CN109505454A - A kind of break camp with automatic cornice structure - Google Patents

A kind of break camp with automatic cornice structure Download PDF

Info

Publication number
CN109505454A
CN109505454A CN201811612416.3A CN201811612416A CN109505454A CN 109505454 A CN109505454 A CN 109505454A CN 201811612416 A CN201811612416 A CN 201811612416A CN 109505454 A CN109505454 A CN 109505454A
Authority
CN
China
Prior art keywords
sliding sleeve
bar
push rod
cornices
break camp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811612416.3A
Other languages
Chinese (zh)
Other versions
CN109505454B (en
Inventor
孙渊儒
曾超
何健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG JASAN LEISURE PRODUCT Co Ltd
Original Assignee
ZHEJIANG JASAN LEISURE PRODUCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG JASAN LEISURE PRODUCT Co Ltd filed Critical ZHEJIANG JASAN LEISURE PRODUCT Co Ltd
Priority to CN201811612416.3A priority Critical patent/CN109505454B/en
Publication of CN109505454A publication Critical patent/CN109505454A/en
Priority to DE212019000099.1U priority patent/DE212019000099U1/en
Priority to JP2020600019U priority patent/JP3230328U/en
Priority to PCT/CN2019/084962 priority patent/WO2020133855A1/en
Priority to AU2019101725A priority patent/AU2019101725A4/en
Priority to US16/628,680 priority patent/US11072943B2/en
Application granted granted Critical
Publication of CN109505454B publication Critical patent/CN109505454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/34Supporting means, e.g. frames
    • E04H15/44Supporting means, e.g. frames collapsible, e.g. breakdown type
    • E04H15/48Supporting means, e.g. frames collapsible, e.g. breakdown type foldable, i.e. having pivoted or hinged means
    • E04H15/50Supporting means, e.g. frames collapsible, e.g. breakdown type foldable, i.e. having pivoted or hinged means lazy-tongs type
    • E04H15/505Supporting means, e.g. frames collapsible, e.g. breakdown type foldable, i.e. having pivoted or hinged means lazy-tongs type characterised by connecting arches with lazy-tongues

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Plants (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention discloses a kind of break camps with automatic cornice structure, including collapsible top ontology, the collapsible top ontology includes leg pipe and folding bar assembly, it is coupled between the leg pipe and the folding bar assembly by leg pipe sliding block and leg tube top part, it further include the component that cornices, the component that cornices includes connector sleeve group and bar group of cornicing, and the connector sleeve group includes the first sliding sleeve, the second sliding sleeve and third sliding sleeve, and the bar group of cornicing includes cornice bar, brace and push rod.The present invention optimizes push rod bascule by optimization design, is designed using the structure of center secure bond both ends sliding, push rod is completed good smooth, shortens the length of push rod, avoid the formation of interference;The first sliding sleeve is combined additionally by push rod, the stress point for the bar that cornices may be at active state, and the overturning for being easy to implement the bar that cornices is corniced;While restriction of the bar by the first sliding sleeve and push rod of cornicing, increase stability of cornicing.

Description

A kind of break camp with automatic cornice structure
Technical field
The present invention relates to break camp technical fields, more particularly, to a kind of break camp with automatic cornice structure.
Background technique
The structure type multiplicity of tent, the tent used for outdoor sun-shading is usually collapsible shelter.Tradition folds account Paulin sunshade area is smaller, in order to increase the sunshade area after tent opens, then has the projecting-eave type tent with cornice structure, The vertex of tent is equipped with the bar that cornices stretched out, achievees the purpose that increase sunshade area by being located at the surrounding edge to cornice on bar.Its Mainly cornice bar or grafting is corniced bar by being pivotally connected on the mandril of fluffy ceiling hold, the outer end activity of the bar that cornices stretch is placed in it is each vertical Except column.However, the bar that cornices is in be independently arranged with respect to tent main body rack, in expansion or folding in current break camp When be required to operate suddenly in two steps.When being unfolded, tent main body rack is first unfolded, breaks into two with one's hands or pulls out one by one again later and respectively choose Eaves bar, due to cornicing, bar is in higher position, is not easy to realize operation, folding is then conversely, there is a problem of identical.Thus existing Break camp is in the presence of structure is complicated, cumbersome, inconvenient problem of taking down the exhibits.
For this purpose, Publication No. CN107476647A, a kind of foldable tent is disclosed, sunshade area is larger and the bar that cornices It can be unfolded together with the first mandril and folding, it is easy to operate;Driving member has booster action to the second mandril after deployment.It is wrapped Columns assemblies, push rod component are included, push rod component includes the first mandril, the second mandril and the bar that cornices, the inner end of the first mandril Rotate connection, and the inner end of the outer end of the first mandril and the second mandril is rotatably coupled, and the outer end of the second mandril is chosen The inner end of eaves bar and the upper end of columns assemblies relatively rotate connection two-by-two or rotate coaxially connection;Tent in unfolded state, First mandril, the second mandril and the bar that cornices is opposite respectively is unfolded and the outer end for the bar that cornices extends to the outer of corresponding columns assemblies Side;Tent is mutually drawn close respectively in folded state, the first mandril, the second mandril and the bar that cornices;Each push rod component is also distinguished Driving member including be used to make the to cornice bar and the expansion of the first mandril or folding that are connected to the first mandril between the bar that cornices.It is public Open the driving member for be unfolded or folding with the first mandril for the bar that makes to cornice including being connected to the first mandril between the bar that cornices, biography Moving part is the drive rod for being rotatably connected at the first mandril between the bar that cornices, the first mandril, the second mandril, cornice bar and Four-bar mechanism is constituted between drive rod, four bars link and mutually fold and be unfolded relatively, and drive rod has and the first mandril The inner end that is rotatably coupled by pivot of outer end and be rotatably coupled with the inner end of the bar that cornices by pivot Outer end, wherein the junction of drive rod and the first mandril is located at the outside of the junction of the second mandril and the first mandril, pass The junction of lever and the bar that cornices is located at the outside of the junction of the second mandril and the bar that cornices, the whole each company of cornice structure Receiving force is fixed position, and drive rod is caused to need longer size, and in addition drive rod inner end is in the first mandril and the Answer length relatively long, especially in some biggish foldings during the storage of entire collapsible top in two mandril junctions position In folded paulin, because there is multistage fold mechanism, therefore it being easy to cause the problem of contradicting with remaining rod piece, influencing storage effect Fruit;In addition, structure completion cornice after because using four-bar mechanism, therefore it is easy to appear shaking when wind-force is larger, Influence using effect.
Summary of the invention
In view of the above-mentioned problems, the present invention is intended to provide a kind of break camp with automatic cornice structure, has contraction side Just quick, the more reasonable feature of the drive mechanism that cornices.
Technical problem solved by the invention can be realized using following technical scheme:
A kind of break camp with automatic cornice structure, including collapsible top ontology, the collapsible top ontology include leg pipe and folding Folded bar assembly, is coupled between the leg pipe and the folding bar assembly by leg pipe sliding block and leg tube top part, feature exists In: it further include the component that cornices, the component that cornices includes connector sleeve group and bar group of cornicing, and the connector sleeve group includes first sliding Set, the second sliding sleeve and third sliding sleeve, the bar group of cornicing include cornice bar, brace and push rod, first sliding sleeve with it is described The bar that cornices is slidably matched, and first sliding sleeve hingedly cooperates with the push rod, second sliding sleeve and the push rod secure fit, Second sliding sleeve is slidably matched with mandril is folded, and second sliding sleeve hingedly cooperates with the brace, the third sliding sleeve With the folding mandril secure fit, the third sliding sleeve hingedly cooperates with brace is folded.
When break camp is in contraction state, the open end of the bar that cornices is in inward position;At break camp When softened state, the open end of the bar that cornices is in external position;When break camp is turned from contraction state to softened state When change, first sliding sleeve is gradually slided to the hinged end of the bar that cornices, when first sliding sleeve slides into extreme position, The bar that cornices is begun turning, and first sliding sleeve is gradually slided to open end, until break camp fully opens;Limit position It sets and is equipped with spacing between the hinged end position of the bar that cornices.
Described bar one end of cornicing hingedly cooperates with the leg tube top part, and first sliding sleeve is pushed by the push rod along institute State bar sliding of cornicing.
When break camp is in contraction state, push rod is in most interior position with the first sliding sleeve articulated position end far from it It sets;When break camp is in softened state, the push rod is in outermost position with the first sliding sleeve articulated position end far from it It sets;When break camp changes from contraction state to softened state, brace drives the second sliding sleeve to be displaced outwardly along mandril is folded, And the push rod is driven to be displaced outwardly, the sliding stroke of second sliding sleeve is third sliding sleeve and the folding mandril and leg tube top Between part articulated position.
It is fixedly mounted in the middle part of the push rod with the second sliding sleeve, described push rod one end is hingedly installed with the first sliding sleeve, described to push away It is in be slidably matched on third sliding sleeve that another end cap of bar, which runs through,.
The push rod includes the first push rod portion and the second push rod portion, and second push rod portion is on the third sliding sleeve Telescopic slide.
The leg tube top part, which is equipped with, to cornice bar mounting groove and folds mandril hinged groove, and the bar that cornices is pacified with the bar that cornices Tankage cell wall hingedly cooperates.
The bar mounting groove side of cornicing is equipped with push rod placing groove.
Second sliding sleeve is equipped with the second hinged lifting lug, and the second hinged lifting lug with described brace one end to cut with scissors Cooperation is connect, the brace other end hingedly cooperates with the folding brace, is additionally provided with the second push rod on second sliding sleeve and wears Hole and second folds mandril perforation.
The third sliding sleeve is equipped with the hinged lifting lug of third, and the hinged lifting lug of third with folding brace hingedly to match It closes, the perforation of third push rod is additionally provided on the third sliding sleeve and third folds mandril perforation.
The present invention optimizes push rod bascule by optimization design, is set using the structure that center secure bond both ends are slided Meter completes push rod good smooth, shortens the length of push rod, avoid the formation of interference;It is combined additionally by push rod The stress point of first sliding sleeve, the bar that cornices may be at active state, and the overturning for being easy to implement the bar that cornices is corniced;Simultaneously cornice bar by To the restriction of the first sliding sleeve and push rod, increase stability of cornicing.
The features of the present invention sees the detailed description of the drawings of the present case and following preferable embodiment and obtains clearly Solution.
Detailed description of the invention
Fig. 1 is whole expanding structure schematic diagram one of the invention;
Fig. 2 is component structure diagram one of cornicing of the invention;
Fig. 3 is component structure diagram two of cornicing of the invention;
Fig. 4 is component structure diagram three of cornicing of the invention;
Fig. 5 is the second shift sleeve structure schematic diagram of the invention;
Fig. 6 is third shift sleeve structure schematic diagram of the invention;
Fig. 7 is that the bar that cornices of the invention completes component structure diagram of cornicing under rollover states;
Fig. 8 is the bar that cornices of the invention i.e. by component structure diagram of cornicing under rollover states;
Fig. 9 is component structure diagram of cornicing under the non-rollover states of the bar that cornices of the invention;
Figure 10 is whole expanding structure schematic diagram two of the invention;
Figure 11 is overall shrinkage structural schematic diagram of the invention;
Figure 12 is whole Semi-folding structural schematic diagram of the invention;
Figure 13 is whole expanding structure schematic diagram four of the invention;
Wherein 1, cornice component;11, cornice bar;12, push rod;13, brace;14, the first sliding sleeve;15, the second sliding sleeve;151, Two hinged lifting lugs;152, the second push rod is perforated;153, second mandril perforation is folded;154, it second cornices bar placing groove;16, third Sliding sleeve;161, the hinged lifting lug of third;162, third push rod is perforated;163, third folds mandril perforation;164, the third bar that cornices is put Set slot;2, leg pipe;3, leg pipe sliding block;4, center-pole;5, center lock set;6, side lever component;7, leg tube top part;71, folding roof Bar hinged groove;72, cornice bar mounting groove;73, push rod placing groove;8, mandril is folded;9, brace is folded;A, hinged end;B, the limit Position;C, open end.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
The nouns of locality such as "inner" as defined herein, "outside" are all using the central point present position of break camp as reference , more closely it is interior with the center from break camp, otherwise is outer.
As shown in figure 1 to figure 13, the present invention provides a kind of break camps with automatic cornice structure, including collapsible top Ontology, collapsible top ontology include leg pipe 2 and fold bar assembly, pass through leg pipe sliding block 3 and leg pipe between leg pipe 2 and folding bar assembly Head part 7 is coupled.
Leg pipe 2, leg pipe sliding block 3 and folding bar assembly can be using in existing break camps in above-mentioned break camp ontology Counter structure;Wherein leg pipe 2 is at least 2, and conventional is 4 or 6, wherein can be 8 there is also some more top collapsible tops Item etc.;Folding bar assembly includes several centers for being located at the center lock set 5 in centre and hingedly cooperating with center lock set 5 Bar 4, be additionally disposed between leg pipe 2 be equipped with side lever component 6, wherein center lock set 5, side lever component 6, leg pipe sliding block 3, leg pipe 2, The components such as center-pole 4 are prior art construction feature, and corresponding connection relationship is conventional structure design in break camp.
Wherein, leg tube top part 7, which is equipped with, cornices bar mounting groove 72 and folds mandril hinged groove 71, cornice bar 11 and bar peace of cornicing 72 cell wall of tankage hingedly cooperates, and equipped with push rod placing groove 73,7 structure of optimization design leg tube top part can for 72 side of bar mounting groove of cornicing Cooperate 1 structure of component of cornicing with effective.
Wherein, the component 1 that cornices includes connector sleeve group and bar group of cornicing, and connector sleeve group includes the first sliding sleeve 14, the second sliding sleeve 15 and third sliding sleeve 16, bar group of cornicing includes cornice bar 11, brace 13 and push rod 12.
Wherein, the first sliding sleeve 14 is slidably matched with the bar 11 that cornices, and the first sliding sleeve 14 hingedly cooperates with push rod 12, and cornice bar 11 One end and leg tube top part 7 hingedly cooperate, and the first sliding sleeve 14 is pushed by push rod 12 along the sliding of bar 11 of cornicing;When break camp is in When contraction state, the open end C for the bar 11 that cornices is in inward position;When break camp is in softened state, cornice bar 11 Open end C is in external position;When break camp changes from contraction state to softened state, the first sliding sleeve 14 is gradually to cornicing The hinged end A of bar 11 is slided, and when the first sliding sleeve 14 slides into extreme position B, the bar 11 that cornices is begun turning, and the first sliding sleeve 14 It is gradually slided to open end C, until break camp fully opens;It is set between extreme position B and the hinged end location A for the bar 11 that cornices There is spacing.
Among the above, open end C and hinged end A are respectively at the end positions for the bar 11 that cornices, and wherein extreme position B is not because The break camp of same specification size, spacing between extreme position B and hinged end A are in different sizes, while extreme position B Must be provided with spacing between the A of hinged end, the spacing be in order to cornice bar 11 in switching process can better driver under stress, Cornicing in 11 switching process of bar has a circular arc spacing, and in addition the curve of the first sliding sleeve 14 sliding is arc route, and the first sliding sleeve 14 is also the same gradually mobile to exploitation end C in sliding process, until break camp fully opens;When break camp fully opens When, the spacing between the first sliding sleeve 14 and hinged end A is greater than the spacing between extreme position B and hinged end A.
Wherein, the second sliding sleeve 15 and 12 secure fit of push rod, the second sliding sleeve 15 are slidably matched with mandril 8 is folded, and second is sliding Set 15 hingedly cooperates with brace 13, and third sliding sleeve 16 is slidably matched with push rod 12, and third sliding sleeve 16 is matched with the fixation of mandril 8 is folded Close, third sliding sleeve 16 and fold brace 9 and hingedly cooperate, the middle part of push rod 12 is fixedly mounted with the second sliding sleeve 15,12 one end of push rod with The first hingedly installation of sliding sleeve 14, another end cap of push rod 12, which runs through, to be set on third sliding sleeve 16;Push rod 12 includes the first push rod portion 121 With the second push rod portion 122, the second push rod portion 122 is to the telescopic slide on third sliding sleeve 16;When break camp is in contraction-like When state, push rod 12 is in most interior position with 14 articulated position end of the first sliding sleeve far from it;When break camp is in softened state, Push rod 12 is in outermost position with 14 articulated position end of the first sliding sleeve far from it;When break camp is from contraction state to softened state When transformation, brace 13 drives the second sliding sleeve 15 to be displaced outwardly along mandril 8 is folded, and push rod 12 is driven to be displaced outwardly, and second is sliding The sliding stroke of set 15 is third sliding sleeve 16 and folds between mandril 8 and 7 articulated position of leg tube top part.
Further, the second sliding sleeve 15 be equipped with the second hinged lifting lug 151, the second hinged lifting lug 151 to brace 13 One end hingedly cooperates, and 13 other end of brace and folding brace 9 hingedly cooperate, and the perforation of the second push rod is additionally provided on the second sliding sleeve 15 152 and second fold mandril perforation 153, and second is equipped among 15 top of the second sliding sleeve and is corniced bar placing groove 154, break camp is worked as When in contraction state, the bar 11 that cornices is placed in second and cornices on bar placing groove 154.
Further, third sliding sleeve 16 be equipped with the hinged lifting lug 161 of third, the hinged lifting lug 161 of third to fold brace 9 Hinged cooperation, is additionally provided with third push rod perforation 162 on third sliding sleeve 16 and third folds mandril perforation 163, on third sliding sleeve 16 It is equipped with third among portion to cornice bar placing groove 164, when break camp is in contraction state, the bar 11 that cornices is placed in third and cornices On bar placing groove 164.
It is as shown in figure 11 when break camp is generally in contraction state, by pulling open leg pipe 2, gradually change to Figure 12, In half-open conjunction state, continues to synchronize and pull open leg pipe 2 and complete to lock by center lock set 5, when being in the stage, group of cornicing Part 1 steps into starting state, and gradually changes to Figure 13, completes strutting for entire break camp.
Wherein, it folds brace one end to be articulated on leg pipe sliding block, the other end is articulated on the hinged lifting lug of third, leg pipe sliding block With constantly moving up, by supporting the hinged lifting lug Foldable mandril of third to strut upwards, while with folding brace It is constantly mobile, drive brace that shift in position occurs, brace drives the second sliding sleeve to slide in and out along brace is folded, the second sliding sleeve Synchronous drive push rod slides in and out, and push rod then drives the first sliding sleeve along bar limit sliding of cornicing, when push rod drives the first sliding sleeve sliding Move near or at cornice bar and leg tube top part articulated position when, the bar that cornices is because persistently by the thrust of push rod, and first is sliding Set is persistently by the power slid in and out, therefore the bar that cornices is realized 180 ° and quickly turned over by the hinged point axle center with leg tube top part Turn, wherein 180 ° of flip angles can have certain angular deviation because of the arrangement of product rod piece, does not represent and spend absolutely 180 ° of overturnings, after the bar that cornices completes overturning, the lasting thrust of push rod is released, to continue to slide in and out the first sliding sleeve Certain stroke, until break camp is in full open position;If desired it shrinks, then the component direction of motion and accepts in opposite State can be completed.
Optimization design realizes that the stress between each rod piece is driven using three different connecting jacket structures in the present invention, wherein The design feature of first sliding sleeve is can be mobile in realization position on bar of cornicing, drive of the push rod to drive the sliding of the first sliding sleeve Dynamic output, so as to realizing that the stress point for the bar that cornices is in alterable state, without being bound by fixed connection point by power limit, It can be slid back and forth along mandril direction is folded in addition combined with push rod, increase the shift motion of push rod, guarantee push rod drive Under the premise of whole stroke needed for dynamic first sliding sleeve, the length dimension of push rod itself can be shortened, reduce material cost, while can To avoid because adding push rod, remaining rod piece is interfered because length is too long;Second sliding sleeve is used to input the driving force of push rod, The second sliding sleeve of optimization design can be easy to implement the restriction to push rod stroke directions along mandril sliding is folded simultaneously;Add third Sliding sleeve, push rod slide on third sliding sleeve, increase the sliding stability of push rod.
Design feature of the invention is, using the folding expanding structure of break camp itself, adds brace and realizes drive The output of power realizes secondary transport in conjunction with the second sliding sleeve and push rod, completes to export the stress for the bar that cornices using the first sliding sleeve, To realize the flip-flop movement for the bar that cornices, completes overturning and cornice.
The present invention optimizes push rod bascule by optimization design, is set using the structure that center secure bond both ends are slided Meter completes push rod good smooth, shortens the length of push rod, avoid the formation of interference;It is combined additionally by push rod The stress point of first sliding sleeve, the bar that cornices may be at active state, and the overturning for being easy to implement the bar that cornices is corniced;Simultaneously cornice bar by To the restriction of the first sliding sleeve and push rod, increase stability of cornicing.
The above is only better embodiment of the invention, not makes any form of restriction to invention, it is all according to According to technical principle any simple modification, equivalent variations or modification made to the above embodiment of the invention, the present invention is still fallen within In the range of technical solution.

Claims (10)

1. a kind of break camp with automatic cornice structure, including collapsible top ontology, the collapsible top ontology include leg pipe and Bar assembly is folded, is coupled between the leg pipe and the folding bar assembly by leg pipe sliding block and leg tube top part, feature It is: further includes the component that cornices, the component that cornices includes connector sleeve group and bar group of cornicing, and the connector sleeve group includes first sliding Set, the second sliding sleeve and third sliding sleeve, the bar group of cornicing include cornice bar, brace and push rod, first sliding sleeve with it is described The bar that cornices is slidably matched, and first sliding sleeve hingedly cooperates with the push rod, second sliding sleeve and the push rod secure fit, Second sliding sleeve is slidably matched with mandril is folded, and second sliding sleeve hingedly cooperates with the brace, the third sliding sleeve With the folding mandril secure fit, the third sliding sleeve hingedly cooperates with brace is folded.
2. a kind of break camp with automatic cornice structure according to claim 1, it is characterised in that: work as break camp When in contraction state, the open end of the bar that cornices is in inward position;It is described to choose when break camp is in softened state The open end of eaves bar is in external position;When break camp from contraction state to softened state change when, first sliding sleeve by It walks and is slided to the hinged end of the bar that cornices, when first sliding sleeve slides into extreme position, the bar that cornices is begun turning, And first sliding sleeve is gradually slided to open end, until break camp fully opens;The hinge of extreme position and the bar that cornices It connects and is equipped with spacing between end position.
3. a kind of break camp with automatic cornice structure according to claim 1 or 2, it is characterised in that: described to choose Eaves bar one end hingedly cooperates with the leg tube top part, and first sliding sleeve is pushed by the push rod along the bar sliding of cornicing.
4. a kind of break camp with automatic cornice structure according to claim 1 or 2, it is characterised in that: work as folding When tent is in contraction state, push rod is in most interior position with the first sliding sleeve articulated position end far from it;Work as break camp When in softened state, the push rod is in outermost position with the first sliding sleeve articulated position end far from it;Work as break camp When changing from contraction state to softened state, brace drives the second sliding sleeve to be displaced outwardly along mandril is folded, and pushes away described in drive Bar is displaced outwardly, the sliding stroke of second sliding sleeve be third sliding sleeve and the foldings mandril and leg tube top part articulated position it Between.
5. a kind of break camp with automatic cornice structure according to claim 4, it is characterised in that: in the push rod Portion and the second sliding sleeve are fixedly mounted, and described push rod one end is hingedly installed with the first sliding sleeve, and another end cap of push rod, which runs through, to be set to It is in be slidably matched on third sliding sleeve.
6. a kind of break camp with automatic cornice structure according to claim 5, it is characterised in that: the push rod packet The first push rod portion and the second push rod portion are included, second push rod portion is to the telescopic slide on the third sliding sleeve.
7. a kind of break camp with automatic cornice structure according to claim 1 or 2, it is characterised in that: the leg Tube top part, which is equipped with, to cornice bar mounting groove and folds mandril hinged groove, and the bar that cornices hingedly is matched with the bar installation groove groove wall of cornicing It closes.
8. a kind of break camp with automatic cornice structure according to claim 7, it is characterised in that: the bar that cornices Mounting groove side is equipped with push rod placing groove.
9. a kind of break camp with automatic cornice structure according to claim 1, it is characterised in that: described second is sliding It puts on and is equipped with the second hinged lifting lug, the second hinged lifting lug with described brace one end hingedly to cooperate, the brace The other end hingedly cooperates with the folding brace, and the perforation of the second push rod is additionally provided on second sliding sleeve and the second folding mandril is worn Hole.
10. a kind of break camp with automatic cornice structure according to claim 1, it is characterised in that: the third Sliding sleeve is equipped with the hinged lifting lug of third, and the hinged lifting lug of third with folding brace hingedly to cooperate, on the third sliding sleeve It is additionally provided with the perforation of third push rod and third folds mandril perforation.
CN201811612416.3A 2018-12-27 2018-12-27 Folding tent with automatic cornice structure Active CN109505454B (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN201811612416.3A CN109505454B (en) 2018-12-27 2018-12-27 Folding tent with automatic cornice structure
DE212019000099.1U DE212019000099U1 (en) 2018-12-27 2019-04-29 Foldable tent with an automatic eaves structure
JP2020600019U JP3230328U (en) 2018-12-27 2019-04-29 Folding tent with automatic awning structure
PCT/CN2019/084962 WO2020133855A1 (en) 2018-12-27 2019-04-29 Collapsible tent having automated overhang structure
AU2019101725A AU2019101725A4 (en) 2018-12-27 2019-04-29 Folding tent with automatic cornice structure
US16/628,680 US11072943B2 (en) 2018-12-27 2019-04-29 Folding tent with automatic cornice structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811612416.3A CN109505454B (en) 2018-12-27 2018-12-27 Folding tent with automatic cornice structure

Publications (2)

Publication Number Publication Date
CN109505454A true CN109505454A (en) 2019-03-22
CN109505454B CN109505454B (en) 2024-04-26

Family

ID=65754960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811612416.3A Active CN109505454B (en) 2018-12-27 2018-12-27 Folding tent with automatic cornice structure

Country Status (1)

Country Link
CN (1) CN109505454B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020133855A1 (en) * 2018-12-27 2020-07-02 浙江健盛休闲用品有限公司 Collapsible tent having automated overhang structure
US20220034118A1 (en) * 2018-05-29 2022-02-03 Zhejiang Jiansheng Leisure Products Co.,Ltd Folding canopy with eave structure
US12037808B2 (en) * 2018-05-29 2024-07-16 Zhejiang Jiansheng Leisure Products Co., Ltd Folding canopy with eave structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205077984U (en) * 2015-09-25 2016-03-09 鹭谱达(厦门)户外用品有限公司 Folding cool covering or awning on a car, boat, etc. frame and eave hack lever mechanism thereof
CN206128828U (en) * 2016-09-19 2017-04-26 客贝利(厦门)休闲用品有限公司 Eaves structure of tent
CN206128831U (en) * 2016-09-19 2017-04-26 客贝利(厦门)休闲用品有限公司 But tent eave structure that interlock was folded up
CN206616931U (en) * 2017-03-23 2017-11-07 浙江健盛休闲用品有限公司 A kind of tent cornices device automatically
CN107476647A (en) * 2017-08-10 2017-12-15 蔚孜电子商务(上海)有限公司 A kind of foldable tent
US20180106067A1 (en) * 2016-10-13 2018-04-19 Campvalley (Xiamen) Co., Ltd. Eave structure and tent frame having same
CN207260738U (en) * 2017-09-27 2018-04-20 浙江健盛休闲用品有限公司 A kind of break camp center locking system
CN209908071U (en) * 2018-12-27 2020-01-07 浙江健盛休闲用品有限公司 Folding tent with automatic cornice structure
WO2020133855A1 (en) * 2018-12-27 2020-07-02 浙江健盛休闲用品有限公司 Collapsible tent having automated overhang structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205077984U (en) * 2015-09-25 2016-03-09 鹭谱达(厦门)户外用品有限公司 Folding cool covering or awning on a car, boat, etc. frame and eave hack lever mechanism thereof
CN206128828U (en) * 2016-09-19 2017-04-26 客贝利(厦门)休闲用品有限公司 Eaves structure of tent
CN206128831U (en) * 2016-09-19 2017-04-26 客贝利(厦门)休闲用品有限公司 But tent eave structure that interlock was folded up
US20180106067A1 (en) * 2016-10-13 2018-04-19 Campvalley (Xiamen) Co., Ltd. Eave structure and tent frame having same
CN206616931U (en) * 2017-03-23 2017-11-07 浙江健盛休闲用品有限公司 A kind of tent cornices device automatically
CN107476647A (en) * 2017-08-10 2017-12-15 蔚孜电子商务(上海)有限公司 A kind of foldable tent
CN207260738U (en) * 2017-09-27 2018-04-20 浙江健盛休闲用品有限公司 A kind of break camp center locking system
CN209908071U (en) * 2018-12-27 2020-01-07 浙江健盛休闲用品有限公司 Folding tent with automatic cornice structure
WO2020133855A1 (en) * 2018-12-27 2020-07-02 浙江健盛休闲用品有限公司 Collapsible tent having automated overhang structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220034118A1 (en) * 2018-05-29 2022-02-03 Zhejiang Jiansheng Leisure Products Co.,Ltd Folding canopy with eave structure
US12037808B2 (en) * 2018-05-29 2024-07-16 Zhejiang Jiansheng Leisure Products Co., Ltd Folding canopy with eave structure
WO2020133855A1 (en) * 2018-12-27 2020-07-02 浙江健盛休闲用品有限公司 Collapsible tent having automated overhang structure

Also Published As

Publication number Publication date
CN109505454B (en) 2024-04-26

Similar Documents

Publication Publication Date Title
JP3230328U (en) Folding tent with automatic awning structure
CN107476647B (en) Foldable tent
US7836908B2 (en) Canopy with automatic roof structure having improved structural stability
CN104847163B (en) Assembly-free hinge-locked foldable tent
CN107938848A (en) A kind of shelter electronic expanding unit and electronic expanded shelter
CN201695751U (en) Bracket structure of eave tent
JP3131143U (en) Tent prop
CN109505454A (en) A kind of break camp with automatic cornice structure
CN207092685U (en) A kind of foldable tent
CN209908071U (en) Folding tent with automatic cornice structure
CN1028957C (en) Collapsible umbrella with at least three-member
CN112031514A (en) Folding tent with automatic telescopic cornice structure
CN207721343U (en) A kind of folding sunshade umbrella
CN201695752U (en) Top structure of large tent
CN216714039U (en) Automatic vertical lifting connecting rod folding roof tent
CN201133114Y (en) Folding type truss
CN201059089Y (en) Structure of tentage having eave
CN106088799A (en) Tent eave hack lever mechanism
CN210478735U (en) Folding automobile-used side subassembly and folding car
CN2556312Y (en) Quick-supporting tent
CN213063160U (en) Folding tent with automatic telescopic cornice structure
CN108798201B (en) A kind of break camp
CN208048203U (en) A kind of two-tube slidingtype parallel support device of folding main umbrella bone
CN2276289Y (en) Connecting block structure for collapsible cot
CN207927946U (en) A kind of folding main umbrella bone slidingtype series winding support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant