CN109490974A - A kind of uranium geology charting working method improving the more metal Comprehensive Exploration efficiency of uranium - Google Patents

A kind of uranium geology charting working method improving the more metal Comprehensive Exploration efficiency of uranium Download PDF

Info

Publication number
CN109490974A
CN109490974A CN201710817161.3A CN201710817161A CN109490974A CN 109490974 A CN109490974 A CN 109490974A CN 201710817161 A CN201710817161 A CN 201710817161A CN 109490974 A CN109490974 A CN 109490974A
Authority
CN
China
Prior art keywords
uranium
route
alteration
geology
mineralization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710817161.3A
Other languages
Chinese (zh)
Other versions
CN109490974B (en
Inventor
薛伟
剡鹏兵
蒋孝君
邢亚杰
王强
刘小刚
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
28th Brigade Of Nuclear Industry
Original Assignee
28th Brigade Of Nuclear Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 28th Brigade Of Nuclear Industry filed Critical 28th Brigade Of Nuclear Industry
Priority to CN201710817161.3A priority Critical patent/CN109490974B/en
Publication of CN109490974A publication Critical patent/CN109490974A/en
Application granted granted Critical
Publication of CN109490974B publication Critical patent/CN109490974B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • G01V5/281
    • G01V5/22
    • G01V5/26

Abstract

The invention belongs to Uranium Exploration fields, are related to a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium.Carry out field reconnaissance and section surveys work processed, study emphasis typical case's arteries and veins body, construction and emphasis alteration features distinguish and sample acquisition;It lays and carries out the specific route of route geology investigation work, including systematic observation route and inspection route;Carry out the investigation of systematic observation route geology, obtains alteration point section that may be significant and sampling and testing;By checking that radioactivity survey, the research of all kinds of Extract Mineralized Alteration Informations and system sample acquisition are completed in route geology investigation comprehensively, the tentative prediction result and sampling and testing of Extract Mineralized Alteration intensity and scale are obtained;Preliminary delineation uranium Polymetallic Mineralization abnormal point band carries out abnormal examination, and comprehensive analysis draws a circle to approve out advantageous uranium and more metal Prospecting foreground zones, carries out engineering verification.This method can improve the searching and evaluation efficiency of uranium mineralization (exception) point, and can take into account more metal collective geological prospectings, save means funds.

Description

A kind of uranium geology charting working method improving the more metal Comprehensive Exploration efficiency of uranium
Technical field
The invention belongs to Uranium Exploration technical fields, and in particular to a kind of to improve uranium more metal Comprehensive Exploration efficiency Uranium geology charting working method.
Background technique
Uranium geology charting works based on geologic observations, and service goal is mainly the relevant rudimentary geology of existing mineralising Information, standard and quality press the geologic mapping regulation enforcement of corresponding proportion ruler.The specification of uranium geology charting at present mainly has 1: 2000 and 1:10000 scale bar, smaller scale ruler then combines reference zone geologic survey specification to carry out.Uranium geology charting It is the basic geology charting based on uranium ore information, during uranium ore research and appraisal, work at present is carried out mainly to check evaluation Based on existing Uranium ore-spot, specific works means then based on the engineering verification equipped with uranium geology charting, are fitted according to the actual situation When the physical prospecting and Geochemical Methods for carrying out Local topography.Popular point, which is said, is exactly, and Uranium Exploration is mainly " just point argument " at present, Purpose is stronger, seeks to submit uranium resource amount, so the Working Means funds overwhelming majority has been used in engineering in real work It discloses and experimental analysis, the funds of other Working Means is just relatively on the low side, it is necessary to our uranium ores in the real work of field Geologic mapping is more efficient, and other Working Means also want more targeted small range limitation to carry out.
The technical method of conventional mineral product geology investigation successively includes: Pre feasibility (data collection), remote Sensing Interpretation, mineral product geology Special charting, physical prospecting, change spy, Integrated Checkout, engineering, Potential Evaluation, comprehensive study and case study etc..Its groundwork is one The complete remote sensing of serial system, geology, physical prospecting, Geochemical Exploration, finally cooperate engineering verification appropriate according to demand, so traditional Uranium Exploration can not directly apply conventional mineral product geology technique for investigation method, furthermore uranium ore belongs to radioactivity mineral products, work Making means also has the characteristic of oneself.
In addition, in the Prospecting For Uranium work of many years and the exchange study with Polymetallic Minerals worker, it has been found that very Extraordinary more metals are also developed in the preferable area of more Uranium Deposits prospects, and having ignored more metals looked for mine, such as core in the past The peach dam uranium ore place of production only finds its U metallogeny potentiality early period, it found also by deep work have good molybdenum, lead, zinc, More Metals Deposit Ore prospects such as copper, silver, more metal potentiality are possibly even beyond uranium ore.Certainly, the bad area of metallogenic conditions for uranium deposits, It is also possible to develop fabulous more metals.Then, we are also actively visiting while thinking improves uranium geology charting efficiency The method of the more metal Comprehensive Explorations of Suo You.
Summary of the invention
It is an object of the invention to maximize and improve uranium evaluation efficiency, simultaneously in uranium geology charting field work The job requirement that more metal collective geological prospectings can be taken into account, the uranium geology for providing a kind of raising more metal Comprehensive Exploration efficiency of uranium are filled out Figure working method.
Realize that the technical solution of the object of the invention is as follows:
A kind of uranium geology charting working method improving the more metal Comprehensive Exploration efficiency of uranium, in turn includes the following steps:
Step 1. preparation stage
Step 1.1 selection can pass through most geologic bodies, important structural belt, representative mineralized belt route, carry out field It makes an on-the-spot survey and surveys work processed with section, to tentatively establish workspace regional tectonic framework, all kinds of geologic body spaces contact relation and ground Plastid built-up sequence, and the basic unit of geologic mapping is determined substantially;
Step 1.2 during step 1.1 carries out field reconnaissance and section and surveys work processed, study emphasis typical case's arteries and veins body, Construction and the acquisition of the character recognition and typical sample of emphasis alteration, by conventional alteration and related with uranium and Polymetallic Mineralization Emphasis alteration features be described in detail, form related with uranium and Polymetallic Mineralization alteration mark and know and takes table;
The investigation of step 2. route geology
According to the scale accuracy of uranium geology charting working method to the specific route for carrying out route geology investigation work It is laid, specific route includes systematic observation route and inspection route;
Step 2.1 systematic observation route is laid
Systematic observation route should be met claimed below based on the method for passing through: (1) must cover comprehensively workspace importantly Plastid, all mineralization bodies and tectosome, (2) can clearly embody the contact relation between geologic body, and (3) can embody comprehensively The space developmental state of the contact relation and important construction of mineralization body and arteries and veins body and country rock;
Step 2.2 radioactivity survey
According to step 2.1 lay systematic observation route carry out systematic observation route geology investigation, during this in addition to It carries except field geology conventional tool, every group of investigator should wear a gamma rifle, carry out γ-radioactivity in passing and survey Amount, and emphasis checks uranium mineralization information, Polymetallic Mineralization information and constructs these information, the uranium established according to step 1 and mostly golden Belong to the related alteration mark knowledge of mineralising and take table, emphatically to target lithology, contact band, arteries and veins body, construction, alteration and special geology phenomenon Inspection is identified and is demanded, emphasis carries out typical sample acquisition to alteration point section that may be significant;
Step 3. checks highway route design
Step 3.1 Preliminary detection
X- luminoscope is timely used on the day of the typical sample acquired to step 2.2 and carries out Preliminary detection, and abnormal aobvious to having The typical sample and project shown is recorded;There are abnormal show or construction, the preferable point band of alteration development, as inspection road The important evidence that line is laid;
Step 3.2 checks that route is laid
Step 3.2.1 checks that route is allowed to comprising described in step 3.1 as a result, laying according to step 3.1 Preliminary detection Construction, the preferable point band of alteration development;
Step 3.2.2 carries out according to the detection route that step 3.2.1 is laid checks route geology investigation, adjusts in the course of work It looks into one group of the more people of personnel, carries gamma rifle, energy disperse spectroscopy and X- luminoscope these portable instruments, complete radioactivity survey, each comprehensively The research of class Extract Mineralized Alteration Information and system sample acquisition, obtain the tentative prediction result of Extract Mineralized Alteration intensity and scale;
Step 3.2.3 carries out earth's surface or shallowly for the sweeping region of alteration of tentative prediction result in step 3.2.2 Table continuous sampling;
After step 3.3 checks route geology investigation comprehensively, laboratory is sent to carry out dividing for tenor all samples Analysis test;
Step 4. abnormal examination
After obtaining the analysis test experiments data of step 3.3, according to the cutoff grade of each metallic element, then preliminary delineation Uranium Polymetallic Mineralization abnormal point band;Abnormal examination work is carried out to uranium Polymetallic Mineralization abnormal point band, checks the true of abnormal point band Pseudo- and spatially extended and development scale situation;
Step 5. radioactivity survey result in conjunction with described in step 3, X- luminoscope detection and analysis test result and step Rapid 3.2 is checking route and step 4 abnormal examination as a result, check step 4 to be that genuine abnormal point band carries out comprehensive analysis processing, Advantageous uranium and more metal Prospecting foreground zones are drawn a circle to approve out respectively;
The uranium and more metals for abnormal point band and step 5 delineation that the comprehensive integration project situation of step 6., step 4 obtain look for mine Prospective area feature, selection further have targetedly high-precision working method, finally carry out engineering verification.
The design of the specific route of the step 2 should geologic body vertical as far as possible, mineralization body, construction line and contact boundary line.
It, should for the systematic observation route all required described in step 2.1 cannot be reached comprehensively in the step 2.1 Recourse route is laid further to explore.
When the step 2.1 carries out the laying of systematic observation route, it is contemplated that and passes through in comprehensive analysis and arrangement workspace Data receives known uranium mineralization information, Polymetallic Mineralization information and tectonic information, and making systematic observation route includes specifically for this The route of a little information, and using it as emphasis observation content.
Abnormal show described in the step 3.1 or construction, the preferable point band of alteration development are finger widths not less than 0.2 The structural belt or alteration zone of rice.
The sweeping region of alteration described in the step 3.2.3 refers to length not less than 1 meter, and width is not less than 0.5 The alteration point band of rice.
The beneficial effects of the present invention are:
Present invention relates particularly to one kind, and raising uranium mineralization is (different in field geological mapping work during uranium ore research and appraisal The searching and evaluation efficiency often) put, and the working method of more metal collective geological prospectings can be taken into account.In the inspection of existing uranium mineralization information It is hopeful to find new uranium mineralization point on the basis of looking into, and more metals can be taken into account and look for mine, it is found that more metals of earth's surface are abnormal, simultaneously The present invention can also improve effect of ore-prospect, save means funds, the funds of saving can be used in greater need for Working Means in.
Detailed description of the invention
Fig. 1 is the regional uranium geology schematic diagram of Duolun County Bai Jiaying;
Fig. 2 is that sheep disk ditch area TC1505 exploratory trench edits and records schematic diagram;
Fig. 3 is that sheep disk ditch area TC1508 exploratory trench edits and records schematic diagram;
Fig. 4 is Duolun County sheep disk ditch area ZKYP2 Hole cross-section plotting.
Specific embodiment
Technical solution of the present invention is further described with reference to the accompanying drawing.
Embodiment 1
The technical solution of the present embodiment is a kind of uranium geology charting work side for improving the more metal Comprehensive Exploration efficiency of uranium Method, this method in turn include the following steps:
Step 1. preparation stage
Step 1.1 selection can pass through most geologic bodies, important structural belt, representative mineralized belt route, carry out field It makes an on-the-spot survey and surveys work processed with section, to tentatively establish workspace regional tectonic framework, all kinds of geologic body spaces contact relation and ground Plastid built-up sequence, and the basic unit of geologic mapping is determined substantially;
Step 1.2 during step 1.1 carries out field reconnaissance and section and surveys work processed, study emphasis typical case's arteries and veins body, Construction and the acquisition of the character recognition and typical sample of emphasis alteration, especially have to conventional alteration and with uranium and Polymetallic Mineralization The emphasis alteration features of pass are described in detail, and form alteration mark knowledge related with uranium and Polymetallic Mineralization and take table.
The investigation of step 2. route geology
The specific route of route geology investigation work is carried out in design.The design of specific route should geologic body vertical as far as possible, Mineralization body, construction line and contact boundary line etc.;Specific route is carried out according to the scale accuracy of uranium geology charting working method Reasonable Arrangement.The specific route for carrying out route geology investigation work includes systematic observation route and inspection route.
Step 2.1 systematic observation highway route design
Step 2.1.1 systematic observation route should be met claimed below based on the method for passing through: (1) must be covered work comprehensively Make the important geologic body in area, all mineralization bodies and tectosome, (2) can clearly embody the contact relation between geologic body as far as possible, (3) contact relation of mineralization body and arteries and veins body and country rock and the space developmental state of important construction can be embodied comprehensively;
Step 2.1.2, should cloth for that cannot reach the systematic observation route all required described in step 2.1.1 comprehensively If recourse route is further explored;Recourse route, which should cover, does not meet requirement described in step 2.1.1 in systematic observation route Area;
Step 2.1.3 simultaneously, passes through uranium mineralization information, more metals known to data collection in comprehensive analysis and arrangement workspace Mineralization information and construction etc. incorporate the route specifically for these information, and it is made in the design of above system observation route For emphasis observation content.
Step 2.2 radioactivity survey
In addition to carrying field geology conventional tool geologic hammer, magnifying glass, compass, palm machine in route geology fact-finding process Deng except, one gamma rifle of every group of wearing carries out γ-radioactivity survey in passing, the uranium and Polymetallic Mineralization established according to step 1 Related alteration mark knowledge takes table, and emphasis checks uranium mineralization information, Polymetallic Mineralization information and construction etc., emphatically to target rock Property, contact band, arteries and veins body, construction, alteration and special geology phenomenon etc. identified and demanded inspection, emphasis is significant to possibility Alteration point section carries out typical sample acquisition.
Step 3. checks highway route design
Step 3.1 Preliminary detection
X- luminoscope is timely used on the day of the typical sample acquired to step 2.2 and carries out Preliminary detection, and abnormal aobvious to having The typical sample and project shown is recorded;There are abnormal show or construction, alteration development preferable point band (structural belt or alteration zone Width is not less than 0.2 meter), as the important evidence for checking that route is laid, making the inspection route laid includes above-mentioned point band.
Step 3.2 checks route
It is targetedly detailed to check that route is used to carry out the construction described in step 3.1, the preferable point band of alteration development Research.In specific works can one group of more people, carry gamma rifle, energy disperse spectroscopy, the portable instruments such as X- luminoscope, complete radioactivity comprehensively Measurement, the research of all kinds of Extract Mineralized Alteration Informations and system sample acquisition, obtain the tentative prediction knot of Extract Mineralized Alteration intensity and scale Fruit.The region of (alteration point strip length is not less than 1 meter, and width is not less than 0.5 meter) big for the alteration scale of tentative prediction result, Carry out earth's surface or shallow earth's surface continuous sampling.
After route geology investigation comprehensively, laboratory is sent to carry out comprising gold such as uranium, gold and silver copper-lead zinc molybdenums all samples Belong to the analysis test of content;
Step 4. abnormal examination
After obtaining the analysis test experiments data of step 3.2, according to the cutoff grade of each metallic element, then preliminary delineation Uranium Polymetallic Mineralization abnormal point band;Abnormal examination work is carried out to uranium Polymetallic Mineralization abnormal point band, i.e., by examining on the spot again It looks into and demands, check the true and false and spatially extended and development scale situation of abnormal point band.
Step 5. radioactivity survey result in conjunction with described in step 3, X- luminoscope detection and analysis test result and step Rapid 3.2 check route and step 4 abnormal examination as a result, according to Uranium Exploration achievement classify (EJT1213-2006T) and 1:50000 mineral product geology investigation work guide checks step 4 to be that genuine abnormal point band carries out comprehensive analysis processing, encloses respectively Make advantageous uranium and more metal Prospecting foreground zones.
The uranium and more metals for abnormal point band and step 5 delineation that the comprehensive integration project situation of step 6., step 4 obtain look for mine Prospective area feature, reasonably selecting further has targetedly high-precision working method, for example large scale spectral measurement, swashs Electric sounding section etc., finally carries out engineering verification.
Embodiment 2
The specific embodiment of mine method is looked in order to illustrate alteration, is introduced uranium geology by taking Bai Jiaying area as an example here and is filled out How figure, which improves efficiency in the process and take into account more metals, is looked for miner to make.Because of different regions actual conditions difference, the reality of part steps Applying and select may be different.
By taking ten thousand white regional uranium ore Geological Survey Works of battalion's of 1:5 as an example.
The sub- land area 321.94km of Bai Jiaying2.It carries out field reconnaissance charting early period and section is surveyed during making, emphasis It strengthens typical lithology, arteries and veins body, construction and the discrimination of alteration and feature knowledge takes.Then on the basis of recognizing herein with having carried out route Matter is investigated, and the maximum feature of this work is exactly radioactivity survey in uranium geology investigation, and we also focus on to highlight simultaneously Identification and recourse inspection to target lithology, contact band, arteries and veins body, construction, alteration and special geology phenomenon etc., emphasis is to may have The point of meaning or location carry out typicalness sampling analysis.Guard station is returned to, all all samples that the same day takes are used in time daily X- luminoscope carry out Preliminary detection, to have abnormal point band route geology investigation the later period exclusively carry out rechecking and recourse. These work are the emphasis that the present invention is used in uranium geology fact-finding process, and accept basic geological works and subsequent high price The key of lattice high-fineness Working Means.
Sub- ten thousand route geology of the 1:5 investigation work of Bai Jiaying is completed, takes 158 groups of all kinds of samples altogether, and send laboratory in time Carry out analysis test.According to experiment analysis results, it has been found that this route geology investigation work all kinds of abnormal points of new discovery are total Count at 22, wherein at new discovery uranium abnormal point 1, at Polymetallic Mineralization (exception) point 21, including at Pb-Zn-Ag ore point 2, silver it is different Often at point 2, at Pb-Zn deposits point 2, at lead mineralization points 2, at Molybdenum Mineralization and abnormal point 7 etc., wherein silver reaches as high as 62.36g/t, Lead content is up to 0.54%.
Then these mine points are reexamined, data is recognized and analyzed in conjunction with previous work, carry out comprehensive study, it is excellent The important Prospecting foreground zone of Yang Pangou is selected, which is also that Polymetallic Mineralization (exception) point is distributed most intensive region, is located at Big battalion's of the regional east northeast portion sheep Pan Gou of Bai Jiaying is nearby (Fig. 1).Then, ten thousand petrogeochemistry of 1:1 has been carried out in the section Work is measured, doubling-up makes comprehensive abnormal dizzy 10, it is shown that the preferable ore-prospecting future of the prospective area.
It swoons and the inspection of mine point in conjunction with geochemical anomaly, has chosen preferable two points band and carried out trenching exposure work, purpose It is to explore earth's surface Polymetallic Mineralization and construct the extension situation to deep, 4 exploratory trenches of constructing altogether achieve preferable exposure Effect, wherein exploratory trench TC1505 (Fig. 2) discloses the lead zinc exception of earth's surface well and construct has that continues to extend to show to deep As, and Extract Mineralized Alteration physically well develops;Exploratory trench TC1508 (Fig. 3) is to explore the abnormal hair with construction deep of earth's surface lead zinc-silver Situation is educated, situation display structure and Extract Mineralized Alteration is disclosed to deep and extends stabilization, prediction deep has preferable ore-prospecting future.
The comprehensive geochemical anomaly of sheep disk ditch prospective area is more obvious, and uranium and more metals look for mine according to sufficiently, in comprehensive study and On the basis of analysis, designed and constructed ZKYP1 and ZKYP2 drilling, in order to investigate the deep TC1505 and TC1508 uranium and More Metals Deposit Ore potentiality.ZKYP1 drills at 348.30~349.50m, develops thickness 1.20m, and 0.021% uranium of grade is abnormal Section;ZKYP2 drills at 130.17~130.97m, develops thickness 0.80m, 0.060% Uranium industry mine section of grade, and find The Silver Mineralization of 1m can be connect with the Silver Mineralization of earth's surface, and display silver ore body extends to deep and stablizes, and Grade change less (Ag 40.6~44.40g/t of grade) (Fig. 4).Totally show that the prospective area has preferable Ore formation of uranium and polymetal prospect.Meanwhile the hole Be also for the first time be detached from " with regard to point look for a little " thinking, with present invention discover that first Uranium industry mine hole, looked in northern Hard Rock-type uranium ore Also there is very important Guide in mine.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.It is if these modifications and variations are within the scope of the claims of the present invention and its equivalent technology, then of the invention It is also intended to include these modifications and variations.

Claims (6)

1. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium, it is characterised in that successively include such as Lower step:
Step 1. preparation stage
Step 1.1 selection can pass through most geologic bodies, important structural belt, representative mineralized belt route, carry out field reconnaissance Work processed is surveyed with section, to tentatively establish workspace regional tectonic framework, all kinds of geologic body spaces contact relation and geologic body Built-up sequence, and the basic unit of geologic mapping is determined substantially;
Step 1.2 is during step 1.1 carries out field reconnaissance and section surveys work processed, study emphasis typical case's arteries and veins body, construction And character recognition and the typical sample acquisition of emphasis alteration, by conventional alteration and related with uranium and Polymetallic Mineralization heavy Point alteration features are described in detail, and form alteration mark knowledge related with uranium and Polymetallic Mineralization and take table;
The investigation of step 2. route geology
The specific route for carrying out route geology investigation work is carried out according to the scale accuracy of uranium geology charting working method It lays, specific route includes systematic observation route and inspection route;
Step 2.1 systematic observation route is laid
Systematic observation route should be met claimed below based on the method for passing through: (1) must cover the important geology in workspace comprehensively Body, all mineralization bodies and tectosome, (2) can clearly embody the contact relation between geologic body, and (3) can embody mine comprehensively Change the space developmental state of the contact relation and important construction of body and arteries and veins body and country rock;
Step 2.2 radioactivity survey
Carry out the investigation of systematic observation route geology according to the systematic observation route that step 2.1 is laid, in addition to carrying during this Except field geology conventional tool, every group of investigator should wear a gamma rifle, carry out γ-radioactivity survey in passing, and Emphasis checks uranium mineralization information, Polymetallic Mineralization information and constructs these information, according to the uranium and Polymetallic Mineralization of step 1 foundation Related alteration mark knowledge takes table, knows to target lithology, contact band, arteries and veins body, construction, alteration and special geology phenomenon emphatically It is not checked with recourse, emphasis carries out typical sample acquisition to alteration point section that may be significant;
Step 3. checks highway route design
Step 3.1 Preliminary detection
X- luminoscope is timely used on the day of the typical sample acquired to step 2.2 and carries out Preliminary detection, and to there is abnormal show Typical sample and project are recorded;There are abnormal show or construction, the preferable point band of alteration development, as inspection route cloth If important evidence;
Step 3.2 checks that route is laid
Step 3.2.1 according to step 3.1 Preliminary detection as a result, lay check route be allowed to comprising construction described in step 3.1, The preferable point band of alteration development;
Step 3.2.2 carries out according to the detection route that step 3.2.1 is laid checks route geology investigation, investigator in the course of work More one groups of people of member, gamma rifle, energy disperse spectroscopy and X- luminoscope these portable instruments are carried, complete radioactivity survey, all kinds of mines comprehensively The research and system sample acquisition for changing alteration Information, obtain the tentative prediction result of Extract Mineralized Alteration intensity and scale;
Step 3.2.3 carries out earth's surface or shallow earth's surface connects for the sweeping region of alteration of tentative prediction result in step 3.2.2 Continuous sampling;
After step 3.3 checks route geology investigation comprehensively, the analysis that all samples send laboratory to carry out tenor is surveyed Examination;
Step 4. abnormal examination
After obtaining the analysis test experiments data of step 3.3, according to the cutoff grade of each metallic element, then tentatively delineation uranium is more Metal mineralising abnormal point band;To uranium Polymetallic Mineralization abnormal point band carry out abnormal examination work, check abnormal point band the true and false and Spatially extended and development scale situation;
Step 5. radioactivity survey result in conjunction with described in step 3, X- luminoscope detection and analysis test result and step 3.2 Check route and step 4 abnormal examination as a result, checking step 4 to be that genuine abnormal point band carries out comprehensive analysis processing, respectively Draw a circle to approve out advantageous uranium and more metal Prospecting foreground zones;
The uranium and more metal Prospect for prospecting for abnormal point band and step 5 delineation that the comprehensive integration project situation of step 6., step 4 obtain Area's feature, selection further have targetedly high-precision working method, finally carry out engineering verification.
2. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium as described in claim 1, Be characterized in that: the design of the specific route of the step 2 should geologic body vertical as far as possible, mineralization body, construction line and contact boundary line.
3. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium as described in claim 1, It is characterized in that: for the systematic observation route all required described in step 2.1 cannot be reached comprehensively in the step 2.1, answering It is further explored when laying recourse route.
4. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium as described in claim 1, It is characterized in that: when the step 2.1 carries out the laying of systematic observation route, being contemplated that and pass through in comprehensive analysis and arrangement workspace Data receives known uranium mineralization information, Polymetallic Mineralization information and tectonic information, and making systematic observation route includes specifically for this The route of a little information, and using it as emphasis observation content.
5. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium as described in claim 1, Be characterized in that: abnormal show described in the step 3.1 or construction, the preferable point band of alteration development are that finger widths are not less than 0.2 meter of structural belt or alteration zone.
6. a kind of uranium geology charting working method for improving the more metal Comprehensive Exploration efficiency of uranium as described in claim 1, Be characterized in that: the sweeping region of alteration described in the step 3.2.3 refers to length not less than 1 meter, and width is not less than 0.5 The alteration point band of rice.
CN201710817161.3A 2017-09-12 2017-09-12 Uranium ore geological map filling working method for improving uranium multi-metal comprehensive exploration efficiency Active CN109490974B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710817161.3A CN109490974B (en) 2017-09-12 2017-09-12 Uranium ore geological map filling working method for improving uranium multi-metal comprehensive exploration efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710817161.3A CN109490974B (en) 2017-09-12 2017-09-12 Uranium ore geological map filling working method for improving uranium multi-metal comprehensive exploration efficiency

Publications (2)

Publication Number Publication Date
CN109490974A true CN109490974A (en) 2019-03-19
CN109490974B CN109490974B (en) 2020-03-17

Family

ID=65688631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710817161.3A Active CN109490974B (en) 2017-09-12 2017-09-12 Uranium ore geological map filling working method for improving uranium multi-metal comprehensive exploration efficiency

Country Status (1)

Country Link
CN (1) CN109490974B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110632669A (en) * 2019-09-05 2019-12-31 山东省地质矿产勘查开发局第六地质大队 Method for prospecting vein-like lead-zinc silver ore in magma active region with complex structure
CN113204059A (en) * 2021-04-15 2021-08-03 中化地质矿山总局地质研究院 Route geology-based ore exploration method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002010797A1 (en) * 2000-07-31 2002-02-07 Scientific Prediction, Inc. System and method for optimizing a mining operation
US20090028000A1 (en) * 2007-07-26 2009-01-29 O'brien Thomas B Method and process for the systematic exploration of uranium in the athabasca basin
CN103852807A (en) * 2014-03-20 2014-06-11 青海省地质矿产研究所 High-altitude permafrost region porphyry type copper polymetallic mine exploration technology combination method
CN204331043U (en) * 2015-01-07 2015-05-13 核工业航测遥感中心 A kind of unmanned plane airborne gamma-ray spectrometry system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002010797A1 (en) * 2000-07-31 2002-02-07 Scientific Prediction, Inc. System and method for optimizing a mining operation
US20090028000A1 (en) * 2007-07-26 2009-01-29 O'brien Thomas B Method and process for the systematic exploration of uranium in the athabasca basin
CN103852807A (en) * 2014-03-20 2014-06-11 青海省地质矿产研究所 High-altitude permafrost region porphyry type copper polymetallic mine exploration technology combination method
CN204331043U (en) * 2015-01-07 2015-05-13 核工业航测遥感中心 A kind of unmanned plane airborne gamma-ray spectrometry system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶发旺 等: ""航空高光谱遥感技术在新疆雪米斯坦铀多金属矿产勘查中的应用研究"", 《地质论评》 *
李洪军 等: ""核桃坝地区铀及多金属成矿作用分析"", 《矿床地质》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110632669A (en) * 2019-09-05 2019-12-31 山东省地质矿产勘查开发局第六地质大队 Method for prospecting vein-like lead-zinc silver ore in magma active region with complex structure
CN113204059A (en) * 2021-04-15 2021-08-03 中化地质矿山总局地质研究院 Route geology-based ore exploration method and system

Also Published As

Publication number Publication date
CN109490974B (en) 2020-03-17

Similar Documents

Publication Publication Date Title
CN107480460B (en) Multi-element geochemical anomaly identification method for large-area complex background area
CN103837908A (en) Rapid prospecting positioning method applicable to hidden sandstone-type uranium mine
EP3809133B1 (en) A method for characterizing underground metallic mineral deposits based on rock coatings and fracture fills
CN110991075A (en) Rapid exploration and evaluation method for metal mineral products
CN102590874A (en) Method for detecting ground surface crack of upland coal-mining subsidence paddy field
CN110727034A (en) Sandstone-type uranium ore mapping method
CN104991286A (en) Sedimentary facies characterization method based on sedimentary modes
CN108535791B (en) Novel method for checking and evaluating copper-lead-zinc abnormality of arid desert landscape area
CN108680965B (en) Rapid ore finding method suitable for shallow coverage area of Gobi desert
CN108107481A (en) The definite method and apparatus of the favourable prospective area of uranium exploration
CN109490974A (en) A kind of uranium geology charting working method improving the more metal Comprehensive Exploration efficiency of uranium
CN102539194B (en) Gradient geochemical exploration method
CN109656906A (en) A kind of processing method of the exploration data based on big data
CN112782773B (en) Method for predicting and evaluating hidden resources of invasive rock type uranium thorium niobium tantalum ore
CN113885082A (en) Kaolin-like gold ore deep detection method
Vearncombe et al. Data upcycling
CN112528106A (en) Volcanic lithology identification method
CN109541722A (en) A kind of Lithology Identification Methods for Volcanic Rocks
CN115081685A (en) Three-dimensional visual positioning prediction method for metal deposit deep resource
Mauger et al. Alteration mapping of the Tarcoola Goldfield (South Australia) using a suite of hyperspectral methods
CN116593407B (en) Rare earth metal mineral rapid investigation device and method
CN114152995B (en) Gold ore rapid prospecting method suitable for cutting shallow coverage area in south Qin Linggao
CN107797138A (en) The improvement of forecast precision influence factor and optimization method in a kind of advance geologic prediction
Huang et al. Geostatistical estimation analysis of typical Carlin gold deposit in Hunan province, China
CN115586155A (en) Method for rapidly delineating vein-like gold deposit ore body and obtaining indication mark index thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant