CN109492920A - Decision management platform based on integrated energy station - Google Patents

Decision management platform based on integrated energy station Download PDF

Info

Publication number
CN109492920A
CN109492920A CN201811378746.0A CN201811378746A CN109492920A CN 109492920 A CN109492920 A CN 109492920A CN 201811378746 A CN201811378746 A CN 201811378746A CN 109492920 A CN109492920 A CN 109492920A
Authority
CN
China
Prior art keywords
energy
integral box
user
output
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811378746.0A
Other languages
Chinese (zh)
Other versions
CN109492920B (en
Inventor
李均
刘琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zero Carbon Future Chongqing Energy Development Co ltd
Original Assignee
Beijing Jingtian Smart Energy Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingtian Smart Energy Development Co ltd filed Critical Beijing Jingtian Smart Energy Development Co ltd
Priority to CN201811378746.0A priority Critical patent/CN109492920B/en
Publication of CN109492920A publication Critical patent/CN109492920A/en
Application granted granted Critical
Publication of CN109492920B publication Critical patent/CN109492920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a decision management platform based on an integrated energy station, which is characterized by comprising a server, wherein the server is connected with M integration boxes, the M integration boxes comprise N integration box types, and each type of integration box comprises at least one integration box; each integration box is provided with operation equipment corresponding to the type of the integration box: the device comprises an electric control assembly, an operation assembly and a detection assembly; the server is connected with a database, and an operation decision module and a user module are arranged in the server; the user module of the server is used for being connected with A users; and the operation decision module is used for controlling the operation states of the M integration boxes. Has the advantages that: and automatic management, control, charging and maintenance of the energy system are realized.

Description

Decision-making management platform based on integrated form energy source station
Technical field
The present invention relates to technical field of energy equipment, specifically a kind of decision-making management based on integrated form energy source station is flat Platform.
Background technique
In building construction process, the every field such as HVAC, electrical, plumbing and electromechanical installation are generally involved.Tradition In technology, owner project leader need successively carried out from multiple processes such as the project plan, preparation, implementation, management, O&M from Reason the problem of larger workload, needs owner to put into a large amount of human and material resources since the professional technique that project is related to is more.
Specifically, need to coordinate the job schedule of multiple commercial vendors in project installation implementation process, but due to It is that vendors are participated, certainly exists responsibility and shift responsibility onto others problem, and personnel are complicated, be easy to happen article damage and equipment Failure does not have the undertaker, and the duration is easy delay.And the equipment of each manufacturer is all to split packing and transporting, and equipment is much all also located In half machining state, i.e., equipment mounting arrangement, wiring, the size etc. of adjustment installation cabinet are also carried out during the installation process.It leads Cause the installation time long.And there are interactional suppliers, it is also necessary to cooperate and coordinate, the duration is caused more to add It is long.
Summary of the invention
The present invention provides a kind of decision-making management platform based on integrated form energy source station, realize energy resource system manage automatically, Control, charging.
In order to achieve the above objectives, the specific technical solution that the present invention uses is as follows:
A kind of decision-making management platform based on integrated form energy source station, it is characterised in that including server, the server and M A integral box connection, M integral box includes N number of integral box type, and the integral box of each type includes at least one integral box;
The running equipment of corresponding integral box type: electrically-controlled component, operating component, inspection is provided on each integral box Survey component;
It is connected with database on the server, operational decisions module and line module are provided in the server;Institute The line module of server is stated for connecting with A user;The operational decisions module is used for the operating status to M integral box It is controlled.
By above-mentioned design, integrated Integrated design can greatly reduce construction and installation early period program, to improve construction Efficiency, while knockdown body structure is used, a variety of hoisting ports and installation environment are conveniently adapted to, there is more good adaptation Property, in later period use process, because being integrated in cabinet, can greatly reduce the vibration of equipment operation bring influences and noise shadow It rings, improves equipment operation environment, be furthermore in the bottom frame of frame structure, be conducive to the heat dissipation of internal pump and refrigeration unit, prevented Cause thermal damage equipment, and control element can be mounted in cabinet, being fully integrated design, and realize centralized management and intelligence point Match.Pass through operational decisions module.The operational mode, investment, excision of system are controlled.
It further describes, the user includes at least administrator, owner user, supplier user, Utility Engineers Family, the energy use user;Each user is provided with corresponding user right.
Wherein administrator can be divided into multiple management person according to user right.User needs when carrying out system access Verification user information needs to proofread user right when carrying out system operatio.
Further describe, preserved in the database M integral box number information, M integral box type information, The fortune of the gauge size information of the running equipment of M integral box, the information on load of the running equipment of M integral box, M integral box The production capacity information of row equipment, the installation site information of the running equipment of M integral box, M the estimated of integral box running equipment make With year limit information, the replacement cycle information of M integral box running equipment, all supplier's numbers of users of M integral box running equipment The history data of service engineer's user data, M integral box, M integral box are corresponded to according to, M integral box running equipment The normal operation data of corresponding detection components;
The database further includes fault indices corresponding to all fault types and each fault type, wherein failure Index includes detection data difference, expected life information, replacement cycle information;Detection data difference be equal to detection data with Operate normally data difference;
Automatically controlled program and picture data all in M integral box, circuit layout electricity are also preserved in the database The electronic data of subdata, M integral box running equipment mechanical connecting structure figure;
All user account informations, all user right informations, the enabled letter of all users are also preserved in the database Breath.
In system is used and updated, database is therewith with new.And administrator needs to carry out core to new data It is right.
By above-mentioned design, it is pasted with two dimensional code on integrated cabinet surface, is labeled with database link in two dimensional code.Maintenance Personnel by surface sweeping two dimensional code enter database carry out program transfer and the data such as program picture save.
It further describes, the operational decisions module obtains industry when the operating status to M integral box controls Primary user and the energy are generated M integral box operating status plan in advance, will be run shape using the energy supply and demand data between user State plan is distributed to corresponding integral box, and each integral box electrically-controlled component is made to execute task according to the operating status plan.
It further describes, the operating status includes working condition, standby mode, shutdown status;The operating status Plan includes plan total time, the sequence of all operating statuses and the working time of each working condition;Carrying out operation shape When state schedules operations, need to check the energy using subscriber payment situation;
The energy supply and demand data include that current owner's energy supply amount, current demand for energy, owner are total for the energy Amount, estimated energy demand, pre- energy supply amount;Current owner's energy supply amount and current demand for energy, estimated energy need The amount of asking and pre- energy supply amount are corresponding proportional;
When the detection components detect that any integral box in execution task breaks down, the operational decisions mould Block updates operating status plan, specific: in the works from former operating status, extracting one and belongs to same integral box type and be in The integral box of standby mode or shutdown status replaces the integral box to break down and corresponding operating status plan.
By above-mentioned design, the operating status of M integral box is controlled, according to actual needs, specifies capacity planning, Reasonable distribution.And after generation accident, timely emergency processing, change plan is corresponding quick, and planning rationally, realizes running equipment Automation control and detection.
Further, energy transaction modules and transaction accounting module are provided in the server;
The energy transaction modules include energy input tracking module and energy output tracking module;
The energy input tracking module is used to obtain the input energy sources coding that input energy sources supplier user gives, according to The supply chain data that inquiry input energy sources are encoded with input energy sources carry out school according to the supply chain data and actual input energy sources It is right;
After the energy output tracking module is used to check the output energy, and it is corresponding according to periodic plan generation Export chain data and corresponding output can source code, and will output can source code be sent to the corresponding energy and use user and described Transaction accounting module;
The supply chain data include input energy sources type, input energy sources price, input energy sources amount, the supply energy source time, Supplier's user information;
The output chain data include output energy source type, output energy prices, output quantity of energy, output can source time, The energy uses user information.
Energy input and output real-time tracking, wherein output input energy sources coding is encrypted using block chain technology, data In transmission process, data can not be changed, and guaranteed data reliability, prevented centre from careless mistake occur.During making system data transmission It is not changed, it is true and reliable.
Further, the transaction accounting module includes Charging Detail Record unit, payment unit;
The Charging Detail Record unit measures input energy sources expense according to input energy sources type, input energy sources price, input energy sources, And input expense is paid to supplier user according to supplier's user information, supply energy source time;
The Charging Detail Record unit obtains output energy expenditure according to output energy source type, output energy prices, output quantity of energy, And the generation statement of expense is sent to the corresponding energy and uses user;
Wherein payment inventory includes that the energy uses user information, output energy source type, output energy prices, the output energy Amount, output energy expenditure, normal payment time limit, defaulted payment term, defaulted expense, arrearage stopped for the time;
The payment unit is used to pay input expense to supplier user;
The payment unit is used to obtain the energy and uses the payment request and payment operation of user.
In the above scheme, after payment, system will convert corresponding integral and use user to the energy.In systems, may be used also Store is integrated with setting, carries out gift exchange.Wherein gift can be energy device accessory, expense is of use volume or other quotient Product.
It further describes, the integral box type includes centrifugal chiller integral box, gas electricity generator integral box, cigarette Gas hot water type lithium bromide absorption cooling and warming water machine integral box, combustion gas vacuum hot water boiler machine integral box, direct combustion three are absorption with type Cold warm water machine integral box;
The electrically-controlled component is centrifugal chiller electrically-controlled component;It or is gas electricity generator electrically-controlled component;It or is flue gas Hot water type lithium bromide absorption cooling and warming water machine electrically-controlled component;It or is combustion gas vacuum hot water boiler Electrical Control component;It or is direct combustion three With type absorption cooling and warming water machine electrically-controlled component;
The electrically-controlled component includes at least controller, control detection driving circuit;
The operating component is centrifugal refrigerating machines;It or is jet dynamic control;It or is fume hot-water type lithium bromide Absorption cooling and warming water machine group;It or is combustion gas vacuum hot water boiler unit;It or is the type absorption cooling and warming water machine group of direct combustion three;
The detection components include all current sensors, all voltage sensors, all solenoid valves, all pressure sensings Device, all temperature sensors, all liquid level sensors, all input channel flow sensors, all output channel flow sensings Device.
In practice, the running equipment in container can carry out corresponding installation and integrate, be not limited only to according to actual needs Above equipment.
Further, the integral box includes container body, which is dismountable fabricated structure, by Top plate and bottom plate and side plate surround;It is provided with operating component in the container body, automatically controlled group is equipped on the side plate Part, the detection components are arranged in the operating component and electrically-controlled component, for realizing real-time detection;It is set in the side plate outer wall There is display panel, the air hole in shutter is distributed on the side plate, face is set the air hole on each side plate two-by-two It sets;It is also provided with service ports on the side plate, and is configured with the dodge gate adaptable with it, the outer rim of the dodge gate is coated with Adhesive tape;The side plate has the protruding portion for protruding from lower surface of base plate straight down.
It, can be at any time using the container removably assembled, it can be achieved that whole Transporting, and for special catwalk Disassembly and installation.
Further, heat dissipation channel or insulating layer are additionally provided on the container body;
If the heat dissipation channel being arranged on container body, the heat dissipation channel includes being vertically provided on side plate inner wall Air-exhausting duct is provided with air intake vent array on air-exhausting duct tube body, and the air-exhausting duct upwardly extends and is pierced by the top plate, described Exhaust fan is installed on top plate;
If the insulating layer being arranged on container body, the top plate and bottom plate and side plate include inner plate surface and outer plate surface, Fireproof and heat-insulating material is filled between the inner plate surface and outer plate surface.
Above scheme needs to keep the temperature or to unit fan heat, by above-mentioned apparatus, raising is set for the special energy Standby operational reliability.
Beneficial effects of the present invention: being based on integrated complete equipment, builds intelligent management system, collects decision, transaction, charging Function realizes long-range management, and intelligent allocation is made rational planning for, and guarantees the effective reliability of multi-energy data.
Detailed description of the invention
Fig. 1 is system control principle block diagram of the invention;
Fig. 2 is centrifugal chiller integral box structure chart one;
Fig. 3 is centrifugal chiller integral box structure chart two;
Fig. 4 is centrifugal chiller running equipment structure chart;
Fig. 5 is screw machine integral box structure chart;
Fig. 6 is screw machine running equipment structure chart
Specific embodiment
Specific embodiment and working principle of the present invention will be described in further detail with reference to the accompanying drawing.
It will be seen from figure 1 that a kind of decision-making management platform based on integrated form energy source station, it is characterised in that including server 1, the server 1 is connect with M integral box, and M integral box includes N number of integral box type, and the integral box of each type includes At least one integral box;
The running equipment of corresponding integral box type: electrically-controlled component, operating component, inspection is provided on each integral box Survey component;
It is connected with database 8 on the server 1, is provided with operational decisions module 2 and line module in the server 1 6;The line module 6 of the server 1 with A user for connecting;The operational decisions module 2 is used for M integral box Operating status is controlled.
In the present embodiment, the operational decisions module 2 is obtained when the operating status to M integral box controls Owner user and the energy are generated M integral box operating status plan in advance, will be run using the energy supply and demand data between user State plan is distributed to corresponding integral box, and each integral box electrically-controlled component is made to execute task according to the operating status plan.
In the present embodiment, M is the positive integer more than or equal to 1, and N is the positive integer more than or equal to 1.A is positive integer.A is big Small basis is equal with number of users.
In the present embodiment, the operating status includes working condition, standby mode, shutdown status;The operating status Plan includes plan total time, the sequence of all operating statuses and the working time of each working condition;Carrying out operation shape When state schedules operations, need to check the energy using subscriber payment situation;The energy supply and demand data include current owner Energy supply amount, current demand for energy, owner are for energy total amount, estimated energy demand, pre- energy supply amount;Current industry Main source of energy supply and current demand for energy, estimated energy demand and pre- energy supply amount are corresponding proportional;Work as institute When stating detection components and detecting that any integral box in execution task breaks down, the operational decisions module 2 updates operation State plan, it is specific: in the works from former operating status, extract one belong to same integral box type and be in standby or The integral box of person's shutdown status replaces the integral box to break down and corresponding operating status plan.
In the present embodiment, the user includes administrator, owner user, supplier user, engineer user, energy Source uses user, intermediate energy source user.;Each user is provided with corresponding user right.
In the present embodiment, M integral box number information is preserved in the database 8, the type of M integral box is believed Information on load, the M integral box of the gauge size information of the running equipment of breath, M integral box, the running equipment of M integral box The production capacity information of running equipment, the installation site information of the running equipment of M integral box, M integral box running equipment it is pre- Count service life information, all supplies commercializations of replacement cycle information, the M integral box running equipment of M integral box running equipment User data, M integral box running equipment correspond to the history data of service engineer's user data, M integral box, M collection The normal operation data of detection components are corresponded at case;The database 8 further includes all fault types and each failure classes Fault indices corresponding to type, wherein fault indices include detection data difference, expected life information, replacement cycle information; Detection data difference is equal to detection data and operates normally data difference;Institute in M integral box is also preserved in the database 8 The automatically controlled program and picture data that have, circuit layout electronic data, M integral box running equipment mechanical connecting structure figure electricity Subdata;All user account informations, all user right informations, the enabled letter of all users are also preserved in the database 8 Breath.
In the present embodiment, when controlling running equipment operation and perhaps stopping transport by cutting off the power or sending triggering letter It number is controlled, in this connection, wireless or wired connection mode can be used and carry out data communication.In the present embodiment, it adopts With wired connection, since installation indoor signal wireless transmission effect is poor, signal ability through walls is poor, with the cost of equipment height etc. got ready Problem, therefore use wired connection.
In the present embodiment, energy transaction modules 4 and transaction accounting module 5 are provided in the server 1.
Wherein, the energy transaction modules 4 include energy input tracking module and energy output tracking module;The energy Input tracking module is used to obtain the input energy sources coding that input energy sources supplier user gives, and looks into according to input energy sources coding The supply chain data for asking input energy sources, are proofreaded according to the supply chain data with actual input energy sources;
After the energy output tracking module is used to check the output energy, and it is corresponding according to periodic plan generation Export chain data and corresponding output can source code, and will output can source code be sent to the corresponding energy and use user and described Transaction accounting module 5;
The supply chain data include input energy sources type, input energy sources price, input energy sources amount, the supply energy source time, Supplier's user information;
The output chain data include output energy source type, output energy prices, output quantity of energy, output can source time, The energy uses user information.
Energy D-chain trace, in conjunction with block chain, improve data transfer authenticity.
In the present embodiment, the transaction accounting module 5 includes Charging Detail Record unit, payment unit and integration module;
The Charging Detail Record unit measures input energy sources expense according to input energy sources type, input energy sources price, input energy sources, And input expense is paid to supplier user according to supplier's user information, supply energy source time;
The Charging Detail Record unit obtains output energy expenditure according to output energy source type, output energy prices, output quantity of energy, And the generation statement of expense is sent to the corresponding energy and uses user;
Wherein payment inventory includes that the energy uses user information, output energy source type, output energy prices, the output energy Amount, output energy expenditure, normal payment time limit, defaulted payment term, defaulted expense, arrearage stopped for the time;
The payment unit is used to pay input expense to supplier user;
The payment unit is used to obtain the energy and uses the payment request and payment operation of user.
After subscriber payment, energy ancillary equipment is exchanged in conjunction with integration module, reduces use cost.
Wherein, the integral box type includes centrifugal chiller integral box, gas electricity generator integral box, fume hot-water type Lithium bromide absorption cooling and warming water machine integral box, combustion gas vacuum hot water boiler machine integral box, the type absorption cooling and warming water machine of direct combustion three Integral box, screw machine integral box;In conjunction with Fig. 2-4 as can be seen that being centrifugal chiller integral box.Fig. 5 is screw machine integral box.
The electrically-controlled component is centrifugal chiller electrically-controlled component;It or is gas electricity generator electrically-controlled component;It or is flue gas Hot water type lithium bromide absorption cooling and warming water machine electrically-controlled component;It or is combustion gas vacuum hot water boiler Electrical Control component;It or is direct combustion three With type absorption cooling and warming water machine electrically-controlled component.
It is centrifugal chiller running equipment in Fig. 4.It is screw machine running equipment in Fig. 6.
The electrically-controlled component includes at least controller, control detection driving circuit;
The operating component is centrifugal refrigerating machines;It or is jet dynamic control;It or is fume hot-water type lithium bromide Absorption cooling and warming water machine group;It or is combustion gas vacuum hot water boiler unit;It or is the type absorption cooling and warming water machine group of direct combustion three;
The detection components include all current sensors, all voltage sensors, all solenoid valves, all pressure sensings Device, all temperature sensors, all liquid level sensors, all input channel flow sensors, all output channel flow sensings Device.
From Fig. 2,3,5 as can be seen that the integral box includes container body, which is dismountable combined type knot Structure is surrounded by top plate and bottom plate and side plate;It is provided with operating component in the container body, is installed on the side plate There is electrically-controlled component, the detection components are arranged in the operating component and electrically-controlled component, for realizing real-time detection;In the side Plate outer wall is equipped with display panel, and the air hole in shutter, the air hole two on each side plate are distributed on the side plate The setting of two faces;It is also provided with service ports on the side plate, and is configured with the dodge gate adaptable with it, outside the dodge gate Edge is coated with adhesive tape;The side plate has the protruding portion for protruding from lower surface of base plate straight down.
In the present embodiment, heat dissipation channel is additionally provided on the container body.The heat dissipation channel includes vertically setting The air-exhausting duct on side plate inner wall is set, air intake vent array is provided on air-exhausting duct tube body, the air-exhausting duct is upwardly extended and worn The top plate out is equipped with exhaust fan on the top plate;
It should be pointed out that the above description is not a limitation of the present invention, the present invention is also not limited to the example above, Variation, modification, addition or the replacement that those skilled in the art are made within the essential scope of the present invention, are also answered It belongs to the scope of protection of the present invention.

Claims (10)

1. a kind of decision-making management platform based on integrated form energy source station, it is characterised in that including server (1), the server (1) it is connect with M integral box, M integral box includes N number of integral box type, and the integral box of each type includes at least one collection At case;
The running equipment of corresponding integral box type: electrically-controlled component, operating component, detection group is provided on each integral box Part;
It is connected with database (8) on the server (1), is provided with operational decisions module (2) and user in the server (1) Module (6);The line module (6) of the server (1) with A user for connecting;The operational decisions module (2) for pair The operating status of M integral box is controlled.
2. the decision-making management platform according to claim 1 based on integrated form energy source station, it is characterised in that: the user is extremely User is used including administrator, owner user, supplier user, engineer user, the energy less;Each user is provided with Corresponding user right.
3. the decision-making management platform according to claim 2 based on integrated form energy source station, it is characterised in that: the database (8) the model ruler of M integral box number information, the running equipment of the type information of M integral box, M integral box is preserved in Very little information, the information on load of the running equipment of M integral box, the production capacity information of the running equipment of M integral box, M integral box The installation site information of running equipment, the expected life information of M integral box running equipment, M integral box operation set Standby replacement cycle information, all supplier's user data of M integral box running equipment, the corresponding dimension of M integral box running equipment The history data of engineer's user data, M integral box is protected, M integral box corresponds to the normal operation data of detection components;
The database (8) further includes fault indices corresponding to all fault types and each fault type, wherein failure Index includes detection data difference, expected life information, replacement cycle information;Detection data difference be equal to detection data with Operate normally data difference;
Automatically controlled program and picture data all in M integral box, circuit layout electronics are also preserved in the database (8) The electronic data of data, M integral box running equipment mechanical connecting structure figure;
All user account informations, all user right informations, the enabled letter of all users are also preserved in the database (8) Breath.
4. the decision-making management platform according to claim 3 based on integrated form energy source station, it is characterised in that: the operation is determined Plan module (2) obtains owner user and the energy and uses the energy between user when the operating status to M integral box controls Supply and demand data in source generate M integral box operating status plan in advance, operating status plan are distributed to corresponding integral box, is made Each integral box electrically-controlled component executes task according to the operating status plan.
5. the decision-making management platform according to claim 4 based on integrated form energy source station, it is characterised in that: the operation shape State includes working condition, standby mode, shutdown status;
The operating status plan includes when planning the work of total time, the sequence of all operating statuses and each working condition Between;When carrying out operating status schedules operations, need to check the energy using subscriber payment situation;
The energy supply and demand data include current owner's energy supply amount, current demand for energy, owner for energy total amount, pre- Count demand for energy, pre- energy supply amount;Current owner's energy supply amount and current demand for energy, estimated energy demand with Pre- energy supply amount corresponds to proportional;
When the detection components detect that any integral box in execution task breaks down, the operational decisions module (2) operating status plan is updated, it is specific: in the works from former operating status, to extract one and belong to same integral box type and place In standby mode or the integral box of shutdown status, the integral box to break down and corresponding operating status plan are replaced.
6. the decision-making management platform according to claim 3 based on integrated form energy source station, it is characterised in that: the server (1) energy transaction modules (4) and transaction accounting module (5) are provided in;
The energy transaction modules (4) include energy input tracking module and energy output tracking module;
The energy input tracking module is used to obtain the input energy sources coding that input energy sources supplier user gives, according to defeated The supply chain data for entering energy source code inquiry input energy sources, are proofreaded according to the supply chain data with actual input energy sources;
After the energy output tracking module is used to check the output energy, and corresponding output is generated according to periodic plan Chain data and corresponding output energy source code, and output energy source code is sent to the corresponding energy and uses user and the transaction Accounting module (5);
The supply chain data include input energy sources type, input energy sources price, input energy sources amount, supply energy source time, supply Quotient's user information;
The output chain data include output energy source type, output energy prices, output quantity of energy, output energy source time, the energy Use user information.
7. the decision-making management platform according to claim 6 based on integrated form energy source station, it is characterised in that: the transaction meter Expense module (5) includes Charging Detail Record unit, payment unit;
The Charging Detail Record unit measures input energy sources expense, and root according to input energy sources type, input energy sources price, input energy sources Input expense is paid to supplier user according to supplier's user information, supply energy source time;
The Charging Detail Record unit obtains output energy expenditure according to output energy source type, output energy prices, output quantity of energy, and will The generation statement of expense is sent to the corresponding energy and uses user;
Wherein payment inventory includes that the energy uses user information, output energy source type, output energy prices, exports quantity of energy, is defeated Energy expenditure, normal payment time limit, defaulted payment term, defaulted expense, arrearage stopped for the time out;
The payment unit is used to pay input expense to supplier user;
The payment unit is used to obtain the energy and uses the payment request and payment operation of user.
8. the decision-making management platform according to claim 3 based on integrated form energy source station, it is characterised in that: the integral box Type includes centrifugal chiller integral box, gas electricity generator integral box, fume hot-water type lithium bromide absorption cooling and warming water machine collection At case, combustion gas vacuum hot water boiler machine integral box, the type absorption cooling and warming water machine integral box of direct combustion three;
The electrically-controlled component is centrifugal chiller electrically-controlled component;It or is gas electricity generator electrically-controlled component;It or is fume hot-water Type lithium bromide absorption cooling and warming water machine electrically-controlled component;It or is combustion gas vacuum hot water boiler Electrical Control component;Or type is used for direct combustion three Absorption cooling and warming water machine electrically-controlled component;
The electrically-controlled component includes at least controller, control detection driving circuit;
The operating component is centrifugal refrigerating machines;It or is jet dynamic control;It or is fume hot-water type lithium bromide absorption Formula cold warm water machine group;It or is combustion gas vacuum hot water boiler unit;It or is the type absorption cooling and warming water machine group of direct combustion three;
The detection components include all current sensors, all voltage sensors, all solenoid valves, all pressure sensors, All temperature sensors, all liquid level sensors, all input channel flow sensors, all output channel flow sensors.
9. the decision-making management platform according to claim 1 based on integrated form energy source station, it is characterised in that: the integral box Including container body, which is dismountable fabricated structure, is surrounded by top plate and bottom plate and side plate;Institute It states and is provided with operating component in container body, electrically-controlled component is installed on the side plate, the detection components are arranged in the fortune Row component and electrically-controlled component, for realizing real-time detection;It is equipped with display panel in the side plate outer wall, is distributed on the side plate There is the air hole in shutter, face is arranged the air hole on each side plate two-by-two;Service ports are also provided on the side plate, And it is configured with the dodge gate adaptable with it, the outer rim of the dodge gate is coated with adhesive tape;The side plate has dashes forward straight down For the protruding portion of lower surface of base plate.
10. based on the decision-making management platform of integrated form energy source station according to claim 1 or described in 9, it is characterised in that: described Heat dissipation channel or insulating layer are additionally provided on container body;
If the heat dissipation channel being arranged on container body, the heat dissipation channel includes the air draft being vertically provided on side plate inner wall Pipe, is provided with air intake vent array, the air-exhausting duct upwardly extends and be pierced by the top plate, in the top plate on air-exhausting duct tube body On exhaust fan is installed;
If the insulating layer being arranged on container body, the top plate and bottom plate and side plate include inner plate surface and outer plate surface, in institute It states between inner plate surface and outer plate surface filled with fireproof and heat-insulating material.
CN201811378746.0A 2018-11-19 2018-11-19 Decision management platform based on integrated energy station Active CN109492920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811378746.0A CN109492920B (en) 2018-11-19 2018-11-19 Decision management platform based on integrated energy station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811378746.0A CN109492920B (en) 2018-11-19 2018-11-19 Decision management platform based on integrated energy station

Publications (2)

Publication Number Publication Date
CN109492920A true CN109492920A (en) 2019-03-19
CN109492920B CN109492920B (en) 2021-09-21

Family

ID=65696294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811378746.0A Active CN109492920B (en) 2018-11-19 2018-11-19 Decision management platform based on integrated energy station

Country Status (1)

Country Link
CN (1) CN109492920B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205081718U (en) * 2015-10-22 2016-03-09 新奥光伏能源有限公司 Portable ability source station
CN106950936A (en) * 2017-05-10 2017-07-14 国网上海市电力公司 The non-stop layer cooperative control system and method for a kind of many distributed busbar protections
CN107657366A (en) * 2017-09-08 2018-02-02 国电南瑞科技股份有限公司 User and the construction method of power network mutually acting systems under being decontroled based on power sales
CN207365496U (en) * 2017-06-01 2018-05-15 浙江陆博环境设备有限公司 A kind of cold and hot energy source station of intelligence integrated
CN108596526A (en) * 2018-06-29 2018-09-28 国网上海市电力公司 Demand-side comprehensive energy station synthetic operation Optimal Scheduling and method
CN108708571A (en) * 2018-04-24 2018-10-26 王静 A kind of distribution building energy station and energy network method for running
CN108829064A (en) * 2018-07-11 2018-11-16 上海电力学院 A kind of energy Internet advertising distribution energy source station cooperative control system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205081718U (en) * 2015-10-22 2016-03-09 新奥光伏能源有限公司 Portable ability source station
CN106950936A (en) * 2017-05-10 2017-07-14 国网上海市电力公司 The non-stop layer cooperative control system and method for a kind of many distributed busbar protections
CN207365496U (en) * 2017-06-01 2018-05-15 浙江陆博环境设备有限公司 A kind of cold and hot energy source station of intelligence integrated
CN107657366A (en) * 2017-09-08 2018-02-02 国电南瑞科技股份有限公司 User and the construction method of power network mutually acting systems under being decontroled based on power sales
CN108708571A (en) * 2018-04-24 2018-10-26 王静 A kind of distribution building energy station and energy network method for running
CN108596526A (en) * 2018-06-29 2018-09-28 国网上海市电力公司 Demand-side comprehensive energy station synthetic operation Optimal Scheduling and method
CN108829064A (en) * 2018-07-11 2018-11-16 上海电力学院 A kind of energy Internet advertising distribution energy source station cooperative control system and method

Also Published As

Publication number Publication date
CN109492920B (en) 2021-09-21

Similar Documents

Publication Publication Date Title
US11507033B2 (en) HVAC control system with model driven deep learning
CN104791903B (en) A kind of heat supply network intelligent dispatching system
CN103444039B (en) Energy expenditure manages
CN102687463B (en) The method of network system and control net system
CN109417497A (en) The device and method of system integrating for HVAC device
KR20130130513A (en) Intelligent building energy consumption management system
CN102833117A (en) Data center dynamic environment monitoring system and method on basis of IOT (Internet Of Things) technology
CN100468259C (en) Environment-friendly energy-saving intelligent control system for building
CN101872185A (en) Intelligent matrix electric energy control system
CN106600164A (en) Energy management and control platform for energy-saving integrated operation and maintenance management
CN109838876A (en) Central air-conditioning freezing computer room team control management system
CN103729328A (en) Data center module and data center formed by micro-modules
CN111142486A (en) Comprehensive energy monitoring and service system and working method thereof
CN101975436A (en) Energy-saving control method for water side equipment of air-conditioning system
CN111127245A (en) Wisdom power plant wisdom management and control system
CN109523169A (en) Operation management platform based on integrated form energy source station
CN109283900A (en) Building quality classification water supply and power-assisted water supply and energy saving emission reduction standardized system and control method
CN103104949A (en) Heat metering method, system and heat metering device
CN204576186U (en) Beverage machine intelligent early-warning system
CN109492920A (en) Decision management platform based on integrated energy station
VanGeet et al. FEMP best practices guide for energy-efficient data center design
US20230085072A1 (en) Hvac control system with model driven deep learning
CN208704104U (en) A kind of unattended equipment room control system of air-conditioning system
CN116703081A (en) Comprehensive energy operation management cloud platform
CN203909837U (en) Online monitoring and energy efficiency assessing system applied to combustion gas distributed energy system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100000 room 0622, 6 / F, MoMA building, 199 Chaoyang North Road, Chaoyang District, Beijing

Patentee after: Beijing Yikai New Energy Development Co.,Ltd.

Address before: 100000 Room 302, floor 3, building 1, No. 12 Jiuxianqiao Road, Chaoyang District, Beijing

Patentee before: BEIJING JINGTIAN SMART ENERGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211230

Address after: 400000 Chongqing Jiangbei District, Gangcheng East Ring Road, No. 5, Building 2, No. 5

Patentee after: CHONGQING JONTIA ENERGY INVESTMENT (GROUP) CO.,LTD.

Address before: 100000 room 0622, 6 / F, MoMA building, 199 Chaoyang North Road, Chaoyang District, Beijing

Patentee before: Beijing Yikai New Energy Development Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220426

Address after: 400000 No. 5, building 2, No. 5, Gangcheng East Ring Road, Tieshanping street, Jiangbei District, Chongqing

Patentee after: Zero carbon future (Chongqing) Energy Development Co.,Ltd.

Address before: 400000 Chongqing Jiangbei District, Gangcheng East Ring Road, No. 5, Building 2, No. 5

Patentee before: CHONGQING JONTIA ENERGY INVESTMENT (GROUP) CO.,LTD.

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20230320

Granted publication date: 20210921