- CN109482655A CN109482655A CN201811327702.5A CN201811327702A CN109482655A CN 109482655 A CN109482655 A CN 109482655A CN 201811327702 A CN201811327702 A CN 201811327702A CN 109482655 A CN109482655 A CN 109482655A
- Authority
- CN
- China
- Prior art keywords
- control system
- control
- milling train
- level
- transformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/48—Tension control; Compression control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/74—Temperature control, e.g. by cooling or heating the rolls or the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
The invention discloses a kind of methods for carrying out second control system transformation to old milling train, increase the level two formed by a secondary server and at least two second level clients on the basis of first class control system, and two systems carry out data exchange by Ethernet, and the sub-control system in first class control system is transformed, its sub-control system transform the automatic data collection of each control system and the automatic exchange of integration and manual handling equipment as, the detection of the temperature of addition pair in transmission control and thickness control operation, and formation temperature closed-loop control, by wirelessly or non-wirelessly forming tree topology between secondary server and at least two second level clients;The present invention carries out information integration to it on the basis of original old milling train, and increases level two, realizes its automatic improving and realizes automated production, extends milling train and uses the time, improve rolling quality, reduces entreprise cost.
Description
Technical field:
The present invention relates to a kind of milling train fields, more particularly to a kind of method for carrying out second control system transformation to old milling train.
Background technique:
Milling train is the equipment for realizing metal rolled process, refer to complete stocking production overall process Zhuan Bei ﹐ include capital equipment,
Ancillary equipment, handling equipment and auxiliary device etc..
Modernization electronically operated mill wherein possesses multiple control systems, wherein level Four can be divided by grade, including
Using PLC, DCS dispatch control system, production control, the level-one control of optimized integration automation are carried out according to the instruction that second level issues
System;Three-level data information is collected, to information processing and is fed back, after generating pass schedule, level-one is sent an instruction to and is produced
The second control system of control;Milling train each section automatic control system is unified into the three-level of a total system by MES
Control system;The level Four control system of the management such as management, quality management, field control that realize a plan control.
But in previous old milling train, operation is in the state of operator's manual operation, even if wherein
There are some automatic control systems, but between be also independent from each other, due to the incompatibility of each system, between each system number
In the case where according to exchange and inconvenient and personnel's operation error, the problem of producing defect rate increase is caused.
Existing automation milling train is expensive, is transformed in the case where old milling train can also be run to it, completes certainly
Dynamicization operation, reduces entreprise cost.
Summary of the invention:
The technical problems to be solved by the present invention are: overcoming the deficiencies of the prior art and provide, a kind of structure is simple, old rolls original
Information integration is carried out to it on the basis of machine, and increases level two, realize its automatic improving and realizes automated production
The method that second control system transformation is carried out to old milling train.
The technical scheme is that a kind of method that second control system transformation is carried out to old milling train, it is characterized in that:
Increase the level two formed by a secondary server and at least two second level clients on the basis of first class control system, and
Two systems carry out data exchange by Ethernet, and are transformed to the sub-control system in first class control system, sub- control
The system reform processed is the automatic data collection of each control system and integration and the automatic exchange of manual handling equipment, is specifically changed
Make that steps are as follows: a, low order control system and thickness control system by using high-order control system to responsible transmission and the movement of valve station
Carry out information integration;
B, in thickness control system, realize that the data of its thickness control system acquire by MTS position sensor built in pressure upper cylinder half;
C, roller is carried out automatically controlling using servo valve in bending system, and forms closed-loop control system in conjunction with profile gauge
System;
D, in the control of valve station, distributed AC servo system respectively is carried out with an IO control cabinet to F1F2, F3F4;
E, in tension force, tension is acquired by tensometer and acquisition information is fed back to TDC, pass through TDC realization pair
The control of four gantry speeds;
F, spray beam controls nozzle the amount of injection using the control mode segmentation of electric control pulse.
Further, the high-order control system is that efficient rolling country research center is researched and developed using Siemens's TDC system
Control system, the detection for the temperature being added in transmission control and thickness control operation pair, and formation temperature closed-loop control.
Further, the quantity that the MTS position sensor is arranged in pressure upper cylinder half is one.
Further, tree-like by wirelessly or non-wirelessly being formed between the secondary server and at least two second level clients
Topological structure.
The beneficial effects of the present invention are:
1, the present invention carries out information integration to it on the basis of original old milling train, and increases level two, realizes its automation
It is transformed and realizes automated production, extend milling train and use the time, improve rolling quality, reduce entreprise cost.
2, the present invention carries out letter to multiple control systems in original roughing control system by Siemens's TDC control system
Breath integration forms a unified system entirety, thickness control control and transmission is controlled and controlled by Siemens's TDC control system
System, there is no the obstacles in data exchange, improve Product Precision and the degree of automation.
3, the differential transformation that the present invention replaces the pressure upper cylinder half in original thickness control system external by U.S. MTS position sensor
Device formula displacement sensor has rigid interference performance strong, and fast response time, in addition there are also small in size, advantages with high accuracy, and can
To press built in upper cylinder half, a pressure upper cylinder half only uses one, reduces the fault point, save the cost.
4, the present invention replaces original people using the system that the faster servo valve of the higher vector of precision adds second level to issue automatically
Work adjusts proportioning valve, and carries out closed-loop control with profile gauge, solves an edition type, convexity is generated by the control gimmick difference of people
Various problems improve the version type quality of product and the stability of template.
5, the present invention uses an IO control cabinet in F1F2, F3F4 rack on the spot, using dcs, system
Unwrapping wire is close, facilitates the acquisition of signal, improves the stability of signal and overhauls conveniently.
6, the present invention replaces original S7-412 control system, solution by the tension control system that tensometer and TDC are formed
Having determined original system there are tension ranges, narrow, manual intervention amount is big, tension unstable problem when threading.
7, the present invention using electric pulse control mode replace original manual segmentation control methods to finish rolling spray beam into
Row control, this method segmentation precision is high, and the amount of each nozzle injection is controllable, and roller very good solution plate face, template is cooperated to ask
Topic, and lay the foundation for the thinned of next step blank.
8, the present invention improves the degree of automation, increases temperature scaling factor, improve by integrating new control system
Speed changes the control precision changed with thickness, simplifies the manual operation of personnel.
9, the major function of level two of the present invention is rolling scaduled management, the statistics of production task, the note of product quality
Record and playback, the calculating of process modeling, secure production technology well, improve production efficiency and the quality of production.
Specific embodiment:
The invention discloses a kind of methods for carrying out second control system transformation to old milling train, on the basis of first class control system
It is upper to increase the level two formed by a secondary server and at least two second level clients, and two systems pass through Ethernet
Data exchange is carried out, and the sub-control system in first class control system is transformed, sub-control system transform each control as
In the automatic exchange of the automatic data collection of system and integration and manual handling equipment, transmission control and thickness control operation
The detection of the temperature of addition pair, and formation temperature closed-loop control, pass through between secondary server and at least two second level clients
Wirelessly or non-wirelessly form tree topology.
The application is described in detail below with reference to the specific embodiment being transformed to old milling train.
Increase level two on the basis of first class control system, level two is ground by efficient rolling country research center
Hair, You Yitai secondary server and several second level groups of clients are at passing through Ethernet and first class control system carries out data
Exchange;And the sub-control system in first class control system is transformed, sub-control system transform the number of each control system as
According to automatic collection and integration and the automatic exchange of manual handling equipment.
Its specific adaptation step is as follows:
Originally there are two the control systems of producer to form for roughing control system, is that Tianjin day passes and the female thickness in Shanghai, Tianjin day respectively
The control system of biography is responsible for transmission and the movement at some valve stations, the female thick use in Shanghai using Siemens's S7-414-2 controller
Be that the control system of four Siemens S7412-1 is responsible for thickness control system, the data exchange of Liang Ge company is inconvenient, and there is controls
Precision processed is low, and thickness fluctuation is big, unstable product quality.
The control system in efficient rolling country research center is used after transformation, this system is using Siemens's highest level
Control system TDC, have many advantages, such as speed of service height, the big control precision of data collection capacity is high.
The position sensor at scene is transformed;Control system is using scorching exaggerated external superseded after originally
Differential transformer type displacement transducer, this sensor are easy to be done by other signals at scene using analog interface
Disturb, in addition volume is big, and precision is low, due to be outer sensor must using two, and increase fault point and maintenance at
This.
Using U.S.'s MTS position sensor after upgrading, Magnetic Sensor uses SSI digital interface, interface tool
There are strong antijamming capability, fast response time, in addition also has the advantages that small in size with high accuracy.
Transformation to live bending system;The roller of original system can only realize letter using proportioning valve, manual adjustment
Single Strip Shape Control, due to being that there is for manual control is reconciled not in time, low-response, degree of regulation is low, each teams and groups
The phenomenon that controlling unstable product quality caused by the difference of gimmick, the control for realizing convexity of also having no idea.
Add second level to issue automatically using the higher faster servo valve of response of precision after transformation, and carries out closed loop with profile gauge
Control solves an edition type, the variety of problems that convexity is generated by the control gimmick difference of people.
Transformation to the control of original valve station;Control system originally is using central controlled scheme, this control system
There is unwrapping wire distance, sensor signal is easy to be disturbed system, and the local voltage attenuation amount remote from control system is big, and maintenance is not
Convenient problem,
Dcs is used after transformation, F1F2, F3F4 respectively use an IO control cabinet on the spot, and this control method has
Unwrapping wire facilitates the function of signal acquisition apart from short.
Transformation to tension control system;Since former controller is using S7-412 control system, this control system
Operational capability is insufficient so tension force has transmission device operation, and there is tension force narrow ranges for this control mode, need
Want manual intervention amount big, tension unstable defect when threading.
TDC is fed back to using a vertical signal for tensometer acquisition after transformation, the speed of four racks of control is calculated by TDC
Degree, perfectly solves that tension range is narrow, and manual intervention amount is big, tension unstable problem when threading.
Transformation to finish rolling spray beam, for former frame spray beam using manual segmentation control methods, segmentation precision is low (intermediate
900mm long sprays, then mono- section of both sides 200mm), the size of each nozzle injection is uncontrollable.
High using the control mode segmentation precision of electric control pulse after transformation, the amount of each nozzle injection is controllable, cooperation
The problem of roller very good solution plate face, version type.
Temperature scaling factor is increased simultaneously, the control precision of speed ring and thickness ring is improved, simplifies operator
Operation.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, it is all
It is any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, still falls within
In the range of technical solution of the present invention.
Claims (4)
1. a kind of method for carrying out second control system transformation to old milling train, it is characterized in that: on the basis of first class control system
Increase the level two that is formed by a secondary server and at least two second level clients, and two systems pass through Ethernet into
Row data exchange, and the sub-control system in first class control system is transformed, sub-control system transform each control system as
The automatic exchange of the automatic data collection of system and integration and manual handling equipment, specific adaptation step are as follows: a, by making
Information integration is carried out with low order control system and thickness control system of the high-order control system to responsible transmission and the movement of valve station;
B, in thickness control system, realize that the data of its thickness control system acquire by MTS position sensor built in pressure upper cylinder half;
C, roller is carried out automatically controlling using servo valve in bending system, and forms closed-loop control system in conjunction with profile gauge
System;
D, in the control of valve station, distributed AC servo system respectively is carried out with an IO control cabinet to F1F2, F3F4;
E, in tension force, tension is acquired by tensometer and acquisition information is fed back to TDC, pass through TDC realization pair
The control of four gantry speeds;
F, spray beam controls nozzle the amount of injection using the control mode segmentation of electric control pulse.
2. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the high-order
Control system is the control system that efficient rolling country research center uses the research and development of Siemens's TDC system, transmission control and thickness
The detection of the temperature of addition pair, and formation temperature closed-loop control in control operation.
3. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the MTS
The quantity that position sensor is arranged in pressure upper cylinder half is one.
4. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the second level
By wirelessly or non-wirelessly forming tree topology between server and at least two second level clients.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811327702.5A CN109482655A (en) | 2018-11-08 | 2018-11-08 | The method that second control system transformation is carried out to old milling train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811327702.5A CN109482655A (en) | 2018-11-08 | 2018-11-08 | The method that second control system transformation is carried out to old milling train |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109482655A true CN109482655A (en) | 2019-03-19 |
Family
ID=65695621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811327702.5A Pending CN109482655A (en) | 2018-11-08 | 2018-11-08 | The method that second control system transformation is carried out to old milling train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109482655A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989786A (en) * | 2012-12-20 | 2013-03-27 | 济钢集团有限公司 | Optimal control system of shape and thickness of steel plate |
CN104942027A (en) * | 2015-06-03 | 2015-09-30 | 辽宁科技大学 | Method for detecting steel plate type through computer second-level data processing system |
CN107442574A (en) * | 2016-05-31 | 2017-12-08 | 本钢板材股份有限公司 | A kind of five Stands Cold Tandem Mills group automated system gets rid of the control method of frame rolling |
CN107626746A (en) * | 2017-09-11 | 2018-01-26 | 杭州五星铝业有限公司 | A kind of control system and control method of aluminum foil rolling thickness optimization |
JP2018108599A (en) * | 2017-01-05 | 2018-07-12 | 株式会社神戸製鋼所 | Plate thickness control device of rolling machine and method thereof and rolling machine |
JP2018122339A (en) * | 2017-02-02 | 2018-08-09 | Jfeスチール株式会社 | Plate thickness control method, plate thickness control device, cold rolling equipment and manufacturing method of steel plate |
-
2018
- 2018-11-08 CN CN201811327702.5A patent/CN109482655A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989786A (en) * | 2012-12-20 | 2013-03-27 | 济钢集团有限公司 | Optimal control system of shape and thickness of steel plate |
CN104942027A (en) * | 2015-06-03 | 2015-09-30 | 辽宁科技大学 | Method for detecting steel plate type through computer second-level data processing system |
CN107442574A (en) * | 2016-05-31 | 2017-12-08 | 本钢板材股份有限公司 | A kind of five Stands Cold Tandem Mills group automated system gets rid of the control method of frame rolling |
JP2018108599A (en) * | 2017-01-05 | 2018-07-12 | 株式会社神戸製鋼所 | Plate thickness control device of rolling machine and method thereof and rolling machine |
JP2018122339A (en) * | 2017-02-02 | 2018-08-09 | Jfeスチール株式会社 | Plate thickness control method, plate thickness control device, cold rolling equipment and manufacturing method of steel plate |
CN107626746A (en) * | 2017-09-11 | 2018-01-26 | 杭州五星铝业有限公司 | A kind of control system and control method of aluminum foil rolling thickness optimization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102189237B (en) | System integration technology for dynamic soft reduction of continuously-cast billet | |
CN1322942C (en) | Band-steel laminar-flow cooling device and its cooling control method | |
CN101607264B (en) | Periodic longitudinal variable-thickness strip and longitudinal variable-thickness plate and preparation method thereof | |
CN101844157B (en) | Integrated roll line control-based hot rolling cooling water control method and system | |
CN101934291B (en) | Center-aligning method of high-speed wire stock finishing mill | |
CN103170508B (en) | Method for controlling width of hot rolling strip steel | |
CN103639210B (en) | A kind of cold roll roller control method and application thereof | |
CN101693290B (en) | On-line width adjusting method of cystallizer | |
CN106111929B (en) | A kind of round billet continuous casting straightening motor load dynamically distributes control system and its control method | |
CN201702186U (en) | Cooling water control system of hot rolling based on integral rolling line control | |
CN101683686B (en) | On-line width adjusting method for crystallizer | |
CN109482655A (en) | The method that second control system transformation is carried out to old milling train | |
CN107520254A (en) | A kind of non-gap rolling system and method based on PLC controls | |
CN103760856A (en) | Cold strip steel leveling unit process control method | |
CN108107849A (en) | A kind of automatic Control System For Hot Strip Mill Line | |
CN103551389A (en) | Flying gauge change control method of tandem cold mill | |
CN102284505A (en) | System for controlling thickness of fuzzy PI (Proportional Integral) based on ARM (Advanced RISC machines) | |
CN106825353B (en) | A kind of control method of multiple pressure machine sharing die processing | |
CN101329575A (en) | Computer intelligent control method of sheet bar continuous casting and rolling | |
CN201969857U (en) | Regulation device for roll gap of continuous casting machine fan-shaped section | |
CN203366067U (en) | Intelligent non-rigid connection mechanism synchronous operation control device | |
CN202270721U (en) | Automatic gauge control (AGC) system for precision hot continuous rolling | |
CN207170517U (en) | Bar wire rod rolling mill speed-adjusting and control system | |
CN105728476B (en) | Made-up belt camber testing and analysis system in the middle of hot rolling | |
CN108089550A (en) | A kind of five rack cold continuous rolling milling train electric control systems based on day erection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190319 |
|
WD01 | Invention patent application deemed withdrawn after publication |