CN109472075A - A kind of base station performance analysis method and system - Google Patents

A kind of base station performance analysis method and system Download PDF

Info

Publication number
CN109472075A
CN109472075A CN201811281699.8A CN201811281699A CN109472075A CN 109472075 A CN109472075 A CN 109472075A CN 201811281699 A CN201811281699 A CN 201811281699A CN 109472075 A CN109472075 A CN 109472075A
Authority
CN
China
Prior art keywords
base station
base
parameter
measured
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811281699.8A
Other languages
Chinese (zh)
Other versions
CN109472075B (en
Inventor
党正阳
王纯斌
赵神州
覃进学
赵红军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Sefon Software Co Ltd
Original Assignee
Chengdu Sefon Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Sefon Software Co Ltd filed Critical Chengdu Sefon Software Co Ltd
Priority to CN201811281699.8A priority Critical patent/CN109472075B/en
Publication of CN109472075A publication Critical patent/CN109472075A/en
Application granted granted Critical
Publication of CN109472075B publication Critical patent/CN109472075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The embodiment of the present invention provides a kind of base station performance analysis method and system.Method includes the status data for obtaining base station, and status data includes base-station node parameter, system environments parameter and network topological information;Dynamic simulative emulation is carried out according to base-station node parameter, system environments parameter and network topological information, obtains the corresponding Radio map in region to be measured, and signal blind zone is identified according to Radio map;Base station performance assessment is carried out according to base-station node parameter, system environments parameter and network topological information, obtains the corresponding running state information in the base station region Zhong Ge to be measured.System is for executing the above method, the embodiment of the present invention is by carrying out analog simulation and Performance Evaluation to the base station in region to be measured using base-station node parameter, system environments parameter and network topological information, the running state information of corresponding Radio map, signal blind zone and each base station is obtained, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.

Description

A kind of base station performance analysis method and system
Technical field
The present invention relates to mobile communication technologies and big data analysis processing technology field, are used in particular to one kind Base station performance analysis method and system.
Background technique
In recent years, with the arrival of the internet of high speed development, the life of modern be unable to do without mobile communication already.Existing Grow directly from seeds in living, the emergency communication ability of communication network also shows its indispensable critical role in emergency management and rescue work. In order to also obtain the abnormal movement of emergency network reflection while emergency communication system stable operation, need to emergency network The signal cover of base station is simulated, and is assessed the performance of impacted base station so that relevant department into Capable quick and effective stringent effort.Therefore, it designs the signal that dynamic simulates Emergency Communications Network base station again and covers model It encloses, and can assess in time and emergency preplan is formulated with important existing for relevant department by the system for the index performance for influencing base station Sincere justice.
Emergency communication provides timely and effectively communication support for various emergencies, is the important of integrated application security system Component part, the even more lifeline of rescue and relief work.In the world, many countries pay much attention to the research of Emergency Communications Network and open Work is sent out, the U.S. begins setting up emergency communication net from the 1970s, in order to meet U.S. government for urgent thing The command scheduling requirement of part.The even more construction of investment huge fund and the physically-isolated government's private network in internet, carries out communication limited service Plan and improves emergency communication supportability using the technologies such as free-space method, WIMAX, WI-FI.Although China is answered The problems such as anxious communication support System Construction has a great development, but still remains technical system and fall behind, and capital investment is insufficient, There are also larger gaps with the actual requirement of emergency communication.
In order to reflect the exception of communication network in time and take corresponding remedial measure, various regions government is directed to itself institute The geographical location of category, economic condition respectively establish affiliated Emergency Communications Network system.Current most of emergency communication net The emergency preplan of network system is all based on the network topology structure of system itself and designs.These systems are mainly by ripe The series of rules library known communication service knowledge and there is the expert of data analysis experience to establish.The rule of this kind of emergency communication system It is general relatively simple, it is only necessary to whether to be interrupted according to the link in network topology structure, judge the base station with the presence or absence of different with this Often, and not reflect in emergency network base station range the power of signal or either with or without signal, and can not embody The corresponding load capacity in all base stations in whole system.
Summary of the invention
In view of this, the embodiment of the present invention is designed to provide a kind of base station performance analysis method and device, to solve Above-mentioned technical problem.
In a first aspect, the embodiment of the invention provides a kind of base station performance analysis methods, comprising:
The status data of all base stations in the corresponding communication system in region to be measured is obtained, the status data includes base station section Point parameter, system environments parameter and network topological information;
Dynamic simulative emulation is carried out according to the base-station node parameter, system environments parameter and network topological information, is obtained The corresponding Radio map in the region to be measured, and signal blind zone is identified according to the Radio map;And
Base station performance assessment is carried out according to the base-station node parameter, system environments parameter and network topological information, is obtained The corresponding running state information in the base station region Zhong Ge to be measured.
Further, described that dynamic is carried out according to the base-station node parameter, system environments parameter and network topological information Analog simulation obtains the corresponding Radio map in the region to be measured, comprising:
According to the base-station node parameter, system environments parameter and network topological information, obtained using signal superposition method The corresponding covering signal strength of each cell in the region to be measured;
Described point, which is carried out, according to the covering signal strength of each cell obtains the Radio map.
It is further, described that signal blind zone is identified according to the Radio map, comprising:
According toBinary conversion treatment is carried out to the Radio map, obtains binary image, CmnThe pixel value of corresponding pixel, C' are arranged for m row n-th in the Radio mapmnFor m in the binary image Row n-th arranges the gray value of corresponding pixel;
According toPixel overturning processing, image after being overturn are carried out to the binary image;Its In, C "mnThe gray value of corresponding pixel is arranged for m row n-th in image after the overturning;
Image after the overturning is carried out image filtering, image expansion, Image erosion, profile orientation detection and profile to delineate Processing, obtains the signal blind zone.
Further, described that base station is carried out according to the base-station node parameter, system environments parameter and network topological information Performance Evaluation obtains the corresponding running state information in the base station region Zhong Ge to be measured, comprising:
According to the base-station node parameter, system environments parameter and network topological information, calculated using PageRank algorithm The corresponding PageRank score in each base station determines that the operating status of respective base station is believed according to the PageRank score of each base station Breath.
Further, described according to the base-station node parameter, system environments parameter and network topological information, utilize signal Method of superposition obtains the corresponding covering signal strength of each cell in the region to be measured, comprising:
According toCalculate the signal coverage strength for obtaining each cell;
Wherein, signalkFor the corresponding signal coverage strength of k-th of cell;CikIt is small to described k-th for i-th of base station The signal coverage strength in area, i and k are positive integer.
Further, described according to the base-station node parameter, system environments parameter and network topological information, it utilizes PageRank algorithm calculates the corresponding PageRank score in each base station, comprising:
According toCalculate the corresponding PageRank score in each base station;
Wherein, PR (Pi) it is PiThe corresponding PageRank score in base station, C (Pj) it is PjGo out chain number, and PjIt is described to be measured P is removed in all base stations that region includesiBase station except base station;Q is damped coefficient;N is total number of base.
Further, after the PageRank score according to each base station determines the running state information of respective base station, The method, further includes:
If the corresponding PageRank score in base station is greater than preset threshold, warning note is carried out.
Further, the method, further includes:
The Radio map, the corresponding running state information in the signal blind zone and each base station are shown and deposited Storage.
Further, in obtaining the corresponding communication system in region to be measured after the status data of all base stations, the side Method, further includes:
Pretreatment operation is carried out to the status data, wherein the pretreatment operation includes that missing is handled, at exceptional value In reason, data integration, Data Discretization and data standardization any one or combinations thereof.
Second aspect, the embodiment of the invention provides a kind of base station performance analysis systems, comprising:
Data acquisition module, it is described for obtaining the status data of all base stations in the corresponding communication system in region to be measured Status data includes base-station node parameter, system environments parameter and network topological information;
Analog simulation module, for being carried out according to the base-station node parameter, system environments parameter and network topological information Dynamic simulative emulation obtains the corresponding Radio map in the region to be measured, and identifies signal according to the Radio map Blind area;
Performance estimation module, for being carried out according to the base-station node parameter, system environments parameter and network topological information Base station performance assessment obtains the corresponding running state information in the base station region Zhong Ge to be measured.
The third aspect, the embodiment of the present invention provide a kind of electronic equipment, comprising: processor, memory and bus, wherein
The processor and the memory complete mutual communication by the bus;
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to refer to Enable the method and step for being able to carry out first aspect.
Fourth aspect, the embodiment of the present invention provide a kind of non-transient computer readable storage medium, comprising:
The non-transient computer readable storage medium stores computer instruction, and the computer instruction makes the computer Execute the method and step of first aspect.
The embodiment of the present invention is by utilizing base-station node parameter, system environments parameter and network topological information to region to be measured In base station carry out analog simulation and Performance Evaluation, obtain the operation shape of corresponding Radio map, signal blind zone and each base station State information, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.
Other features and advantages of the present invention will be illustrated in subsequent specification, also, partly be become from specification It is clear that by implementing understanding of the embodiment of the present invention.The objectives and other advantages of the invention can be by written theory Specifically noted structure is achieved and obtained in bright book, claims and attached drawing.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is a kind of base station performance analysis method provided in an embodiment of the present invention;
Fig. 2 is dynamic simulative emulation flow diagram provided in an embodiment of the present invention;
Fig. 3 is estimation flow schematic diagram in base station provided in an embodiment of the present invention;
Fig. 4 is a kind of base station performance analysis system structural schematic diagram provided in an embodiment of the present invention;
Fig. 5 is electronic equipment entity structure schematic diagram provided in an embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile of the invention In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
Fig. 1 is a kind of base station performance analysis method provided in an embodiment of the present invention, as shown in Figure 1, this method comprises:
Step 101: obtaining the status data of all base stations in the corresponding communication system in region to be measured, the state data packets Include base-station node parameter, system environments parameter and network topological information.
In the specific implementation process, analysis system can be connect by a data collection interface with communication system, so The status data of all base stations in region to be measured is obtained by data collection interface afterwards, it should be noted that analysis system is real-time Status data is obtained, and status data is stored.Therefore, existing historical state data is stored in analysis system, and is had The status data at current time.Wherein, communication system can be Emergency Communications Network system, and status data may include base station The network topological information of node parameter, system environments parameter and the communication system also may include that signal in system scope covers Lid data, base station communication data and user behavior data etc..Also, network topological information includes the number of base station, longitude and latitude, base It stands and resides the information such as population support, base station location type and BTS service channel capacity.
Step 102: it is imitative that dynamic analog being carried out according to the base-station node parameter, system environments parameter and network topological information Very, the corresponding Radio map in the region to be measured is obtained, and signal blind zone is identified according to the Radio map.
In the specific implementation process, network topological information includes number, longitude and latitude, the resident population in base station of base station The information such as mesh, base station location type, BTS service channel capacity, base-station node parameter include road survey signal, system Environmental parameter includes base station range data etc..After analysis system gets status data, according to the number of base station, longitude and latitude Information, road survey signal and the bases such as population support, base station location type, BTS service channel capacity are resided in degree, base station Coverage area of standing data carry out dynamic simulative emulation, and so-called dynamic simulative emulation is since analysis system can obtain status number in real time According to just will do it corresponding analog simulation after obtaining new status data, because of referred to herein as dynamic simulative emulation.Pass through dynamic The covering signal strength that each cell in region to be measured can be obtained after analog simulation draws according to covering signal strength and generates letter Number coverage diagram, and signal blind zone is identified according to Radio map.It is understood that may include multiple small in region to be measured Area, when communication system operates normally, each cell has at least one base station to cover it.
Step 103: base station performance being carried out according to the base-station node parameter, system environments parameter and network topological information and is commented Estimate, obtains the corresponding running state information in the base station region Zhong Ge to be measured.
On the basis of the above embodiments, after analysis system gets status data, according to base-station node parameter, system Environmental parameter and network topological information assess the performance of each base station in region to be measured, obtain the operation of each base station Status information.It is understood that running state information may include the load capacity of each base station.
It should be noted that required parameter can specifically have: network topology when the performance to base station is assessed Base station network topological structure in information, the base station in system environments parameter log in personnel amount and base-station node in real time The real-time Traffic Channel occupation proportion of the real-time traffic channel capacity in base station and base station in parameter.Step 102 and step 103 can To carry out parallel, can also successively carry out, and sequencing can be adjusted according to the actual situation.
The embodiment of the present invention is by utilizing base-station node parameter, system environments parameter and network topological information to region to be measured In base station carry out analog simulation and Performance Evaluation, obtain the operation shape of corresponding Radio map, signal blind zone and each base station State information, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.
On the basis of the above embodiments, described according to the base-station node parameter, system environments parameter and network topology Information carries out dynamic simulative emulation, obtains the corresponding Radio map in the region to be measured, comprising:
According to the base-station node parameter, system environments parameter and network topological information, obtained using signal superposition method The corresponding covering signal strength of each cell in the region to be measured;
Described point, which is carried out, according to the covering signal strength of each cell obtains the Radio map.
In the specific implementation process, Fig. 2 is dynamic simulative emulation flow diagram provided in an embodiment of the present invention, is such as schemed Shown in 2, which is specifically included that
Step 201: data conversion;The format disunity for the status data that analysis system is got, and dynamic analog is imitative Very required data format is different from the format for the status data that analysis system obtains, thus carry out dynamic simulative emulation it Before, data conversion can be carried out to the status data that analysis system is got, be converted into the format of status data to meet needs Format.
Step 202: signal dynamics simulation;It, can be every using signal superposition method analysis during dynamic simulative emulation The case where one cell is covered by base station.
Specific analog simulation process is as follows:
Assuming that { C1,C2,C3,C4…..CmBe m base station signal coverage information, it should be noted that the value of m has to be measured The quantity of base station in region determines that the structure of entire data field should be:
{C11,C12,C13,C14…..C1n},
{C21,C22,C23,C24…..C2n},
{C31,C32,C33,C34…..C3n},
{Cm1,Cm2,Cm3,Cm4…..Cmn}
Wherein C12Be meant that the 1st base station of current time correspond to second cell particle signal, entire data set, There is n data field, easily describes data mode required for this process.
According toCalculate the signal coverage strength for obtaining each cell;
Wherein, signalkFor the corresponding signal coverage strength of k-th of cell;And k-th of cell is by least one base station pair It carries out signal covering, CikIt is i-th of base station to the signal coverage strength of k-th of cell, and CikValue can by point Base-station node parameter, system environments parameter and the network topological information that analysis system is got are comprehensive to be obtained, and i and k are positive integer, k Maximum value determined by the base station number for including in region to be measured, the base station that the maximum value of n is capped by cell to be calculated it is total Number determines.Such as: when calculating the signal coverage strength of some cell, it is assumed that there are three base stations to cover the cell simultaneously, that N is 3, and there is corresponding signal coverage strength in each base station to the cell, and signal coverage strength is maximum as the cell Signal coverage strength.
Step 203: generating Radio map;After getting the corresponding signal coverage strength of each cell, using scatterplot The form of figure carries out described point, generates Radio map, and identify current signal blind zone for Radio map.It is understood that , signal blind zone is not known as by the region that signal covers in Radio map.It is understood that each point indicates One cell can indicate signal coverage strength by different colours or different color depths.It can be signal coverage strength to get over By force, the color for describing the point come is deeper, and signal coverage strength value can also be marked directly on corresponding point.
The embodiment of the present invention by according to the corresponding covering signal strength of each cell, according to covering signal strength obtain to The corresponding Radio map in region is surveyed, covers feelings so as to the more intuitive signal for obtaining each cell in region to be measured Condition.
It is on the basis of the above embodiments, described that signal blind zone is identified according to the Radio map, comprising:
Step 204: image binaryzation;After acquiring the corresponding Radio map in region to be measured, according toBinary conversion treatment is carried out to Radio map, obtains binary image, CmnFor in Radio map M row n-th arranges the pixel value of corresponding pixel, C'mnThe gray scale of corresponding pixel is arranged for m row n-th in binary image Value;
Step 205: image pixel overturning;According toPixel overturning processing is carried out to binary image, Image after being overturn;Wherein, C'm'nThe gray value of corresponding pixel is arranged for m row n-th in image after overturning;
Step 206: image outline detection;By after the overturning image carry out image filtering, image expansion, Image erosion, Profile orientation detection and profile delineate processing, obtain the signal blind zone.
Image filtering technology mainly removes some noises (such as white Gaussian noise) in image.Expansion is exactly in image High bright part expanded, " contiguous range expansion ", effect picture possesses the highlight regions bigger than original image.Corrosion is exactly in original image High bright part is corroded, and " neighborhood is nibbled ", effect picture possesses highlight regions more smaller than original image.In this course, image Filtering processing repeatedly alternately, specifically needs to carry out the processing of how many times with image expansion processing, Image erosion processing, can be with It is determined according to required precision with actual production mode.
Image filtering processing technique includes but is not limited to following technology:
1) mean filter (normalized box filter): first picture is replaced with the average value of its pixel surrounding pixel Element value, can also filter the marginal information of image while filtering out noise.
2) gaussian filtering (Gaussian filter): gaussian filtering is most common filter, has separable property, Dimensional Gaussian operation can be converted to one-dimensional Gauss operation, be essentially a low-pass filter.
3) median filtering (median filter): median filtering is with the intermediate value generation in test pixel surrounding neighbors set of pixels For original pixel.When median filtering removes salt-pepper noise and patch noise, effect is clearly.
4) bilateral filtering (bilateral filter): bilateral filtering can be good at retaining edge spy in smoothed image Property, but its arithmetic speed is slow.
After above-mentioned steps form specific profile, and then needs to carry out profile orientation detection and profile delineates processing, Edge detection is carried out by some edge detection operators, realizes that profile highlights.
Edge detection process technology includes but is not limited to following technology:
1) difference edge detection
2) Reborts operator
3) Sobel operator
4) Prewitt operator
5) Kirsch operator
6) Laplace operator
7) LOG operator
8) Canny operator
By above-mentioned several edge detection operators, carries out profile orientation detection and profile delineates processing, gradient operator meter It calculates simply, but precision is not high, can only detect the rough profile of image, and thinner edge may be ignored. Prewitt and Sobel operator ratio Roberts effect is much better.The detection effect of LOG filter and Canny operator is better than ladder Operator is spent, is capable of detecting when the thinner marginal portion of image.Different system, for different environmental condition and requirement, selection Suitable operator to carry out edge detection to image.
By above-mentioned each step can by the corresponding Radio map in region to be measured by signal cover region and It is not distinguished by the region that signal covers, to obtain signal blind zone, can intuitively obtain which region not by base Station covers, and staff is enabled to repair in time.
On the basis of the above embodiments, described according to the base-station node parameter, system environments parameter and network topology Information carries out base station performance assessment, obtains the corresponding running state information in the base station region Zhong Ge to be measured, comprising:
According to the base-station node parameter, system environments parameter and network topological information, calculated using PageRank algorithm The corresponding PageRank score in each base station determines that the operating status of respective base station is believed according to the PageRank score of each base station Breath.
In the specific implementation process, Fig. 3 is estimation flow schematic diagram in base station provided in an embodiment of the present invention, such as Fig. 3 institute Show, specific appraisal procedure includes:
Step 301: data conversion;It is collected to analysis system in advance when the performance to each base station is assessed Status data formats, and is converted into format required when assessment.
Step 302: calculation base station load capacity;The corresponding PageRank in each base station is calculated by PageRank algorithm to obtain Point, further obtain the load capacity of base station.
Wherein PageRank algorithm is as follows:
1) each index value for influencing base station is determined;Base-station node parameter that wherein, index value is got by analysis system, It is obtained in system environments parameter and network topological information, specifically has which index value that can obtain according to the actual situation;
2) network topology structure of emergency communication network is determined;The network topology structure is acquired by analysis system;
3) the link ability of network topology structure is added in basic PageRank algorithm, particularly by base station Historical information is added in PageRank algorithm, it is to be understood that historical information is the base-station node ginseng of the history got Number.
PageRank algorithm basic principle is as follows:
1) in the initial stage: base station builds Web graph by linking relationship, and same PageRank is arranged in each base station Value, by the calculating of several wheels, can obtain each base station PageRank value finally obtained.With each round calculating into Row, the current PageRank value in base station can be continuously available update.
2) calculation method of base station PageRank score is updated in a wheel: updating base station PageRank score in a wheel In calculating, each base station goes out what its current PageRank value was evenly distributed to that this base station includes on chain, in this way each Link obtains corresponding weight.And each base station will all point at the weight summation for entering chain and being passed to of this base station, just Available new PageRank score.When each base station obtains updated PageRank value, a wheel has just been finished PageRank is calculated.
PageRank algorithm basic calculating formula is as follows:
Wherein PR (Pi) it is base station PiPageRank score, C (Pj) it is PjGo out chain number, and PjIt is wrapped for the region to be measured P is removed in all base stations includediBase station except base station;Q is damped coefficient;N is total number of base.
Assuming that: if a set being made of only 4 base stations: A, B, C and D.If whole base stations all chains to A, The so PR of A (PageRank) value summation that will be B, C and D.
PR (A)=PR (B)+PR (C)+PR (D)
If continuing B is also linked to C, and D also has 3 base stations being linked to comprising A.One base station cannot vote 2 It is secondary.So B gives each base station half fare, with identical logic, ticket that D is launched only has three/in one arrived A's On PageRank.
In other words, go out the PR value that sum divides a base station equally according to chain.
Because being 0 there are some base station chaining numbers, no matter that is, those base stations for not linking what other base station, Referred to as isolated base station, enables very more base stations to be asked by imitative.Therefore PageRank formula need be modified, i.e., simple The general value q=0.85 of damped coefficient (damping factor) q, q is added on the basis of formula.Its meaning is, random Moment, user reach behind certain base station and continue the probability transmitted backward.
Step 303: assessment load of base station ability;Base station can be evaluated according to the corresponding PageRank score in each base station Load capacity, PageRank score is higher, and the load for proving that base station is current is bigger, and load capacity is lower.
Step 304: releasing overload base station;Preset threshold is set according to historical data, by the corresponding of each base station PageRank score is compared with preset threshold, if the PageRank score of some base station is greater than preset threshold, illustrates this Base station is overload base station.
Step 305: overload base station early warning;It alarms overload base station.
The embodiment of the present invention is by utilizing base-station node parameter, system environments parameter and network topological information to region to be measured In base station carry out analog simulation and Performance Evaluation, obtain the operation shape of corresponding Radio map, signal blind zone and each base station State information, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.
On the basis of the above embodiments, the method, further includes:
The Radio map, the corresponding running state information in the signal blind zone and each base station are shown and deposited Storage enables staff to understand the base station performance intuitively got in region to be measured.
Data storage technology includes but is not limited to following technology: 1) relevant database;2)HDFS;3)Hive;4) HBase;5)ElasticSearch;6) PMML file;7) Else Rule and knowledge store format.
On the basis of the various embodiments described above, the status number of all base stations in obtaining the corresponding communication system in region to be measured According to later, the method, further includes:
Pretreatment operation is carried out to the status data, wherein the pretreatment operation includes that missing is handled, at exceptional value In reason, data integration, Data Discretization and data standardization any one or combinations thereof.
In the specific implementation process, it after analysis system gets status data, needs to carry out status data pre- Processing operation, when carrying out state data acquisition, can be loaded by extracting conversion (Extract-Transform-Load, ETL) subsystem is acquired, and the main function of ETL subsystem is from the database of exterior (including various storage service numbers According to the databases such as relevant database, document-type, key assignments type, pattern) or file (what such as user accessed IP address information is System or business diary file) in extract required for data, and necessary cleaning and conversion are carried out to data, are then stored into big In data-storage system.
One, ETL collecting method includes but is not limited to following technology:
1) merging data from multiple tables of same database;
2) merging data from the different tables of the database of multiple same types, set;
3) from the database combining data of multiple and different types;
4) the drawing-out structure data from unstructured or semi-structured data;
5) subset of field used or attribute is extracted from former record or document.
Two, shortage of data processing method includes but is not limited to following technology:
1) duplicate record is removed;
2) record of field or attribute that missing is of great significance is deleted;
3) different field name or the attribute-name different still identical field of meaning or attributes are removed;
4) type for converting field or attribute, is such as converted into UTC integer for date type;
5) continuous value type is converted into discrete type, hundred-mark system achievement is such as converted into grade;
6) the same constant of the attribute of missing is replaced into (such as " null " or mean value etc.);
7) with most likely value filling (such as tool with recurrence, Bayes etc. based on reasoning or Decision Tree Inductive it is true It is fixed).
Three, outlier processing method includes but is not limited to following technology:
1) direct suppressing exception value;
2) retain for the time being, the comprehensive analysis after integrating overall model;
3) replaced using mean value or other statistics;
4) missing values are regarded as, are filled up using statistical model.
Data integration relates generally to redundancy processing and colliding data detection and handles.Data integrating method includes but is not limited to Following technology:
1) for numerical attribute, the two categories data redundancy: are estimated by the related coefficient between computation attribute A and B Property correlation an attribute is rejected from the two attributes if the correlation between two attributes is larger, using remaining Attribute substitute biggish two primitive attributes of correlation, reduce data redundancy
2) it colliding data detection and processing: when matching the attribute of a database with another when data integration, to examine The structure of data is considered, for guaranteeing the matching in the dependence of the attribute function in original system and reference constraint and goal systems.
(for example, weight attribute may be stored in a system with metric unit, and with made in Great Britain single in another system Position storage.)
Data normalization method includes but is not limited to following technology:
1) min-max is standardized;
2) z-score is standardized;
3) decimal scaling decimal calibration standardization;
4) vector normalization method;
5) linear scale transform's method;
6) mean value method;
7) index conversion method.
Method of Data Discretization includes but is not limited to following technology:
1) group is away from grouping: group is the most basic method of data branch mailbox away from grouping, including is equidistantly grouped and is grouped with non-equidistant.Deng Away from grouping: the difference of each group of other upper and lower bound is equal.Non-equidistant grouping: the difference of each group of other upper and lower bound, Differ.Data after grouping, if being used as input variable in subsequent modeling, for the classification prediction to output variable, then not Appropriate group may make certain sample sizes unbalance away from grouping, influence the effect of model.
2) quantile is grouped: being divided into counting to be grouped and is also done equal frequency divisions group, is point of observation to be uniformly divided into n equal portions, wraps in every part The observation points contained are identical.(such as: some main package shares 50,000 people order, and frequency divisions section is waited to need first user by the order time It is arranged in order, whole subscribed users can be uniformly divided into ten sections by one group of 5000 people after arranging.)
3) single argument is grouped: single argument grouping is also referred to as order grouping.Method be by all variables in descending order or ascending order row Sequence, sequence ranking is group result, is to be classified as variate-value is identical in same group.
4) based on the discretization of comentropy.
The embodiment of the present invention is by utilizing base-station node parameter, system environments parameter and network topological information to region to be measured In base station carry out analog simulation and Performance Evaluation, obtain the operation shape of corresponding Radio map, signal blind zone and each base station State information, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.
Fig. 4 is a kind of base station performance analysis system structural schematic diagram provided in an embodiment of the present invention, as shown in figure 4, this is System includes: data acquisition module 401, analog simulation module 402 and performance estimation module 403, wherein
Data acquisition module 401 is used to obtain the status data of all base stations in the corresponding communication system in region to be measured, institute Stating status data includes base-station node parameter, system environments parameter and network topological information;Analog simulation module 402 is used for basis The base-station node parameter, system environments parameter and network topological information carry out dynamic simulative emulation, obtain the region to be measured Corresponding Radio map, and signal blind zone is identified according to the Radio map;Performance estimation module 403 is used for according to institute It states base-station node parameter, system environments parameter and network topological information and carries out base station performance assessment, obtain in the region to be measured The corresponding running state information in each base station.
It is apparent to those skilled in the art that for convenience and simplicity of description, the device of foregoing description Specific work process, no longer can excessively be repeated herein with reference to the corresponding process in preceding method.
In conclusion the embodiment of the present invention is by utilizing base-station node parameter, system environments parameter and network topological information Analog simulation and Performance Evaluation are carried out to the base station in region to be measured, obtain corresponding Radio map, signal blind zone and Ge Ji The running state information stood, so as to the more accurate operating status for knowing the corresponding communication system in region to be measured.
Fig. 5 is electronic equipment entity structure schematic diagram provided in an embodiment of the present invention, as shown in figure 5, the electronic equipment, It include: processor (processor) 501, memory (memory) 502 and bus 503;Wherein,
The processor 501 and memory 502 complete mutual communication by the bus 503;
The processor 501 is used to call the program instruction in the memory 502, to execute above-mentioned each method embodiment Provided method, for example, obtain the status data of all base stations in the corresponding communication system in region to be measured, the state Data include base-station node parameter, system environments parameter and network topological information;According to the base-station node parameter, system environments Parameter and network topological information carry out dynamic simulative emulation, obtain the corresponding Radio map in the region to be measured, and according to institute It states Radio map and identifies signal blind zone;And believed according to the base-station node parameter, system environments parameter and network topology Breath carries out base station performance assessment, obtains the corresponding running state information in the base station region Zhong Ge to be measured.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated When machine executes, computer is able to carry out method provided by above-mentioned each method embodiment, for example, it is corresponding to obtain region to be measured Communication system in all base stations status data, the status data includes base-station node parameter, system environments parameter and net Network topology information;Dynamic simulative emulation is carried out according to the base-station node parameter, system environments parameter and network topological information, is obtained The corresponding Radio map in the region to be measured is obtained, and signal blind zone is identified according to the Radio map;And according to institute It states base-station node parameter, system environments parameter and network topological information and carries out base station performance assessment, obtain in the region to be measured The corresponding running state information in each base station.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium Computer instruction is stored, the computer instruction makes the computer execute method provided by above-mentioned each method embodiment, example It such as include: the status data for obtaining all base stations in the corresponding communication system in region to be measured, the status data includes base station section Point parameter, system environments parameter and network topological information;According to the base-station node parameter, system environments parameter and network topology Information carries out dynamic simulative emulation, obtains the corresponding Radio map in the region to be measured, and know according to the Radio map It Chu not signal blind zone;And base station performance is carried out according to the base-station node parameter, system environments parameter and network topological information Assessment obtains the corresponding running state information in the base station region Zhong Ge to be measured.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes: that USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should also be noted that similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.

Claims (10)

1. a kind of base station performance analysis method characterized by comprising
The status data of all base stations in the corresponding communication system in region to be measured is obtained, the status data includes base-station node ginseng Number, system environments parameter and network topological information;
Dynamic simulative emulation is carried out according to the base-station node parameter, system environments parameter and network topological information, described in acquisition The corresponding Radio map in region to be measured, and signal blind zone is identified according to the Radio map;And
Base station performance assessment is carried out according to the base-station node parameter, system environments parameter and network topological information, described in acquisition The corresponding running state information in the base station region Zhong Ge to be measured.
2. the method according to claim 1, wherein described join according to the base-station node parameter, system environments Several and network topological information carries out dynamic simulative emulation, obtains the corresponding Radio map in the region to be measured, comprising:
According to the base-station node parameter, system environments parameter and network topological information, obtained using signal superposition method described in The corresponding covering signal strength of each cell in region to be measured;
Described point, which is carried out, according to the covering signal strength of each cell obtains the Radio map.
3. the method according to claim 1, wherein described identify that signal is blind according to the Radio map Area, comprising:
According toBinary conversion treatment is carried out to the Radio map, obtains binary image, CmnFor M row n-th arranges the pixel value of corresponding pixel, C' in the Radio mapmnFor m row n-th in the binary image Arrange the gray value of corresponding pixel;
According toPixel overturning processing, image after being overturn are carried out to the binary image;Wherein, C”mnThe gray value of corresponding pixel is arranged for m row n-th in image after the overturning;
Image after the overturning is subjected to image filtering, image expansion, Image erosion, profile orientation detection and profile and delineates place Reason, obtains the signal blind zone.
4. the method according to claim 1, wherein described join according to the base-station node parameter, system environments Several and network topological information carries out base station performance assessment, obtains the corresponding running state information in the base station region Zhong Ge to be measured, Include:
According to the base-station node parameter, system environments parameter and network topological information, calculated using PageRank algorithm each The corresponding PageRank score in base station, the running state information of respective base station is determined according to the PageRank score of each base station.
5. according to the method described in claim 2, it is characterized in that, described join according to the base-station node parameter, system environments Several and network topological information is strong using the corresponding covering signal of cell each in the signal superposition method acquisition region to be measured Degree, comprising:
According toCalculate the signal coverage strength for obtaining each cell;
Wherein, signalkFor the corresponding signal coverage strength of k-th of cell;CikIt is i-th of base station to k-th of cell Signal coverage strength, i and k are positive integer.
6. according to the method described in claim 4, it is characterized in that, described join according to the base-station node parameter, system environments Several and network topological information calculates the corresponding PageRank score in each base station using PageRank algorithm, comprising:
According toCalculate the corresponding PageRank score in each base station;
Wherein, PR (Pi) it is PiThe corresponding PageRank score in base station, C (Pj) it is PjGo out chain number, and PjFor the region to be measured Including all base stations in remove PiBase station except base station;Q is damped coefficient;N is total number of base.
7. according to the method described in claim 4, it is characterized in that, being corresponded to being determined according to the PageRank score of each base station After the running state information of base station, the method, further includes:
If the corresponding PageRank score in base station is greater than preset threshold, warning note is carried out.
8. the method according to claim 1, wherein the method, further includes:
The Radio map, the corresponding running state information in the signal blind zone and each base station are displayed and store.
9. method according to claim 1-8, which is characterized in that obtaining the corresponding communication system in region to be measured In all base stations status data after, the method, further includes:
To the status data carry out pretreatment operation, wherein the pretreatment operation include missing processing, outlier processing, In data integration, Data Discretization and data standardization any one or combinations thereof.
10. a kind of base station performance analysis system characterized by comprising
Data acquisition module, for obtaining the status data of all base stations in the corresponding communication system in region to be measured, the state Data include base-station node parameter, system environments parameter and network topological information;
Analog simulation module, for carrying out dynamic according to the base-station node parameter, system environments parameter and network topological information Analog simulation obtains the corresponding Radio map in the region to be measured, and identifies signal blind zone according to the Radio map;
Performance estimation module, for carrying out base station according to the base-station node parameter, system environments parameter and network topological information Performance Evaluation obtains the corresponding running state information in the base station region Zhong Ge to be measured.
CN201811281699.8A 2018-10-30 2018-10-30 Base station performance analysis method and system Active CN109472075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811281699.8A CN109472075B (en) 2018-10-30 2018-10-30 Base station performance analysis method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811281699.8A CN109472075B (en) 2018-10-30 2018-10-30 Base station performance analysis method and system

Publications (2)

Publication Number Publication Date
CN109472075A true CN109472075A (en) 2019-03-15
CN109472075B CN109472075B (en) 2022-11-08

Family

ID=65666549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811281699.8A Active CN109472075B (en) 2018-10-30 2018-10-30 Base station performance analysis method and system

Country Status (1)

Country Link
CN (1) CN109472075B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110008202A (en) * 2019-04-15 2019-07-12 北京搜狐新媒体信息技术有限公司 A kind of model dispositions method and system reducing EMS memory occupation
CN111163486A (en) * 2019-12-24 2020-05-15 重庆邮电大学 D2D communication simulation and performance test system and method
CN111274109A (en) * 2020-01-20 2020-06-12 国网甘肃省电力公司信息通信公司 Evaluation algorithm and system of system software and hardware topology based on request processing simulation
CN113316161A (en) * 2020-12-01 2021-08-27 广州天越电子科技有限公司 Method for judging discontinuous cell coverage of digital indoor division design scheme
CN114095961A (en) * 2020-07-31 2022-02-25 中国移动通信集团四川有限公司 Coverage analysis method and system based on color clustering and electronic equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008014818A1 (en) * 2006-08-02 2008-02-07 Arieso Simulation tool and method for simulating a communication system
US20090323530A1 (en) * 2008-06-26 2009-12-31 Reverb Networks Dynamic load balancing
US9113353B1 (en) * 2015-02-27 2015-08-18 ReVerb Networks, Inc. Methods and apparatus for improving coverage and capacity in a wireless network
US20150350923A1 (en) * 2012-12-20 2015-12-03 Datang Mobile Communications Equipment Co., Ltd Network coverage planning method and apparatus of evolution communication system
CN108235452A (en) * 2017-12-22 2018-06-29 福州市协成智慧科技有限公司 A kind of lora Internet of Things base station and group network system
CN108632832A (en) * 2017-03-23 2018-10-09 北京神州泰岳软件股份有限公司 network coverage analysis method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008014818A1 (en) * 2006-08-02 2008-02-07 Arieso Simulation tool and method for simulating a communication system
US20090323530A1 (en) * 2008-06-26 2009-12-31 Reverb Networks Dynamic load balancing
US20150350923A1 (en) * 2012-12-20 2015-12-03 Datang Mobile Communications Equipment Co., Ltd Network coverage planning method and apparatus of evolution communication system
US9113353B1 (en) * 2015-02-27 2015-08-18 ReVerb Networks, Inc. Methods and apparatus for improving coverage and capacity in a wireless network
CN108632832A (en) * 2017-03-23 2018-10-09 北京神州泰岳软件股份有限公司 network coverage analysis method and system
CN108235452A (en) * 2017-12-22 2018-06-29 福州市协成智慧科技有限公司 A kind of lora Internet of Things base station and group network system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
A.W.REZA 等: "A New Technique of Removing Blind Spots to Optimize Wireless Coverage in Indoor Area", 《INTERNATIONAL JOURNAL OF ANTENNAS AND PROPAGATION》 *
刘晓娟: "城市轨道交通CBTC系统关键技术研究", 《中国优秀博硕士学位论文全文数据库(博士)工程科技Ⅱ辑》 *
国知局: "无线网络信号覆盖区域的强度分析方法和装置与流程", 《HTTP://WWW.XJISHU.COM/ZHUANLI/62/201710123400.HTML》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110008202A (en) * 2019-04-15 2019-07-12 北京搜狐新媒体信息技术有限公司 A kind of model dispositions method and system reducing EMS memory occupation
CN111163486A (en) * 2019-12-24 2020-05-15 重庆邮电大学 D2D communication simulation and performance test system and method
CN111163486B (en) * 2019-12-24 2022-04-15 重庆邮电大学 D2D communication simulation and performance test system and method
CN111274109A (en) * 2020-01-20 2020-06-12 国网甘肃省电力公司信息通信公司 Evaluation algorithm and system of system software and hardware topology based on request processing simulation
CN111274109B (en) * 2020-01-20 2023-06-02 国网甘肃省电力公司信息通信公司 Evaluation method and system for system software and hardware topology based on request processing simulation
CN114095961A (en) * 2020-07-31 2022-02-25 中国移动通信集团四川有限公司 Coverage analysis method and system based on color clustering and electronic equipment
CN114095961B (en) * 2020-07-31 2023-04-28 中国移动通信集团四川有限公司 Coverage analysis method and system based on color clustering and electronic equipment
CN113316161A (en) * 2020-12-01 2021-08-27 广州天越电子科技有限公司 Method for judging discontinuous cell coverage of digital indoor division design scheme
CN113316161B (en) * 2020-12-01 2023-01-17 广州天越电子科技有限公司 Method for judging discontinuous cell coverage of digital indoor division design scheme

Also Published As

Publication number Publication date
CN109472075B (en) 2022-11-08

Similar Documents

Publication Publication Date Title
CN109472075A (en) A kind of base station performance analysis method and system
Musa et al. A review of geospatial-based urban growth models and modelling initiatives
CN106933956B (en) Data mining method and device
CN109859054A (en) Network community method for digging, device, computer equipment and storage medium
Liu et al. A generalized framework for measuring pedestrian accessibility around the world using open data
Chen Analysis and forecast of traffic accident big data
Karimi et al. Urban expansion modeling using an enhanced decision tree algorithm
CN114611941A (en) Landslide disaster evaluation method and system considering space dangerousness
CN114418175A (en) Personnel management method and device, electronic equipment and storage medium
CN115271373A (en) Method and system for defining elastic development boundary of urban group
CN114529747A (en) Policy detection method, policy detection device, electronic apparatus, and storage medium
CN113505980A (en) Reliability evaluation method, device and system for intelligent traffic management system
CN111008730B (en) Crowd concentration prediction model construction method and device based on urban space structure
Lagarias Exploring land use policy scenarios with the use of a cellular automata-based model: urban sprawl containment and sustainable development in Thessaloniki
CN113807587B (en) Integral early warning method and system based on multi-ladder nuclear deep neural network model
CN113824580A (en) Network index early warning method and system
CN110222892A (en) The get-off stop prediction technique and device of passenger
CN115393148A (en) Data monitoring system, monitoring method, device, medium and terminal for natural resources
CN112561121B (en) Rework trend prediction method and system based on mobile phone signaling data
CN115271514A (en) Communication enterprise monitoring method and device, electronic equipment and storage medium
Chuangchang et al. Modelling urban growth over time using grid-digitized method with variance inflation factors applied to spatial correlation
CN114818849A (en) Convolution neural network based on big data information and anti-electricity-stealing method based on genetic algorithm
Gaitan et al. Opportunities for multivariate analysis of open spatial datasets to characterize urban flooding risks
Reggiani Evolutionary approaches to transport and spatial systems
CN115345465B (en) Multicolor level management method and system based on basic level treatment event

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant