CN109482655A - The method that second control system transformation is carried out to old milling train - Google Patents

The method that second control system transformation is carried out to old milling train Download PDF

Info

Publication number
CN109482655A
CN109482655A CN201811327702.5A CN201811327702A CN109482655A CN 109482655 A CN109482655 A CN 109482655A CN 201811327702 A CN201811327702 A CN 201811327702A CN 109482655 A CN109482655 A CN 109482655A
Authority
CN
China
Prior art keywords
control system
control
milling train
level
transformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811327702.5A
Other languages
Chinese (zh)
Inventor
王璐团
徐金洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN WANDA ALUMINUM Co Ltd
Original Assignee
HENAN WANDA ALUMINUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN WANDA ALUMINUM Co Ltd filed Critical HENAN WANDA ALUMINUM Co Ltd
Priority to CN201811327702.5A priority Critical patent/CN109482655A/en
Publication of CN109482655A publication Critical patent/CN109482655A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/16Control of thickness, width, diameter or other transverse dimensions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/48Tension control; Compression control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

The invention discloses a kind of methods for carrying out second control system transformation to old milling train, increase the level two formed by a secondary server and at least two second level clients on the basis of first class control system, and two systems carry out data exchange by Ethernet, and the sub-control system in first class control system is transformed, its sub-control system transform the automatic data collection of each control system and the automatic exchange of integration and manual handling equipment as, the detection of the temperature of addition pair in transmission control and thickness control operation, and formation temperature closed-loop control, by wirelessly or non-wirelessly forming tree topology between secondary server and at least two second level clients;The present invention carries out information integration to it on the basis of original old milling train, and increases level two, realizes its automatic improving and realizes automated production, extends milling train and uses the time, improve rolling quality, reduces entreprise cost.

Description

The method that second control system transformation is carried out to old milling train
Technical field:
The present invention relates to a kind of milling train fields, more particularly to a kind of method for carrying out second control system transformation to old milling train.
Background technique:
Milling train is the equipment for realizing metal rolled process, refer to complete stocking production overall process Zhuan Bei ﹐ include capital equipment, Ancillary equipment, handling equipment and auxiliary device etc..
Modernization electronically operated mill wherein possesses multiple control systems, wherein level Four can be divided by grade, including Using PLC, DCS dispatch control system, production control, the level-one control of optimized integration automation are carried out according to the instruction that second level issues System;Three-level data information is collected, to information processing and is fed back, after generating pass schedule, level-one is sent an instruction to and is produced The second control system of control;Milling train each section automatic control system is unified into the three-level of a total system by MES Control system;The level Four control system of the management such as management, quality management, field control that realize a plan control.
But in previous old milling train, operation is in the state of operator's manual operation, even if wherein There are some automatic control systems, but between be also independent from each other, due to the incompatibility of each system, between each system number In the case where according to exchange and inconvenient and personnel's operation error, the problem of producing defect rate increase is caused.
Existing automation milling train is expensive, is transformed in the case where old milling train can also be run to it, completes certainly Dynamicization operation, reduces entreprise cost.
Summary of the invention:
The technical problems to be solved by the present invention are: overcoming the deficiencies of the prior art and provide, a kind of structure is simple, old rolls original Information integration is carried out to it on the basis of machine, and increases level two, realize its automatic improving and realizes automated production The method that second control system transformation is carried out to old milling train.
The technical scheme is that a kind of method that second control system transformation is carried out to old milling train, it is characterized in that: Increase the level two formed by a secondary server and at least two second level clients on the basis of first class control system, and Two systems carry out data exchange by Ethernet, and are transformed to the sub-control system in first class control system, sub- control The system reform processed is the automatic data collection of each control system and integration and the automatic exchange of manual handling equipment, is specifically changed Make that steps are as follows: a, low order control system and thickness control system by using high-order control system to responsible transmission and the movement of valve station Carry out information integration;
B, in thickness control system, realize that the data of its thickness control system acquire by MTS position sensor built in pressure upper cylinder half;
C, roller is carried out automatically controlling using servo valve in bending system, and forms closed-loop control system in conjunction with profile gauge System;
D, in the control of valve station, distributed AC servo system respectively is carried out with an IO control cabinet to F1F2, F3F4;
E, in tension force, tension is acquired by tensometer and acquisition information is fed back to TDC, pass through TDC realization pair The control of four gantry speeds;
F, spray beam controls nozzle the amount of injection using the control mode segmentation of electric control pulse.
Further, the high-order control system is that efficient rolling country research center is researched and developed using Siemens's TDC system Control system, the detection for the temperature being added in transmission control and thickness control operation pair, and formation temperature closed-loop control.
Further, the quantity that the MTS position sensor is arranged in pressure upper cylinder half is one.
Further, tree-like by wirelessly or non-wirelessly being formed between the secondary server and at least two second level clients Topological structure.
The beneficial effects of the present invention are:
1, the present invention carries out information integration to it on the basis of original old milling train, and increases level two, realizes its automation It is transformed and realizes automated production, extend milling train and use the time, improve rolling quality, reduce entreprise cost.
2, the present invention carries out letter to multiple control systems in original roughing control system by Siemens's TDC control system Breath integration forms a unified system entirety, thickness control control and transmission is controlled and controlled by Siemens's TDC control system System, there is no the obstacles in data exchange, improve Product Precision and the degree of automation.
3, the differential transformation that the present invention replaces the pressure upper cylinder half in original thickness control system external by U.S. MTS position sensor Device formula displacement sensor has rigid interference performance strong, and fast response time, in addition there are also small in size, advantages with high accuracy, and can To press built in upper cylinder half, a pressure upper cylinder half only uses one, reduces the fault point, save the cost.
4, the present invention replaces original people using the system that the faster servo valve of the higher vector of precision adds second level to issue automatically Work adjusts proportioning valve, and carries out closed-loop control with profile gauge, solves an edition type, convexity is generated by the control gimmick difference of people Various problems improve the version type quality of product and the stability of template.
5, the present invention uses an IO control cabinet in F1F2, F3F4 rack on the spot, using dcs, system Unwrapping wire is close, facilitates the acquisition of signal, improves the stability of signal and overhauls conveniently.
6, the present invention replaces original S7-412 control system, solution by the tension control system that tensometer and TDC are formed Having determined original system there are tension ranges, narrow, manual intervention amount is big, tension unstable problem when threading.
7, the present invention using electric pulse control mode replace original manual segmentation control methods to finish rolling spray beam into Row control, this method segmentation precision is high, and the amount of each nozzle injection is controllable, and roller very good solution plate face, template is cooperated to ask Topic, and lay the foundation for the thinned of next step blank.
8, the present invention improves the degree of automation, increases temperature scaling factor, improve by integrating new control system Speed changes the control precision changed with thickness, simplifies the manual operation of personnel.
9, the major function of level two of the present invention is rolling scaduled management, the statistics of production task, the note of product quality Record and playback, the calculating of process modeling, secure production technology well, improve production efficiency and the quality of production.
Specific embodiment:
The invention discloses a kind of methods for carrying out second control system transformation to old milling train, on the basis of first class control system It is upper to increase the level two formed by a secondary server and at least two second level clients, and two systems pass through Ethernet Data exchange is carried out, and the sub-control system in first class control system is transformed, sub-control system transform each control as In the automatic exchange of the automatic data collection of system and integration and manual handling equipment, transmission control and thickness control operation The detection of the temperature of addition pair, and formation temperature closed-loop control, pass through between secondary server and at least two second level clients Wirelessly or non-wirelessly form tree topology.
The application is described in detail below with reference to the specific embodiment being transformed to old milling train.
Increase level two on the basis of first class control system, level two is ground by efficient rolling country research center Hair, You Yitai secondary server and several second level groups of clients are at passing through Ethernet and first class control system carries out data Exchange;And the sub-control system in first class control system is transformed, sub-control system transform the number of each control system as According to automatic collection and integration and the automatic exchange of manual handling equipment.
Its specific adaptation step is as follows:
Originally there are two the control systems of producer to form for roughing control system, is that Tianjin day passes and the female thickness in Shanghai, Tianjin day respectively The control system of biography is responsible for transmission and the movement at some valve stations, the female thick use in Shanghai using Siemens's S7-414-2 controller Be that the control system of four Siemens S7412-1 is responsible for thickness control system, the data exchange of Liang Ge company is inconvenient, and there is controls Precision processed is low, and thickness fluctuation is big, unstable product quality.
The control system in efficient rolling country research center is used after transformation, this system is using Siemens's highest level Control system TDC, have many advantages, such as speed of service height, the big control precision of data collection capacity is high.
The position sensor at scene is transformed;Control system is using scorching exaggerated external superseded after originally Differential transformer type displacement transducer, this sensor are easy to be done by other signals at scene using analog interface Disturb, in addition volume is big, and precision is low, due to be outer sensor must using two, and increase fault point and maintenance at This.
Using U.S.'s MTS position sensor after upgrading, Magnetic Sensor uses SSI digital interface, interface tool There are strong antijamming capability, fast response time, in addition also has the advantages that small in size with high accuracy.
Transformation to live bending system;The roller of original system can only realize letter using proportioning valve, manual adjustment Single Strip Shape Control, due to being that there is for manual control is reconciled not in time, low-response, degree of regulation is low, each teams and groups The phenomenon that controlling unstable product quality caused by the difference of gimmick, the control for realizing convexity of also having no idea.
Add second level to issue automatically using the higher faster servo valve of response of precision after transformation, and carries out closed loop with profile gauge Control solves an edition type, the variety of problems that convexity is generated by the control gimmick difference of people.
Transformation to the control of original valve station;Control system originally is using central controlled scheme, this control system There is unwrapping wire distance, sensor signal is easy to be disturbed system, and the local voltage attenuation amount remote from control system is big, and maintenance is not Convenient problem,
Dcs is used after transformation, F1F2, F3F4 respectively use an IO control cabinet on the spot, and this control method has Unwrapping wire facilitates the function of signal acquisition apart from short.
Transformation to tension control system;Since former controller is using S7-412 control system, this control system Operational capability is insufficient so tension force has transmission device operation, and there is tension force narrow ranges for this control mode, need Want manual intervention amount big, tension unstable defect when threading.
TDC is fed back to using a vertical signal for tensometer acquisition after transformation, the speed of four racks of control is calculated by TDC Degree, perfectly solves that tension range is narrow, and manual intervention amount is big, tension unstable problem when threading.
Transformation to finish rolling spray beam, for former frame spray beam using manual segmentation control methods, segmentation precision is low (intermediate 900mm long sprays, then mono- section of both sides 200mm), the size of each nozzle injection is uncontrollable.
High using the control mode segmentation precision of electric control pulse after transformation, the amount of each nozzle injection is controllable, cooperation The problem of roller very good solution plate face, version type.
Temperature scaling factor is increased simultaneously, the control precision of speed ring and thickness ring is improved, simplifies operator Operation.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, it is all It is any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, still falls within In the range of technical solution of the present invention.

Claims (4)

1. a kind of method for carrying out second control system transformation to old milling train, it is characterized in that: on the basis of first class control system Increase the level two that is formed by a secondary server and at least two second level clients, and two systems pass through Ethernet into Row data exchange, and the sub-control system in first class control system is transformed, sub-control system transform each control system as The automatic exchange of the automatic data collection of system and integration and manual handling equipment, specific adaptation step are as follows: a, by making Information integration is carried out with low order control system and thickness control system of the high-order control system to responsible transmission and the movement of valve station;
B, in thickness control system, realize that the data of its thickness control system acquire by MTS position sensor built in pressure upper cylinder half;
C, roller is carried out automatically controlling using servo valve in bending system, and forms closed-loop control system in conjunction with profile gauge System;
D, in the control of valve station, distributed AC servo system respectively is carried out with an IO control cabinet to F1F2, F3F4;
E, in tension force, tension is acquired by tensometer and acquisition information is fed back to TDC, pass through TDC realization pair The control of four gantry speeds;
F, spray beam controls nozzle the amount of injection using the control mode segmentation of electric control pulse.
2. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the high-order Control system is the control system that efficient rolling country research center uses the research and development of Siemens's TDC system, transmission control and thickness The detection of the temperature of addition pair, and formation temperature closed-loop control in control operation.
3. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the MTS The quantity that position sensor is arranged in pressure upper cylinder half is one.
4. the method according to claim 1 for carrying out second control system transformation to old milling train, it is characterized in that: the second level By wirelessly or non-wirelessly forming tree topology between server and at least two second level clients.
CN201811327702.5A 2018-11-08 2018-11-08 The method that second control system transformation is carried out to old milling train Pending CN109482655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811327702.5A CN109482655A (en) 2018-11-08 2018-11-08 The method that second control system transformation is carried out to old milling train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811327702.5A CN109482655A (en) 2018-11-08 2018-11-08 The method that second control system transformation is carried out to old milling train

Publications (1)

Publication Number Publication Date
CN109482655A true CN109482655A (en) 2019-03-19

Family

ID=65695621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811327702.5A Pending CN109482655A (en) 2018-11-08 2018-11-08 The method that second control system transformation is carried out to old milling train

Country Status (1)

Country Link
CN (1) CN109482655A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989786A (en) * 2012-12-20 2013-03-27 济钢集团有限公司 Optimal control system of shape and thickness of steel plate
CN104942027A (en) * 2015-06-03 2015-09-30 辽宁科技大学 Method for detecting steel plate type through computer second-level data processing system
CN107442574A (en) * 2016-05-31 2017-12-08 本钢板材股份有限公司 A kind of five Stands Cold Tandem Mills group automated system gets rid of the control method of frame rolling
CN107626746A (en) * 2017-09-11 2018-01-26 杭州五星铝业有限公司 A kind of control system and control method of aluminum foil rolling thickness optimization
JP2018108599A (en) * 2017-01-05 2018-07-12 株式会社神戸製鋼所 Plate thickness control device of rolling machine and method thereof and rolling machine
JP2018122339A (en) * 2017-02-02 2018-08-09 Jfeスチール株式会社 Plate thickness control method, plate thickness control device, cold rolling equipment and manufacturing method of steel plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989786A (en) * 2012-12-20 2013-03-27 济钢集团有限公司 Optimal control system of shape and thickness of steel plate
CN104942027A (en) * 2015-06-03 2015-09-30 辽宁科技大学 Method for detecting steel plate type through computer second-level data processing system
CN107442574A (en) * 2016-05-31 2017-12-08 本钢板材股份有限公司 A kind of five Stands Cold Tandem Mills group automated system gets rid of the control method of frame rolling
JP2018108599A (en) * 2017-01-05 2018-07-12 株式会社神戸製鋼所 Plate thickness control device of rolling machine and method thereof and rolling machine
JP2018122339A (en) * 2017-02-02 2018-08-09 Jfeスチール株式会社 Plate thickness control method, plate thickness control device, cold rolling equipment and manufacturing method of steel plate
CN107626746A (en) * 2017-09-11 2018-01-26 杭州五星铝业有限公司 A kind of control system and control method of aluminum foil rolling thickness optimization

Similar Documents

Publication Publication Date Title
CN102189237B (en) System integration technology for dynamic soft reduction of continuously-cast billet
CN1322942C (en) Band-steel laminar-flow cooling device and its cooling control method
CN101607264B (en) Periodic longitudinal variable-thickness strip and longitudinal variable-thickness plate and preparation method thereof
CN101844157B (en) Integrated roll line control-based hot rolling cooling water control method and system
CN101934291B (en) Center-aligning method of high-speed wire stock finishing mill
CN103170508B (en) Method for controlling width of hot rolling strip steel
CN103639210B (en) A kind of cold roll roller control method and application thereof
CN101693290B (en) On-line width adjusting method of cystallizer
CN106111929B (en) A kind of round billet continuous casting straightening motor load dynamically distributes control system and its control method
CN201702186U (en) Cooling water control system of hot rolling based on integral rolling line control
CN101683686B (en) On-line width adjusting method for crystallizer
CN109482655A (en) The method that second control system transformation is carried out to old milling train
CN107520254A (en) A kind of non-gap rolling system and method based on PLC controls
CN103760856A (en) Cold strip steel leveling unit process control method
CN108107849A (en) A kind of automatic Control System For Hot Strip Mill Line
CN103551389A (en) Flying gauge change control method of tandem cold mill
CN102284505A (en) System for controlling thickness of fuzzy PI (Proportional Integral) based on ARM (Advanced RISC machines)
CN106825353B (en) A kind of control method of multiple pressure machine sharing die processing
CN101329575A (en) Computer intelligent control method of sheet bar continuous casting and rolling
CN201969857U (en) Regulation device for roll gap of continuous casting machine fan-shaped section
CN203366067U (en) Intelligent non-rigid connection mechanism synchronous operation control device
CN202270721U (en) Automatic gauge control (AGC) system for precision hot continuous rolling
CN207170517U (en) Bar wire rod rolling mill speed-adjusting and control system
CN105728476B (en) Made-up belt camber testing and analysis system in the middle of hot rolling
CN108089550A (en) A kind of five rack cold continuous rolling milling train electric control systems based on day erection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190319

WD01 Invention patent application deemed withdrawn after publication