CN109493425A - A kind of method for building up of mine three-dimensional goaf physical model - Google Patents

A kind of method for building up of mine three-dimensional goaf physical model Download PDF

Info

Publication number
CN109493425A
CN109493425A CN201811541345.2A CN201811541345A CN109493425A CN 109493425 A CN109493425 A CN 109493425A CN 201811541345 A CN201811541345 A CN 201811541345A CN 109493425 A CN109493425 A CN 109493425A
Authority
CN
China
Prior art keywords
goaf
software
dimensional
mine
point cloud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811541345.2A
Other languages
Chinese (zh)
Inventor
王飞飞
邹平
孟中华
李爱兵
刘正宇
虎万杰
马增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201811541345.2A priority Critical patent/CN109493425A/en
Publication of CN109493425A publication Critical patent/CN109493425A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Computer Graphics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a kind of method for building up of mine three-dimensional goaf physical model, include the following steps: the point cloud data that goaf is obtained using three-dimensional laser scanner;Processing point cloud data obtains the point cloud threedimensional model in entire goaf;Generate the CAD facial contour line in goaf;CAD facial contour line is converted and imports into the facial contour line in MIDAS software;The three-dimensional goaf physical model for generating and being consistent with actual conditions is handled using MIDAS software.The present invention can more really and accurately reflect the actual conditions of mine worked-out section.

Description

A kind of method for building up of mine three-dimensional goaf physical model
Technical field
The present invention relates to mining engineering fields, particularly, are related to a kind of foundation side of mine three-dimensional goaf physical model Method.
Background technique
Past major part mine use open-stope mining underground ore bodies, due to various reasons, the mine caused there are The goaf of large area forms goaf group, and seriously affects the safety in production in mine.
In order to solve the stability problem in existing goaf, need to learn the stability in existing goaf.Most convenient at present Feasible method is exactly to use Numerical Analysis methods, using the stability in numerical simulation analysis goaf, problems faced It is exactly how Goaf Area accurately establishes three-dimensional mined out section model.It is complex-shaped changeable since goaf area is larger, with Toward being all to choose local goaf or establish model progress stability analysis after simplifying to entire goaf group, typically just The drawing provided with mine carries out simple analysis and simple modeling to local goaf using certain single software, such as FLAC3D, MIDAS-GTS/NX, ABAQUS etc..Goaf is generally all assumed to be more regular profile by the analysis method, cannot Strictly according to the facts situations such as the reflection true shaped volumes in Goaf Area, accurately analysis is hardly resulted in as a result, cannot be mined out Area, which administers, provides accurately reference.
Therefore, there is a need in the field to provide a kind of modeling and analysis methods of new mine worked-out section.Correspondingly, being also required to one kind The method for building up of mine three-dimensional goaf physical model and a kind of method for building up of the three-dimensional mine physical model comprising goaf.
Summary of the invention
The purpose of the present invention is to provide a kind of modeling and analysis methods of mine worked-out section, a kind of mine three-dimensional goaf are real The method for building up of body Model and a kind of method for building up of the three-dimensional mine physical model comprising goaf, to achieve the above object, Technical solution of the present invention includes content as described below.
The present invention provides a kind of method for building up of mine three-dimensional goaf physical model first, and this method includes following step It is rapid:
S1, it is scanned using three-dimensional laser scanner in mine worked-out section, mine worked-out section is scanned into point cloud data;
S2, the software point Yun Jinhang obtained to each scan node by handling three-dimensional laser scanner point cloud data Splicing obtains the threedimensional model constructed by cloud in entire goaf;
The software of S3, the threedimensional model processing three-dimensional laser scanner point cloud data by cloud building for completing processing Save into the point cloud file of the openable file format of CAD software;
S4, the point cloud file of the openable file format of the CAD software of preservation is imported into CAD software, it is soft in CAD The profile in goaf is depicted with spline curve in part, forms the curved surface profile line in each face in goaf, and is saved respectively;
S5, the curved surface profile line in each face obtained in S4 is converted into the formatted file that MIDAS software can identify, and protected It deposits;
S6, the formatted file that can identify the MIDAS software of each curved surface in S5 are soft using MIDAS finite element analysis Interface between part and CAD software is imported into MIDAS finite element analysis software, and the contour line in each face is in the same three-dimensional Among space, the contour line of each curved surface in practical goaf is reduced;
S7, using the pre-treatment modeling function in MIDAS finite element analysis software by the contour generating face in each face, then Entity is generated by face;
S8, generation multiple entities three-dimensional is adopted by the realization of entity intersection operation in MIDAS finite element analysis software The reconstruct of dead zone model forms the three-dimensional goaf physical model being consistent with actual conditions.
The method for building up of the present invention also provides a kind of three-dimensional mine physical model comprising goaf, this method includes following Step:
Step step S1~S8 as previously described and step S9~S12, S9 as described below and step S1~S8 It is independent, can its first, behind or simultaneously, can be by assigning using stratum generator in MIDAS finite element analysis software Have elevation goaf earth's surface contour lines creation and the Terrain surficial model that is actually consistent;
It is S10, independent with step S1~S8 and step S9, certain size is established using MIDAS finite element analysis software Mine entity, the entity include the geo-logical terrain in mine;
S11, the mine entity in ground surface obtained in S9 and S10 is carried out to face cutting physical manipulations to get arrived with The mine stratum landforms three-dimensional entity model that actual conditions are consistent;
S12, the three-dimensional mine physical model in the three-dimensional goaf physical model and S11 in S8 is subjected to Boolean calculation, The three-dimensional mine physical model comprising goaf is obtained.
The present invention also provides a kind of modeling and analysis methods of mine worked-out section, method includes the following steps:
Step step S1~S12 as previously described and step S13~S16, S13 as described below, it will be obtained in S12 To goaf-country rock physical model carry out fining grid dividing using MIDAS finite element analysis software, obtain comprising mined out The mine three-dimensional grid model in area;
S14, in MIDAS finite element analysis software by S13 three-dimensional grid model save at FPN file;
S15, FPNtoFLAC is utilized3DFPN file in S14 is converted into FLAC by .exe software3DFile;
S16, the FLAC that will be generated in S153DFile imported into FLAC3DIn software, every kind of rock mass physical power in model is assigned Parameter is learned, analysis operating condition needed for establishing research carries out the analysis of various situations to Goaf Area.
Further, in the present invention, before step S1, the goaf to be scanned first is planned, and in goaf Coordinate origin is found, the position in practical goaf is corresponded to convenient for the goaf point cloud data by scanning, for building for later period model It is vertical to lay the foundation.
It further, in the present invention, further include using data splice marks, to be carried out in goaf in step S1 The data obtained after three-dimensional laser scanner operation more than twice carry out splicing identification.
Further, in the present invention, in step S1, the data splice marks include at least two groups ball, and every group of circle Ball is three or more, and three, the front of three-dimensional laser scanner, three circles are placed or hung to different location when every subjob Ball puts second group of ball when this three-dimensional laser scanner operation completion and when scanner is forwarded in front of these three balls It sets or is hung on three different locations in the front of three-dimensional laser scanner operation;It is preferred that the ball is to be easy at dark place The Archon of identification.
Further, in the present invention, the software for three-dimensional laser scanner point cloud data being handled described in step S2 is FARO Scene software.
Further, in the present invention, CAD software is AutoCAD.
Further, in the present invention, the openable file format of CAD software described in step S3 is .rcp format.
Further, in the present invention, in step S4 each face curved surface profile line be each face Irregular Boundary Surface profile Line.
Further, in the present invention, the format that MIDAS software can identify in step S5 is .dxf format.
Compared with the prior art, the invention has the following advantages:
(1), in method of the invention, the data of mine worked-out section are acquired into a cloud using three-dimensional laser scanner for the first time Data, and build out in CAD the curved surface profile line of truth, in conjunction with using MIDAS finite element analysis software to be handled, It provides the foundation to obtain mine three-dimensional goaf physical model in the present invention for the first time.It is visually three-dimensional to obtain mine worked-out section Pattern is laid a good foundation for the qualitative research in goaf.
(2), the mine three-dimensional entity model obtained in the present invention herein in connection with MIDAS finite element analysis software is included The three-dimensional mine physical model in goaf, thus it is real to get the visual three-dimensional mine comprising goaf in the present invention for the first time Body Model provides the foundation for the qualitative research in mine and goaf.
(3), the present invention is soft herein in connection with FLAC is used on the basis of obtaining the three-dimensional mine physical model comprising goaf Part has obtained the quantitative data of mine worked-out section model, brings more believable result for mine worked-out section stability analysis.
Generally speaking, method provided by the invention greatly reduces the complexity modeled manually, significantly improves modeling Efficiency is accurately analyzed more realistically situations such as the shaped volumes of reflection mine worked-out section as a result, controlling for goaf Reason provides accurately reference.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below with reference to figure, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart during a kind of method for building up of mine three-dimensional of the invention goaf physical model is implemented.
Specific embodiment
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be limited according to claim Fixed and covering multitude of different ways is implemented.
Referring to Fig. 1, a kind of method for building up of mine three-dimensional goaf provided by the invention physical model, this method include with Lower step:
S1, it is scanned using three-dimensional laser scanner in mine worked-out section, mine worked-out section is scanned into point cloud data; Point cloud data refers to that scanning data records in dots, each point includes three-dimensional coordinate;Before carrying out S1 step, first It plans the goaf to be scanned, and to find coordinate origin in goaf, convenient for the goaf point cloud that will be scanned Data correspond to the position in practical goaf, more really establish three-dimensional mine physical model for the later period and lay the foundation;
S2, pass through the software point obtained to each scan node of dedicated processing three-dimensional laser scanner point cloud data Cloud carries out splicing, obtains the threedimensional model constructed by cloud in entire goaf;Since three-dimensional laser scanner is effectively made Industry range is within 20m, so for goaf group, it is impossible to disposably be scanned for out, moreover have inside goaf In order to solve this problem the structures such as obturation, pre- pillar, the problem for causing laser scanning incomplete every time before scanning, are being swept The front and back for retouching instrument respectively puts three special balls of white, and the later period can be according to ball in the software of processing point cloud data The point cloud data scanned every time is spliced well, realizes goaf overall effect;Wherein, dedicated processing 3 D laser scanning The software of instrument point cloud data is FAROScene software;
S3, the dedicated processing three-dimensional laser scanner point cloud data of threedimensional model constructed by cloud for completing processing Software save at .rcp format point cloud file;
S4, the point cloud file of the .rcp format of preservation is imported into AutoCAD, by the wheel in goaf in AutoCAD Exterior feature is depicted with spline curve, forms the Irregular Boundary Surface contour line in each face in goaf, and is saved respectively;It utilizes .rcp format goaf point cloud data file is opened in insertion-attachment order in AutoCAD, will form three-dimensional point cloud goaf mould Type establishes the contour line in each face according to each face of model;
S5, each Irregular Boundary Surface contour line obtained in S4 is converted into .dxf formatted file, and saved;
S6, by the .dxf formatted file of each Irregular Boundary Surface in S5, using MIDAS finite element analysis software with Interface between AutoCAD is imported into MIDAS finite element analysis software, and the contour line in each face is in the same three-dimensional space Among, reduce the contour line in each face in practical goaf;
S7, the contour line in each face is given birth to using the powerful pre-treatment modeling function in MIDAS finite element analysis software At face, recycle the extension function in MIDAS finite element analysis software that face is generated entity;
S8, generation multiple entities three-dimensional is adopted by the realization of entity intersection operation in MIDAS finite element analysis software The reconstruct of dead zone model forms the three-dimensional goaf physical model being consistent with actual conditions.
The method for building up of the present invention also provides a kind of three-dimensional mine physical model comprising goaf, this method includes following Step:
Step step S1~S8 as previously described and step S9~S12, S9 as described below, to the contour of mine Line topographic map, which passes through, the processing such as deletes, adds elevation, and saves as .dxf file;Using in MIDAS finite element analysis software Layer generator, can be by with elevation mine worked-out section earth's surface contour lines creation and the Terrain surficial model that is actually consistent;
S10, the mine entity that certain size is established using MIDAS finite element analysis software, the entity include the ground in mine Quality layer;
S11, by the mine entity in Terrain surficial model obtained in S9 and S10 in MIDAS finite element analysis software into Physical manipulations are cut in row face, delete cut surface top entity to get to the mine stratum landforms three being consistent with actual conditions Tie up physical model;
S12, by S8 three-dimensional goaf physical model and S11 in three-dimensional mine physical model in MIDAS finite element Boolean calculation is carried out in analysis software to get the three-dimensional mine physical model comprising goaf has been arrived.
The present invention also provides a kind of modeling and analysis methods of mine worked-out section, method includes the following steps:
Step step S1~S12 as previously described and step S13~S16, S13 as described below, it will be obtained in S12 To goaf-country rock physical model carry out fining grid dividing, obtain the mine three-dimensional grid model comprising goaf;It is logical Grid model is crossed, the physical model being previously obtained can be used for mechanics operation, to obtain the accurate mechanics in goaf Data judge the stability in goaf;
S14, in MIDAS finite element analysis software by S13 three-dimensional grid model save at FPN file;
S15, FPNtoFLAC is utilized3DFPN file in S14 is converted into FLAC by .exe software3DFile;
S16, the FLAC that will be generated in S153DFile imported into FLAC3DIn software, every kind of rock mass physical power in model is assigned Parameter is learned, analysis operating condition needed for establishing research carries out the analysis of various situations to Goaf Area.
Wherein, required analysis operating condition is studied for example including linearity and non-linearity static analysis, kinematic analysis, Analysis of The Seepage Or orebody mining and goaf filling are analyzed;
After walking by S16, the corresponding data such as lower angle can be obtained: such as stress concentration, ore pillar axle power, ore pillar position It moves, top plate is displaced and/or ore pillar plastic zone;These analyses can be used to judge the stability in goaf, such as: large area plastic zone Or top plate displacement is larger, then the stability in goaf is with regard to poor.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of method for building up of mine three-dimensional goaf physical model, which is characterized in that method includes the following steps:
S1, it is scanned using three-dimensional laser scanner in mine worked-out section, mine worked-out section is scanned into point cloud data;
S2, obtained cloud of each scan node is spliced by handling the software of three-dimensional laser scanner point cloud data Processing obtains the threedimensional model constructed by cloud in entire goaf;
S3, it is saved what processing was completed by the threedimensional model of the cloud building software of processing three-dimensional laser scanner point cloud data At the point cloud file of the openable file format of CAD software;
S4, the point cloud file of the openable file format of the CAD software of preservation is imported into CAD software, in CAD software The profile in goaf is depicted with spline curve, forms the curved surface profile line in each face in goaf, and is saved respectively;
S5, the curved surface profile line in each face obtained in S4 is converted into the formatted file that MIDAS software can identify, and saved;
S6, the formatted file that can identify the MIDAS software of each curved surface in S5, using MIDAS finite element analysis software with Interface between CAD software is imported into MIDAS finite element analysis software, and the contour line in each face is in the same three-dimensional space Among, reduce the contour line of each curved surface in practical goaf;
S7, using the pre-treatment modeling function in MIDAS finite element analysis software by the contour generating face in each face, then by face Generate entity;
S8, generation multiple entities realized by the entity intersection operation in MIDAS finite element analysis software to three-dimensional goaf The reconstruct of model forms the three-dimensional goaf physical model being consistent with actual conditions.
2. the method according to claim 1, wherein before step S1, first plan to be scanned it is mined out Area, and coordinate origin is found in goaf, the position in practical goaf is corresponded to convenient for the goaf point cloud data by scanning, Foundation for later period model lays the foundation.
3. the method according to claim 1, wherein in step S1, further include using data splice marks, so as to Splicing identification is carried out to the data for carrying out obtaining after three-dimensional laser scanner operation more than twice in goaf.
4. according to the method described in claim 3, it is characterized in that, the data splice marks include at least two in step S1 Group ball, and every group of ball is three or more, when every subjob, put in three, the front of three-dimensional laser scanner different location Three balls are set or hang, when this three-dimensional laser scanner operation completion and when scanner is forwarded in front of these three balls, Second group of ball is placed or is hung on three different locations in front of three-dimensional laser scanner operation;It is preferred that the ball For readily identified Archon at dark.
5. the method according to claim 1, wherein handling three-dimensional laser scanner point cloud number described in step S2 According to software be FARO Scene software.
6. the method according to claim 1, wherein CAD software is AutoCAD.
7. the method according to claim 1, wherein the openable tray of CAD software described in step S3 Formula is .rcp format.
8. the method according to claim 1, wherein the curved surface profile line in each face is each face in step S4 Irregular Boundary Surface contour line.
9. the method according to claim 1, wherein the format that MIDAS software can identify in step S5 is .dxf Format.
CN201811541345.2A 2018-12-17 2018-12-17 A kind of method for building up of mine three-dimensional goaf physical model Pending CN109493425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811541345.2A CN109493425A (en) 2018-12-17 2018-12-17 A kind of method for building up of mine three-dimensional goaf physical model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811541345.2A CN109493425A (en) 2018-12-17 2018-12-17 A kind of method for building up of mine three-dimensional goaf physical model

Publications (1)

Publication Number Publication Date
CN109493425A true CN109493425A (en) 2019-03-19

Family

ID=65710606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811541345.2A Pending CN109493425A (en) 2018-12-17 2018-12-17 A kind of method for building up of mine three-dimensional goaf physical model

Country Status (1)

Country Link
CN (1) CN109493425A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820766A (en) * 2019-11-13 2020-02-21 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN112307552A (en) * 2020-11-06 2021-02-02 中国葛洲坝集团易普力股份有限公司 Green mine construction planning method based on live-action three-dimensional modeling
CN114755391A (en) * 2022-04-15 2022-07-15 长沙矿山研究院有限责任公司 Method for simulating complex goaf of mine based on physical model test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130297574A1 (en) * 2012-05-02 2013-11-07 Level Set Systems, Inc. Method and apparatus for compressing three-dimensional point cloud data
CN104282040A (en) * 2014-09-29 2015-01-14 北京航空航天大学 Finite element preprocessing method for reconstructing three-dimensional entity model
CN107037496A (en) * 2017-04-01 2017-08-11 重庆地质矿产研究院 On-site dynamic detection method for surface mine
CN107101579A (en) * 2017-04-26 2017-08-29 长沙迪迈数码科技股份有限公司 A kind of goaf point cloud coordinates compensation method
CN107990876A (en) * 2017-11-20 2018-05-04 北京科技大学 The quick scanning means in underground mine goaf and method based on unmanned vehicle
CN108765565A (en) * 2018-04-10 2018-11-06 南京航空航天大学 A kind of tri-dimensional entity modelling method of FOD damages

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130297574A1 (en) * 2012-05-02 2013-11-07 Level Set Systems, Inc. Method and apparatus for compressing three-dimensional point cloud data
CN104282040A (en) * 2014-09-29 2015-01-14 北京航空航天大学 Finite element preprocessing method for reconstructing three-dimensional entity model
CN107037496A (en) * 2017-04-01 2017-08-11 重庆地质矿产研究院 On-site dynamic detection method for surface mine
CN107101579A (en) * 2017-04-26 2017-08-29 长沙迪迈数码科技股份有限公司 A kind of goaf point cloud coordinates compensation method
CN107990876A (en) * 2017-11-20 2018-05-04 北京科技大学 The quick scanning means in underground mine goaf and method based on unmanned vehicle
CN108765565A (en) * 2018-04-10 2018-11-06 南京航空航天大学 A kind of tri-dimensional entity modelling method of FOD damages

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
曹平: "《计算岩石力学》", 31 August 2016, 中南大学出版社 *
李发本: "地下转露天矿山复杂空区安全管理与控制研究", 《中国优秀博士学位论文全文数据库——工程科技Ⅰ辑》 *
罗广强 等: "复杂形态井巷工程三维激光扫描与MIDAS-FLAC耦合建模稳定性分析研究", 《中国安全生产科学技术》 *
翟翊 等: "《现代测量学》", 31 July 2016, 测绘出版社 *
雷宏刚: "《土木工程结构检测鉴定与加固改造新进展 上》", 31 October 2012, 中国建材工业出版社 *
黎朝斌 等: "《武当山古建筑群的测绘与研究》", 31 October 2015, 东南大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820766A (en) * 2019-11-13 2020-02-21 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN110820766B (en) * 2019-11-13 2021-03-19 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN112307552A (en) * 2020-11-06 2021-02-02 中国葛洲坝集团易普力股份有限公司 Green mine construction planning method based on live-action three-dimensional modeling
CN112307552B (en) * 2020-11-06 2022-07-01 中国葛洲坝集团易普力股份有限公司 Green mine construction planning method based on live-action three-dimensional modeling
CN114755391A (en) * 2022-04-15 2022-07-15 长沙矿山研究院有限责任公司 Method for simulating complex goaf of mine based on physical model test

Similar Documents

Publication Publication Date Title
CN111899341B (en) Three-dimensional geological rapid modeling method for long and large banded linear engineering
CN112560154B (en) Highway tunnel engineering BIM model dynamic creation method based on Unity platform
CN102194253B (en) Method for generating tetrahedron gridding for three-dimensional geological structure
CN104574511B (en) A kind of quick progressive three-dimensional geological modeling method
CN102254349B (en) Method for constructing three-dimensional physical model of sedimentary stratum system by using drilling data
CN102609982B (en) Topology discovery method of space geological data based on unstructured mode
CN109102564B (en) Coupling modeling method for numerical model of complex geologic body
CN104504754B (en) A kind of method and device of oil and gas reservoir multi-point statistic modeling
CN107730585A (en) A kind of landform threedimensional model generation method and system
CN104766366A (en) Method for establishing three-dimensional virtual reality demonstration
CN109493425A (en) A kind of method for building up of mine three-dimensional goaf physical model
CN109712241A (en) A kind of method for building up of the three-dimensional mine physical model comprising goaf
CN105184867A (en) Three-dimensional stratum modeling method based on regular grids and corner-point grid technology
CN112381937A (en) Multi-source geological data coupling modeling method based on drilling and complex geological profile
CN109063973A (en) Construction project method of construction based on artificial intelligence
CN106709987B (en) Dynamic construction method of three-dimensional geological profile model
CN116152461B (en) Geological modeling method, device, computer equipment and computer readable storage medium
CN112231818B (en) Mountain city three-dimensional geological modeling method based on BIM
CN105205865B (en) A kind of modeling method suitable for rock mass
CN105225272A (en) A kind of tri-dimensional entity modelling method based on the reconstruct of many outline lines triangulation network
CN110909407A (en) Cave laboratory and vertical shaft BIM model creation method based on BIM
CN105719342B (en) A kind of the three-dimensional modeling method for visualizing and device of ground fissure geologic body
CN109858076A (en) A kind of modeling and analysis methods of mine worked-out section
CN107507179B (en) Rock-soil mass quantitative analysis method based on GOCAD
CN104504756A (en) Dynamic updating method of ore deposit three dimension geology model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319