- CN109494626A CN109494626A CN201811270085.XA CN201811270085A CN109494626A CN 109494626 A CN109494626 A CN 109494626A CN 201811270085 A CN201811270085 A CN 201811270085A CN 109494626 A CN109494626 A CN 109494626A
- Authority
- CN
- China
- Prior art keywords
- guide wheel
- lateral guide
- wheel
- vertical frame
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The present invention relates to a kind of multi-functional cable directive wheels, including chassis and vertical frame, first longitudinal direction guide wheel and second longitudinal direction guide wheel are connected in the vertical frame, the lateral guide wheel of connection first on the chassis, the lateral guide wheel of setting second above described first lateral guide wheel, described second lateral guide wheel is fixed in vertical frame by scale, strip hole is set on the scale, one end of described second lateral guide wheel passes through strip hole and is fastened on scale by nut, by tightening nut, the distance between the adjustable second lateral guide wheel and the first lateral guide wheel.The configuration of the present invention is simple, it is convenient to use, can used aloned, can also combine use, realize multiple functions, meet various laying needs, moreover it is possible to which limiting power cable is detached from cable directive wheel, according to the specification of cable, the distance between the second lateral guide wheel and the first lateral guide wheel are adjusted by elastic hand nutting, to preferably control power cable, it is prevented to be detached from cable directive wheel.
Description
Technical field
The invention belongs to power cable construction tool field, especially a kind of multi-functional cable directive wheel.
Background technique
In power cable pipeline laying work progress, various cable directive wheels can be used, but in the market
Cable directive wheel function is relatively simple, can be only done a kind of effect substantially, and since power cable is generally relatively large in diameter, internal
The mostly strand copper wire of major diameter, it is not flexible, when using cable directive wheel operation, it is easy to move out, to deviate cable
At this moment directive wheel will affect the progress of construction, furthermore power cable can also move up and down on cable directive wheel, it is also possible to partially
From cable directive wheel, the progress of construction also will affect in this way.
Summary of the invention
It is an object of the invention in place of overcome the deficiencies in the prior art, provide a kind of structure it is simple, using safe more
Function cable directive wheel.
The present invention solves its technical problem and adopts the following technical solutions to achieve:
A kind of multi-functional cable directive wheel, including chassis and vertical frame connect first longitudinal direction guide wheel and second in the vertical frame
Longitudinal guide wheel, the lateral guide wheel of connection first on the chassis, the lateral guide wheel of setting second above the described first lateral guide wheel are described
Second lateral guide wheel is fixed in vertical frame by scale, and strip hole, one end of the described second lateral guide wheel are arranged on the scale
It is fastened on scale across strip hole by nut, by tightening nut, the adjustable second lateral guide wheel and first is laterally led
The distance between wheel, the hinged side frame in the side of the chassis are fixedly connected with third guide wheel, the same chassis of side frame on the side frame
Be detachably connected, the vertical frame be it is arc-shaped, the first cylinder is arranged in the side of vertical frame, and the second cylinder is arranged in the other side of vertical frame,
The first cylinder and the second cylinder are combined together by bolt, and application method is:
Power cable is placed between the second lateral guide wheel and the first lateral guide wheel in use, unclamping nut, according to electric power
The line footpath specification of cable adjusts distance between the second lateral guide wheel and the first lateral guide wheel, keeps it suitable by the numerical value of graduation mark
When needing shaft mouth operation, side frame is can be used in the power cable that should be laid at present, meet through the cooperation between the two, go into the well it is curved
Degree needs, and can additionally be cooperated by bolt, the first cylinder and the second cylinder, multiple cable directive wheels can be connected
Come, be used cooperatively, realizes multiple functions.
Moreover, graduation mark is arranged on the scale, according to the distance between the second lateral guide wheel and the first lateral guide wheel mark
Infuse number of division.
Moreover, the nut is hand nutting.
Moreover, the multiple cable directive wheel will be connected, it is used cooperatively, realizes multiple functions.
Moreover, the first longitudinal direction guide wheel, second longitudinal direction guide wheel, the second lateral guide wheel and the first lateral guide wheel are all I-shaped
Wheel.
The advantages and positive effects of the present invention are:
The configuration of the present invention is simple, be easy to use, can used aloned, can also combine uses, realize multiple functions, expire
The various layings of foot need, and pass through elastic hand according to the specification of cable moreover it is possible to limit power cable and be detached from cable directive wheel
Nutting adjusts the distance between the second lateral guide wheel and the first lateral guide wheel, to preferably control power cable, prevents it
It is detached from cable directive wheel.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is that side frame of the present invention uses schematic diagram;
Fig. 3 is the structural schematic diagram of the multiple connections of the present invention;
Fig. 4 is the multiple connection side schematic views of the present invention.
Figure label: 1, chassis;2, vertical frame;3, first longitudinal direction guide wheel;4, second longitudinal direction guide wheel;5, the first lateral guide wheel;
6, the second lateral guide wheel;7, scale;8, strip hole;9, nut;10, graduation mark;11, side frame;12, third guide wheel;13, the first circle
Cylinder;14, the second cylinder;15, bolt;16, power cable;17, piping shaft.
Specific embodiment
The invention will be further described with reference to the accompanying drawing and by specific embodiment, and following embodiment is descriptive
, it is not restrictive, this does not limit the scope of protection of the present invention.
As shown in Figs. 1-2, a kind of multi-functional cable directive wheel provided in an embodiment of the present invention, including chassis 1 and vertical frame 2,
First longitudinal direction guide wheel 3 and second longitudinal direction guide wheel 4 are connected in the vertical frame 2, the lateral guide wheel 5 of connection first, described on the chassis 1
The lateral guide wheel 6 of setting second above first lateral guide wheel 5, the described second lateral guide wheel 6 are fixed in vertical frame 2 by scale 7, institute
Setting strip hole 8 on scale 7 is stated, one end of the described second lateral guide wheel 6 passes through strip hole 8 and is fastened on scale 7 by nut 9
On, by tightening nut 9, the distance between the adjustable second lateral guide wheel 6 and the first lateral guide wheel 5 can be limited preferably
Power cable processed up and down and the movement of front and back, prevents power cable disengaging cable directive wheel, moreover it is possible to according to the specification of power cable,
The distance between the second lateral guide wheel 6 and first lateral guide wheel 5 are adjusted, it is made preferably limit that power cable is upper and lower and front and back
Movement, improves the efficiency of construction.
Graduation mark 10 is set on scale 7, according to the distance between the second lateral guide wheel 6 and the first 5 outer diameter of lateral guide wheel mark
Infuse number of division, can accurately according to the line footpath specification of power cable, adjust the second lateral guide wheel 6 and the first lateral guide wheel 5 it
Between distance, prevent power cable be detached from cable directive wheel.
Nut 9 is hand nutting, by using hand nutting can quickly and easily tightening nut 9, thus fast and easy
The lateral guide wheel 6 of adjusting second and the distance between the first lateral guide wheel 5.
The hinged side frame 11 in the side of chassis 1 is fixedly connected with third guide wheel 12 on the side frame, and the side frame 11 is the same as chassis 1
It is detachably connected, can be used in pipeline well head, side frame 11 is placed in well head, power cable passes through the first 5 He of lateral guide wheel
It will form certain radian when third guide wheel 12, to facilitate construction, also increase the function of this device.
Vertical frame 2 be it is arc-shaped, the first cylinder 13 is arranged in the side of the vertical frame 2, and the second cylinder is arranged in the other side of vertical frame 2
14, the first cylinder 13 and the second cylinder 14 are combined together by bolt 15, and multiple cable directive wheels is made to link together cooperation
It uses, increases the function of this device, realize multi-purpose content.
Preferably, the lateral guide wheel 6 of the first longitudinal direction guide wheel 3, second longitudinal direction guide wheel 4, second and the first lateral guide wheel 5 be all
For I-beam wheel, I-beam wheel can also limit power cable sideslip to a certain extent.
The working principle of the invention and process for using: power cable is placed in the second lateral guide wheel in use, unclamping nut 9
6 and first between lateral guide wheel 5, according to the line footpath specification of power cable, pass through the numerical value of graduation mark, adjust the second lateral guide wheel
6 and first distance between lateral guide wheel 5, the power cable that the adaptation for keeping its best is laid at present can when needing shaft mouth operation
To use side frame 11, meet the camber needs gone into the well through the cooperation between the two, can additionally pass through bolt 15, the first cylinder
13 and the second cylinder 14 cooperate, multiple cable directive wheels can be connected, be used cooperatively, realize multiple functions.
Although disclosing the embodiment of the present invention and attached drawing for the purpose of illustration, those skilled in the art can be managed
Solution: do not departing from the present invention and spirit and scope of the appended claims in, various substitutions, changes and modifications be all it is possible,
Therefore, the scope of the present invention is not limited to the embodiment and attached drawing disclosure of that.
Claims (5)
1. a kind of multi-functional cable directive wheel, including chassis (1) and vertical frame (2), first longitudinal direction guide wheel is connected on the vertical frame (2)
(3) and second longitudinal direction guide wheel (4), the lateral guide wheel (5) of connection first on the chassis (1), it is characterised in that: described first laterally
The lateral guide wheel (6) of setting second above guide wheel (5), the described second lateral guide wheel (6) are fixed on vertical frame (2) by scale (7),
Strip hole (8) are set on the scale (7), one end of the described second lateral guide wheel (6) passes through strip hole (8) and passes through nut (9)
It is fastened on scale (7), by tightening nut (9), between the adjustable second lateral guide wheel (6) and the first lateral guide wheel (5)
Distance, the hinged side frame in side (11) of the chassis (1) is fixedly connected with third guide wheel (12), the side frame on the side frame
(11) same to chassis (1) is detachably connected, the vertical frame (2) be it is arc-shaped, the first cylinder (13), vertical frame is arranged in vertical frame (2) side
(2) the other side is arranged the second cylinder (14), and the first cylinder (13) and the second cylinder (14) are combined together by bolt (15),
Its application method is: power cable being placed in the second lateral guide wheel (6) and the first lateral guide wheel (5) in use, unclamping nut (9)
Between, it adjusts the second lateral guide wheel (6) and first by the numerical value of graduation mark according to the line footpath specification of power cable and laterally leads
Both distance between (5) is taken turns, the power cable laid at present is adapted it to, when needing shaft mouth operation, using side frame (11), pass through
Cooperation, meet the camber needs gone into the well.
2. multi-functional cable directive wheel as described in claim 1, it is characterised in that: graduation mark is arranged on the scale (7)
(10), according to the distance between the second lateral guide wheel (6) and the first lateral guide wheel (5) mark number of division.
3. multi-functional cable directive wheel as described in claim 1, it is characterised in that: the nut (9) is hand nutting.
4. multi-functional cable directive wheel as described in claim 1, it is characterised in that: connect the multiple cable directive wheel
Come, be used cooperatively, realizes multiple functions.
5. the multi-functional cable directive wheel as described in claim 1-4 any one, it is characterised in that: the first longitudinal direction guide wheel
(3), second longitudinal direction guide wheel (4), the second lateral guide wheel (6) and the first lateral guide wheel (5) are all I-beam wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811270085.XA CN109494626A (en) | 2018-10-23 | 2018-10-23 | Multi-functional cable directive wheel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811270085.XA CN109494626A (en) | 2018-10-23 | 2018-10-23 | Multi-functional cable directive wheel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109494626A true CN109494626A (en) | 2019-03-19 |
Family
ID=65693274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811270085.XA Pending CN109494626A (en) | 2018-10-23 | 2018-10-23 | Multi-functional cable directive wheel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109494626A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111517150A (en) * | 2020-05-18 | 2020-08-11 | 郭云美 | Wire burying device for water conservancy and hydropower engineering and implementation method thereof |
CN112830351A (en) * | 2021-01-04 | 2021-05-25 | 凌利 | A walk traditional thread binding putting for wire and cable |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201509029U (en) * | 2009-09-30 | 2010-06-16 | 辽宁省电力有限公司大连供电公司 | Cable moving guide frame for wellhead |
CN201509028U (en) * | 2009-09-30 | 2010-06-16 | 辽宁省电力有限公司大连供电公司 | Guide frame for moving cable |
CN104716604A (en) * | 2015-03-27 | 2015-06-17 | 国网浙江桐乡市供电公司 | Paying-off tackle |
CN204886014U (en) * | 2015-08-26 | 2015-12-16 | 济宁鲁宁电力安装服务有限公司 | Cable shaft lays coaster |
CN205753224U (en) * | 2016-06-27 | 2016-11-30 | 无锡南方电工机械有限公司 | Cable laying machine guider |
CN206915484U (en) * | 2017-05-26 | 2018-01-23 | 深圳市龙供供电服务有限公司 | A kind of cable clamping conveying device |
-
2018
- 2018-10-23 CN CN201811270085.XA patent/CN109494626A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201509029U (en) * | 2009-09-30 | 2010-06-16 | 辽宁省电力有限公司大连供电公司 | Cable moving guide frame for wellhead |
CN201509028U (en) * | 2009-09-30 | 2010-06-16 | 辽宁省电力有限公司大连供电公司 | Guide frame for moving cable |
CN104716604A (en) * | 2015-03-27 | 2015-06-17 | 国网浙江桐乡市供电公司 | Paying-off tackle |
CN204886014U (en) * | 2015-08-26 | 2015-12-16 | 济宁鲁宁电力安装服务有限公司 | Cable shaft lays coaster |
CN205753224U (en) * | 2016-06-27 | 2016-11-30 | 无锡南方电工机械有限公司 | Cable laying machine guider |
CN206915484U (en) * | 2017-05-26 | 2018-01-23 | 深圳市龙供供电服务有限公司 | A kind of cable clamping conveying device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111517150A (en) * | 2020-05-18 | 2020-08-11 | 郭云美 | Wire burying device for water conservancy and hydropower engineering and implementation method thereof |
CN112830351A (en) * | 2021-01-04 | 2021-05-25 | 凌利 | A walk traditional thread binding putting for wire and cable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109494626A (en) | Multi-functional cable directive wheel | |
CN203380648U (en) | Manual tube clamping device for drilling process | |
CN209367564U (en) | A kind of multi-functional cable directive wheel | |
CN206307797U (en) | Adjustable contactless film roll handler | |
CN205271073U (en) | Construction pipe cutting jig | |
CN203650430U (en) | Bolt screwing hanging rod device adjustable in length and replaceable in size | |
CN206936072U (en) | A kind of structural metal pipeline portable tube bending machine | |
CN203726219U (en) | Clamping mechanism for silicon bar cutting-off machine tool | |
CN206509937U (en) | A kind of handware fixed jig | |
CN201671628U (en) | Roadheader boosting mechanism | |
CN203715066U (en) | Thin plate lifting appliance | |
CN203507734U (en) | Multi-angle adjustable spray dust collector | |
CN203077185U (en) | Quick-release type rope tightening device | |
CN207450863U (en) | A kind of laborsaving plate carries spanner | |
CN206543931U (en) | A kind of middle wire wire cutting machine wire transporting device | |
CN207311868U (en) | It is a kind of can multi-angle regulation apply top load ground universal turn to loading device | |
CN206123730U (en) | Handheld PE pipe cutter | |
CN206972676U (en) | A kind of pipe connecting device | |
CN205150776U (en) | Cell body water level regulating device | |
CN206241157U (en) | The wire cutting machine of energy flexible modulation | |
CN204504969U (en) | A kind of small building pipe cutting machine | |
CN206205794U (en) | Adjustable drill steel support seat | |
CN205040155U (en) | Automatic plough of ploughing of suspension type | |
CN204506435U (en) | A kind of trac. bimodulus regulates awning | |
CN203981506U (en) | A kind of LDH burst pressure tests machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190319 |
|
RJ01 | Rejection of invention patent application after publication |