anchoring chemical grout in air bag 411, and 7 slurry of inlet well is the chemical pulps such as cement grout or Ma Lisan Liquid.
In conjunction with shown in Fig. 7-8, slip casting machine 5 of the present invention includes motor 51, slip casting steel pipe 52, control valve 53, slurry can 54, spiral pushing device 55, central spindle 551, helical blade 552, three-legged support 56, grout outlet 57, rotational speed governor 58, " NO " is opened Dynamic key 581, " OFF " stop key 582, speed control key 583.
Slurry can 54 is cylinder, and motor 51 is located at the top of slurry can 54, and slip casting steel pipe 52 is set to slurry can 54 Upper side, is arranged control valve 53 between slip casting steel pipe 52 and slurry can 54, slurry can 54 is internally provided with screw propulsion dress Set 55, spiral pushing device 55 include central spindle 551 and be fixedly arranged on central spindle side using its axis be rotary shaft along axial screw advance from Its front end extends to the helical blade 552 of rear end, in helical blade 552 along with central spindle 551 is closed is bonded, outer and slurry can 54 The closed fitting of shell, is correspondingly formed a slot between the adjacent blade of helical blade 552 and central spindle 551, entire helical blade 552 is in axis Formation extends to the spiral of rear end face connection front/rear end from its front end face and leads matter slot on core 551, and three-legged support 56 is located at storage 54 lower part of tank is starched, the grout outlet 57 is set to 54 bottom of slurry can, and control is arranged between the grout outlet 57 and slurry can 54 Valve 53, the rotational speed governor 58 setting on 54 surface of slurry can, the rotational speed governor 58 include " NO " start key 581, " OFF " stop key 582, speed control key 583, the speed control key 583 divide for " I ", " II ", " III " three gears.
Specifically, 5 operating process of slip casting machine: pressing " NO " start key 581, the motor on the rotational speed governor 58 51 startings, the rotation of 51 bearing of motor drive the rotation of 54 internal helicoid propulsion device 55 of slurry can, 55 high speed of auger device Spiral rotating, which advances, does manual work, and generates the thrust of delivery slurry, and final slurry is discharged from grout outlet 57, and slip casting terminates to press described turn " OFF " stop key 582 on fast controller 58, slip casting machine 5 stops working.By adjusting the speed control above rotational speed governor 58 Key 583 adjusts the revolving speed of spiral pushing device 55, and " I ", " II ", " III " three gear speed successively increase, and then preferably suitable Slip casting under varying environment is answered to work.
As shown in figure 9, grouting monitoring device 6 of the present invention is the main grouting pipe 61 connecting with slip casting machine 5, main grouting pipe Main inlet control valve 65 is installed, main inlet control valve 65 can flexibly be controlled into slurry amount, and 65 side of main inlet control valve is equipped on 61 Into slurry regulating valve 64, it is connected with pressure gauge 1 in regulating valve 64 into starching, it can be with the pressure of flexible modulation slurry into slurry regulating valve 64 Power, pressure gauge 1 are used to show the convenient adjusting into slurry regulating valve 64 to slurry pressure of pressure value, 65 other side of main inlet control valve Blowing regulating valve 67 is installed, pressure gauge 2 66 is connected in blowing regulating valve 67, dump valve 67 is for defeated to slip casting hose 422 The control of the grouting amount entered, main grouting pipe 61 are slurry-feeding hole 62, slurry-feeding hole 62 and slip casting machine pulp into 64 side of regulating valve is starched Pipe 57 connects, and 67 side of grouting pipe blowing regulating valve is slurry outlet 68, and slurry outlet 68 is connect with slip casting hose 422.
The application method of above-mentioned gob side entry driving coal column hardened system, comprising the following steps:
(1) in gob side entry driving goaf, 6 side coal column 2 carries out being drilled with anchor cable drilling, and anchor cable drilling depth is to penetrate coal column 2, Anchor cable drilling reinforces anchor cable 4 for installing coal column.Gob side entry driving prearranged pillar generally in 3-5m or so, was set if coal column stays Narrow, the stability and bearing capacity of coal column are not achieved, and coal column crushes easily, and cause roadway deformation, unstability;It is set if coal column stays It is wide, it results in waste of resources;
(2) coal column reinforces anchor cable 4 and penetrates coal column 2 by anchor cable drilling, and coal column reinforces 4 anchoring section 41 of anchor cable, gear cash Device 43 is located in goaf 3, and coal column reinforces 4 anchoring section 41 of anchor cable and is close to 3 side coal column wall of goaf;
(3) for gangue stopping device 43 in anchor cable drilling, high-strength spring 434 is in compressive state, high-strength steel sheet 432, sail Cloth 435 is tightly attached to 411 surrounding of air bag, wear-out failure during advance in anchor cable drills to prevent air bag 411, when gangue stopping device 43 When into goaf 3, high-strength spring 434 is flicked, and high-strength steel sheet 432 and canvas 435 are opened therewith, forms the shape of " umbrella " Shape can play the role of blocking 3 spoil of goaf, push down air bag 411 to prevent spoil;
(4) slip casting hose 422 is connect with the slurry outlet 68 of grouting monitoring device 6,5 grout outlet 57 of slip casting machine and grouting monitoring The slurry-feeding hole 62 of device 6 connects;
(5) start slip casting machine 5, so that slurry is reached suitable speed discharge by adjusting rotational speed governor 58, slurry is passed through It crosses grouting monitoring device 6 to inject in air bag 411, during slip casting, observes pressure gauge 1,2 66 numerical value of pressure gauge, pass through tune Section main inlet control valve 65, the flow that slurry is controlled into slurry regulating valve 64, blowing regulating valve 6, when pressure gauge 1, pressure gauge 2 66 When reaching specified value, slip casting machine 5 is closed, closes main inlet control valve 65, stops slip casting.It is tested through experiment, when pressure-detecting device 6 Upper pressure gauge stops slip casting when reaching 2Mpa, 2-3 hours rear gasbags 411 is waited to form stable anchorage body, and 411 slip casting of air bag is stablized Anchorage effect can be not only played afterwards, can also block drilling, prevent 3 pernicious gas of goaf from overflowing, when slurry in air bag 411 After solidification, the pallet 423 of anchor cable 4 is reinforced to coal column in 1 side of tunnel, lockset 424 anchors, application prestressing force, 411 entoplasm of air bag Body is fast quick solidifying slurries;
(6) it is reinforced between anchor cable drilling in coal column and be drilled with inlet well 7,7 depth of inlet well is 2 half of coal column, Slip casting is carried out to inlet well 7 by slip casting machine 5;
(7) coal column reinforces 4 arrangement of anchor cable are as follows: first row makes a call to three coal columns and reinforces anchor cable 4, and second row makes a call to two coal columns Anchor cable 4 is reinforced, is so recycled, it is 1.5m × 1.5m that the coal column, which reinforces 4 array pitch of anchor cable,;
(8) along tunnelling direction, coal column of successively constructing reinforces anchor cable 4, realizes that the coal column 2 of entire working face is reinforced.
It uses for reference the prior art and can be realized in the above-mentioned part that do not address.
It should be noted that any equivalent way that those skilled in the art are made under the introduction of this specification, or Obvious variant should all be within the scope of the present invention.

Claims (5)

1. a kind of gob side entry driving coal column hardened system, including coal column reinforce anchor cable, inlet well, grouting monitoring device and slip casting Machine, it is characterised in that:
It includes anchoring section, free segment and gangue stopping device that the coal column, which reinforces anchor cable,;
The anchoring section includes air bag, front fixed ring, rear portion fixed ring and injected hole, the front fixed ring and it is described after Portion's fixed ring is for fixing the air bag, and the front fixed ring is located at the front end of the air bag, and the rear portion fixed ring is located at The rear end of air bag, the injected hole are located in the rear portion fixed ring;
The free segment includes steel strand wires, pallet, lockset and interior Grouting Pipe, and described interior Grouting Pipe one end and the injected hole connect It connects, the other end is connect with the grouting monitoring device, and the air bag is arranged along steel strand wires length direction, the air bag cladding In the outer peripheral surface of the steel strand wires;
The gangue stopping device includes cylinder, steel plate, spring, bolt and canvas, the diameter of the cylinder and the steel strand wires Diameter is identical, and outer peripheral surface is evenly arranged there are four fixed connection apparatus on the left of the cylinder, arranges on the left of the cylinder Vertical drilling arranges cross drilling in middle position;Described steel plate one end is connect by bolt with the fixed connection apparatus;Institute It states spring to be mounted in the cross drilling and vertical drilling, the both ends of the spring is connect with steel plate, is contained inside the canvas Iron wire, the canvas are fixed on the steel plate;
The slip casting machine includes motor, slip casting steel pipe, control valve, slurry can, spiral pushing device, three-legged support, pulp Steel pipe and rotational speed governor, the slurry can are cylinder, and the motor is located at the top of slurry can, and the slip casting steel pipe is set It is placed in slurry can upper side, the control valve, setting inside the slurry can are set between the Grouting Pipe and slurry can The spiral pushing device, the spiral pushing device includes central spindle and to be fixedly arranged on central spindle side using its axis be rotary shaft along axial Be threadingly advanced the helical blade that rear end is extended to from its front end, in the helical blade along with central spindle is closed is bonded, outer and storage The closed fitting of tank shell is starched, a slot is correspondingly formed between the adjacent blade of helical blade and central spindle, entire helical blade is in central spindle It is formed to extend to rear end face from its front end face and be connected to the spiral of front/rear end and leads matter slot, the three-legged support is located at slurry can Lower part, the pulp steel pipe are set to slurry can bottom, are arranged control valve between the pulp steel pipe and slurry can, and described turn Fast controller is arranged on slurry can surface.
2. a kind of gob side entry driving coal column hardened system according to claim 1, it is characterised in that: the grouting monitoring dress It sets and is connect with the slip casting machine, the grouting monitoring device includes main grouting pipe, is installed on the main grouting pipe There is a main inlet control valve, the main inlet control valve side is equipped with into slurry regulating valve, described into being connected with pressure gauge one, institute in slurry regulating valve It states the main inlet control valve other side and blowing regulating valve is installed, pressure gauge two, the main Grouting Pipe are connected in the blowing regulating valve Road is slurry-feeding hole into slurry regulating valve side, and the slurry-feeding hole is connect with the grout outlet of the slip casting machine, blowing regulating valve side End is slurry outlet, and the slurry outlet is connected with slip casting hose.
3. a kind of gob side entry driving coal column hardened system according to claim 1, it is characterised in that: the coal column reinforces anchor cable Arrangement are as follows: first row makes a call to three coal columns and reinforces anchor cable, and second row makes a call to two coal columns and reinforces anchor cable, so recycles, the coal Array pitch is 1.5m × 1.5m between column reinforces anchor cable.
4. a kind of gob side entry driving coal column hardened system according to claim 1, it is characterised in that: the depth of the inlet well Degree is the half of coal column.
5. a kind of application method of gob side entry driving coal column hardened system according to claim 2, which is characterized in that successively wrap Include following steps:
A, anchor cable drilling is drilled at the coal column of gob side entry driving goaf side, the depth of the anchor cable drilling is to penetrate coal column;
B, the coal column reinforces anchor cable and penetrates coal column by anchor cable drilling, and the coal column reinforces the anchoring section of anchor cable, gear cash Device is located in goaf, and the anchoring section that the coal column reinforces anchor cable is close to goaf side coal column wall;
C, the gangue stopping device is mounted in anchor cable drilling, and spring is in compressive state, and steel plate, canvas are tightly attached to air bag surrounding, When gangue stopping device enters goaf, spring is flicked, and steel plate and canvas are opened therewith, is formed the shape of " umbrella ", is blocked with playing The effect of goaf spoil;
D, the slip casting hose is connect with the slurry outlet, and the grout outlet is connect with the slurry-feeding hole;
E, start slip casting machine, so that slurry is reached suitable speed discharge by adjusting rotational speed governor, slurry is supervised by slip casting It surveys in device injection air bag, during slip casting, observes pressure gauge one, two numerical value of pressure gauge, by adjusting main inlet control valve, being adjusted into slurry Section valve, blowing regulating valve close slip casting machine when pressure gauge one, pressure gauge two reach specified value to control the flow of slurry, Main inlet control valve is closed, slip casting is stopped;
F, it is reinforced between anchor cable drilling in the coal column and is drilled with inlet well, the inlet well depth is coal column half, is passed through Slip casting machine carries out slip casting to the inlet well;
G, along tunnelling direction, coal column of successively constructing reinforces anchor cable, realizes that the coal column of entire working face is reinforced.
CN201910006597.3A 2019-01-04 2019-01-04 Gob-side entry driving coal pillar reinforcing system and using method thereof Expired - Fee Related CN109505639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910006597.3A CN109505639B (en) 2019-01-04 2019-01-04 Gob-side entry driving coal pillar reinforcing system and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910006597.3A CN109505639B (en) 2019-01-04 2019-01-04 Gob-side entry driving coal pillar reinforcing system and using method thereof

Publications (2)

Publication Number Publication Date
CN109505639A true CN109505639A (en) 2019-03-22
CN109505639B CN109505639B (en) 2020-03-31

Family

ID=65756166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910006597.3A Expired - Fee Related CN109505639B (en) 2019-01-04 2019-01-04 Gob-side entry driving coal pillar reinforcing system and using method thereof

Country Status (1)

Country Link
CN (1) CN109505639B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111396052A (en) * 2020-02-18 2020-07-10 温州大学 Method for mineralizing and reinforcing coal pillar by urease microorganisms
CN111814242A (en) * 2020-07-16 2020-10-23 新疆工程学院 Method and system for judging gob-side entry driving coal pillar width by using data of Internet of things
CN112267884A (en) * 2020-10-27 2021-01-26 陕西煤业化工技术研究院有限责任公司 Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
CN112922653A (en) * 2021-03-16 2021-06-08 太原理工大学 Small coal pillar overlapped grouting through anchor cable
CN113153394A (en) * 2021-03-10 2021-07-23 中国矿业大学 Self-expansion reinforced anchoring type anchor rod structure and method for narrow coal pillar along hollow crossheading end
CN113803087A (en) * 2021-09-07 2021-12-17 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
AU2021277730A1 (en) * 2020-10-29 2022-05-19 China Coal Research Institute Control method and control device for full-automatic pillar filling mining
CN116291396A (en) * 2023-04-07 2023-06-23 徐州中矿岩土技术股份有限公司 Method for monitoring goaf slurry migration and condensation in drilled holes in real time

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425439A (en) * 2012-01-17 2012-04-25 中国矿业大学 Method for reinforcing bidirectional staged stretched anchor cable of preset steel strand
CN103899342A (en) * 2014-04-15 2014-07-02 中国矿业大学(北京) Gob-side entrydriving coal pillar anchor cable through reinforcing method
CN205117377U (en) * 2015-10-20 2016-03-30 山东科技大学 Gob entry driving fender is consolidated and is used slip casting anchor rope
CN105727781A (en) * 2016-02-14 2016-07-06 山东科技大学 Grouting pump for high-pressure constant-flow test
CN105927248A (en) * 2016-04-29 2016-09-07 中南大学 Pressure stabilizing and gas exhausting device used for grouting site and mounting and using method thereof
CN106884655A (en) * 2017-01-10 2017-06-23 山东建筑大学 A kind of two-way reinforcement means of gob side entry driving coal column
CN206477871U (en) * 2017-01-10 2017-09-08 山东建筑大学 A kind of gob side entry driving coal column is reinforced with swollen locking-type two-ended cables
CN108868769A (en) * 2018-06-07 2018-11-23 兖州煤业股份有限公司 A kind of construction method for reinforcing coal column based on swollen locking-type anchor cable
CN108930543A (en) * 2018-07-17 2018-12-04 河南理工大学 A kind of big cross section gob side entry driving coupling supporting structure and construction method
CN208310825U (en) * 2018-05-24 2019-01-01 中煤能源研究院有限责任公司 Gob side entry driving fender erosion control release anchors integral structure to drawing
CN109441512A (en) * 2018-11-20 2019-03-08 华北科技学院 Armored concrete two-ended cables and its construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425439A (en) * 2012-01-17 2012-04-25 中国矿业大学 Method for reinforcing bidirectional staged stretched anchor cable of preset steel strand
CN103899342A (en) * 2014-04-15 2014-07-02 中国矿业大学(北京) Gob-side entrydriving coal pillar anchor cable through reinforcing method
CN205117377U (en) * 2015-10-20 2016-03-30 山东科技大学 Gob entry driving fender is consolidated and is used slip casting anchor rope
CN105727781A (en) * 2016-02-14 2016-07-06 山东科技大学 Grouting pump for high-pressure constant-flow test
CN105927248A (en) * 2016-04-29 2016-09-07 中南大学 Pressure stabilizing and gas exhausting device used for grouting site and mounting and using method thereof
CN106884655A (en) * 2017-01-10 2017-06-23 山东建筑大学 A kind of two-way reinforcement means of gob side entry driving coal column
CN206477871U (en) * 2017-01-10 2017-09-08 山东建筑大学 A kind of gob side entry driving coal column is reinforced with swollen locking-type two-ended cables
CN208310825U (en) * 2018-05-24 2019-01-01 中煤能源研究院有限责任公司 Gob side entry driving fender erosion control release anchors integral structure to drawing
CN108868769A (en) * 2018-06-07 2018-11-23 兖州煤业股份有限公司 A kind of construction method for reinforcing coal column based on swollen locking-type anchor cable
CN108930543A (en) * 2018-07-17 2018-12-04 河南理工大学 A kind of big cross section gob side entry driving coupling supporting structure and construction method
CN109441512A (en) * 2018-11-20 2019-03-08 华北科技学院 Armored concrete two-ended cables and its construction method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111396052A (en) * 2020-02-18 2020-07-10 温州大学 Method for mineralizing and reinforcing coal pillar by urease microorganisms
CN111396052B (en) * 2020-02-18 2023-03-07 温州大学 Method for mineralizing and reinforcing coal pillar by urease microorganisms
CN111814242B (en) * 2020-07-16 2023-10-03 新疆工程学院 Method and system for judging width of gob-side entry driving coal pillar by utilizing data of Internet of things
CN111814242A (en) * 2020-07-16 2020-10-23 新疆工程学院 Method and system for judging gob-side entry driving coal pillar width by using data of Internet of things
CN112267884A (en) * 2020-10-27 2021-01-26 陕西煤业化工技术研究院有限责任公司 Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
AU2021277730A1 (en) * 2020-10-29 2022-05-19 China Coal Research Institute Control method and control device for full-automatic pillar filling mining
AU2021277730B2 (en) * 2020-10-29 2022-08-11 China Coal Research Institute Control method and control device for full-automatic pillar filling mining
CN113153394A (en) * 2021-03-10 2021-07-23 中国矿业大学 Self-expansion reinforced anchoring type anchor rod structure and method for narrow coal pillar along hollow crossheading end
CN113153394B (en) * 2021-03-10 2023-10-27 中国矿业大学 Self-expansion reinforced anchoring type anchor rod structure and method for narrow coal pillar along-void gate way end
CN112922653A (en) * 2021-03-16 2021-06-08 太原理工大学 Small coal pillar overlapped grouting through anchor cable
CN113803087A (en) * 2021-09-07 2021-12-17 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
CN113803087B (en) * 2021-09-07 2023-11-10 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
CN116291396A (en) * 2023-04-07 2023-06-23 徐州中矿岩土技术股份有限公司 Method for monitoring goaf slurry migration and condensation in drilled holes in real time
CN116291396B (en) * 2023-04-07 2023-10-20 徐州中矿岩土技术股份有限公司 Method for monitoring goaf slurry migration and condensation in drilled holes in real time

Also Published As

Publication number Publication date
CN109505639B (en) 2020-03-31

Similar Documents

Publication Publication Date Title
CN109505639A (en) A kind of gob side entry driving coal column hardened system and its application method
CN101749030B (en) Porous parallel-connected grouting method and device for reinforcing roadway weak surrounding rock
CN104481560B (en) Back water-bearing layer administering method
CN108678769A (en) Deep Gateway anchor note cuts top master control and stays lane method
CN101624910B (en) Method for reinforcing concealed tunnel
CN105651132B (en) Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN108087008B (en) A kind of three-soft seam gob side entry method for protecting support
CN101603431A (en) A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN111764863B (en) Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN103032086A (en) Method for filling resin explosive cartridge in drilled hole of tunnel roof anchor rod
CN110905538A (en) Construction method for TBM (Tunnel boring machine) of unfavorable geological section
CN112796296A (en) High-pressure rotary spraying combined PVC sleeve retaining wall earth surface reinforcing construction method
CN107143338A (en) A kind of coal mine roadway driving and method for protecting support
CN103195443A (en) Deep mining method capable of optimizing support parameters and preventing roadway delaying water gushing
CN109798140A (en) Km Deep Soft Rock fracture grouting support reinforcement method
CN108374672B (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN107060779A (en) A kind of anti-cut construction method of narrow regions ultra-deep passage inclined shaft
CN110439582A (en) Unfavorable geology method of disposal, TBM, which support to tunnel when happening suddenly unfavorable geology at boots, at TBM support boots passes through method
CN108867639A (en) The replaceable anchor pole of overall length inflatable gib
CN113818882B (en) Method for recycling stope jack posts under loose tailing filling body
Wang et al. Novel application of the roof-cutting-type gob-side entry retaining in coal mine
CN202531098U (en) Broken coal-rock mass grouting system
CN112392524B (en) Geotechnical engineering sectional type cavity slip casting anchor rope device
CN111894601B (en) Coal seam roadway surrounding rock structure passing geological structure and advanced modification tunneling method thereof
CN113338998A (en) Coal mining broken tape slip casting supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200331

CF01 Termination of patent right due to non-payment of annual fee