CN109491901A - A kind of the test execution progress metrics system and equipment of various dimensions - Google Patents

A kind of the test execution progress metrics system and equipment of various dimensions Download PDF

Info

Publication number
CN109491901A
CN109491901A CN201811293046.1A CN201811293046A CN109491901A CN 109491901 A CN109491901 A CN 109491901A CN 201811293046 A CN201811293046 A CN 201811293046A CN 109491901 A CN109491901 A CN 109491901A
Authority
CN
China
Prior art keywords
test
tester
test item
unit
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811293046.1A
Other languages
Chinese (zh)
Inventor
徐丹
陈小天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201811293046.1A priority Critical patent/CN109491901A/en
Publication of CN109491901A publication Critical patent/CN109491901A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The present invention provides the test execution progress metrics system and equipment of a kind of various dimensions, operation port of the TU task unit for Servers-all test assignment information in offer system, user is changed by looking into of providing of operation port to delete increasing mode of operation and operates to Servers-all test assignment information;Operation port of the personal unit for server test assignment information corresponding to each tester in offer system, each tester change the mode of operation for deleting increasing by looking into of providing of the operation port and operate to the server test assignment information of tester under one's name;Operation port of the use-case unit for each test case in offer system, user is changed by looking into of providing of the operation port to delete increasing mode of operation and operates to each test case.Realize various dimensions test execution progress metrics system equipment allow QA Manager, tester, project personnel more rapidly, more convenient, various dimensions monitoring test execution progress.

Description

A kind of the test execution progress metrics system and equipment of various dimensions
Technical field
The present invention relates to the test execution progress metrics system of java testing field more particularly to a kind of various dimensions and set It is standby.
Background technique
Java is an Object-Oriented Programming Language, not only absorbs the various advantages of C Plus Plus, has also abandoned in C++ The concepts such as elusive more succession, pointers, therefore Java language has powerful and easy to use two features.Java language It says as the representative of static Object-Oriented Programming Language, admirably realizes object-oriented theory, allow programmer with gracefulness The mode of thinking carries out complicated programming.Java has simplicity, object-oriented, platform independent special with portability, dynamic etc. Point.Java can write multipad, web application, distributed system and embedded system application program etc., have Wide programming uses field.
Usually after with Java programming, need to carry out test verifying, in measuring executing process, tester to program And project personnel need to monitor the implementation progress of test case, manual statistical test implementation progress takes considerable time, can not be right Server test execution progress is monitored in real time, and it is real-time to carry out various dimensions to server test execution result using the tool The metrics management of property.
Summary of the invention
In order to overcome the deficiencies in the prior art described above, the present invention provides a kind of test execution progress metrics system of various dimensions System, comprising: TU task unit, personal unit and use-case unit;
Operation port of the TU task unit for Servers-all test assignment information in offer system, user pass through operating side Mouthful provide look into change delete increase mode of operation Servers-all test assignment information is operated;
Operating side of the personal unit for server test assignment information corresponding to each tester in offer system Mouthful, each tester changes the server of the mode of operation for deleting increasing under one's name to tester by looking into of providing of the operation port Test assignment information is operated;
Operation port of the use-case unit for each test case in offer system, user are provided by the operation port Look into change delete increase mode of operation each test case is operated.
Preferably, further includes: test item unit;
For providing the operation port of each test item, user is provided test item unit by the operation port Look into change delete increase mode of operation each test item is operated;
It is also used to be arranged test item list, makes all test item information configurations into test item task list, use Family obtains the status information of each test item by test item task list;
Test item information includes: tester's information involved in test item, and test involved in test item is used Test case operation information involved in example information and test item.
Preferably, TU task unit is also used to that task list is arranged, and makes Servers-all test assignment information configuration to task In list, user obtains the test execution progress under each task by task list;
Personal unit is also used to be arranged tester's list, makes all tester's information configurations to tester's list In, tester obtains test execution progress by tester's list;
Use-case unit is also used to be arranged test case list, arranges all test case information configurations to test case task In table, user obtains the status information of each test case by test case task list.
Preferably, further includes: tree-like configuration unit;
Tree-like configuration unit is for configuring tree shape display state;
By TU task unit, personal unit and use-case unit are configured in tree-like configuration unit,
Inquiry is shown in tree-like form to Servers-all test assignment information;
Inquiry is shown in tree-like form to the server test assignment information of tester under one's name;
Inquiry is shown in tree-like form to the information of each test case;
Inquiry is shown in tree-like form to the status information of each test item.
Preferably, further includes: tester's operating right unit;
Tester's operating right unit is for being arranged each tester, server maintenance personnel and system manager The permission for logging in test macro, is arranged each tester, server maintenance personnel and system manager pass through login account It is used with password login;In tester, when server maintenance personnel and system manager log in test macro, judge to test Personnel, whether the account and password of server maintenance personnel or system manager's input match, after account and password match, according to The permission sign-on access of each tester, server maintenance personnel and system manager, and shown according to different permissions Different test macro operation interfaces, the tester for being set as system manager safeguard people to each tester and server The permission that member is held is added, modifies;System manager is to the addition of non-administrator's account, modification, deletion and to non- The priority assignation of administrator's account.
Preferably, test item unit is also used in test system configurations test item interface, test item interface Yi Shu Dress form shows each test item;
Test item is set in test item interface and adds port, tester transfers test item addition port and surveying Test item is added on examination project interface;Adding test item includes: test item encoded information input port, test item name Claim information input port, test item time started input port, test item end time input port, test item remarks Information input port, test item submit operation input key, test item reset information key and test item delay end Mouthful;
It is also used to configure on test item interface and editor port is carried out to the test item added;User is set to pass through volume Port is collected to edit the test item added;
It is also used in the task items information input port of each test item of test item interface configurations, tester's information It looks into change and deletes increasing operation port, test case, which is looked into change, deletes increasing operation port, and test case execution sequence operation port, test case is held Row degree of association operation port, tester's framework operation port.
Preferably, further includes: data type processing unit;
Data type processing unit is for receiving by serial port or parallel port or bus board or local area network, or outside The test data information of the various formats of equipment transmission is connect, and the test data information of various formats is changed into needed for test macro Format test data.
Preferably, further includes: warning note unit and test result push unit;
Warning note unit endless loop occurs for test case involved in test item or related test is used Example is not carried out next connection test use-case or involved after there is operation time-out length or involved current test case end of run And when after current test case end of run being not carried out preset next connection test use-case, to tester, server maintenance Personnel and system manager send out by way of short message, or by client browser interface or by E-mail mode Warning note out;
Test result push unit is used for by way of short message, or by client browser interface or passes through electronics Lettergram mode pushes test process log and test result report.
A kind of equipment for realizing various dimensions test execution progress metrics system, comprising:
Memory, for storing computer program and realizing various dimensions test execution progress metrics system;
Processor, for executing the computer program and realizing various dimensions test execution progress metrics system, to realize The various dimensions test execution progress metrics system as described in claim 1 to 8 any one.
As can be seen from the above technical solutions, the invention has the following advantages that
System, which is realized, carries out test execution Schedule monitoring function to all items, will be divided into clothes to the progress control of project Business device test assignment, server test is personal, and server test case, server tests test item four dimensions, according to four The quantity progress of a dimension inquiry test case, time schedule and the data such as whether delay.
The equipment that system realizes various dimensions test execution progress metrics system makes QA Manager, tester, project personnel Can more rapidly, more convenient, various dimensions monitoring test execution progress.
Detailed description of the invention
In order to illustrate more clearly of technical solution of the present invention, attached drawing needed in description will be made below simple Ground introduction, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ordinary skill For personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the test execution progress metrics system schematic of various dimensions;
Fig. 2 is the test execution progress metrics system embodiment schematic diagram of various dimensions.
Specific embodiment
The present invention provides a kind of test execution progress metrics system of various dimensions, as shown in Figure 1, comprising: TU task unit 1, Personal unit 2 and use-case unit 3;
Operation port of the TU task unit 1 for Servers-all test assignment information in offer system, user pass through operation Port provide look into change delete increase mode of operation Servers-all test assignment information is operated;Personal unit 2 is for providing The operation port of server test assignment information corresponding to each tester in system, each tester pass through the behaviour Make looking into for port offer to change the mode of operation for deleting increasing and operate the server test assignment information of tester under one's name;Use-case Operation port of the unit 3 for each test case in offer system, user look into change and delete increasing by what the operation port provided Mode of operation operates each test case.
It in order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below will be with specific Examples and drawings, the technical solution protected to the present invention are clearly and completely described, it is clear that implementation disclosed below Example is only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiment in this patent, the common skill in this field Art personnel all other embodiment obtained without making creative work belongs to the model of this patent protection It encloses.
In embodiment provided by the invention, as shown in Fig. 2, system further include: test item unit 4;
For providing the operation port of each test item, user is provided test item unit 4 by the operation port Look into change delete increase mode of operation each test item is operated;It is also used to be arranged test item list, makes all test items For mesh information configuration into test item task list, user obtains the state of each test item by test item task list Information;Test item information includes: tester's information involved in test item, the letter of test case involved in test item Test case operation information involved in breath and test item.
TU task unit 1 is also used to that task list is arranged, and makes Servers-all test assignment information configuration into task list, User obtains the test execution progress under each task by task list;Personal unit 2 is also used to be arranged tester's list, Make all tester's information configurations into tester's list, tester by tester's list obtain test execution into Degree;Use-case unit 3 is also used to be arranged test case list, makes all test case information configurations to test case task list In, user obtains the status information of each test case by test case task list.
System uses Spring+SpringMVC+MyBatis rearward end frame, the front end easyUI frame by development language of java Frame is shown.System, which is realized, carries out test execution Schedule monitoring function to all items, will be divided into clothes to the progress control of project Business device test assignment, server test is personal, and server test case, server tests test item four dimensions, according to four The quantity progress of a dimension inquiry test case, time schedule, test backfill rate, the data such as whether delay.
Technology as described herein may be implemented in hardware, software, firmware or any combination of them.The various spies Sign is module, and unit or assembly may be implemented together in integration logic device or separately as discrete but interoperable logic Device or other hardware devices.In some cases, the various features of electronic circuit may be implemented as one or more integrated Circuit devcie, such as IC chip or chipset.
The form that above-described embodiment uses list carries out the course of work and state that show system.Reality provided by the invention It applies in example, system further include: tree-like configuration unit 11;Tree-like configuration unit 11 is for configuring tree shape display state;By task Unit 1, personal unit 2 and use-case unit 3 are configured in tree-like configuration unit 11, to Servers-all test assignment information with Tree-like form is shown inquiry;The server test assignment information of tester under one's name is shown in tree-like form Inquiry;Inquiry is shown in tree-like form to the information of each test case;To the status information of each test item with Tree-like form is shown inquiry.
If realized within hardware, the present invention relates to a kind of devices, such as can be used as processor or integrated circuit dress It sets, such as IC chip or chipset.Alternatively or additionally, if realized in software or firmware, the technology can Realize at least partly by computer-readable data storage medium, including instruction, when implemented, make processor execute one or More above methods.For example, computer-readable data storage medium can store the instruction such as executed by processor.
It can be carried out in the following way by the way of tree:
In embodiment provided by the invention, system further include: 6 operating right unit 5 of tester;Tester 6 operates Permission unit 5 logs in the power of test macro for each tester 6, server maintenance personnel 7 and system manager 8 to be arranged Limit, is arranged each tester 6, server maintenance personnel 7 and system manager 8 are made by login account and password login With;In tester 6, when server maintenance personnel 7 and system manager 8 log in test macro, judges tester 6, take Whether the account and password that business device maintenance personnel 7 or system manager 8 input match, after account and password match, according to each Tester 6, the permission sign-on access of server maintenance personnel 7 and system manager 8, and are shown not according to different permissions Same test macro operation interface, the tester 6 for being set as system manager 8 safeguard each tester 6 and server The permission that personnel 7 are held is added, modifies;System manager 8 to the addition of non-administrator's account, modification, deletion and To the priority assignation of non-administrator's account.
In some embodiments, computer readable storage medium may include non-volatile media.Term " non-transient " institute Stating storage medium can indicate to be not included in carrier wave or transmitting signal.In certain embodiments, non-transitory storage medium can be with Storing data, it can be changed over time in (for example, RAM or cache).
In embodiment provided by the invention, test item unit 4 is also used to survey at test system configurations test item interface Examination project interface shows each test item in the form of dress to set;
Test item is set in test item interface and adds port, tester transfers test item addition port and surveying Test item is added on examination project interface;Adding test item includes: test item encoded information input port, test item name Claim information input port, test item time started input port, test item end time input port, test item remarks Information input port, test item submit operation input key, test item reset information key and test item delay end Mouthful;It is also used to configure on test item interface and editor port is carried out to the test item added;User is set to pass through editor end Mouth edits the test item added;It is also used to the task items information in each test item of test item interface configurations Input port, tester's information, which is looked into change, deletes increasing operation port, and test case, which is looked into change, deletes increasing operation port, and test case executes suitable Sequence operation port, test case execute degree of association operation port, tester's framework operation port.
Method and device of the invention may be achieved in many ways.For example, can by software, hardware, firmware or Person's software, hardware, firmware any combination realize method and device of the invention.The step of for the method it is above-mentioned Sequence is merely to be illustrated, and the step of method of the invention is not limited to sequence described in detail above, unless with other sides Formula illustrates.In addition, in some embodiments, the present invention can be also embodied as recording program in the recording medium, these Program includes for realizing machine readable instructions according to the method for the present invention.Thus, the present invention also covers storage for executing The recording medium of program according to the method for the present invention.
In embodiment provided by the invention, system further include: data type processing unit 12;
Data type processing unit 12 passes through serial port or parallel port or bus board or local area network for receiving, or The test data information of the various formats of external equipment transmission, and the test data information of various formats is changed into test macro institute The format test data needed.
System further include: warning note unit 13 and test result push unit 14;
There is endless loop or related test for test case involved in test item in warning note unit 13 Use-case is not carried out next connection test use-case or institute after there is operation time-out length or involved current test case end of run When being related to being not carried out preset next connection test use-case after current test case end of run, to tester, server dimension Shield personnel and system manager are by way of short message, or by client browser interface or pass through E-mail mode Issue warning note;
Test result push unit 14 is used for by way of short message, or by client browser interface or passes through electricity Sub- lettergram mode push test process log and test result report.
In embodiment provided by the invention, the test of query service device is carried out
Test case implementation progress is inquired under test assignment dimension
The present invention also provides a kind of equipment for realizing various dimensions test execution progress metrics system, comprising: memory is used for It stores computer program and realizes various dimensions test execution progress metrics system;Processor, for executing the computer program And realize various dimensions test execution progress metrics system, to realize various dimensions test execution progress metrics system.
The equipment for realizing various dimensions test execution progress metrics system makes QA Manager, tester, project personnel can be with More rapidly, more convenient, various dimensions monitoring test execution progresses.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (9)

1. a kind of test execution progress metrics system of various dimensions characterized by comprising TU task unit, personal unit and Use-case unit;
Operation port of the TU task unit for Servers-all test assignment information in offer system, user are mentioned by operation port Supply look into change delete increase mode of operation Servers-all test assignment information is operated;
Operation port of the personal unit for server test assignment information corresponding to each tester in offer system, often A tester changes the mode of operation for deleting increasing by looking into of providing of the operation port and tests the server of tester under one's name Mission bit stream is operated;
Operation port of the use-case unit for each test case in offer system, user are looked by what the operation port provided Change delete increase mode of operation each test case is operated.
2. the test execution progress metrics system of various dimensions according to claim 1, which is characterized in that
Further include: test item unit;
For providing the operation port of each test item, user is changed test item unit by looking into of providing of the operation port Increasing mode of operation is deleted to operate each test item;
It is also used to be arranged test item list, makes all test item information configurations into test item task list, Yong Hutong Cross the status information that test item task list obtains each test item;
Test item information includes: tester's information involved in test item, the letter of test case involved in test item Test case operation information involved in breath and test item.
3. the test execution progress metrics system of various dimensions according to claim 2, which is characterized in that
TU task unit is also used to that task list is arranged, and makes Servers-all test assignment information configuration into task list, user The test execution progress under each task is obtained by task list;
Personal unit is also used to be arranged tester's list, makes all tester's information configurations into tester's list, surveys Examination personnel obtain test execution progress by tester's list;
Use-case unit is also used to be arranged test case list, makes all test case information configurations to test case task list In, user obtains the status information of each test case by test case task list.
4. the test execution progress metrics system of various dimensions according to claim 1, which is characterized in that
Further include: tree-like configuration unit;
Tree-like configuration unit is for configuring tree shape display state;
By TU task unit, personal unit and use-case unit are configured in tree-like configuration unit,
Inquiry is shown in tree-like form to Servers-all test assignment information;
Inquiry is shown in tree-like form to the server test assignment information of tester under one's name;
Inquiry is shown in tree-like form to the information of each test case;
Inquiry is shown in tree-like form to the status information of each test item.
5. the test execution progress metrics system of various dimensions according to claim 2, which is characterized in that
Further include: tester's operating right unit;
Tester's operating right unit is logged in for each tester, server maintenance personnel and system manager to be arranged The permission of test macro, is arranged each tester, and server maintenance personnel and system manager pass through login account and close Code, which logs in, to be used;In tester, when server maintenance personnel and system manager log in test macro, tester is judged Member, whether the account and password of server maintenance personnel or system manager's input match, after account and password match, according to every The permission sign-on access of a tester, server maintenance personnel and system manager, and shown not according to different permissions Same test macro operation interface, is set as the tester of system manager to each tester and server maintenance personnel The permission held is added, modifies;System manager is to the addition of non-administrator's account, modification, deletion and to non-pipe The priority assignation of reason person's account.
6. the test execution progress metrics system of various dimensions according to claim 2, which is characterized in that
Test item unit is also used at test system configurations test item interface, test item interface by set show in the form of dress it is every A test item;
Test item is set in test item interface and adds port, tester transfers test item addition port in test item Mesh adds test item on interface;Addition test item includes: test item encoded information input port, test item title letter Cease input port, test item time started input port, test item end time input port, test item remark information Input port, test item submit operation input key, test item reset information key and test item delay port;
It is also used to configure on test item interface and editor port is carried out to the test item added;User is set to pass through editor end Mouth edits the test item added;
It is also used in the task items information input port of each test item of test item interface configurations, tester's information, which is looked into, to be changed Increasing operation port is deleted, test case, which is looked into change, deletes increasing operation port, and test case execution sequence operation port, test case executes pass Connection degree operation port, tester's framework operation port.
7. the test execution progress metrics system of various dimensions according to claim 1 or 2, which is characterized in that
Further include: data type processing unit;
Data type processing unit is for receiving through serial port or parallel port or bus board or local area network or external setting The test data information of the various formats of standby transmission, and lattice needed for the test data information of various formats is changed into test macro Formula test data.
8. the test execution progress metrics system of various dimensions according to claim 2, which is characterized in that
Further include: warning note unit and test result push unit;
Warning note unit endless loop occurs for test case involved in test item or related test case goes out It is not carried out next connection test use-case after now operation time-out is long or involved current test case end of run or involved works as When being not carried out preset next connection test use-case after preceding test case end of run, to tester, server maintenance personnel And system manager issues report by way of short message, or by client browser interface or by E-mail mode Alert prompt;
Test result push unit is used for by way of short message, or by client browser interface or passes through Email Mode pushes test process log and test result report.
9. a kind of equipment for realizing various dimensions test execution progress metrics system characterized by comprising
Memory, for storing computer program and realizing various dimensions test execution progress metrics system;
Processor, for executing the computer program and realizing various dimensions test execution progress metrics system, to realize as weighed Benefit requires various dimensions test execution progress metrics system described in 1 to 8 any one.
CN201811293046.1A 2018-11-01 2018-11-01 A kind of the test execution progress metrics system and equipment of various dimensions Pending CN109491901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811293046.1A CN109491901A (en) 2018-11-01 2018-11-01 A kind of the test execution progress metrics system and equipment of various dimensions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811293046.1A CN109491901A (en) 2018-11-01 2018-11-01 A kind of the test execution progress metrics system and equipment of various dimensions

Publications (1)

Publication Number Publication Date
CN109491901A true CN109491901A (en) 2019-03-19

Family

ID=65693608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811293046.1A Pending CN109491901A (en) 2018-11-01 2018-11-01 A kind of the test execution progress metrics system and equipment of various dimensions

Country Status (1)

Country Link
CN (1) CN109491901A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780812A (en) * 2021-09-13 2021-12-10 深圳一信泰质量技术有限公司 Management method, device, equipment and storage medium for product test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105068809A (en) * 2015-08-13 2015-11-18 上海斐讯数据通信技术有限公司 PyQt-based platform for implementing automation project management and case execution
CN105068929A (en) * 2015-08-06 2015-11-18 网易(杭州)网络有限公司 Test script generation method, test script generation device, testing method, testing device and testing system
CN105302732A (en) * 2015-12-10 2016-02-03 广东欧珀移动通信有限公司 Automatic mobile terminal testing method and device
CN106055466A (en) * 2015-04-13 2016-10-26 中兴通讯股份有限公司 Method for implementing server testing, testing server and to-be-tested server
CN106961362A (en) * 2017-03-09 2017-07-18 杭州铜板街互联网金融信息服务有限公司 Automated testing method and mobile cloud test system
US20170220455A1 (en) * 2016-01-29 2017-08-03 Mentor Graphics Corporation Test case generation using a constraint graph solver

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055466A (en) * 2015-04-13 2016-10-26 中兴通讯股份有限公司 Method for implementing server testing, testing server and to-be-tested server
CN105068929A (en) * 2015-08-06 2015-11-18 网易(杭州)网络有限公司 Test script generation method, test script generation device, testing method, testing device and testing system
CN105068809A (en) * 2015-08-13 2015-11-18 上海斐讯数据通信技术有限公司 PyQt-based platform for implementing automation project management and case execution
CN105302732A (en) * 2015-12-10 2016-02-03 广东欧珀移动通信有限公司 Automatic mobile terminal testing method and device
US20170220455A1 (en) * 2016-01-29 2017-08-03 Mentor Graphics Corporation Test case generation using a constraint graph solver
CN106961362A (en) * 2017-03-09 2017-07-18 杭州铜板街互联网金融信息服务有限公司 Automated testing method and mobile cloud test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780812A (en) * 2021-09-13 2021-12-10 深圳一信泰质量技术有限公司 Management method, device, equipment and storage medium for product test

Similar Documents

Publication Publication Date Title
US11025512B2 (en) Automated service-oriented performance management
US9383900B2 (en) Enabling real-time operational environment conformity to an enterprise model
US7992155B2 (en) Method and system to correlate and consolidate a plurality of events
US9269061B2 (en) Performance, analytics and auditing framework for portal applications
US20150081701A1 (en) Systems and methods for data flow exploration
AU2016322817B2 (en) Application provisioning system for requesting configuration updates for application objects across data centers
EP4006731A1 (en) Method, apparatus, device, storage medium and computer program product for testing code
KR20080049757A (en) Template based management of services
CN107357593A (en) Source code file construction method, device, electric terminal and readable storage medium storing program for executing
US9086898B2 (en) Testing a configuration change
CN101414255A (en) Method and apparatus for processing log event
CN104601673B (en) Extensible high-availability server layered monitoring system
US10587655B1 (en) Compliance management system and method for an integrated computing system
US20130232127A1 (en) Meta-directory control and evaluation of events
US10410152B2 (en) System and method for automatically and efficiently monitoring software development life cycles
van Hoorn et al. DynaMod project: Dynamic analysis for model-driven software modernization
CN108073506A (en) Test method and device
US20150269504A1 (en) Non-intrusive, semantics-driven impact analysis for business applications
BRPI0618565A2 (en) multidimensional aggregation in event streams
CN112860970B (en) Data processing method and device, electronic equipment and storage medium
US20130014257A1 (en) Limiting execution of software programs
CN109992496A (en) A kind of data processing method and device for automatic test
CN110704394B (en) Report configuration modification method and device
CN109063473A (en) A kind of convenient household safety monitoring device and method based on computer network
US7802145B1 (en) Approach for facilitating analysis of computer software errors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319

RJ01 Rejection of invention patent application after publication