CN109503032A - A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder - Google Patents

A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder Download PDF

Info

Publication number
CN109503032A
CN109503032A CN201910009205.9A CN201910009205A CN109503032A CN 109503032 A CN109503032 A CN 109503032A CN 201910009205 A CN201910009205 A CN 201910009205A CN 109503032 A CN109503032 A CN 109503032A
Authority
CN
China
Prior art keywords
red mud
asphalt
physical modification
modified material
filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910009205.9A
Other languages
Chinese (zh)
Other versions
CN109503032B (en
Inventor
张吉哲
李沛钊
姚占勇
蒋红光
梁明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201910009205.9A priority Critical patent/CN109503032B/en
Publication of CN109503032A publication Critical patent/CN109503032A/en
Application granted granted Critical
Publication of CN109503032B publication Critical patent/CN109503032B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B20/00Use of materials as fillers for mortars, concrete or artificial stone according to more than one of groups C04B14/00 - C04B18/00 and characterised by shape or grain distribution; Treatment of materials according to more than one of the groups C04B14/00 - C04B18/00 specially adapted to enhance their filling properties in mortars, concrete or artificial stone; Expanding or defibrillating materials
    • C04B20/02Treatment
    • C04B20/023Chemical treatment
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of asphalts and preparation method thereof of physical modification red mud substitution miberal powder, belong to road engineering material and preparation technical field.Aqueous solution is made the described method includes: 1) be mixed in a certain ratio modified material and water;2) red mud broken, after drying is added according to a certain percentage in step 1) and stirs to get mixed serum in aqueous solution obtained;3) mixed serum obtained in step 2) is obtained into the physical modification red mud powder for asphalt processed by suction filtration, dry, shattering process;4) the substitution miberal powder of physical modification red mud powder obtained in step 3) is prepared into asphalt.By the present invention in that preparing asphalt with physical modification red mud substitution miberal powder, it can effectively improve the high temperature performance and anti-water damage ability of asphalt, the performance of asphalt be effectively ensured.

Description

A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder
Technical field
The invention belongs to road engineering material and preparation technical fields, are related to a kind of preparation method of asphalt, special It is not to be related to a kind of asphalt and preparation method thereof using physical modification red mud substitution miberal powder.
Background technique
Red mud (Red mud or Bauxite residue) is that alumina producer alkaline process processing bauxite extracts aluminium oxide The insoluble solid trade waste discharged afterwards shows red or brown because it is rich in iron oxide, therefore referred to as red mud.Every life It produces the big appointment of 1 ton of aluminium oxide and generates 1.0-1.8 tons of red muds.China's aluminum i ndustry, which was stepped into since the nineties in last century, rapidly develops rank Section, while aluminium oxide production capacity improves rapidly, the discharge amount of red mud is also growing.According to statistics, China's red mud accumulation stockpiling Amount is more than 3.5 hundred million tons, and wherein the accumulation volume of cargo in storage of Shandong Province is more than 200,000,000 tons, and stockyard is taken up an area more than 13,000,000 square metres.2016 Year China red mud total release is about 80,000,000 tons, and consumption is only 3,200,000 tons, and comprehensive utilization ratio is less than 4%.At this stage, The red mud of domestic and international Alumina Enterprise discharge is mainly conveyed to stacking field and is carried out by the way of " wet type conveying-dry type is stacked " It builds a dam stacking.This outdoor stacking mode does not only take up a large amount of soils, expends a large amount of stockyard construction and arable land expense, simultaneously Also security risk is brought to surrounding soil and underground water link.In China area with heavy rainfall, alkaline attached liquid in red mud and Heavy metal ion can penetrate into soil with rainwater, to cause soil alkalization and underground water pollution, these harmful substances that can pass through Underground water and crops enter human body, constitute a threat to the life security of the mankind.Meanwhile because red mud strong basicity, plant is difficult With existence, red mud dump is directly exposed under rainwash erosion without vegetative coverage, easily the disasters such as initiation landslide, dam break. As society is to the pay attention to day by day of safety in production and environmental protection, the discharge and stockpiling of red mud, which have become, restricts alumina industry hair The heavy burden of important bottleneck and the regional society development and environmental protection of exhibition.
At the same time, with the development of the infrastructure constructions such as China's urban construction and highway, railway, engineering construction consumption A large amount of non-renewable resources.Wherein, by the irrational extraction of resources of decades, the lime stone in the most areas in China has become dilute Lack resource.According to statistics, the overall reserves of China's limestone are about 75,000,000,000 tons, are only capable of maintaining China's base by current depletion rate Plinth design and construction demand at most 15 years.It is therein to fill out as main surface layer pavement material-asphalt of highway in China construction Material part is limestone limestone mineral powder obtained after broken, levigate.The volume of filler accounts for about asphalt gross mass 5%, it is main rise filling gather materials skeleton gap, improve bitumen stiffness and raising gather materials-rubber cement adhesion the effects of, be that pitch is mixed Close important component indispensable in material.And with the continuous consumption of Natural Resources in China, it is especially social in recent years right The enhancing of environmental protection and natural resources protection consciousness, a large amount of limestone building stones factory close, and leading to building stones, supply falls short of demand, high-quality Building stones have reached by the crazy degree robbed.At the same time, since a large amount of dust generated in limestone mineral powder production process is to sky Makings amount generates and its negative impact, the underproof limestone mineral powder manufacturing enterprise in part are shut down rectification, lead to limestone Miberal powder price rises year by year, brings serious cost pressure to investments in highway building unit and construction enterprises.Therefore, exploitation at The limestone mineral powder alternative materials that this is controllable, performance is stable, research are suitable for the asphalt preparation process of alternative materials, are Highway construction field critical issue urgently to be resolved.
Patent CN105753375A discloses a kind of asphalt and preparation method thereof for making filler using red mud, each group Point weight proportion be respectively as follows: 30~80 parts of coarse aggregate, 20~70 parts of fine aggregate, 3~6 parts of pitch, 3~6 parts of filler, filler is The weight proportion of the mixture of limestone dust and red mud, limestone dust and red mud is (1~3): (1~3).Preparation method is such as Under: 1. red mud is dried it is levigate, according to the ratio with limestone dust mix, then in 160~180 DEG C of pre- stand-by heats;2. by thickness Gather materials after 160~180 DEG C of preheatings, it is uniform that asphalt mixing is added;3. the filler of preheating is added to 2. mixing that step is prepared It is mixed thoroughly in material.The present invention can not only accomplish to turn waste into wealth, subtract using industrial waste red mud as the filler of asphalt Few land seizure area and environmental pollution, can also reduce the material cost for preparing asphalt, while can improve pitch mixing The pavement performance of material should be widely promoted and use.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of using physical modification red mud as the mixing of the pitch of miberal powder Material and preparation method thereof, industrial wastes red mud is used in asphalt, is reduced the cost using miberal powder and is improved environment.
To realize the above-mentioned technical purpose, The technical solution adopted by the invention is as follows:
A kind of physical modification red mud for replacement miberal powder, the following raw material composition: red mud, modified material, the weight of the two Proportion is 1:0.1~0.5;
The red mud is at least one of red mud from sintering process or Bayer process red mud;
The application research discovery: the modified material of single composition can only often improve certain aspect performance of red mud, It is difficult to substitute miberal powder, the requirement of asphalt.For this purpose, the application to current several common asphalt modification mixtures into It has gone after compounding, discovery: calcium hydroxide, flyash in cement, are suitably added a certain amount of blast-furnace cinder, white clay and carbide slag Mixture, the comprehensive performance of changed red mud can be effectively improved, guarantee that the dynamic stability of asphalt, Marshall are stablized Degree, maximum bending strain are not less than hot-mix asphalt mixture.
The modified material is calcium hydroxide, flyash, cement, blast-furnace cinder, white clay and carbide slag.
Addition calcium hydroxide and cement can significantly improve the water stability of obtained asphalt;
In some embodiments, the flyash is that a kind of industrial solid that thermal power plant pulverized coal fired boiler excludes is discarded Object.Addition flyash and blast-furnace cinder can then significantly improve the high-temperature stability of asphalt;
In some embodiments, the blast-furnace cinder is a kind of solid waste excluded from blast furnace in manUfaCtUre of pig iron Object.Addition flyash and blast-furnace cinder can then significantly improve the high-temperature stability of asphalt;
In some embodiments, the white clay is the solid waste pollution that paper industry generates in alkali recovery process Object.Addition white clay and carbide slag then have a distinct increment for water stability and low-temperature cracking-resistance.
In some embodiments, the ancillary industry generated when the carbide slag is using calcium carbide method acetylene production is discarded Object.Addition white clay and carbide slag then have a distinct increment for water stability and low-temperature cracking-resistance.
And processing lower, for modified material is required preparation process when preparing asphalt using above-mentioned material Also relatively simple.
Processing of the application for modified material: being put into 105 DEG C of baking ovens dry 1-3h for modified material and remove moisture removal, it Afterwards using high speed disintegrator it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to required by filler Partial size.
It is insufficient that traditional changed red mud water stability can be improved well using calcium hydroxide, flyash and modified cement red mud The characteristics of.
Compared to traditional limestone dust is used, the asphalt using this physical modification red mud substitution miberal powder exists It is performed better than in high-temperature stability and low-temperature cracking-resistance.
In some embodiments, the red mud carries out after drying levigate processing, and granularity meets " asphalt highway construction skill Art specification " requirement in (JTGF40-2004) one to filler, and appearance is agglomerated without granule.
The present invention also provides a kind of above-mentioned preparation methods for the physical modification red mud instead of miberal powder, comprising:
Red mud is crushed, it is dry, it is then levigate to " standard specification for construction and acceptance of highway asphalt pavement " (JTGF40-2004) In to partial size required by filler, obtain levigate red mud;
Modified material is poured into water, is uniformly mixed, obtains modified material aqueous solution;
Above-mentioned levigate red mud is poured into modified material aqueous solution, is uniformly mixed, obtains changed red mud slurries;
By changed red mud slurries into dehydration, drying, it is crushed, is levigate to " standard specification for construction and acceptance of highway asphalt pavement " (JTGF40-2004) to partial size required by filler to get physical modification red mud in.
In some embodiments, the mass ratio of the quality of the modified material and water is 0.1~0.4:1.
In some embodiments, the dehydration is by the way of filtering.
In some embodiments, the drying condition is dry 1~3h in 101~105 DEG C of baking ovens.
The present invention also provides a kind of asphalt preparation methods using physical modification red mud substitution miberal powder, comprising:
(1) above-mentioned physical modification red mud is dried, the substitution filler as asphalt;
(2) coarse aggregate and fine aggregate are preheated, it is spare as gathering materials for asphalt;
(3) matrix pitch or modified pitch preheating 1-3h are made into its thawing;
(4) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, dry mixing, thickness is made to gather materials progress Premixing;
(5) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, is then added in thickness is gathered materials according to match ratio It is reused after the road matrix pitch of the parts by weight and mixes pot stirring 1-3min until uniformly;
(6) filler after preheating in step (1) is added in mixture prepared in step (3) and is stirred using mixing and stirring pot 30-60s is mixed until uniformly to get asphalt for road.
In some embodiments, the type of the asphalt is AC-13, AC-20, AC-25 or SMA-13.
In some embodiments, the preheating temperature gathered materials is the preheating temperature of 160-180 DEG C, matrix pitch or modified pitch It is 140-160 DEG C.
The present invention also provides the asphalts of any above-mentioned method preparation.
The beneficial effects of the present invention are:
(1) chemical composition of the invention according to industrial red mud itself, and calcium hydroxide, flyash, cement, Blast Furnace Ore is added Slag, white clay and carbide slag are used to substitute miberal powder by making a kind of physical modification red mud and mix in asphalt, be effectively ensured The mechanical property of asphalt.
(2) test proves that, after physical modification red mud prepared by the present invention is added, it is ensured that asphalt Integral strength, to guarantee the structural stability of bituminous pavement.
(3) test proves that, the freeze thawing that the addition of physical modification red mud of the present invention significantly improves asphalt is split Resistance to spalling ratio can be effectively improved the water resistant damage capability of bituminous pavement.
(4) test proves that, after physical modification red mud prepared by the present invention is added, it is ensured that asphalt Dynamic stability, Marshall stability, maximum bending strain are not less than hot-mix asphalt mixture, it was demonstrated that physical modification of the invention The high temperature performance of asphalt can be effectively ensured in red mud.
(5) for raw materials for production angle, the present invention can efficiently use various solid wastes, not only have significant Environmental benefit can also reduce the overall cost of asphalt.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used in this application have logical with the application person of an ordinary skill in the technical field The identical meanings understood.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, replaced for the limestone mineral powder that development cost is controllable, performance is stable is badly in need of at present The problem of for material.Therefore, the present invention proposes a kind of physical modification red mud, is made of the following raw material: red mud, modified material, two The weight proportion of person is 1:0.1~0.5.
In some embodiments, the industrial pollution being discharged when the red mud is aluminium industry extraction aluminium oxide is discarded Object.Red mud is carried out to dry levigate processing, granularity meets " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) one In requirement to filler, and appearance is agglomerated without granule.
In some embodiments, the red mud be red mud from sintering process, it is one or two kinds of in Bayer process red mud.
In some embodiments, the modified material is calcium hydroxide, flyash, cement, blast-furnace cinder, white clay and calcium carbide Slag, mass ratio are 1:2~3:1~3:3~5:2~6:1~5.
The preparation method for the physical modification red mud that the present invention also provides a kind of for replacing miberal powder, comprising:
(1) red mud is carried out routine first to be just crushed, places into dry 1-3h in 105 DEG C of baking ovens and remove moisture removal, makes later With high speed disintegrator it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to grain required by filler Diameter;
(2) a certain amount of modified material is poured into water, is stirred under 100-300 revs/min of revolving speed with reinforcement blender It mixes them thoroughly within 10-20 minutes, wherein the mass ratio of the quality of modified material and water is 0.1~0.4:1;
(3) a certain amount of levigate red mud is poured into modified material aqueous solution, with reinforcement blender at 100-300 revs/min It stirs 10-20 minutes and mixes them thoroughly under revolving speed, wherein red mud and the mass ratio of modified material are 1:0.1~0.5;
(4) in order to remove the moisture in mixed serum, well-mixed changed red mud slurries are poured into bottle,suction, are carried out It filters, is put into togerther to dry 1-3 hours in 105 DEG C of baking oven by filter paper and filter residue after the completion of suction filtration and removes moisture removal;
(5) filter paper and filter residue are taken out, filter residue is removed from filter paper, and filter residue is crushed and levigate to " public affairs Road Asphalt Pavement Construction Technique specification " in (JTG F40-2004) to partial size required by filler, obtain the physics at this time Changed red mud.
A kind of asphalt preparation method using physical modification red mud substitution miberal powder, can prepare different types of drip Green mixture, such as AC-13, AC-20, AC-25, SMA-13.
The preparation method of asphalt recited above, the specific steps of which are as follows:
(1) the physical modification red mud after will be levigate dries 3h under the conditions of 105 DEG C and removes moisture removal, as asphalt Substitute filler.
(2) coarse aggregate and fine aggregate are preheated into 1-3h under the conditions of 160-180 DEG C, it is standby as gathering materials for asphalt With;
(3) matrix pitch or modified pitch are preheated to 1-3h under the conditions of 140-160 DEG C makes its thawing;
(4) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, are done under the conditions of 160-180 DEG C It mixes 30-60 seconds, so that thickness is gathered materials and be pre-mixed.
(5) to prepare AC asphalt, road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, then according to Match ratio, which is added after the road matrix pitch of the parts by weight to reuse in thickness is gathered materials, mixes pot stirring 1-3min until uniformly, To prepare SMA asphalt, then modified pitch is used;
(6) filler after preheating in step (1) is added in mixture prepared in step (3) and is stirred using mixing and stirring pot 30-60s is mixed until uniformly to get asphalt for road.
In order to enable those skilled in the art can clearly understand technical solution of the present invention, below with reference to tool The embodiment of body and the technical solution that the present invention will be described in detail.
Embodiment 1:
1, a kind of asphalt of physical modification red mud substitution miberal powder, by mass percentage, including following component: 0- 20%, the 10-15cm's that gathers materials of 40%, the 5-10cm that gathers materials of 5cm gathers materials 30%, No. 70 matrix bi tumenf orr oads 4.5%, object Changed red mud 5.5% is managed, described to gather materials using basalt, all technical meets " standard specification for construction and acceptance of highway asphalt pavement " Related request in (JTG F40-2004).Asphalt type: AC-20.
Red mud used in the physical modification red mud is red mud from sintering process, and modified material is calcium hydroxide, flyash, water Mud, blast-furnace cinder, white clay and carbide slag, mass ratio 1:2:1.5:3:4.5:3.
The physical modification red mud is the mixture of red mud and calcium hydroxide, and the mass ratio of red mud and modified material is 1:0.5.
2, the asphalt of above-mentioned physical modification red mud substitution miberal powder the preparation method is as follows:
(1) red mud from sintering process is carried out routine first to be crushed, is then placed in 105 DEG C of baking ovens dry 3h and removes moisture removal, it Afterwards using high-speed breakage crusher machine 2min it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to filling out The required partial size of material;
(2) a certain amount of modified material is poured into water, is stirred under 100-300 revs/min of revolving speed with reinforcement blender It mixes them thoroughly within 20 minutes, wherein the mass ratio of the quality of modified material and water is 0.4:1;
(3) red mud that a certain amount of step (1) obtains is poured into modified material aqueous solution, with reinforcement blender in 100- It stirs 20 minutes and mixes them thoroughly under 300 revs/min of revolving speed, wherein red mud and the mass ratio of modified material are 1:0.5;
(4) it in order to which by the moisture removal in mixed serum, well-mixed changed red mud slurries are poured into bottle,suction, takes out 3min is filtered, is put into togerther filter paper and filter residue after the completion of suction filtration 3 hours dry in the baking oven that temperature is 105 DEG C;
(5) filter paper and filter residue are taken out, filter residue is removed from filter paper, and high-speed breakage crusher machine is used to filter residue 3min is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to partial size required by filler, at this time To the physical modification red mud.
(6) physical modification red mud described in step (3) is dried under the conditions of 105 DEG C 3h and removes moisture removal, it is mixed as pitch Close the substitution filler of material.
(7) coarse aggregate and fine aggregate are preheated into 1h under the conditions of 160-180 DEG C, it is spare as gathering materials for asphalt;
(8) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, are done under the conditions of 160-180 DEG C 30s is mixed, so that thickness is gathered materials and is pre-mixed.
(9) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, is then added in thickness is gathered materials according to match ratio It is reused after the road matrix pitch of the parts by weight and mixes pot stirring 1-3min until uniformly;
(10) filler after preheating in step (6) is added in mixture prepared in step (9) and is stirred with mixing pot 30s is until uniformly to get asphalt for road.
Embodiment 2:
1, a kind of asphalt of physical modification red mud substitution miberal powder, by mass percentage, including following component: 0- 20%, the 10-15cm's that gathers materials of 40%, the 5-10cm that gathers materials of 5cm gathers materials 30%, No. 70 matrix bi tumenf orr oads 4.5%, object Changed red mud 5.5% is managed, described to gather materials using basalt, all technical meets " standard specification for construction and acceptance of highway asphalt pavement " Related request in (JTG F40-2004).Asphalt type: AC-20.
Red mud used in the physical modification red mud is red mud from sintering process, and modified material is calcium hydroxide, flyash, water Mud, blast-furnace cinder, white clay and carbide slag, mass ratio 1:3:2:3:4.5:3.
The physical modification red mud is the mixture of red mud and modified material, and the mass ratio of red mud and modified material is 1: 0.1。
2, the asphalt of above-mentioned physical modification red mud substitution miberal powder the preparation method is as follows:
(1) red mud from sintering process is carried out routine first to be crushed, is then placed in 105 DEG C of baking ovens dry 3h and removes moisture removal, it Afterwards using high-speed breakage crusher machine 2min it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to filling out The required partial size of material;
(2) a certain amount of modified material is poured into water, is stirred under 100-300 revs/min of revolving speed with reinforcement blender It mixes them thoroughly within 20 minutes, wherein the mass ratio of the quality of modified material and water is 0.1:1;
(3) red mud that a certain amount of step (1) obtains is poured into modified material aqueous solution, with reinforcement blender in 100- It stirs 20 minutes and mixes them thoroughly under 300 revs/min of revolving speed, wherein red mud and the mass ratio of modified material are 1:0.1;
(4) it in order to which by the moisture removal in mixed serum, well-mixed changed red mud slurries are poured into bottle,suction, takes out 3min is filtered, is put into togerther filter paper and filter residue after the completion of suction filtration 3 hours dry in the baking oven that temperature is 105 DEG C;
(5) filter paper and filter residue are taken out, filter residue is removed from filter paper, and high-speed breakage crusher machine is used to filter residue 3min is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to partial size required by filler, at this time To the physical modification red mud.
(6) physical modification red mud described in step (3) is dried under the conditions of 105 DEG C 3h and removes moisture removal, it is mixed as pitch Close the substitution filler of material.
(7) coarse aggregate and fine aggregate are preheated into 1h under the conditions of 160-180 DEG C, it is spare as gathering materials for asphalt;
(8) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, are done under the conditions of 160-180 DEG C 30s is mixed, so that thickness is gathered materials and is pre-mixed.
(9) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, is then added in thickness is gathered materials according to match ratio It is reused after the road matrix pitch of the parts by weight and mixes pot stirring 1-3min until uniformly;
(10) filler after preheating in step (6) is added in mixture prepared in step (9) and is stirred with mixing pot 30s is until uniformly to get asphalt for road.
Embodiment 3:
1, a kind of asphalt of physical modification red mud substitution miberal powder, by mass percentage, including following component: 0- 20%, the 10-15cm's that gathers materials of 40%, the 5-10cm that gathers materials of 5cm gathers materials 30%, No. 70 matrix bi tumenf orr oads 4.5%, object Changed red mud 5.5% is managed, described to gather materials using basalt, all technical meets " standard specification for construction and acceptance of highway asphalt pavement " Related request in (JTG F40-2004).Asphalt type: AC-20.
Red mud used in the physical modification red mud is Bayer process red mud, and modified material is calcium hydroxide, flyash, water Mud, blast-furnace cinder, white clay and carbide slag, mass ratio 1:2.5:1.5:3:4:3.
The physical modification red mud is the mixture of red mud and modified material, and the mass ratio of red mud and modified material is 1: 0.5。
2, the asphalt of above-mentioned physical modification red mud substitution miberal powder the preparation method is as follows:
(1) Bayer process red mud is carried out routine first to be crushed, is then placed in 105 DEG C of baking ovens dry 3h and removes moisture removal, it Afterwards using high-speed breakage crusher machine 2min it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to filling out The required partial size of material;
(2) a certain amount of modified material is poured into water, is stirred under 100-300 revs/min of revolving speed with reinforcement blender It mixes them thoroughly within 20 minutes, wherein the mass ratio of the quality of modified material and water is 0.4:1;
(3) red mud that a certain amount of step (1) obtains is poured into modified material aqueous solution, with reinforcement blender in 100- It stirs 20 minutes and mixes them thoroughly under 300 revs/min of revolving speed, wherein red mud and the mass ratio of modified material are 1:0.5;
(4) it in order to which by the moisture removal in mixed serum, well-mixed changed red mud slurries are poured into bottle,suction, takes out 3min is filtered, is put into togerther filter paper and filter residue after the completion of suction filtration 3 hours dry in the baking oven that temperature is 105 DEG C;
(5) filter paper and filter residue are taken out, filter residue is removed from filter paper, and high-speed breakage crusher machine is used to filter residue 3min is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to partial size required by filler, at this time To the physical modification red mud.
(6) physical modification red mud described in step (3) is dried under the conditions of 105 DEG C 3h and removes moisture removal, it is mixed as pitch Close the substitution filler of material.
(7) coarse aggregate and fine aggregate are preheated into 1h under the conditions of 160-180 DEG C, it is spare as gathering materials for asphalt;
(8) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, are done under the conditions of 160-180 DEG C 30s is mixed, so that thickness is gathered materials and is pre-mixed.
(9) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, is then added in thickness is gathered materials according to match ratio It is reused after the road matrix pitch of the parts by weight and mixes pot stirring 1-3min until uniformly;
(10) filler after preheating in step (6) is added in mixture prepared in step (9) and is stirred with mixing pot 30s is until uniformly to get asphalt for road.
Embodiment 4:
1, a kind of asphalt of physical modification red mud substitution miberal powder, by mass percentage, including following component: 0- 20%, the 10-15cm's that gathers materials of 40%, the 5-10cm that gathers materials of 5cm gathers materials 30%, No. 70 matrix bi tumenf orr oads 4.5%, object Changed red mud 5.5% is managed, described to gather materials using basalt, all technical meets " standard specification for construction and acceptance of highway asphalt pavement " Related request in (JTG F40-2004).Asphalt type: AC-20.
Red mud used in the physical modification red mud is Bayer process red mud, and modified material is modified material, flyash, water Mud, blast-furnace cinder, white clay and carbide slag, mass ratio 1:3:3:3.5:5:2.
The physical modification red mud is the mixture of red mud and modified material, and the mass ratio of red mud and modified material is 1: 0.1。
2, the asphalt of above-mentioned physical modification red mud substitution miberal powder the preparation method is as follows:
(1) Bayer process red mud is carried out routine first to be crushed, is then placed in 105 DEG C of baking ovens dry 3h and removes moisture removal, it Afterwards using high-speed breakage crusher machine 2min it is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to filling out The required partial size of material;
(2) a certain amount of modified material is poured into water, is stirred under 100-300 revs/min of revolving speed with reinforcement blender It mixes them thoroughly within 20 minutes, wherein the mass ratio of the quality of modified material and water is 0.1:1;
(3) red mud that a certain amount of step (1) obtains is poured into modified material aqueous solution, with reinforcement blender in 100- It stirs 20 minutes and mixes them thoroughly under 300 revs/min of revolving speed, wherein red mud and the mass ratio of modified material are 1:0.1;
(4) it in order to which by the moisture removal in mixed serum, well-mixed changed red mud slurries are poured into bottle,suction, takes out 3min is filtered, is put into togerther filter paper and filter residue after the completion of suction filtration 3 hours dry in the baking oven that temperature is 105 DEG C;
(5) filter paper and filter residue are taken out, filter residue is removed from filter paper, and high-speed breakage crusher machine is used to filter residue 3min is levigate into " standard specification for construction and acceptance of highway asphalt pavement " (JTG F40-2004) to partial size required by filler, at this time To the physical modification red mud.
(6) physical modification red mud described in step (3) is dried under the conditions of 105 DEG C 3h and removes moisture removal, mixed as pitch The substitution filler of material.
(7) coarse aggregate and fine aggregate are preheated into 1h under the conditions of 160-180 DEG C, it is spare as gathering materials for asphalt;
(8) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, are done under the conditions of 160-180 DEG C 30s is mixed, so that thickness is gathered materials and is pre-mixed.
(9) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, is then added in thickness is gathered materials according to match ratio It is reused after the road matrix pitch of the parts by weight and mixes pot stirring 1-3min until uniformly;
(10) filler after preheating in step (6) is added in mixture prepared in step (9) and is stirred with mixing pot 30s is until uniformly to get asphalt for road.
The common red mud of comparative example 1
Raw material proportioning and the preparation method is the same as that of Example 1, the difference is that, it is red mud from sintering process that red mud, which uses, not plus Enter modified material.
Comparative example 2AC-20
Raw material proportioning and the preparation method is the same as that of Example 1, the difference is that, red mud is using ground granulated blast furnace slag replacement.
Performance test:
In order to evaluate the performance of physical modification red mud asphalt, while it is identical as raw material to be prepared for a kind of gradation, Asphalt sample as a comparison using limestone mineral powder as filler.Referring to " highway engineering pitch and asphalt examination Test regulation " experiment process of (JTG E20-2011), integral strength, high-temperature behavior, low has been carried out to above-mentioned 5 kinds of asphalts The evaluation of warm nature energy, water stability, specific evaluation index are shown in Table 1
Table 1
By the above the performance test results it can be seen that passing through progress after (1) addition physical modification red mud prepared by the present invention The freeze-thaw split intensity ratio and immersion residual stability for the asphalt that indirect tensile test on frozen-thaw and immersion Marshall test obtain It significantly improves, illustrates that physical modification red mud prepared by the present invention can effectively improve the water stability of asphalt.(2) it is added After physical modification red mud prepared by the present invention, the asphalt that the girder bend test by carrying out asphalt obtains is most Macrobending strain significantly improves, illustrate physical modification red mud prepared by the present invention can effectively improve asphalt low temperature it is anti- Fragility.(3) it after physical modification red mud prepared by the present invention being added, is obtained by carrying out Marshall stability test and wheel tracking test Asphalt Marshall stability and dynamic stability significantly improve, illustrate that physical modification red mud prepared by the present invention can be with Effectively improve the high-temperature stability of asphalt.
Finally it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not limited to this hair It is bright, although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still It can modify to technical solution documented by previous embodiment, or part is equivalently replaced.It is all in this hair Within bright spirit and principle, any modification, equivalent replacement, improvement and so on should be included in protection scope of the present invention Within.Above-mentioned, although specific embodiments of the present invention have been described, and it is not intended to limit the protection scope of the present invention, institute Category field technical staff should be understood that based on the technical solutions of the present invention those skilled in the art do not need to pay wound The various modifications or changes that the property made labour can be made are still within protection scope of the present invention.

Claims (10)

1. a kind of for replacing the physical modification red mud of miberal powder, which is characterized in that the following raw material composition: red mud, modified material, two The weight proportion of person is 1:0.1~0.5;
The red mud is at least one of red mud from sintering process or Bayer process red mud;
The modified material is calcium hydroxide, flyash, cement, blast-furnace cinder, white clay and carbide slag, and mass ratio is 1:2~3:1 ~3:3~5:2~6:1~5.
2. red mud as described in claim 1, which is characterized in that the red mud carries out after drying levigate processing, and granularity meets " public Road Asphalt Pavement Construction Technique specification " requirement in (JTGF40-2004) one to filler, and appearance is agglomerated without granule.
3. a kind of preparation method of any of claims 1 or 2 for the physical modification red mud instead of miberal powder, which is characterized in that Include:
Red mud is crushed, it is dry, it is then levigate right into " standard specification for construction and acceptance of highway asphalt pavement " (JTGF40-2004) Partial size required by filler obtains levigate red mud;
Modified material is poured into water, is uniformly mixed, obtains modified material aqueous solution;
Above-mentioned levigate red mud is poured into modified material aqueous solution, is uniformly mixed, obtains changed red mud slurries;
By changed red mud slurries into dehydration, drying, it is crushed, is levigate to " standard specification for construction and acceptance of highway asphalt pavement " (JTGF40- 2004) to partial size required by filler to get physical modification red mud in.
4. the method as described in claim 1, which is characterized in that the mass ratio of the quality of the modified material and water is 0.1 ~0.4:1.
5. the method as described in claim 1, which is characterized in that the dehydration is by the way of filtering.
6. the method as described in claim 1, which is characterized in that the drying condition is dry 1 in 101~105 DEG C of baking ovens ~3h.
7. a kind of asphalt preparation method using physical modification red mud substitution miberal powder characterized by comprising
(1) physical modification red mud of any of claims 1 or 2 is dried, the substitution filler as asphalt;
(2) coarse aggregate and fine aggregate are preheated, it is spare as gathering materials for asphalt;
(3) matrix pitch or modified pitch preheating 1-3h are made into its thawing;
(4) coarse aggregate centainly matched and fine aggregate are placed in asphalt to mix in pot, dry mixing, so that thickness is gathered materials and is premixed It closes;
(5) road matrix pitch is heated into 1-2h under the conditions of 135 DEG C, be then added in thickness is gathered materials according to match ratio described in It is reused after the road matrix pitch of parts by weight and mixes pot stirring 1-3min until uniformly;
(6) filler after preheating in step (1) is added in mixture prepared in step (3) and is stirred using mixing and stirring pot 30-60s is until uniformly to get asphalt for road.
8. the method for claim 7, which is characterized in that the type of the asphalt is AC-13, AC-20, AC- 25 or SMA-13.
9. the method for claim 7, which is characterized in that the preheating temperature gathered materials is 160-180 DEG C, matrix pitch or changes Property pitch preheating temperature be 140-160 DEG C.
10. the asphalt of the described in any item method preparations of claim 7-9.
CN201910009205.9A 2019-01-04 2019-01-04 A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder Active CN109503032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910009205.9A CN109503032B (en) 2019-01-04 2019-01-04 A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910009205.9A CN109503032B (en) 2019-01-04 2019-01-04 A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder

Publications (2)

Publication Number Publication Date
CN109503032A true CN109503032A (en) 2019-03-22
CN109503032B CN109503032B (en) 2019-07-26

Family

ID=65756177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910009205.9A Active CN109503032B (en) 2019-01-04 2019-01-04 A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder

Country Status (1)

Country Link
CN (1) CN109503032B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110317463A (en) * 2019-08-07 2019-10-11 太原理工大学 A kind of more partial size red mud modified pitch, preparation method, the asphalt using the modified pitch
CN110642555A (en) * 2019-10-15 2020-01-03 山东大学 Red mud-based nano anti-stripping agent and preparation method and application thereof
CN111499240A (en) * 2020-03-16 2020-08-07 山东大学 Red mud fiber composite material, preparation method thereof and application thereof in modified asphalt
CN111499247A (en) * 2020-04-24 2020-08-07 山东大学 Red mud-silicate composite anti-aging agent, asphalt mixture and preparation method and application thereof
CN112010586A (en) * 2020-08-25 2020-12-01 广西路建工程集团有限公司 Red mud desalted sea sand AC-16 asphalt mixture and preparation method thereof
CN112250348A (en) * 2020-11-18 2021-01-22 同济大学 Porous red mud asphalt pavement material for purifying runoff pollutants and preparation and application thereof
CN113354309A (en) * 2021-04-09 2021-09-07 中铝山东环保科技有限公司 Modified red mud powder and preparation method thereof
CN113880478A (en) * 2019-06-26 2022-01-04 海南蓝岛环保产业股份有限公司 Mineral powder for asphalt concrete and preparation method and application thereof
CN115087707A (en) * 2021-05-07 2022-09-20 德州学院 Method for preparing composite pigment filler for coating by using red mud

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1844029A (en) * 2006-04-28 2006-10-11 武汉理工大学 Red mud autoclaved brick and preparation method thereof
CN101215142A (en) * 2008-01-04 2008-07-09 华中科技大学 Bayer process red mud composite brick and producing method thereof
CN103693924A (en) * 2013-12-10 2014-04-02 同济大学 Bayer-process red mud doped dry-mixed plastering mortar and use method thereof
CN105753375A (en) * 2016-02-29 2016-07-13 河南城建学院 Asphalt mixture taking red mud as filler and preparation method thereof
CN107722649A (en) * 2017-09-18 2018-02-23 同济大学 A kind of modified pitch and its preparation and application

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1844029A (en) * 2006-04-28 2006-10-11 武汉理工大学 Red mud autoclaved brick and preparation method thereof
CN101215142A (en) * 2008-01-04 2008-07-09 华中科技大学 Bayer process red mud composite brick and producing method thereof
CN103693924A (en) * 2013-12-10 2014-04-02 同济大学 Bayer-process red mud doped dry-mixed plastering mortar and use method thereof
CN105753375A (en) * 2016-02-29 2016-07-13 河南城建学院 Asphalt mixture taking red mud as filler and preparation method thereof
CN107722649A (en) * 2017-09-18 2018-02-23 同济大学 A kind of modified pitch and its preparation and application

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113880478A (en) * 2019-06-26 2022-01-04 海南蓝岛环保产业股份有限公司 Mineral powder for asphalt concrete and preparation method and application thereof
CN110317463A (en) * 2019-08-07 2019-10-11 太原理工大学 A kind of more partial size red mud modified pitch, preparation method, the asphalt using the modified pitch
CN110642555A (en) * 2019-10-15 2020-01-03 山东大学 Red mud-based nano anti-stripping agent and preparation method and application thereof
CN111499240A (en) * 2020-03-16 2020-08-07 山东大学 Red mud fiber composite material, preparation method thereof and application thereof in modified asphalt
CN111499240B (en) * 2020-03-16 2022-02-22 山东大学 Red mud fiber composite material, preparation method thereof and application thereof in modified asphalt
CN111499247A (en) * 2020-04-24 2020-08-07 山东大学 Red mud-silicate composite anti-aging agent, asphalt mixture and preparation method and application thereof
CN111499247B (en) * 2020-04-24 2021-06-22 山东大学 Red mud-silicate composite anti-aging agent, asphalt mixture and preparation method and application thereof
CN112010586A (en) * 2020-08-25 2020-12-01 广西路建工程集团有限公司 Red mud desalted sea sand AC-16 asphalt mixture and preparation method thereof
CN112250348A (en) * 2020-11-18 2021-01-22 同济大学 Porous red mud asphalt pavement material for purifying runoff pollutants and preparation and application thereof
CN113354309A (en) * 2021-04-09 2021-09-07 中铝山东环保科技有限公司 Modified red mud powder and preparation method thereof
CN113354309B (en) * 2021-04-09 2022-08-30 中铝山东环保科技有限公司 Modified red mud powder and preparation method thereof
CN115087707A (en) * 2021-05-07 2022-09-20 德州学院 Method for preparing composite pigment filler for coating by using red mud
WO2022233039A1 (en) * 2021-05-07 2022-11-10 德州学院 Method for preparing composite pigment filler for coating by using red mud

Also Published As

Publication number Publication date
CN109503032B (en) 2019-07-26

Similar Documents

Publication Publication Date Title
CN109503032B (en) A kind of asphalt and preparation method thereof of physical modification red mud substitution miberal powder
CN110104997A (en) A kind of regeneration concrete and its production technology
CN101544480B (en) Admixture of active powder of ball milling steel slag tailing slurry and application thereof in preparing concrete
CN103951333B (en) Cellular concrete prepared by a kind of road waste aggregate and preparation technology
CN106009719A (en) Plant-mixed warm recycled asphalt mixture and preparation method thereof
CN107352864A (en) One kind is modified non-burning brick and preparation method thereof
CN101468905A (en) Red mud unburned brick and preparation thereof
CN104086131B (en) Road pavements that building waste is prepared with agstone compound and preparation method thereof
CN104003661B (en) A kind of permeable reclaimed asphalt mixture pavior brick and preparation method thereof
CN103159448A (en) Preparation method for artificial fish reef concrete material with slag as main raw material
CN106007563A (en) Ecological and environmental protection type pervious concrete prepared from waste concrete
CN109354430A (en) A kind of Diacel cement for concrete wraps up in slurry aggregate and the preparation method and application thereof
CN102503196A (en) Method for preparing cement clinker by using waste concrete
CN104355574B (en) The road pavements manufactured with building waste and flyash and manufacture method thereof
CN104072069A (en) Baking-free brick using coal gangue and red mud as main materials, and preparation method for baking-free brick
CN104016601B (en) The method that industrial residue sludge produces cement cementitious material
CN108516740A (en) Concrete containing electrolytic manganese residues and preparation method thereof, concrete road surface
CN103044936B (en) A kind of gangue asphalt modifier, modified asphalt mixture and preparation method thereof
CN110078415A (en) A kind of domestic garbage incineration flyash base asphalt modifier, modified asphalt mixture and preparation method thereof
CN105801049B (en) The preparation method of rubber asphalt concrete
CN108083729A (en) A kind of concrete being combined by slag as aggregate and preparation method thereof
CN108341624B (en) A method of bituminous concrete is made using domestic garbage incineration flyash
CN111302728A (en) Pavement brick produced by industrial waste residues and production method thereof
CN112408862B (en) Asphalt concrete
CN109704384B (en) Preparation method of anhydrous calcium chloride

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant