CN109505589A - A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method and tubing string - Google Patents

A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method and tubing string Download PDF

Info

Publication number
CN109505589A
CN109505589A CN201811432291.6A CN201811432291A CN109505589A CN 109505589 A CN109505589 A CN 109505589A CN 201811432291 A CN201811432291 A CN 201811432291A CN 109505589 A CN109505589 A CN 109505589A
Authority
CN
China
Prior art keywords
oil
oil well
memory type
thermometer
field distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811432291.6A
Other languages
Chinese (zh)
Other versions
CN109505589B (en
Inventor
朱洪征
黄伟
甘庆明
吕亿明
王百
崔文昊
牛彩云
石海霞
常莉静
苏祖波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201811432291.6A priority Critical patent/CN109505589B/en
Publication of CN109505589A publication Critical patent/CN109505589A/en
Application granted granted Critical
Publication of CN109505589B publication Critical patent/CN109505589B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • E21B47/07Temperature
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells

Abstract

The invention belongs to oil-field hot-washing wax remover technical field more particularly to a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test methods and tubing string.The present invention includes at least the thermometer group being from top to bottom distributed in oil pipe, at least one thermometer is located between the oil well pump and screen casing in oil pipe in thermometer group.The present invention realizes hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests, solve the problems, such as that fibre optic temperature sensor testing cost is high, influences vulnerable to hole condition, effective riser column length phase application reliability, simplify on-site operation process, temperature variations when intuitive reflection thermal well flushing in pit shaft, the basic principle with method of process parameter optimizing provide foundation when being thermal well flushing.

Description

A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method and tubing string
Technical field
The invention belongs to oil-field hot-washing wax remover technical field more particularly to a kind of hot cleanout and paraffin removal of oil well temperature in wellbore field distribution Test method and tubing string.
Background technique
Thermal well flushing is to maintain oil well and normally produces one of most common maintenance measure, and oil well paraffinication can be effectively prevented and make At tube rod card, reduce extraction equipment load, extend oil well repair free period, reduce cost of winning.And influence thermal well flushing effect Most important factor is Temperature Distribution of the hot wash medium in entire pit shaft, if the technological parameters such as well-flushing temperature, well-flushing discharge capacity are arranged Unreasonable, hot wash medium will be lower than dewaxing temperature in the temperature of wax deposition section, and then cause well washing effect unobvious, or It is long to restore the period for oil-producing after well-flushing, or even phenomena such as yield after well-flushing sharply declines occurs.Be badly in need of by different well-flushing temperature, Under well-flushing discharge capacity hot wash pit shaft temperature distributing rule study, and then propose thermal well flushing when process parameter optimizing basic principle with Method.Ordinary temperature field test technology mainly uses the mating magnetic locator of fibre optic temperature sensor to measure different depth coordinate at present Under temperature, but it is at high cost, be affected by hole condition, accurate difficulty of test is big.
Summary of the invention
An object of the present invention be to provide a kind of testing cost it is low, not vulnerable to hole condition influence hot cleanout and paraffin removal of oil well pit shaft Thermo parameters method test method;The second object of the present invention is to provide a kind of higher and simplified on-site operation process of reliability Hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string;The third object of the present invention is that tubing string can intuitively reflect thermal well flushing When pit shaft in temperature variations.
To achieve the above object, the technical solution adopted by the present invention is that:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string includes at least oil pipe, it is characterised in that: further includes setting Thermometer group, sucker rod, oil well pump and screen casing in oil pipe;Oil well pump is placed in above screen casing, at least one in thermometer group Between oil well pump and screen casing, remaining thermometer is successively set on above oil well pump thermometer from top to bottom;Thermometer group It is detachably connected with oil pipe inner sidewall;Oil well pump upper end is connect with sucker rod one end;The sucker rod other end, which is connected with, to be arranged in oil Pumping unit outside pipe.
It further include silk plug, the silk plug is connected to the lower end port of oil pipe.
The thermometer group is made of 3-10 thermometer.
The thermometer group is provided with 4 thermometers, respectively memory type temperature meter one, memory type temperature meter two, deposit Storage formula thermometer three and memory type temperature meter four, wherein memory type temperature meter four is located between the oil well pump and screen casing in oil pipe, Remaining memory type temperature meter one, memory type temperature meter two, memory type temperature meter three are successively set on the pumping in oil pipe from top to bottom Above oil pump.
The spacing distance between all adjacent thermometers in the thermometer group is equal.
The thermometer group, screen casing are all made of screw thread mode with oil well pump and are mutually connected in oil pipe.
The sucker rod and there is gap between the thermometer on oil well pump top.
The upper end lateral wall of the oil pipe is also connected with oil connection.
The upper end of the oil pipe is provided with casing joint.
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method, it is characterised in that:
Step 1) will successively be connected with memory type temperature meter one using oil pipe, memory type temperature meter two, memory type temperature meter three, take out Oil pump, memory type temperature meter four, screen casing and silk plug tubing string, position is hung according to oil well pump, which is transferred into purpose position It sets;
Step 2 opens the casing joint valve resting on the ground, to the fluid of injection heat, through oil jacket annulus downlink and underground liquid Body mixing, pumping unit drive sucker rod that oil well pump is entered downhole fluid along oil pipe uplink from screen casing, pumping to ground from Oil connection output;
Step 3) memory type temperature meter four, memory type temperature meter three, memory type temperature meter two, memory type temperature meter one continue respectively Record measures the temperature of corresponding position;
Step 4) stops well, closes casing joint valve, then dismantles production wellhead, acts tubing string;
Step 5) plays back above-mentioned each memory type temperature meter temperature data, and it is corresponding to draw out different well depth positions according to the temperature of survey Temperature curve, fitting can acquire hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests curve.
Beneficial effects of the present invention:
The present invention passes through the thermometer group being from top to bottom distributed in oil pipe, at least one thermometer is located in thermometer group Oil well pump and screen casing in oil pipe and between, realize hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests, solve optical fiber temperature The problem of sensor testing cost is high, vulnerable to hole condition influence is spent, effective riser column length phase application reliability simplifies field operation Process.The present invention passes through the setting of memory type temperature meter group, temperature variations when intuitively reflecting thermal well flushing in pit shaft, The basic principle and method of process parameter optimizing provide foundation when for thermal well flushing.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is schematic structural view of the invention.
In figure, 1- pumping unit;2- casing joint;3- oil connection;4- oil pipe;5- memory type temperature meter one;6- memory-type Thermometer two;7- memory type temperature meter three;8- sucker rod;9- oil well pump;10- memory type temperature meter four;11- screen casing;12- It is stifled.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
Embodiment one:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as shown in Figure 1 includes at least oil pipe 4 and is arranged in oil Thermometer group, sucker rod 8, oil well pump 9 and screen casing 11 in pipe 4;Oil well pump 9 is placed in above screen casing 11, in thermometer group at least For one thermometer between oil well pump 9 and screen casing 11, remaining thermometer is successively set on 9 top of oil well pump from top to bottom; Thermometer group is detachably connected with 4 inner sidewall of oil pipe;9 upper end of oil well pump is connect with 8 one end of sucker rod;8 other end of sucker rod connects It is connected to the pumping unit 1 being arranged in outside oil pipe 4.
Embodiment two:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as shown in Figure 1 includes at least oil pipe 4 and is arranged in oil Thermometer group, sucker rod 8, oil well pump 9 and screen casing 11 in pipe 4;Oil well pump 9 is placed in above screen casing 11, in thermometer group at least For one thermometer between oil well pump 9 and screen casing 11, remaining thermometer is successively set on 9 top of oil well pump from top to bottom; Thermometer group is detachably connected with 4 inner sidewall of oil pipe;9 upper end of oil well pump is connect with 8 one end of sucker rod;8 other end of sucker rod connects It is connected to the pumping unit 1 being arranged in outside oil pipe 4.
The thermometer group is provided with 4 thermometers, respectively memory type temperature meter 1, memory type temperature meter 26, Memory type temperature meter 37 and memory type temperature meter 4 10, wherein memory type temperature meter four is located at oil well pump 9 and sieve in oil pipe 4 Between pipe 11, remaining memory type temperature meter one, memory type temperature meter two, memory type temperature meter three are successively set on oil from top to bottom 9 top of oil well pump in pipe 4.
It preferably further include silk plug 12, the silk plug 12 is connected to the lower end port of oil pipe 4.
Preferably the thermometer is memory type temperature meter.
Preferably the thermometer group, screen casing 11 are all made of screw thread mode with oil well pump 9 and are mutually connected in oil pipe 4.
The upper end of the oil pipe 4 is provided with casing joint 2.
In actual use, the pumping unit 1 being arranged on the ground is connected by the sucker rod 8 in oil pipe 4 with oil well pump 9 It connects.Successively thermometer group, oil well pump 9 and screen casing 11 are connected in oil pipe 4 from top to bottom, but at least one temperature in thermometer group Degree meter be located at oil pipe 4 in oil well pump 9 and screen casing 11 and between.Thermometer group, oil well pump 9 and screen casing 11 also can be directly used The connected mode of screw thread.Thermometer group can encrypt laying for thermometer according to well depth situation.Thermometer uses memory type temperature Meter can record the temperature variations of the clear overall process of thermal well flushing, analyze convenient for subsequent data.Memory type temperature That count model selection is JDYM-120-45-0.05.The setting of silk plug 12 prevents the leakage of pipeline, plays the role of sealing.
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method: include the following steps:
Step 1) will successively be connected with memory type temperature meter 1, memory type temperature meter 26, memory type temperature meter three using oil pipe 7, the tubing string of oil well pump 9, memory type temperature meter 4 10, screen casing 11 and silk plug 12 hangs position according to oil well pump, will be under the tubing string It is put into destination locations;
Step 2 opens 2 valve of casing joint resting on the ground, to the fluid of injection heat, through oil jacket annulus downlink and underground liquid Body mixing, pumping unit drive sucker rod that oil well pump is entered downhole fluid along oil pipe uplink from screen casing, pumping to ground from Oil connection output;
Step 3) memory type temperature meter four, memory type temperature meter three, memory type temperature meter two, memory type temperature meter one continue respectively Record measures the temperature of corresponding position;
Step 4) stops well, closes 2 valve of casing joint, then dismantles production wellhead, acts tubing string;
Step 5) plays back above-mentioned each memory type temperature meter temperature data, and it is corresponding to draw out different well depth positions according to the temperature of survey Temperature curve, fitting can acquire hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests curve.
The present invention is realized hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests, is solved by the setting of thermometer group The problem of fibre optic temperature sensor testing cost is high, vulnerable to hole condition influence, and effectively improve the reliable of prolonged application of the present invention Property, simplify on-site operation process.Temperature variations when can intuitively reflect thermal well flushing in pit shaft, draw out difference The corresponding temperature curve in well depth position, fitting can acquire hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests curve, be the later period Different blocks different type paraffin-troubled well determines that hot washing process, medium and parameter provide scientific basis.
Embodiment three:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as shown in Figure 1, with embodiment two the difference is that: The thermometer group is made of 3-10 thermometer, is not limited only to 4 of embodiment two.
In actual use, the setting of thermometer group allows the invention to obtain the temperature information of different location, is convenient for Comprehensive analysis well temperature variation, the basic principle and method of process parameter optimizing provide science, accurately when being thermal well flushing Foundation.Being provided with 3-10 thermometer, basic test meets needs, if well depth increases, can be further added by temperature according to actual needs Spend the setting number of meter.
Example IV:
The spacing distance phase between all adjacent thermometers on the basis of embodiment two or three, in the thermometer group Deng.
In actual use, 4 thermometers of thermometer group setting, i.e. memory type temperature meter 1, memory type temperature meter two 6 and 37 position of memory type temperature meter more than wax deposition well section, three thermometers, which are arranged, just can satisfy required, make testing expense It is preferably minimized, save the cost.The spacing distance between all adjacent thermometers in thermometer group is equal, makes the data obtained more Add and is conducive to data analysis.At least one thermometer, that is, setting of memory type temperature meter 4 10 is in oil well pump 9 and sieve in thermometer group Between pipe 11, all temperature informations at wax deposition position in well are able to record, guarantee to obtain the comprehensive of data.
Embodiment five:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as shown in Figure 1, with embodiment two the difference is that: The sucker rod 8 and there is gap between the thermometer on 9 top of oil well pump.
In actual use, between the thermometer on 9 top of sucker rod 8 and oil well pump gap setting, avoid sucker rod 8 The friction generated between oil well pump 9 ensure that thermometer safety, successional acquisition number so as to avoid the damage of equipment According to.
Embodiment six:
A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as shown in Figure 1, with embodiment two the difference is that: The upper end lateral wall of the oil pipe 4 is also connected with oil connection 3.
In actual use, the upper end lateral wall oil connection 3 of oil pipe 4 is connected with the pipeline on ground, ensure that this Invention also can normally carry out oil producing operation while obtaining associated temperature test data.
In conclusion the present invention realizes hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests, solves fiber optic temperature biography The problem of sensor testing cost is high, vulnerable to hole condition influence, effective riser column length phase application reliability simplifies field operation work Sequence, while temperature variations when can intuitively reflect thermal well flushing in pit shaft, the base of process parameter optimizing when being thermal well flushing This principle and method provide foundation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as Its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " first ", " The second " feature can explicitly or implicitly include at least one of the features.
Technical solution between each embodiment can be combined with each other, but must be with those of ordinary skill in the art's energy It is enough realize based on, will be understood that the knot of this technical solution when conflicting or cannot achieve when occurs in the combination of technical solution Conjunction is not present, also not the present invention claims protection scope within.

Claims (10)

1. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string includes at least oil pipe (4), it is characterised in that: also wrap Include thermometer group, sucker rod (8), oil well pump (9) and the screen casing (11) being arranged in oil pipe (4);Oil well pump (9) is placed in screen casing (11) top, at least one thermometer is located between oil well pump (9) and screen casing (11) in thermometer group, remaining thermometer is from upper It is successively set under above oil well pump (9);Thermometer group is detachably connected with oil pipe (4) inner sidewall;Oil well pump (9) upper end with The connection of sucker rod (8) one end;Sucker rod (8) other end is connected with the setting pumping unit (1) external in oil pipe (4).
2. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: also wrap It includes silk plug (12), the silk plug (12) is connected to the lower end port of oil pipe (4).
3. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: described Thermometer group be made of 3-10 thermometer.
4. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as claimed in claim 3, it is characterised in that: described Thermometer group be provided with 4 thermometers, respectively memory type temperature meter one, memory type temperature meter two, memory type temperature meter three With memory type temperature meter four, wherein memory type temperature meter four is located between the oil well pump (9) in oil pipe (4) and screen casing (11), Remaining memory-type thermometer one, memory type temperature meter two, memory type temperature meter three are successively set on the pumping in oil pipe (4) from top to bottom Above oil pump (9).
5. such as a kind of any one of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string of claim 1,3,4, Be characterized in that: the spacing distance between all adjacent thermometers in the thermometer group is equal.
6. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: described Thermometer group, screen casing (11) and oil well pump (9) be all made of screw thread mode and be mutually connected in oil pipe (4).
7. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: described Sucker rod (8) and be located at oil well pump (9) top thermometer between have gap.
8. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: described The upper end lateral wall of oil pipe (4) be also connected with oil connection (3).
9. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string as described in claim 1, it is characterised in that: described The upper end of oil pipe (4) be provided with casing joint (2).
10. a kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method, it is characterised in that:
Step 1) will successively be connected with memory type temperature meter one using oil pipe, memory type temperature meter two, memory type temperature meter three, take out Oil pump, memory type temperature meter four, screen casing and silk plug tubing string, position is hung according to oil well pump, which is transferred into purpose position It sets;
Step 2 opens the casing joint valve resting on the ground, to the fluid of injection heat, through oil jacket annulus downlink and underground liquid Body mixing, pumping unit drive sucker rod that oil well pump is entered downhole fluid along oil pipe uplink from screen casing, pumping to ground from Oil connection output;
Step 3) memory type temperature meter four, memory type temperature meter three, memory type temperature meter two, memory type temperature meter one continue respectively Record measures the temperature of corresponding position;
Step 4) stops well, closes casing joint valve, then dismantles production wellhead, acts tubing string;
Step 5) plays back above-mentioned each memory type temperature meter temperature data, and it is corresponding to draw out different well depth positions according to the temperature of survey Temperature curve, fitting can acquire hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests curve.
CN201811432291.6A 2018-11-28 2018-11-28 Oil well hot washing paraffin removal shaft temperature field distribution testing method and pipe column Active CN109505589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811432291.6A CN109505589B (en) 2018-11-28 2018-11-28 Oil well hot washing paraffin removal shaft temperature field distribution testing method and pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811432291.6A CN109505589B (en) 2018-11-28 2018-11-28 Oil well hot washing paraffin removal shaft temperature field distribution testing method and pipe column

Publications (2)

Publication Number Publication Date
CN109505589A true CN109505589A (en) 2019-03-22
CN109505589B CN109505589B (en) 2023-09-26

Family

ID=65750932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811432291.6A Active CN109505589B (en) 2018-11-28 2018-11-28 Oil well hot washing paraffin removal shaft temperature field distribution testing method and pipe column

Country Status (1)

Country Link
CN (1) CN109505589B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065328A (en) * 2019-06-10 2020-12-11 中国石油天然气股份有限公司 Device and method for cleaning wax in oil pipe through hot washing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030051881A1 (en) * 2000-03-02 2003-03-20 Vinegar Harold J. Electro-hydraulically pressurized downhole valve actuator
US20080087434A1 (en) * 2006-10-13 2008-04-17 Ronald Wilen Engine/steam generator with afterburner
CN201865632U (en) * 2010-11-26 2011-06-15 中国石油天然气股份有限公司 Wax removing and preventing device for oil wells
CN102168551A (en) * 2011-01-19 2011-08-31 杨平 Device and method for continuously measuring working fluid level depth of oil well and continuously metering produced liquid
CN201963296U (en) * 2011-01-19 2011-09-07 杨平 Degree of depth continuous measurement of oil well producing fluid level and extraction liquid continuous metering device
CN102206995A (en) * 2011-05-26 2011-10-05 河南省科学院同位素研究所有限责任公司 System for continuously monitoring temperature and pressure during steam injection and soaking process
CN103821479A (en) * 2014-02-17 2014-05-28 康庆刚 Device not pressing oil reservoir during thermal washing of mechanical producing well
CN108287029A (en) * 2017-12-15 2018-07-17 中国地质调查局水文地质环境地质调查中心 Quasi-distributed underground heat shallow well real-time temperature test sytem and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030051881A1 (en) * 2000-03-02 2003-03-20 Vinegar Harold J. Electro-hydraulically pressurized downhole valve actuator
US20080087434A1 (en) * 2006-10-13 2008-04-17 Ronald Wilen Engine/steam generator with afterburner
CN201865632U (en) * 2010-11-26 2011-06-15 中国石油天然气股份有限公司 Wax removing and preventing device for oil wells
CN102168551A (en) * 2011-01-19 2011-08-31 杨平 Device and method for continuously measuring working fluid level depth of oil well and continuously metering produced liquid
CN201963296U (en) * 2011-01-19 2011-09-07 杨平 Degree of depth continuous measurement of oil well producing fluid level and extraction liquid continuous metering device
CN102206995A (en) * 2011-05-26 2011-10-05 河南省科学院同位素研究所有限责任公司 System for continuously monitoring temperature and pressure during steam injection and soaking process
CN103821479A (en) * 2014-02-17 2014-05-28 康庆刚 Device not pressing oil reservoir during thermal washing of mechanical producing well
CN108287029A (en) * 2017-12-15 2018-07-17 中国地质调查局水文地质环境地质调查中心 Quasi-distributed underground heat shallow well real-time temperature test sytem and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065328A (en) * 2019-06-10 2020-12-11 中国石油天然气股份有限公司 Device and method for cleaning wax in oil pipe through hot washing

Also Published As

Publication number Publication date
CN109505589B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
CN102877832B (en) A kind of measuring method of well fluid level and system
CN106194158A (en) The comprehensive fault detection system of casing tube
US20160003032A1 (en) Matrix temperature production logging tool
CN103510940B (en) Mechanical oil well operating mode integrated diagnosing and analyzing method and device
Carnahan et al. Fiber optic temperature monitoring technology
CN102682195B (en) Semisubmersible platform transient state bored shaft temperature computation method
CN105178944A (en) Simulation experiment device for deepwater underwater shaft
CN209483338U (en) A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution tests tubing string
CN105041294A (en) Conveying and storing type produced fluid profile testing technique for coiled tube of horizontal well
US11261712B2 (en) System and method for automated well annulus pressure control
CN109505589A (en) A kind of hot cleanout and paraffin removal of oil well Wellbore Temperature Field distribution test method and tubing string
Nath et al. Fiber-optic distributed-temperature-sensing technology used for reservoir monitoring in an Indonesia steam flood
CN106593411A (en) Experimental device and method for airtightness of cement sheath and uplifting of casings
CN111441763A (en) Oil field horizontal well liquid production profile testing pipe column, system and method
CN204060675U (en) π production well log system
CN205936588U (en) Annotate fixed profile fiber temperature measurement technology tubular column of vapour well
CN205172564U (en) Drilling fluid leakage position survey of fire hole device
CN115163050A (en) Temperature field monitoring device for well shaft and produced liquid of pumping well
Seabrook et al. First Real-Time Fiber Optic Surveillance and Analysis of a Bullhead Stimulation of an Extended-Reach Horizontal Lateral in a Giant Offshore Carbonate Oil Field
CN107130949A (en) Deep-layer heavy crude CO_2 stimulation injection process phase-state change method of testing
CN110714754A (en) Method, system and storage medium for determining height of fractured zone and height of caving zone
CN109931028A (en) A kind of cementing practice monitoring system and leakage, effluent analysis method
CN201180538Y (en) Test device for down-hole drop ply position
CN212428803U (en) Oil field horizontal well liquid production section test pipe column and system
McCullagh et al. Coupling distributed temperature sensing (DTS) based wellbore temperature models with microseismic data for enhanced characterization of hydraulic fracture stimulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant