CN109494878A CN201811503966.1A CN201811503966A CN109494878A CN 109494878 A CN109494878 A CN 109494878A CN 201811503966 A CN201811503966 A CN 201811503966A CN 109494878 A CN109494878 A CN 109494878A
Authority
CN
China
Prior art keywords
data
remote signalling
report
remote
monitoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811503966.1A
Other languages
Chinese (zh)
Inventor
袁嘉博
孙蕊
夏威
顾黎强
王沁
张麟
沈健
陈志樑
奚曹明
张晋
吴士敏
盛佳蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201811503966.1A priority Critical patent/CN109494878A/en
Publication of CN109494878A publication Critical patent/CN109494878A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0017

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The intelligence based on electric power monitoring system blended data that the invention discloses a kind of is checked and method of disposal, study the data call relationship between each system application of electric power monitoring system, the data relationship between each system application, advanced application is analyzed, the data source relational tree of electric power monitoring system, network security management system is formed;Analyze electric power monitoring system data acquisition information, including information such as telemetering, remote signalling, remote control and alarms, the standardization process of data source change is formed, the present invention realizes the functions such as process is realized automatically, process intelligently generates, result actively differentiates, abnormal Real-time Alarm in dispatching automation O&M, debugging process.

Description

A kind of intelligence check and method of disposal based on electric power monitoring system blended data
Technical field
The present invention relates to the dispatching automation debugging technique fields of electric power monitoring system, in particular to a kind of to be supervised based on electric power The intelligence for controlling System Admixture Data is checked and method of disposal.
Background technique
Electric power monitoring system detects for real-time data acquisition, the switch state of dispatching automation and long-range control provides base Plinth platform, major function have telemetering, remote signalling, remote control and communication etc..But in actual operation, dispatching automation debugs work Work is related to that each system, equipment are numerous, and the importance of especially secondary security protection is outstanding day by day, and the access of network security management system must not It can lack.Debugging efforts are cumbersome simultaneously, cannot judge and position rapidly when something goes wrong.
Summary of the invention
The intelligence based on electric power monitoring system blended data that the purpose of the present invention is to provide a kind of is checked and method of disposal, The data call relationship between each system application of electric power monitoring system is studied, the number between each system application, advanced application is analyzed According to relationship, the data source relational tree of electric power monitoring system, network security management system is formed;Analysis electric power monitoring system data are adopted Collect the information such as information, including telemetering, remote signalling, remote control and alarm, the standardization process of data source change is formed, in dispatching automation The functions such as process is realized automatically, process intelligently generates, result actively differentiates, abnormal Real-time Alarm are realized in O&M, debugging process.
In order to achieve the above object, the invention is realized by the following technical scheme:
It is a kind of in electric power monitoring system blended data intelligence check and method of disposal, include following procedure:
Intelligent check and disposition are carried out to the telemetry in the master of Automation of Electric Systems, plant stand joint debugging, include: operation Intelligence is checked and treatment procedures, and by comparing, whether multiplex telemetering data are consistent and whether data transmission period meets It is required that judge whether telemetry passes through;
And/or intelligent check and disposition, packet are carried out to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging Contain: operation intelligence is checked and treatment procedures, and whether confirmation remote signalling point number is consistent with remote signalling ID, and obtains main in electric power monitoring system It stands all initial remote signalling states that should adopt equipment in side, is stored in for subsequent comparison and analysis in database, and before obtaining main website side The message data that data and plant stand side are uploaded by longitudinal encryption in machine is set, remote signalling Bitwise is compared and whether point number is consistent, To judge whether remote signalling parameter evidence passes through;
And/or intelligent check and disposition, packet are carried out to the remote-control data in the master of Automation of Electric Systems, plant stand joint debugging Contain: operation intelligence is checked and treatment procedures, and whether confirmation remote control point number and remote control ID are consistent, and obtains main in electric power monitoring system It stands all initial remote signalling states that should adopt equipment in side, is stored in database for subsequent comparison and analysis, and is preset by being remotely controlled And after executing, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, remote signalling is compared and becomes Whether position state and point number are consistent, to judge whether remote-control data passes through.
Preferably, intelligent check and disposition are carried out to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging In the process, it further includes:
S1, operation intelligence is checked and treatment procedures;
S2, the message translation data that real-time telemetry data and plant stand in front end processor upload are read, recording real-time data refreshes Time and Quality Codes;
S3, when detecting that channel or message upload data and have refreshing, then compare whether multiplex telemetering data one are shown And channel telemetry and message data it is whether consistent: when data error≤1%, then generate normal data report, illustrate to adjust It pinged;As data error > 1%, if then channel is exited at this time, generates warning information or be not that channel is exited at this time But data transmission period is greater than 4s and then generates warning information, and generates abnormal data report, illustrates that debugging does not pass through;
S4, after normal data report and abnormal data report are integrated into complete comparing report, journey is continued to execute Sequence detects whether the variation transmission of other telemetering amounts, if so, continuing step S1, circulation is carried out, until completing all telemeterings The check and disposition of data, enter step S5;
S5, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
Preferably, intelligent check and disposition are carried out to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging In the process, it further includes:
T1, operation intelligence is checked and treatment procedures;
Whether T2, confirmation remote signalling point number and remote signalling ID correspond and correctly: if so, T3 is entered step, if it is not, generating different Constant it was reported that;
T3, obtain electric power monitoring system in all initial remote signalling states that should adopt equipment in main website side, be stored in database in For subsequent comparison and analysis;
T4, the initial remote signalling data that the initial remote signalling state and the plant stand side that obtain in the step S3 upload is compared Compared with: if the two original state is consistent, enter step T5;If the two original state is inconsistent, analysis is the original that channel is exited Cause or other reasons, and generate abnormal data report;
T5, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling Whether Bitwise is consistent with point number: if so, generating normal data report;If it is not, then generating abnormal data report;
T6, after normal data report and abnormal data report are integrated into complete comparing report, journey is continued to execute Sequence detects whether the variation transmission of other remote signalling amounts, if so, continuing step T1, circulation is carried out, until completing all remote signalling The check and disposition of amount, enter step T7;
T7, final comparison report are uploaded to work station, analyze and handle for automatically working personnel.
Preferably, it is further included in the step T5:
If remote signalling Bitwise and point number are inconsistent, judge whether main website side multichannel remote signalling displacement is consistent: if so, Then generate abnormal data report;If it is not, then continuing to judge to conjugate whether remote signalling data is error signal, if remote signalling displacement data are to miss Signal then generates abnormal data report, if remote signalling displacement data are not error signals, judge whether it is that channel is exited, finally will Abnormal data report is written in comparison result.
Preferably, intelligent check and disposition are carried out to the remote-control data in the master of Automation of Electric Systems, plant stand joint debugging In the process, it further includes:
P1, operation intelligence is checked and treatment procedures;
P2, it reads parameter and confirms whether remote control point number and remote control ID correspond and correctly, if so, entering step P3, if it is not, generating abnormal data report;
P3, obtain electric power monitoring system in all initial remote signalling states that should adopt equipment in main website side, be stored in database in For subsequent comparison and analysis;
P4, the initial remote signalling data that the initial remote signalling state and the plant stand side that obtain in the step P3 upload is compared Compared with entering step P5 if original state is consistent;If original state is inconsistent, analysis be the reason of channel is exited or its His reason generates abnormal data report;
P5, remote control is preset and executes: after remote control is preset and runs succeeded, P6 is entered step, when remote control is preset and executes At failure, then assert it is that channel is exited and generates abnormal data report;
P6, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling Whether Bitwise is consistent with point number: if (1) consistent, generating normal data report;(2) if it is inconsistent, generating different Constant it was reported that;
P7, after normal data report and abnormal data report are integrated into complete comparing report, journey is continued to execute Sequence, detects whether the variation transmission of other remote control amounts, if so, continuing step P1, until last all channels have all been remotely controlled Bi Hou enters step P8;
P8, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
Preferably, it is further included in the step P6:
When comparing remote signalling Bitwise and point number is inconsistent, judge whether that remote control dislocation occurs: if judging result is distant Control dislocation then generates abnormal data report;If judging result is not remote control dislocation, at this point, if conjugating the time is greater than 10s, Abnormal data report is generated to continue to analyse whether that reason is exited in channel, will finally analyze knot if the displacement time is not more than 10s Abnormal data report is written in fruit.
Preferably, anti-interference mechanism is introduced in the step P6, it is accidentally distant to prevent channel switching or configuration error from generating Control.
Compared with prior art, the invention has the benefit that the present invention by combing data between correlation and Sequentially, judge the integrality and correctness of data in automation O&M and debugging process, form electric power monitoring system data source and become Standardization process more realizes that O&M and the automatic realization of debugging process, process intelligently generate, result actively differentiates, abnormal real When alarm etc. functions.
Detailed description of the invention
Fig. 1 intelligence of the invention based on electric power monitoring system blended data is checked and the signal for the treatment of procedures network structure Figure;
The intelligence of telemetry is checked and disposal process in the master of Automation of Electric Systems Fig. 2 of the invention, plant stand joint debugging Schematic diagram;
In the master of Automation of Electric Systems of the invention Fig. 3 of the invention, plant stand joint debugging the intelligence of remote signalling data check and Disposal process schematic diagram;
In the master of Automation of Electric Systems of the invention Fig. 4 of the invention, plant stand joint debugging the intelligence of remote-control data check and Disposal process schematic diagram;
Multichannel remote signalling data Fig. 5 of the invention compares schematic diagram.
Specific embodiment
In order to keep the present invention more obvious and easy to understand, the present invention is done furtherly below in conjunction with the drawings and specific embodiments It is bright.
As shown in Figure 1, the intelligence of the invention based on electric power monitoring system blended data is checked and method of disposal passes through electricity Power monitoring system data analysis (data acquisition information includes the information such as telemetering, remote signalling, remote control and alarm) and network security management Syslog analysis forms the data source relational tree of electric power monitoring system, network security management system.Main website, power supply company side electricity Power monitoring system uses D5000 system as technical support, by the various ways such as RTU and computer communication to real-time, history It is acquired and handles with alarm data, realize the monitoring and control to electric power monitoring system real-time running state.Network security Supervising platform runs on the safe area II using C/S framework, and disposes acquisition module in the acquisition device in the area I, II, main website, and acquisition comes From operation information, operation information and the warning information of safety equipment, host equipment and the network equipment in electric power monitoring system, And uniformly summarize acquisition data to the area II Platform Server, showed by man-machine work station concentration.
Meanwhile on the basis of the analysis of electric power monitoring system data and network security management system log analysis, research electricity The Automatic implementation of power monitoring system debugging process and the information and network security management system for studying electric power monitoring system The coordinated scheme aimed at day in three distant function debugging automatic sequences controls, realized in dispatching automation O&M, debugging efforts The functions such as Cheng Zidong is realized, process intelligently generates, result actively differentiates, abnormal Real-time Alarm.The plant stand side report that the present invention obtains Text, is the data message transmitted by longitudinal encryption device, and the message format and data content of network supervision platform are lower single orders The primary study content of section.Network security supervising platform can save as txt text document to specification monitoring result, define its portion Cellular is as follows: [time] transmission direction (measures type): (data type, data amount check, transmission are former for message source code and parsing Cause, point number, value);Such as:
[10 11:10:50 2018 of Wed Oct] sends (telemetering): 685A3ED16802 0D < data type: short floating-point Number>0A<data amount check: 10>03000100<transmission reason: being sent in active>104000AC30B64000<15:5.693>;
[10 11:10:51 2018 of Wed Oct] sends (remote signalling): 01 < data type of 68160E000A00: single-point letter Breath>03<data amount check: 3>0,300 0100<transmission reason: being sent in active>01000001<1:1>02000001<2:1> 03000001<3:1>;
[10 11:10:51 2018 of Wed Oct] sends (remote control): 680E12000E00 2E < data type: two point life Enable>01<data amount check: 1>0,600 0100<transmission reason: activation>01000081<1:1>.
Embodiment one:
Telemetering, that is, distant place measurement, is transmitted to remote main website layer for the close-in measurement value of substation level to realize long distance Technology from measurement.Telemetry is generally divided into short floating-point number and normalized value.
As shown in Fig. 2, telemetering ID is to automatically generate, therefore only need manual entry point number, and guarantee with plant stand end one Cause property.If inconsistent, because of the uniqueness of telemetering ID and point number, can by software program judge generate alarm, the later period by Manual intervention.For telemetry, data transmission channel is divided into special line channel and data Netcom road, therefore it is required that different logical The data error that road transmits is no more than 1%, while data transmission period should not exceed 4s.
From the foregoing, it will be observed that the intelligence of telemetry is checked and is located in the master of Automation of Electric Systems of the invention, plant stand joint debugging It is specific as follows to set method:
S1, the operation intelligence of the invention based on electric power monitoring system blended data is checked and treatment procedures.
S2, software program read parameter (the message translation number that real time data and plant stand upload i.e. in reading front end processor first According to), recording real-time data refresh time and Quality Codes.
S3, when detecting that channel or message upload data and have refreshing, then compare whether multiplex telemetering data one are shown And channel telemetry and message data it is whether consistent: generate data report 1 if consistent (i.e. data error≤1% when), I.e. by comparison result write-in normal data report, illustrates that this telemetry is debugged and pass through;If inconsistent (i.e. data error When > 1%) if then at this time channel exit and generate warning information or be not channel exit but data transmission period be greater than 4s then generates warning information, and record point number, telemetering ID, Refresh Data time, numerical value, Quality Codes etc., data report 2 is generated, I.e. by comparison result write-in abnormal data report, illustrates that this telemetry is debugged and do not pass through.
S4, normal data report (data report 1, qualified comparison report) and abnormal data are reported (data report 2, Underproof comparison report) be integrated into complete comparing report after, continue to execute program, detected whether other telemetering amounts Variation transmission, if so, continuing step S1, circulation is carried out, until the check and disposition of all telemetries are completed, into step Rapid S5.
S5, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
Embodiment two:
Remote signalling, that is, distant place status signal gives the status signal Long Distant Transmit of the equipment of substation level to main website side.Remote signalling State generally uses binary number " 0 " and " 1 ", represents state " dividing " (exiting) and " conjunction " (investment).For displacement remote signalling state, together The being consistent property of data and synchronism, data transmission period that sample requires different channel transfers to come should not exceed 3s.It conjugates distant Letter data divides position signal and protection signal again, and program can be by time series, the judgement of remote signalling ID and remote signalling point number, automatically Discriminant classification, while meeting different remote signalling displacement conditions.
Wherein, in obtaining displacement remote signalling state procedure, present invention introduces anti-interference mechanism, because in practical debugging process In, plant stand end is possible to carry out other electrical tests, to prevent generating interference to debugging process.Anti-interference mechanism is a plurality of distant when having When letter displacement data upload, discriminated whether according to the accuracy of the uniqueness and sequence of event of point number and remote signalling ID Pass through.
Shown in combining such as Fig. 3 and Fig. 5, remote signalling data in the master of the Automation of Electric Systems in the present invention, plant stand joint debugging Intelligence is checked and method of disposal is specific as follows:
T1, the operation intelligence of the invention based on electric power monitoring system blended data is checked and treatment procedures;
Whether T2, confirmation remote signalling point number and remote signalling ID correspond and correctly: if so, T3 is entered step, if it is not, then giving birth to At data report 2 i.e. by comparison result write-in abnormal data report.
T3, obtain electric power monitoring system in all initial remote signalling states that should adopt equipment in main website side, be stored in database in For subsequent comparison and analysis.
T4, the initial remote signalling data that the initial remote signalling state and the plant stand side that obtain in the step S3 upload is compared Compared with: if the two original state is consistent, enter step T5;If the two original state is inconsistent, needing to analyze is that channel is exited The reason of or other reasons (such as substation level Equipment), if generating data report 2, i.e., for example, channel is exited By comparison result write-in abnormal data report.
T5, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling Whether Bitwise is consistent with point number: if (1) consistent, generating data report 1, i.e., normal data report is written in comparison result It accuses;(2) if it is inconsistent, continuing to judge whether main website side multichannel remote signalling displacement is consistent, (i) if it is data stand-off error Reason then generates data report 2, i.e., by comparison result write-in abnormal data report, (ii) is former if not data stand-off error Cause then judges to conjugate whether remote signalling data is that error signal (specifically includes: being error signal when remote signalling conjugates data, then generate data Report 2, i.e., by comparison result write-in abnormal data report;It is not error signal when remote signalling conjugates data, then judges whether to be channel It exits, finally by the report of comparison result write-in abnormal data).
T6, after normal data report and abnormal data report are integrated into complete comparing report, journey is continued to execute Sequence detects whether the variation transmission of other remote signalling amounts, if so, continuing step T1, circulation is carried out, until completing all remote signalling The check and disposition of amount, enter step T7.
T7, final comparison report are uploaded to work station, analyze and handle for automatically working personnel.
Embodiment three:
Remote control is distant place control, it is from main website side transmitting order to lower levels to realize the operation to substation level remote device.It is distant Control step is generally divided into preset remote control, remote control execution, is remotely controlled and returns to school.Remote control command has " dividing " and " conjunction ", uses binary zero respectively " 1 " represents.Remote control result is embodied with remote signalling state, so anti-interference mechanism has also been introduced in remote control process.
Meanwhile remote signalling table and digital control table triggering respective switch whether remote control, channel switching or configuration in order to prevent Mistake, which generates, to be accidentally remotely controlled, and is equally introduced anti-interference mechanism, is established preposition remote signalling by remote signalling table and define table and downlink remote information The strong relationship of one-to-one correspondence between table.
As shown in Fig. 4 and Fig. 5 combination, it is remotely controlled preset and execution as a result, being returned to school by remote control to analyze, influences result It is exited or other reasons (such as substation level Equipment) because being known as channel.The remote signalling state displacement time is general in remote control process No more than 10s, the being consistent property of data and synchronism that different channel transfers come are also required that, while remote control request difference is logical The switching in road is debugged, can it is all should adopt equipment remote-control after the completion of, switch different channels investment states, then batch is suitable again Sequence remote control.Distinct device is remotely controlled time interval, and the present invention is set as 70s, it is contemplated that the time that channel transfer and equipment execute is abundant Amount.
In remote control process, can be returned to school according to remote control with remote signalling displacement differentiates whether remote control succeeds.For example, preset fault Three times, a warning information is generated;Mistake of returning to school executes failure three times, generates a warning information;Remote signalling Bitwise is not Unanimously, a warning information is generated;By automatically switching channel module, the intelligent order switching in five channels is realized.
From the foregoing, it will be observed that the intelligence of remote-control data is checked and is located in the master of Automation of Electric Systems of the invention, plant stand joint debugging It is specific as follows to set method:
P1, the operation intelligence of the invention based on electric power monitoring system blended data is checked and treatment procedures;
P2, software program read parameter first, and whether confirmation remote control point number and remote control ID correspond and correctly, if so, P3 is then entered step, if it is not, data report 2 is generated, by comparison result write-in abnormal data report.
P3, obtain electric power monitoring system in all initial remote signalling states that should adopt equipment in main website side, be stored in database in For subsequent comparison and analysis.
P4, the initial remote signalling data that the initial remote signalling state and the plant stand side that obtain in the step P3 upload is compared Compared with entering step P5 if original state is consistent;If original state is inconsistent, analysis be the reason of channel is exited or its His reason (such as substation level Equipment), if generating data report 2, i.e., writing comparison result for example, channel is exited Enter abnormal data report.
P5, remote control is preset and executes: after remote control is preset and runs succeeded, P6 is entered step, when remote control is preset and executes At failure, it is concluded that channel is exited and generates data report 2, i.e., by comparison result write-in abnormal data report.
P6, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling Whether Bitwise is consistent with point number: if (1) consistent, generating data report 1 and normal data report is written in comparison result It accuses;(2) if it is inconsistent, continuing to determine whether that remote control dislocation occurs, (2-1) is generated if judging result is remote control dislocation Data report 2, i.e., by comparison result write-in abnormal data report;(2-2) if judging result be not remote control dislocation, at this point, if The time is conjugated greater than 10s, then generates data report 2, i.e., by comparison result write-in abnormal data report, if the displacement time is little In 10s, then continue to analyse whether that reason is exited in channel, will finally analyze result write-in abnormal data report.
P7, after normal data report and abnormal data report are integrated into complete comparing report, journey is continued to execute Sequence, detects whether the variation transmission of other remote control amounts, if so, continuing step P1, until last all channels have all been remotely controlled Bi Hou enters step P8.
P8, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
It is discussed in detail although the contents of the present invention have passed through above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (7)

1. a kind of intelligence based on electric power monitoring system blended data is checked and method of disposal, which is characterized in that this method includes Following procedure:
Intelligent check and disposition are carried out to the telemetry in the master of Automation of Electric Systems, plant stand joint debugging, include: operation intelligence It checks and treatment procedures, by comparing, whether multiplex telemetering data are consistent and whether data transmission period meets and want It asks, to judge whether telemetry passes through;
And/or intelligent check and disposition are carried out to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging, include: fortune Row intelligence is checked and treatment procedures, and whether confirmation remote signalling point number is consistent with remote signalling ID, and obtains main website side in electric power monitoring system All initial remote signalling states that should adopt equipment are stored in for subsequent comparison and analysis in database, and obtain main website side front end processor The message data that middle data and plant stand side are uploaded by longitudinal encryption, compares remote signalling Bitwise and whether point number is consistent, to Judge whether remote signalling parameter evidence passes through;
And/or intelligent check and disposition are carried out to the remote-control data in the master of Automation of Electric Systems, plant stand joint debugging, include: fortune Row intelligence is checked and treatment procedures, and whether confirmation remote control point number and remote control ID are consistent, and obtain main website side in electric power monitoring system All initial remote signalling states that should adopt equipment are stored in database for subsequent comparison and analysis, and by being remotely controlled preset and holding After row, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, remote signalling is compared and conjugates shape Whether state is consistent with point number, to judge whether remote-control data passes through.
2. the intelligence based on electric power monitoring system blended data is checked as described in claim 1 and method of disposal, feature exist In,
During carrying out intelligent check and disposition to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging, into one Step includes:
S1, operation intelligence is checked and treatment procedures;
S2, the message translation data that real-time telemetry data and plant stand in front end processor upload, recording real-time data refresh time are read And Quality Codes;
S3, when detecting that channel or message upload data and have refreshing, then it is whether consistent and logical to compare multiplex telemetering data Whether road telemetry is consistent with message data: when data error≤1%, then generating normal data report, illustrates that debugging is logical It crosses;As data error > 1%, if then channel is exited at this time, generates warning information or be not that channel is exited still at this time Data transmission period is greater than 4s and then generates warning information, and generates abnormal data report, illustrates that debugging does not pass through;
S4, after normal data report and abnormal data report are integrated into complete comparing report, program is continued to execute, is examined Whether have the variation of other telemetering amounts transmit, if so, continuing step S1, circulation is carried out if surveying, until completing all telemetries Check and disposition, enter step S5;
S5, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
3. the intelligence based on electric power monitoring system blended data is checked as described in claim 1 and method of disposal, feature exist In,
During carrying out intelligent check and disposition to the remote signalling data in the master of Automation of Electric Systems, plant stand joint debugging, into one Step includes:
T1, operation intelligence is checked and treatment procedures;
Whether T2, confirmation remote signalling point number and remote signalling ID correspond and correctly: if so, T3 is entered step, if it is not, generating abnormal number It was reported that;
T3, all initial remote signalling states that should adopt equipment in main website side in electric power monitoring system are obtained, be stored in database for rear It is continuous to compare and analyze;
T4, the initial remote signalling state obtained in the step S3 is compared with the initial remote signalling data that plant stand side uploads: if The two original state is consistent, then enters step T5;If the two original state is inconsistent, analysis be the reason of channel is exited or Other reasons, and generate abnormal data report;
T5, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling displacement Whether state is consistent with point number: if so, generating normal data report;If it is not, then generating abnormal data report;
T6, after normal data report and abnormal data report are integrated into complete comparing report, program is continued to execute, is examined Whether have the variation of other remote signalling amounts transmit, if so, continuing step T1, circulation is carried out if surveying, until completing all remote signalling amounts It checks and disposes, enter step T7;
T7, final comparison report are uploaded to work station, analyze and handle for automatically working personnel.
4. the intelligence based on electric power monitoring system blended data is checked as claimed in claim 3 and method of disposal, feature exist In,
It is further included in the step T5:
If remote signalling Bitwise and point number are inconsistent, judge whether main website side multichannel remote signalling displacement is consistent: if so, raw It is reported at abnormal data;If it is not, then continuing to judge to conjugate whether remote signalling data is error signal, if remote signalling displacement data are accidentally to believe Number, then abnormal data report is generated, if remote signalling displacement data are not error signals, judge whether it is that channel is exited, will finally compare To result write-in abnormal data report.
5. the intelligence based on electric power monitoring system blended data is checked as described in claim 1 and method of disposal, feature exist In,
During carrying out intelligent check and disposition to the remote-control data in the master of Automation of Electric Systems, plant stand joint debugging, into one Step includes:
P1, operation intelligence is checked and treatment procedures;
P2, it reads parameter and confirms whether remote control point number and remote control ID correspond and correctly, if so, P3 is entered step, if It is no, generate abnormal data report;
P3, all initial remote signalling states that should adopt equipment in main website side in electric power monitoring system are obtained, be stored in database for rear It is continuous to compare and analyze;
P4, the initial remote signalling state obtained in the step P3 is compared with the initial remote signalling data that plant stand side uploads, if Original state is consistent, then enters step P5;If original state is inconsistent, analysis is the reason of channel is exited or other are former Cause generates abnormal data report;
P5, remote control is preset and executes: after remote control is preset and runs succeeded, P6 is entered step, when remote control is preset and executes into mistake It loses, then assert it is that channel is exited and generates abnormal data report;
P6, the message data that data and plant stand side are uploaded by longitudinal encryption in the front end processor of main website side is obtained, compares remote signalling displacement Whether state is consistent with point number: if (1) consistent, generating normal data report;
(2) if it is inconsistent, generating abnormal data report;
P7, after normal data report and abnormal data report are integrated into complete comparing report, program is continued to execute, is examined Whether survey has the variation of other remote control amounts to transmit, if so, continue step P1, until after last all channels are all remotely controlled, Enter step P8;
P8, final comparison report is uploaded to work station, analyzes and handle for automatically working personnel.
6. the intelligence based on electric power monitoring system blended data is checked as claimed in claim 5 and method of disposal, feature exist In,
It is further included in the step P6:
When comparing remote signalling Bitwise and point number is inconsistent, judge whether that remote control dislocation occurs: if judging result is wrong for remote control Position then generates abnormal data report;If judging result is not remote control dislocation, at this point, being generated if the displacement time is greater than 10s Abnormal data report continues to analyse whether that reason is exited in channel, will finally analyze result if the displacement time is not more than 10s Abnormal data report is written.
7. such as the intelligence check and method of disposal described in claim 5 or 6 based on electric power monitoring system blended data, feature It is,
Anti-interference mechanism is introduced in the step P6, to prevent channel from switching or configuration error generation accidentally remote control.
CN201811503966.1A 2018-12-10 2018-12-10 A kind of intelligence check and method of disposal based on electric power monitoring system blended data Pending CN109494878A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811503966.1A CN109494878A (en) 2018-12-10 2018-12-10 A kind of intelligence check and method of disposal based on electric power monitoring system blended data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811503966.1A CN109494878A (en) 2018-12-10 2018-12-10 A kind of intelligence check and method of disposal based on electric power monitoring system blended data

Publications (1)

Publication Number Publication Date
CN109494878A true CN109494878A (en) 2019-03-19

Family

ID=65709666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811503966.1A Pending CN109494878A (en) 2018-12-10 2018-12-10 A kind of intelligence check and method of disposal based on electric power monitoring system blended data

Country Status (1)

Country Link
CN (1) CN109494878A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110009885A (en) * 2019-04-08 2019-07-12 郑州轨道交通信息技术研究院 A kind of method of real-time system alarm false alarm prevention
CN110531724A (en) * 2019-09-17 2019-12-03 国网辽宁省电力有限公司辽阳供电公司 A kind of automatic sample definition method of telemetering based on smart grid Dispatching Control System
CN112579628A (en) * 2020-12-07 2021-03-30 国网四川省电力公司天府新区供电公司 Power monitoring information autonomous checking system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850581A (en) * 2015-04-09 2015-08-19 国电南瑞科技股份有限公司 Multi-source data verification method for power dispatching automation system
CN107612998A (en) * 2017-09-19 2018-01-19 国电南瑞科技股份有限公司 A kind of transformer station's telemechanical forwarding remote data nucleus correcting system and method
CN108322374A (en) * 2018-02-28 2018-07-24 国电南瑞科技股份有限公司 A kind of boss station monitoring information check method based on wide-area services bus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850581A (en) * 2015-04-09 2015-08-19 国电南瑞科技股份有限公司 Multi-source data verification method for power dispatching automation system
CN107612998A (en) * 2017-09-19 2018-01-19 国电南瑞科技股份有限公司 A kind of transformer station's telemechanical forwarding remote data nucleus correcting system and method
CN108322374A (en) * 2018-02-28 2018-07-24 国电南瑞科技股份有限公司 A kind of boss station monitoring information check method based on wide-area services bus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆承宇等: "智能变电站远动信息快速校核方法", 《电力系统保护与控制》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110009885A (en) * 2019-04-08 2019-07-12 郑州轨道交通信息技术研究院 A kind of method of real-time system alarm false alarm prevention
CN110531724A (en) * 2019-09-17 2019-12-03 国网辽宁省电力有限公司辽阳供电公司 A kind of automatic sample definition method of telemetering based on smart grid Dispatching Control System
CN112579628A (en) * 2020-12-07 2021-03-30 国网四川省电力公司天府新区供电公司 Power monitoring information autonomous checking system and method

Similar Documents

Publication Publication Date Title
CN109494878A (en) A kind of intelligence check and method of disposal based on electric power monitoring system blended data
CN113112635B (en) Conventional inspection system for intelligent equipment
CN102110485B (en) Automated periodic surveillance testing method and apparatus in digital reactor protection system
CN110829595B (en) Intelligent power station relay protection equipment overhaul safety isolation measure execution method and system
CN112817280A (en) Implementation method for intelligent monitoring alarm system of thermal power plant
CN110535238A (en) A kind of transformer equipment intelligent monitor system and method
CN102140929A (en) Mine safety production inspection system
CN102880115A (en) Remote collaborative diagnosis system of numerical-control machine tool on basis of internet of things
CN110633901A (en) Intelligent substation relay protection device operation situation perception and remote maintenance system
CN206313530U (en) A kind of telecontrol system with on-line monitoring function
CN117171694B (en) Distribution scene safety identification system based on AI technology
CN111525689B (en) Accurate two location distribution terminal monitoring management system
CN116485212B (en) Safe operation management method and system for rail transit power supply equipment
CN115481941A (en) Multifunctional area combined intelligent security management method and system
CN113473261A (en) Prestressed engineering construction monitoring system and method based on Internet of things
CN110912915B (en) Communication safety early warning system based on data acquisition
CN111313966A (en) Centralized monitoring and early warning equipment based on optical fiber network maintenance
CN208848258U (en) A kind of smart lock for electric power data analysis
KR101553891B1 (en) Cyber security monitoring method and system of digital safety system in nuclear power plant
CN104579776B (en) A kind of smart grid maloperation analysis system based on non-interfering
CN211880401U (en) Centralized monitoring and early warning equipment based on optical fiber network maintenance
CN110211362A (en) A kind of mobile unit comprehensively monitoring and remote alarm method and system based on GPRS communication
CN113938370B (en) Operation and maintenance debugging system for intelligent fusion terminal of power distribution area
CN113067414B (en) Power distribution network information protection system based on LIRS algorithm and communication task management method
CN115188146B (en) Tablet personal computer electronic fence system based on UWB technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319