CN109505249A - Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision - Google Patents

Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision Download PDF

Info

Publication number
CN109505249A
CN109505249A CN201811449725.3A CN201811449725A CN109505249A CN 109505249 A CN109505249 A CN 109505249A CN 201811449725 A CN201811449725 A CN 201811449725A CN 109505249 A CN109505249 A CN 109505249A
Authority
CN
China
Prior art keywords
section
segment
production
whole
steel case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811449725.3A
Other languages
Chinese (zh)
Other versions
CN109505249B (en
Inventor
潘熙雄
龚海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yiye Steel Structure Co Ltd
Original Assignee
Wuhan Yiye Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yiye Steel Structure Co Ltd filed Critical Wuhan Yiye Steel Structure Co Ltd
Priority to CN201811449725.3A priority Critical patent/CN109505249B/en
Publication of CN109505249A publication Critical patent/CN109505249A/en
Application granted granted Critical
Publication of CN109505249B publication Critical patent/CN109505249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of Landscape Bridge steel casees to encircle the production method that segmented production reaches whole prepackage precision, comprising the following steps: measures to the using area of installation steel case arch, obtains the length numerical value of using area;Steel case arch is divided into 2n+1 segment;It regards the (n+1)th segment and left side as an entirety M, while another entirety M ' that regards as on the (n+1)th segment and right side is then entered into next step when the length of measurement entirety M is bigger than the length numerical value of using area;Otherwise multiple segments are continued to be divided into two parts;The production moulding bed of steel case arch is set up, multiple steel case arches make equal sectional making and whole prepackage;The component number of note is compiled according to production factory to separate different steel case arches in erecting bed, completes in-site installation according to the position line of assembly production.Overcome production place bottleneck, improve production precision, meets production needs, improve production efficiency, guarantee that in-site installation is gone on smoothly.

Description

Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of segmented make of Landscape Bridge steel case arch reaches whole The production method for pre-installing precision.
Background technique
With the fast development of China's economic, the continuous acceleration of urban construction, major main cities and various regions small and medium-sized cities All in the development characteristic for actively finding respective city, especially in urban construction, new construction style and architectural style are drawn Into with highlight.Wherein, by introduction and utilization gradually, steel construction relies on certainly the various building based on steel building Heavy and light, beautiful design, structure safety, the rapid advantage of installation, have rapidly developed to the every field of architectural engineering.
An important branch of the engineering bridge as engineering construction, has also obtained quick development, especially one in recent years Landscape bridge based on a little steel constructions is rapidly designed and is built on the middle and small river of various regions, such landscape bridge, Not only self structure is graceful, but also fusion and ambient enviroment and local characteristic well, receives the ardent joyous of the various regions people It meets.However Jing Guan Qiaokou steel case arch generally is curved stayed structure, and entire span and sagitta numerical value are all bigger;It is general to apply Work order position is all unable to satisfy demand of the steel case arch integral manufacturing to production construction site, and the linear precision control of entire steel case arch Positioning with anchor tube is all the problem that unit in charge of construction needs to overcome.
Up to the present the production and installing engineering of multiple steel construction landscape bridges, such bridge, had been accepted by my company Beam upper steel case arch structure is graceful, and moulding is unique, and most steel casees arches are all the structure type of mirror symmetry, wherein my company In the such engineering accepted, what is represented the most is the long sand road fishing knife river Landscape Bridge engineering in Changsha country biological industry base and Shishou Jianning bridge new construction.
Summary of the invention
The technical problem to be solved by the present invention is in view of the foregoing defects the prior art has, provide a kind of Landscape Bridge Steel case encircles the production method that segmented production reaches whole prepackage precision, overcomes production place bottleneck, improves production precision, meets Production needs, and improves production efficiency, guarantees that in-site installation is gone on smoothly.
Used technical solution is the present invention to solve above-mentioned technical problem:
A kind of Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision, comprising the following steps:
1) using area of production steel case arch is measured, show that the available length numerical value of using area is remembered respectively Are as follows: X1, Y1, Z1;
2) by steel case arch be divided into 2n+1 segment, successively be labeled as Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., (n+1)th segment, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment, the wherein 1 ' segment Section 1 Duan Yu, Section 2 section With the 2nd ' segment ... the n-th segment and the n-th ' segment are mirror symmetry segment or symmetrical segment, and the (n+1)th segment is itself mirror image pair Claim or itself is symmetrical;
3) Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., the (n+1)th segment are regarded as an entirety M, while by The segment n+1, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment regard another entirety M ', whole M and entirety M ' as The (n+1)th segment is all shared, and M and M ' is mirror image or symmetrical structure, according to the whole structure type being linked to be, adjustment The spatiality of whole M measures the length of entirety M, obtains its length corresponding numerical value x1, y1, z1;
4) size for comparing numerical value X1, Y1, Z1 and x1, y1, z1, as X1 > x1 and Y1 > y1 and Z1 > z1+z ' establishment, then Into in next step;Work as X1 > x1 and Y1 > y1 and Z1 > z1+z ' it is invalid, then by Section 1 section of whole M, Section 2 section, Section 3 Several units m is continued to be divided into the (n+1)th segment of section ..., the length size of each unit m than numerical value X1, Y1, Z1 are small;The size that the number of unit depends on each unit is smaller than numerical value X1, Y1, Z1, i.e., if only needed Being divided into two units and can meeting numerical value comparison condition then need to only be divided into two parts, if being unsatisfactory for numerical value comparison condition Greater number of unit is then divided, is similarly divided into whole M ' single with several the symmetrical parts several units m First m ', and note component number is compiled to each unit, wherein z ' is the minimum altitude of moulding bed;
5) the production moulding bed for setting up Landscape Bridge steel case arch is only used at this time when whole M and entirety M ' is symmetrical structure form The moulding bed that is produced on several units m of the production moulding bed of several units m, Landscape Bridge steel case arch is completed to be segmented Production and whole prepackage;When whole M and entirety M ' are mirror image form, if need to set up several units m with The production moulding bed of dry unit m ', the production of entire Landscape Bridge steel case arch a is by several units m and several parts The moulding bed of unit m ' is pre-installed to complete sectional making and entirety;Multiple Landscape Bridge steel case arch production encircle a according to Landscape Bridge steel case Mode complete sectional making and whole prepackage;
6) erecting bed is compiled the component number of note according to production factory and is encircleed to separate different steel casees, then according to assembly production Position line completes in-site installation.
According to above-mentioned technical proposal, it is divided to m number of several units for being to be two whole M in the step 4), It is denoted as m1, m2 respectively, wherein the final section of m1 is exactly the first section of m2, several units m ' number that whole M ' is divided into Two are similarly, is denoted as m1 ', m2 ' respectively, wherein the final section of m1 ' is exactly the first section of m2 ';
The production moulding bed that Landscape Bridge steel case arch is set up in the step 5), when whole M and entirety M ' is symmetrical junction configuration When formula, the production moulding bed of m1, m2 are only used at this time, and the quantity of m1, m2 are 2, and Landscape Bridge steel case arch is produced on m1's and m2 Moulding bed is pre-installed to complete sectional making and entirety;When whole M and entirety M ' is mirror image form, entire Landscape Bridge steel The production of case arch a is by m1, m2, m1 ', the moulding bed of m2 ' complete sectional making and whole prepackage.
According to above-mentioned technical proposal, in the step 5), the sectional making of steel case arch and whole prepackage detailed process are as follows: when It when whole M and entirety M ' is symmetrical structure or can analogize when mirror symmetry, after completing the moulding bed of m1 and m2, first complete M's Assembly production work, the i.e. assembly work of Section 1 section, Section 2 section, Section 3 section ... the n-th segment, the (n+1)th segment;M1's The assembly production that m1 corresponds to segment is completed on moulding bed, each segment of m1 completes before lower tire, in each intersegmental panel of m1, bottom Upper installation check position line is charged and attacked with sample on plate, web, as field erected foundation;Then the final section of m1 is put into m2 The first section of moulding bed is set, and the whole assembly production work of m2 is completed, before each segment m2 completes the production lower tire, in the intersegmental face m2 Plate, bottom plate with sample charge and attack upper installation check position line on web, as field erected foundation;It is put down the final section of m2 Face rotates 180 degree, is placed on head section of the same position as m2 ' of m2 moulding bed, and the whole assembly system of m2 ' is completed on the moulding bed of m2 Make work, before each segment m2 ' completes the production lower tire, charges and attacks upper installation with sample on the intersegmental panel, bottom plate of m2 ', web and examine Bit line is vouched, as field erected foundation;It completes the position for finally final section of m2 ' being placed on the first segment of m1 moulding bed The whole assembly production of m1 ' before each segment m1 ' completes the production lower tire, is rushed on the intersegmental panel, bottom plate of m1 ', web with sample Installation check position line is stamped, as field erected foundation;Sectional making and the entirety for completing steel case arch a at this time are pre- Dress., need to be with different steel casees arch number to distinguish to avoid directly obscuring with group steel case arch, and charged and attacked with sample in steel case On each segment of arch.
The invention has the following advantages:
This method classifies to steel case arch by the space geometry characteristic of analysis structure, gives rigorous mathematical analysis The reference frame that method divides tire to make as steel case arch, can be used as the theoretical foundation of Instructing manufacture, pass through date comprision, system Fixed special project segmentation scheme, overcomes the limitation in space, can use the steel of limited production space production high camber, large span Case arch structure engineering controls thinking using simple cycle, and is similar to and beats the simple control means such as position line, makes entirely to make Process has rigorous scientific basis, theoretical and actually all ensure that the globality of steel case arch production, overcomes production place Bottleneck improves production precision, meets production needs, improves production efficiency, guarantee that in-site installation is gone on smoothly.
Detailed description of the invention
Fig. 1 is the coordinate schematic diagram that the place of steel case arch is installed in the embodiment of the present invention;
Fig. 2 is that the segment that steel case encircles in the embodiment of the present invention divides schematic diagram;
Fig. 3 is that numerical value x1, y1, z1 of entirety M in the embodiment of the present invention shows compared with numerical value X1, Y1, Z1 of using area It is intended to;
Fig. 4 is the segmented process schematic of entirety M in the embodiment of the present invention;
Fig. 5 is the segmented process schematic of entirety M ' in the embodiment of the present invention;
Fig. 6 is the schematic cross-section that mirror symmetry steel case encircles in the embodiment of the present invention;
Fig. 7 is the schematic cross-section of symmetrical steel case arch in the embodiment of the present invention;
Fig. 8 is the schematic diagram that the moulding bed that steel case encircles in the embodiment of the present invention sets up process;
Fig. 9 is that in-site installation checks the schematic diagram of position line between adjacent segment in the embodiment of the present invention;
In figure, the segment 1-, the 2nd ' segment 2- entirety M, 3- entirety M ', 4-, the 1st ' segment 5-, 6- steel case arch, the identical section of 7- Section, 8- Section 1 section, 9- Section 2 section, 10- Section 3 section, the (n+1)th segment 11-, the 3rd ' segment 12-.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Shown in referring to Fig.1~Fig. 9, the segmented production of Landscape Bridge steel case arch in one embodiment provided by the invention reaches The production method of whole prepackage precision, comprising the following steps:
1) using area of installation steel case arch is measured, determines the available length of using area, obtains use The length numerical value in place is denoted as respectively: X1, Y1, Z1;
2) by steel case arch be divided into 2n+1 segment, successively be labeled as Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., (n+1)th segment, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment, the wherein 1 ' segment Section 1 Duan Yu, Section 2 section With the 2nd ' segment ... the n-th segment and the n-th ' segment are mirror symmetry segment, itself mirror symmetry of the (n+1)th segment, such as Fig. 2 institute Show;
3) Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., the (n+1)th segment are regarded as an entirety M, while by The segment n+1, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment regard another entirety M ', whole M and entirety M ' as The (n+1)th segment is shared, and M and M ' is that symmetrical structure or mirror image are filled according to the whole structure type being linked to be With connection, the length of entirety M is measured, its length corresponding numerical value x1, y1, z1 are obtained;
Further, it is determined that assembly method (formal dress, upside-down mounting, side dress), and to appropriate in the whole M progress space being linked to be Rotation obtains an advantageous assembly space layout.
4) size for comparing numerical value X1, Y1, Z1 and x1, y1, z1, as X1 > x1 and Y1 > y1 and Z1 > z1+z ' establishment, then Into in next step;Work as X1 > x1 and Y1 > y1 and Z1 > z1+z ' it is invalid, then by Section 1 section of whole M, Section 2 section, Section 3 Several units m is continued to be divided into the (n+1)th segment of section ..., the length size of each unit m than numerical value X1, Y1, Z1 are small;The size that the number of unit depends on each unit is smaller than numerical value X1, Y1, Z1, i.e., if only needed Being divided into two units and can meeting numerical value comparison condition then need to only be divided into two parts, if being unsatisfactory for numerical value comparison condition Greater number of unit is then divided, is similarly divided into whole M ' single with several the symmetrical parts several units m First m ', wherein z ' is the minimum altitude of moulding bed, and compiles note component number to each unit;
5) the production moulding bed for setting up Landscape Bridge steel case arch is only used at this time when whole M and entirety M ' is symmetrical structure form The moulding bed that is produced on several units m of the production moulding bed of several units m, Landscape Bridge steel case arch is completed to be segmented Production and whole prepackage;When whole M and entirety M ' are mirror image form, if need to set up several units m with The production moulding bed of dry unit m ', the production of entire Landscape Bridge steel case arch a is by several units m and several parts The moulding bed of unit m ' is pre-installed to complete sectional making and entirety;Multiple Landscape Bridge steel case arch production encircle a according to Landscape Bridge steel case Mode complete sectional making and whole prepackage;
6) erecting bed is compiled the component number of note according to production factory and is encircleed to separate different steel casees, then according to assembly production Position line completes in-site installation.
Further, whole M is divided in the step 4) m number of several units for being be two, be denoted as respectively M1, m2, wherein the final section of m1 is exactly the first section of m2, several units m ' number that whole M ' is divided into is similarly two It is a, it is denoted as m1 ', m2 ' respectively, wherein the final section of m2 ' is exactly the first section of m1 ';
The production moulding bed that Landscape Bridge steel case arch is set up in the step 5), when whole M and entirety M ' is symmetrical junction configuration When formula, the production moulding bed of m1, m2 are only used at this time, and the quantity of m1, m2 are 2, and Landscape Bridge steel case arch is produced on m1's and m2 Moulding bed is pre-installed to complete sectional making and entirety;When whole M and entirety M ' is mirror image form, m1, m2 need to be set up Production moulding bed, the production of entire Landscape Bridge steel case arch a by the moulding bed of several units m and several units m ' Lai Complete sectional making and whole prepackage.
Further, in the step 5), the sectional making of steel case arch and whole prepackage detailed process are as follows: as whole M and Whole M ' (can analogize) when being symmetrical structure when mirror symmetry, after completing the moulding bed of m1 and m2, first complete the assembly production of M Work, the i.e. assembly work of Section 1 section, Section 2 section, Section 3 section ... the n-th segment, the (n+1)th segment;It is complete on the moulding bed of m1 The assembly production of segment is corresponded at m1, each segment of m1 completes before lower tire, in each intersegmental panel, bottom plate of m1, web On with sample charge and attack upper installation check position line, as field erected foundation;Then the final section of m1 is put into m2 moulding bed First section is set, and the whole assembly production work of m2 is completed, before each segment m2 completes the production lower tire, in the intersegmental panel of m2, bottom Upper installation check position line is charged and attacked with sample on plate, web, as field erected foundation;In the final section (i.e. (n+1)th m2 Segment) Plane Rotation 180 degree, it is placed on head section of the same position as m2 ' of m2 moulding bed, the whole of m2 ' is completed on the moulding bed of m2 The work of body assembly production, before each segment m2 ' completes the production lower tire, is charged and attacked on the intersegmental panel, bottom plate of m2 ', web with sample Upper installation check position line, as field erected foundation;Finally the final section of m2 ' is placed on the position of the first segment of m1 moulding bed The whole assembly production for completing m1 ' is set, before each segment m1 ' completes the production lower tire, on the intersegmental panel, bottom plate of m1 ', web Upper installation check position line is charged and attacked with sample, as field erected foundation;The steel case arch sectional making of a and whole is completed at this time Body prepackage., need to be with different steel casees arch number to distinguish to avoid directly obscuring with group steel case arch, and charged and attacked with sample On each segment of steel case arch.
In one embodiment of the present of invention, Landscape Bridge steel case encircles the production side that segmented production reaches whole prepackage precision Method, comprising the following steps:
Step 1: determining the quantity of steel lagging jack, carries out being divided into A1 group, A2 group ... to steel lagging jack, identical and Cheng Jing As symmetrical steel lagging jack is divided into one group.Every group of steel lagging jack is individually studied.
Step 2: measuring workable place, determines the length in usable place, obtains usable place Length numerical value X1, Y1, Z1. it is as shown in Figure 1.
Step 3: the steel lagging jack in each group is individually studied and is made, every group of research is identical with production method.
Step 4: studying any one steel lagging jack (box beam after steel lagging jack segmentation is steel case arch) in A1 group, false If studied steel case arch is a1, a1 will be divided into 2n+1 segment, i.e. Section 1 section, Section 2 section, the n-th section of Section 3 section ... Section, the (n+1)th segment, the n-th ' segment ... the 3rd ' segment, the 2nd ' segment, the 1st ' segment.Wherein 1 ' the segment Section 1 Duan Yu, the 2nd Segment and the 2nd ' segment,, the n-th segment and the n-th ' segment be symmetrical segment or mirror symmetry segment, the (n+1)th segment itself is pair Title or itself mirror symmetry.As shown in Figure 2.
Step 5: whole M (this that research Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., the (n+1)th segment are linked to be When the (n+1)th segment, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment regard another entirety M ' as), whole M with Whole M ' has the (n+1)th segment, and M and M ' is symmetrical structure or mirror image, according to the whole structure type being linked to be, It determines assembly method (formal dress, upside-down mounting, side dress), and the appropriate rotation in space is carried out to the whole M being linked to be, obtain one favorably Assembly space layout, measure entirety M length, obtain its length corresponding numerical value x1, y1, z1.Such as Fig. 3 institute Show.
Step 6: comparing the size of numerical value X1, Y1, Z1 and x1, y1, z1, works as X1 > x1 and Y1 > y1 and Z1 > z1+z ' are set up When, wherein z ' is the minimum altitude of moulding bed, into next step;If X1 > x1 and Y1 > y1 and Z1 > z1+z ' is invalid, to the 1st Ingredient is continued for two parts or multiple portions, herein we assume that being divided into segment, Section 2 section, the (n+1)th segment of Section 3 section ... When two part m1, m2, m1, m2 meet comparison condition (the case where multiple portions is similar), and wherein the final section of m1 is just It is the first section of m2.The discussion of following steps we be all discussion so that an entirety M is divided into m1 and m2, entirety M ' is divided into m2 ', m1 ' Basis, m1 and m1 ', m2 and the symmetry characteristic of m2 ' and entirety M are identical as M ', as shown in Figure 4 and Figure 5.
Step 7: the production moulding bed of steel case arch a is set up.As shown in Figure 6 and Figure 7, when whole M and entirety M ' is symmetrical structure When form, the production moulding bed of m1, m2 are only used at this time, and the production of entire steel case arch a can make in the moulding bed of m1 and m2 to complete segmentation Make and entirety is pre-installed, the steel case arch production of entire A group can be pre-installed in the moulding bed of m1 and m2 to complete sectional making and entirety. When whole M and entirety M ' are mirror image form, m1, m2, m2 need to be set up ', the production moulding bed of m1 ', entire steel case arch a Production can be in m1, m2, m2 ', the moulding bed of m1 ' complete sectional making and whole prepackage, the steel case arch of entire A group makes all may be used In m1, m2, m2 ', the moulding bed of m1 ' complete sectional making and whole prepackage.Entirety M only is discussed below and entirety M ' is symmetrical Structure type, whole M and entirety M ' are that mirror image form can obtain production method by similar method.
Step 8: after completing the moulding bed of m1 and m2, as shown in figure 8, first completing the assembly production work of M, i.e. Section 1 The assembly work of section, Section 2 section, Section 3 section ... the n-th segment, the (n+1)th segment.M1 is completed on the moulding bed of m1 corresponds to segment Assembly production, each segment m1 completes before lower tire, charges and attacks upper peace with sample on each intersegmental panel, bottom plate of m1, web Dress checks position line, as field erected foundation.Then the first section that the final section of m1 is put into m2 moulding bed is set, completes m2 Whole assembly production work, before each segment m2 completes the production lower tire, rushed on the intersegmental panel, bottom plate of m2, web with sample Installation check position line is stamped, as field erected foundation.In final section (i.e. the (n+1)th segment) Plane Rotation m2 180 degree is placed on head section of the same position as m2 ' of m2 moulding bed, the whole assembly production work of m2 ' is completed on the moulding bed of m2 Make, before each segment m2 ' completes the production lower tire, charges and attacks upper installation check with sample on the intersegmental panel, bottom plate of m2 ', web and determine Bit line, as field erected foundation.Complete m1's ' in the position for finally final section of m2 ' being placed on the first segment of m1 moulding bed Whole assembly production before each segment m1 ' completes the production lower tire, is charged and attacked on the intersegmental panel, bottom plate of m1 ', web with sample Installation check position line, as field erected foundation.Sectional making and the entirety prepackage of steel case arch a are completed at this time.For It avoids directly obscuring with group steel case arch, need to be distinguished with different steel casees arch number, and charged and attacked with sample in steel case arch On each segment.In-site installation checks that position line is as shown in Figure 9.
Step 9: erecting bed the component number of note is compiled to separate different steel case arches, then according to assembly according to production factory The position line of production completes in-site installation.
In conclusion the innovation of the invention consists in that: 1, the space geometry characteristic for analyzing structure classifies to steel case arch, Give the reference frame that rigorous mathematical analysis method divides tire to make as steel case arch, can be used as Instructing manufacture it is theoretical according to According to.2, by date comprision, special segmentation scheme is formulated, the limitation in space is overcome, can use limited production Space makes the steel case arch structure engineering of high camber, large span.3, using A+1,1+B, B+1 ', the simple cycle control of 1 '+C... Thinking processed, and be similar to and beat the simple control means such as position line, so that entire manufacturing process is had rigorous scientific basis, it is resonable By and actually all ensure that steel case arch production globality.
Above is only presently preferred embodiments of the present invention, and of course, the scope of rights of the present invention cannot be limited by this, Therefore according to equivalence changes made by scope of the present invention patent, still belong to protection scope of the present invention.

Claims (3)

1. a kind of Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision, which is characterized in that including with Lower step:
1) using area for making Landscape Bridge steel case arch is measured, obtains the available length numerical value of using area It is denoted as respectively: X1, Y1, Z1;
2) Landscape Bridge steel case arch is divided into 2n+1 segment, is successively labeled as Section 1 section, Section 2 section, the n-th section of Section 3 section ... Section, the (n+1)th segment, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment;
Wherein 1 ' the segment Section 1 Duan Yu, the 2 ' segment Section 2 Duan Yu ... the n-th segment is mirror symmetry section with the n-th ' segment Section or symmetrical segment, the (n+1)th segment are itself mirror symmetry or symmetrical segment;
3) Section 1 section, Section 2 section, the n-th segment of Section 3 section ..., the (n+1)th segment are regarded as an entirety M, while by (n+1)th Segment, the 3rd ' segment of the n-th ' segment ..., the 2nd ' segment, the 1st ' segment regard another entirety M ', whole M and entirety M ' as all There is n+1 segment, and M and M ' is mirror image or symmetrical structure, according to the overall structure form being linked to be, adjustment entirety M Spatiality, measure entirety M length, obtain its length corresponding numerical value x1, y1, z1;
4) size for comparing numerical value X1, Y1, Z1 and x1, y1, z1 then enters as X1 > x1 and Y1 > y1 and Z1 > z1+z ' establishment In next step;Work as X1 > x1 and Y1 > y1 and Z1 > z1+z ' it is invalid, then by Section 1 section of whole M, Section 2 section, Section 3 section ... N+1 continues segment to be divided into several units m, and the length size of each unit m is smaller than numerical value X1, Y1, Z1, Similarly by whole M ' be divided into symmetrical several units m ' of several units m, and each unit is compiled and is infused Component number, wherein z ' is the minimum altitude of moulding bed;
5) the production moulding bed for setting up Landscape Bridge steel case arch, when whole M and entirety M ' is symmetrical structure form, whole M and entirety M ' is completed the production and is pre-installed using identical moulding bed;When whole M and entirety M ' is mirror image form, need to respectively set up Moulding bed production moulding bed is completed the production and is pre-installed;
6) erecting bed separates different steel casees according to the component number for compiling note and encircles, and then completes according to the position line of assembly production In-site installation.
2. Landscape Bridge steel case according to claim 1 encircles the production method that segmented production reaches whole prepackage precision, It is characterized in that, is divided to m number of several units for being to be two whole M in the step 4), is denoted as m1, m2 respectively, The final section of middle m1 is exactly the first section of m2, several units m ' number that whole M ' is divided into is similarly two, respectively It is denoted as m1 ', m2 ', wherein the final section of m2 ' is exactly the first section of m1 ';
The production moulding bed that Landscape Bridge steel case arch is set up in the step 5), when whole M and entirety M ' is symmetrical structure form, The production moulding bed of m1, m2 are only used at this time, and the quantity of m1, m2 are 2, and the moulding bed for being produced on m1 and m2 of Landscape Bridge steel case arch comes Complete sectional making and whole prepackage;When whole M and entirety M ' is mirror image forms, need to set up simultaneously m1, m2, M1 ', m2 ' production moulding bed come complete steel case arch a sectional making and whole prepackage.
3. Landscape Bridge steel case according to claim 2 encircles the production method that segmented production reaches whole prepackage precision, Be characterized in that, in the step 5), the sectional making of Landscape Bridge steel case arch and whole prepackage detailed process are as follows: complete m1 and After the moulding bed of m2, the assembly production work of M, i.e. Section 1 section, Section 2 section, the n-th segment Section 3 section ..., the (n+1)th section are first completed The assembly work of section;The assembly production that m1 corresponds to segment is completed on the moulding bed of m1, each segment of m1 completes before lower tire, Upper installation check position line is charged and attacked with sample in each intersegmental panel, bottom plate of m1, web, as field erected foundation;Then The first section that the final section of m1 is put into m2 moulding bed is set, completes the whole assembly production work of m2, each segment m2 completes the production Before lower tire, charge and attack upper installation check position line with sample on the intersegmental panel, bottom plate of m2, web, as it is field erected according to According to;Again the final section Plane Rotation 180 degree of m2, it is placed on head section of the same position as m2 ' of m2 moulding bed, in the moulding bed of m2 The whole assembly production of upper completion m2 ' works, before each segment m2 ' completes the production lower tire, in the intersegmental panel, bottom plate of m2 ', abdomen Upper installation check position line is charged and attacked with sample on plate, as field erected foundation;The final section of m2 ' is finally placed on m1 moulding bed First segment position complete m1 ' whole assembly production, before each segment m1 ' completes the production lower tire, in the intersegmental face m1 ' Plate, bottom plate with sample charge and attack upper installation check position line on web, as field erected foundation;Steel case arch a is completed at this time Sectional making and whole prepackage.
CN201811449725.3A 2018-11-30 2018-11-30 Manufacturing method for achieving integral preassembly precision by segmental manufacturing of steel box arch of landscape bridge Active CN109505249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811449725.3A CN109505249B (en) 2018-11-30 2018-11-30 Manufacturing method for achieving integral preassembly precision by segmental manufacturing of steel box arch of landscape bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811449725.3A CN109505249B (en) 2018-11-30 2018-11-30 Manufacturing method for achieving integral preassembly precision by segmental manufacturing of steel box arch of landscape bridge

Publications (2)

Publication Number Publication Date
CN109505249A true CN109505249A (en) 2019-03-22
CN109505249B CN109505249B (en) 2020-08-11

Family

ID=65751210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811449725.3A Active CN109505249B (en) 2018-11-30 2018-11-30 Manufacturing method for achieving integral preassembly precision by segmental manufacturing of steel box arch of landscape bridge

Country Status (1)

Country Link
CN (1) CN109505249B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898399A (en) * 2019-04-19 2019-06-18 中建钢构有限公司 A kind of assembled Landscape Bridge and its assembling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003020618A (en) * 2001-07-06 2003-01-24 Nkk Corp Existing bridge reinforcing method, and reinforced existing bridge
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
CN105421211A (en) * 2015-12-21 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Manufacturing method for large-span single-arch-rib steel box arch
JP2017078297A (en) * 2015-10-20 2017-04-27 ケイコン株式会社 Connected concrete block body for arch bridge structure, and deck-type arch bridge
CN207244467U (en) * 2017-09-19 2018-04-17 中铁上海工程局集团有限公司 A kind of steel box arch rib assembly positioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003020618A (en) * 2001-07-06 2003-01-24 Nkk Corp Existing bridge reinforcing method, and reinforced existing bridge
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
JP2017078297A (en) * 2015-10-20 2017-04-27 ケイコン株式会社 Connected concrete block body for arch bridge structure, and deck-type arch bridge
CN105421211A (en) * 2015-12-21 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Manufacturing method for large-span single-arch-rib steel box arch
CN207244467U (en) * 2017-09-19 2018-04-17 中铁上海工程局集团有限公司 A kind of steel box arch rib assembly positioner

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘熙雄: "长沙捞刀河景观桥工程钢箱拱制作技术",潘熙雄,工业建筑,增刊I,第708页-第712页", 《工业建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898399A (en) * 2019-04-19 2019-06-18 中建钢构有限公司 A kind of assembled Landscape Bridge and its assembling method

Also Published As

Publication number Publication date
CN109505249B (en) 2020-08-11

Similar Documents

Publication Publication Date Title
CN101799276B (en) Method for measuring and controlling tower column and cable pipeline in synchronous construction of tower and beam of cable-stayed bridge
CN107587429B (en) Cord clip of suspension bridge installation site modification method
CN110056106A (en) A kind of frame curtain wall quick assembling construction method and system based on BIM
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
CN106284665B (en) A kind of oblique steel column double helix space structure and its construction method
CN109505249A (en) Landscape Bridge steel case encircles the production method that segmented production reaches whole prepackage precision
CN108103949A (en) A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN114510768A (en) Steel pipe concrete arch bridge construction monitoring method and system based on digital twinning
CN111636303B (en) Cross baseline control method for block assembly manufacturing of curve steel box structure
CN114541264A (en) Cable-stayed bridge cable guide pipe integrated measuring and positioning method
Xiuren et al. Calculation of dynamic assembly and tensioning loads at multiple points of prefabricated structure
He et al. Closed-form design solutions for parallelogram hollow structural sections under bending scenarios
CN110318548A (en) A kind of assembled wall mounting bracket and its construction method
CN109898399A (en) A kind of assembled Landscape Bridge and its assembling method
CN106403858B (en) A kind of superaltitude large cantilever steel platform tip deflection monitoring method
CN108385538A (en) The method that the prefabricated head tower of cable-stayed bridge is installed on concrete king-post
CN104196245A (en) Segmented manufacturing and splicing method for large steel tube truss curved beam with variable cross-sections
CN205035902U (en) Crutch supported complicated curved surface rack axle construction in large -scale minute
CN116628795A (en) Multi-curved-surface combined high and large template installation method based on BIM modeling technology
CN103489217A (en) Modeling method of building based on column system
Xu Truss construction of green fabricated steel structure based on BIM intelligent technology
CN105544982A (en) Construction method for hyperboloid torsional steel column
CN207484265U (en) Spelling fills implicit low-pylon cable-stayed bridge
CN113323153A (en) Bending-twisting aluminum alloy structure in existing complex space and construction method
CN108358077B (en) A kind of installation method of irregular boom shelf

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant