CN109470102A - A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof - Google Patents

A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof Download PDF

Info

Publication number
CN109470102A
CN109470102A CN201811614395.9A CN201811614395A CN109470102A CN 109470102 A CN109470102 A CN 109470102A CN 201811614395 A CN201811614395 A CN 201811614395A CN 109470102 A CN109470102 A CN 109470102A
Authority
CN
China
Prior art keywords
bamboo
panel
dough sheet
tunnel
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811614395.9A
Other languages
Chinese (zh)
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Greenland Construction Group Co Ltd
Original Assignee
Shanghai Greenland Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Greenland Construction Group Co Ltd filed Critical Shanghai Greenland Construction Group Co Ltd
Priority to CN201811614395.9A priority Critical patent/CN109470102A/en
Publication of CN109470102A publication Critical patent/CN109470102A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D5/00Safety arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27JMECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
    • B27J1/00Mechanical working of cane or the like
    • B27J1/02Braiding, e.g. basket-making
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27MWORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
    • B27M3/00Manufacture or reconditioning of specific semi-finished or finished articles
    • B27M3/0013Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Wood Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of Tunnel Blasting protection bamboo raft reinforcement walls and preparation method thereof, including protective plate and are installed on the bracket of protective plate behind;Protective plate includes several reinforcement ribs of the panel being bonded with tunnel face and back side of panel;Panel is made of several bamboo panels being woven into using bamboo dough sheet, and the shape of several bamboo panels is identical as the shape of tunnel excavation section;The marginal dimension of entire panel exceeds tunnel contour line 50cm;Several reinforcement ribs are welded on bracket, form reticular structure in a crisscross manner.Bamboo raft reinforcement wall of the present invention before Portal Section blast working, is close to Tunnel muzzle arch setting bamboo raft reinforcement and keeps off stone walling, prevent individual fly-rock throwing too far;The present invention needs to process baffle in advance, and fee of material is lower, can reuse;Slungshot diffusion length can be effectively reduced, preferably reduction noise;It after machine-shaping of the present invention, can repeatedly utilize, quick for installation, work efficiency is high.

Description

A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof
[technical field]
The invention belongs to blasting protection field, it is related to a kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof.
[background technique]
Constructing tunnel relies primarily on explosion at present, the issuable adverse effect of protected object near the area explosion Shi Duibao. The vibration as caused by explosion individual flyings, air-shock wave, noise, underwater shock wave, flowing pressure, surges, dust, has Evil gas etc..If blast area is located near visit scenic spot, 3 warning points need to be set, and 1# warning point is at 200 meters of blast area due west The rear setting of machinery side by side outside prevents someone from entering work zone by sidewalk, and 2# warning point is 260 meters of the northeast Dong Ding Pavement fork in the road is swum, prevents visitor from crossing enclosing and enters work zone;3# warning point, which is located at fire point southeastern direction, prevents ditch Someone's drop-in.Winged corpse when explosion may injure building by a crashing object or treasure trees, and while explosion, have noise pollution with And pernicious gas pollution;For this purpose, a large amount of human resources need to be expended.
Mostly use two kinds of protectiving schemes greatly in the prior art:
(1) cubic metre of earth and stone protection is at tunnel face, at 20 meters of face explosion rear place, banks up a large amount of slags of delaying, width should reach To boundary is excavated, height is no less than 3m.With the slungshot for preventing Tunnel Blasting from generating.Program abundant raw materials are easy to get, but mechanical Demand is big, though winged corpse diffusion length can be effectively reduced, noise is lower smaller, while the program is affected time-consuming, working efficiency It is low.
(2) steel plate protectiving scheme.Before Portal Section blast working, splices one block of steel plate, used before explosion, it will with job platform Steel plate is close to Tunnel muzzle arch and is close to Tunnel muzzle arch progress blasting protection.The program need to process baffle, fee of material in advance It is higher, it can reuse, 1 loading machine is needed to be bulldozed platform;Though slungshot diffusion length can be effectively reduced, noise is reduced, needs weight Multiple assembly steel plate, working efficiency are lower.
[summary of the invention]
It is an object of the invention to overcome the above-mentioned prior art, a kind of Tunnel Blasting protection bamboo raft reinforcement wall is provided And preparation method thereof.
In order to achieve the above objectives, the present invention is achieved by the following scheme:
A kind of Tunnel Blasting protects bamboo raft reinforcement wall, including protective plate and is installed on the bracket of protective plate behind;Protective plate Several reinforcement ribs including the panel and back side of panel that are bonded with tunnel face;Panel is woven by several using bamboo dough sheet Bamboo panel constitute, the shape of several bamboo panels is identical as the shape of tunnel excavation section;The marginal dimension of entire panel exceeds Tunnel contour line 50cm;Several reinforcement ribs are welded on bracket, form reticular structure in a crisscross manner.
A further improvement of the present invention lies in that:
One bamboo panel is made of six roots of sensation bamboo dough sheet, and six roots of sensation bamboo dough sheet is as booster bamboo dough sheet, then by single bamboo dough sheet It successively crosses through to form a bamboo panel;The length of bamboo dough sheet is 3-4.5m, width 6-10cm, between adjacent bamboo dough sheet Spacing is 5-10mm.
Between reinforcement rib is set to back side of panel in length and breadth, and at every spacing 50cm setting one.
Bracket is welded using the support tripod of steel pipe production, and with reinforcement rib;The diagonal brace length of support tripod For 6m, erecting support length is 4.2m, and spacing 2m is together.
Diameter of steel tube is 42mm, spacing 2m.
There are the doors entered and left for explosion personnel for panel center bottom.
A kind of production method of bamboo raft reinforcement wall, comprising the following steps:
Step 1: bamboo dough sheet being woven into shape corresponding with tunnel excavation section, bamboo panel is made;
Step 2: overlapping in length and breadth add reinforcement rib on the back of the panel, then bamboo panel binding is completed into protection on bracket The production of plate;
Step 3: reinforcement rib and bracket being welded, the production of entire bamboo raft folder muscle wall is completed.
Its further improvement is as follows:
The specific method is as follows for the braiding of bamboo dough sheet in step 1:
Setting six roots of sensation bamboo dough sheet successively crosses through to form a bamboo face as booster bamboo dough sheet, then by single bamboo dough sheet Plate.
Compared with prior art, the invention has the following advantages:
Bamboo raft reinforcement wall of the present invention before Portal Section blast working, is close to Tunnel muzzle arch setting bamboo raft reinforcement and keeps off stone walling, Prevent individual fly-rock throwing too far;The present invention needs to process baffle in advance, and fee of material is lower, can reuse;It can be effectively reduced Slungshot diffusion length, preferably reduction noise;It after machine-shaping of the present invention, can repeatedly utilize, quick for installation, work efficiency is high.
According to " shotfiring safety regulation " (GB6722-2011), blasting flyrock safe distance is 70 meters, and the present invention can make quick-fried Broken slungshot diffusion length is reduced to 30 meters;According to the requirement of locating geographical environment, vibrating noise is 90 decibels, and the present invention can make quick-fried Noise is reduced to 60 decibels at area's 260m residential house.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram of bamboo raft reinforcement wall of the present invention;
Fig. 2 is the rearview of bamboo raft reinforcement wall of the present invention.
Wherein: 1- bamboo panel;2- tunnel contour line;3- reinforcement rib;4- steel pipe;5- suspension centre.
[specific embodiment]
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, the embodiment being not all of, and it is not intended to limit range disclosed by the invention.In addition, with In lower explanation, descriptions of well-known structures and technologies are omitted, obscures concept disclosed by the invention to avoid unnecessary.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment should fall within the scope of the present invention.
The various structural schematic diagrams for disclosing embodiment according to the present invention are shown in the attached drawings.These figures are not in proportion It draws, wherein some details are magnified for the purpose of clear expression, and some details may be omitted.As shown in the figure The shape in various regions, layer and relative size, the positional relationship between them out is merely exemplary, in practice may be due to Manufacturing tolerance or technical restriction and be deviated, and those skilled in the art may be additionally designed as required have not Similar shape, size, the regions/layers of relative position.
In context disclosed by the invention, when one layer/element is referred to as located at another layer/element "upper", the layer/element Can may exist intermediate layer/element on another layer/element or between them.In addition, if in a kind of court One layer/element is located at another layer/element "upper" in, then when turn towards when, the layer/element can be located at another layer/ Element "lower".
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
The invention will be described in further detail with reference to the accompanying drawing:
Referring to figure, Tunnel Blasting of the present invention protects bamboo raft reinforcement wall, including protective plate and is installed on the branch of protective plate behind Frame;Protective plate includes several reinforcement ribs 3 of the panel being bonded with tunnel face and back side of panel;Panel uses bamboo by several The bamboo panel 1 that dough sheet is woven into is constituted, and the shape of several bamboo panels 1 is identical as the shape of tunnel excavation section;Entire panel Marginal dimension exceeds 50cm than tunnel contour line 2;Several reinforcement ribs 3 are welded on bracket, form reticular structure in a crisscross manner.
One bamboo panel 1 is made of six roots of sensation bamboo dough sheet, and six roots of sensation bamboo dough sheet is as booster bamboo dough sheet, then by single bamboo dough sheet It successively crosses through to form a bamboo panel 1;The length of bamboo dough sheet is 3-4.5m, width 6-10cm, between adjacent bamboo dough sheet Spacing be 5-10mm.Between reinforcement rib 3 is set to back side of panel in length and breadth, and at every spacing 50cm setting one.Bracket is to use The support tripod that steel pipe 4 makes, and welded with reinforcement rib 3;The diagonal brace length of support tripod is 6m, and perpendicular support length is 4.2m, spacing 2m are together.4 diameter of steel pipe is 42mm, spacing 2m.There are the doors entered and left for explosion personnel for panel center bottom.
When use: as shown in Fig. 2, the bamboo raft reinforcement wall made is suspended on two, transverse and longitudinal steel pipe top by crane At suspension centre 5, slings and be installed at pre- explosion tunnel face, by bamboo raft reinforcement wall slant setting, and the center of gravity position of bamboo raft reinforcement wall In in tunnel;Bursting work is carried out after the installation is completed.
Bamboo raft reinforcement wall of the present invention it is specific the production method is as follows:
Step 1: production protecting wall
(1) it draws Preliminary design drawing: according to tunnel excavation face size, drawing up out protecting wall size, draw frame design Figure, is linked with diameter for the steel pipe of 42mm, steel pipe spacing general control is advisable in 2m in length and breadth.In the back side of bamboo panel spacing in length and breadth Every 50cm sets rib of putting more energy at one, i.e. increasing frame strength, is also convenient for that bamboo raft can be bound.
(2) it makes protecting wall steel pipe skeleton: according to frame design figure, making protecting wall skeleton, weldering using waste and old geomantic omen pipe Connect reinforcement rib.
(3) bamboo raft is installed: according to existing steel skeleton, by bamboo raft successively orderly binding, it is desirable that bamboo raft arrangement is compact, installation Securely, there are the wickets entered and left for explosion personnel for bamboo raft wall center bottom.
Step 2: production ballistic support
(1) it selectes protecting wall supporting way: disposing the size in place, design according to protecting wall size, mode of transport, processing Corresponding supporting way and intensity requirement, and draw design drawing.
(2) it processes ballistic support: according to design drawing, suitable material being selected to process the structural support of requirement.
(3) protecting wall is assembled: it is assembled that protecting wall main body and support rack that processing and fabricating finishes are carried out welding
Step 3: in-site installation, debugging
The bamboo raft reinforcement wall that finishes of assembly is moved into portal mouth with excavator, check whether be close to portal it is closely knit.
Test protective capacities:
After bamboo raft reinforcement wall, to later blasting flyrock expanding distance and Blasting shock wave size carried out data receipts Collection, effect are obvious.Statistics is as shown in Table 1 and Table 2.
1 blasting flyrock expanding distance statistics table of table
From above-mentioned collection data cases it is found that blasting flyrock expanding distance is obviously reduced
2 noise of blasting statistical form of table
From above-mentioned collection data cases it is found that Blasting shock wave size is obviously reduced.
The above content is merely illustrative of the invention's technical idea, and this does not limit the scope of protection of the present invention, all to press According to technical idea proposed by the present invention, any changes made on the basis of the technical scheme each falls within claims of the present invention Protection scope within.

Claims (8)

1. a kind of Tunnel Blasting protects bamboo raft reinforcement wall, which is characterized in that including protective plate and be installed on the branch of protective plate behind Frame;Protective plate includes several reinforcement ribs (3) of the panel being bonded with tunnel face and back side of panel;Panel is by several uses The bamboo panel (1) that bamboo dough sheet is woven into is constituted, and the shape of several bamboo panels (1) is identical as the shape of tunnel excavation section;Entirely The marginal dimension of panel exceeds tunnel contour line (2) 50cm;Several reinforcement ribs (3) are welded on bracket, criss-cross to be formed Reticular structure.
2. Tunnel Blasting according to claim 1 protects bamboo raft reinforcement wall, which is characterized in that a bamboo panel (1) is by six Root bamboo dough sheet is made, and six roots of sensation bamboo dough sheet successively crosses through to form a bamboo as booster bamboo dough sheet, then by single bamboo dough sheet Panel (1);The length of bamboo dough sheet is 3-4.5m, width 6-10cm, and the spacing between adjacent bamboo dough sheet is 5-10mm.
3. Tunnel Blasting according to claim 1 protects bamboo raft reinforcement wall, which is characterized in that reinforcement rib (3) is set to Back side of panel in length and breadth between, and every spacing 50cm setting one at.
4. Tunnel Blasting according to claim 1 protects bamboo raft reinforcement wall, which is characterized in that bracket is using steel pipe (4) The support tripod of production, and welded with reinforcement rib (3);The diagonal brace length of support tripod is 6m, and erecting support length is 4.2m, Spacing 2m is together.
5. Tunnel Blasting according to claim 4 protects bamboo raft reinforcement wall, which is characterized in that steel pipe (4) diameter is 42mm, Spacing 2m.
6. Tunnel Blasting according to claim 1 protects bamboo raft reinforcement wall, which is characterized in that there are confessions for panel center bottom The door that explosion personnel enter and leave.
7. the production method of bamboo raft reinforcement wall described in a kind of claim 1-6 any one, which is characterized in that including following step It is rapid:
Step 1: bamboo dough sheet being woven into shape corresponding with tunnel excavation section, bamboo panel (1) is made;
Step 2: overlapping add reinforcement rib (3) in length and breadth on the back of the panel, then by bamboo panel (1) binding on bracket, complete anti- The production of backplate;
Step 3: reinforcement rib (3) and bracket being welded, the production of entire bamboo raft folder muscle wall is completed.
8. production method according to claim 7, which is characterized in that the specific method is as follows for the braiding of bamboo dough sheet in step 1:
Setting six roots of sensation bamboo dough sheet successively crosses through to form a bamboo panel as booster bamboo dough sheet, then by single bamboo dough sheet (1)。
CN201811614395.9A 2018-12-27 2018-12-27 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof Pending CN109470102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811614395.9A CN109470102A (en) 2018-12-27 2018-12-27 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811614395.9A CN109470102A (en) 2018-12-27 2018-12-27 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof

Publications (1)

Publication Number Publication Date
CN109470102A true CN109470102A (en) 2019-03-15

Family

ID=65676759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811614395.9A Pending CN109470102A (en) 2018-12-27 2018-12-27 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109470102A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320339A (en) * 2021-12-20 2022-04-12 攀钢集团工程技术有限公司 Buffering damping device for preventing blasting damage of tunnel portal

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6414500A (en) * 1987-07-09 1989-01-18 Hazama Gumi Prevention of diffusion for blasting dust
AR244124A1 (en) * 1980-06-28 1993-10-29 Mario Hugo Ferrando A method for manufacturing imitation wicker furniture.
CN102419140A (en) * 2011-11-25 2012-04-18 中铁十二局集团第三工程有限公司 Multielement three-dimensional safety protection method
KR101359610B1 (en) * 2013-07-19 2014-02-11 주식회사 경동건설 Tunnel construction method with blasting and center wall building
CN203798263U (en) * 2014-04-28 2014-08-27 中铁一局集团有限公司 Bamboo reinforced stone-retaining device for blasting protection
CN204228008U (en) * 2014-10-27 2015-03-25 中交第二航务工程局有限公司 A kind of tunnel portal explosion three-dimensional protector being close to existing building
CN108562198A (en) * 2018-06-26 2018-09-21 武汉科技大学 A kind of collaboration means of defence being used for blasting flyrock and blasting vibration

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AR244124A1 (en) * 1980-06-28 1993-10-29 Mario Hugo Ferrando A method for manufacturing imitation wicker furniture.
JPS6414500A (en) * 1987-07-09 1989-01-18 Hazama Gumi Prevention of diffusion for blasting dust
CN102419140A (en) * 2011-11-25 2012-04-18 中铁十二局集团第三工程有限公司 Multielement three-dimensional safety protection method
KR101359610B1 (en) * 2013-07-19 2014-02-11 주식회사 경동건설 Tunnel construction method with blasting and center wall building
CN203798263U (en) * 2014-04-28 2014-08-27 中铁一局集团有限公司 Bamboo reinforced stone-retaining device for blasting protection
CN204228008U (en) * 2014-10-27 2015-03-25 中交第二航务工程局有限公司 A kind of tunnel portal explosion three-dimensional protector being close to existing building
CN108562198A (en) * 2018-06-26 2018-09-21 武汉科技大学 A kind of collaboration means of defence being used for blasting flyrock and blasting vibration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320339A (en) * 2021-12-20 2022-04-12 攀钢集团工程技术有限公司 Buffering damping device for preventing blasting damage of tunnel portal

Similar Documents

Publication Publication Date Title
CN113152928B (en) Dismantling method for super high-rise building
CN101967888A (en) Multidirectional multi-fold blasting method for high-rise building with frame-shear structure
US20090020241A1 (en) Portable ballistics barrier
US9637945B2 (en) Air beam system for an air beam structure for shielding against airborne projectiles
EP1955005A2 (en) Protective structure and protective system
CN211084972U (en) Rubber pad net-shaped gun and quilt demolition blasting protection device
CN112983047A (en) Static cutting demolition method suitable for blasting demolition
US20080185565A1 (en) Fence and installation method therefor
CN100582411C (en) Assembled blast wall and inverted type road lunge combination protection device
CN110553560A (en) Blasting demolition method for building
CN109470102A (en) A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof
CN203798263U (en) Bamboo reinforced stone-retaining device for blasting protection
KR101258043B1 (en) Eco-friendly reinforced retainaing wall and construction method thereof
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
CN202247902U (en) Micro-difference control blasting demolition structure for supporting beam in foundation pit concrete
CN106088098A (en) Supporting removal construction method
CN108362180A (en) A kind of surge wave means of defence of armored concrete water-retaining cofferdam antiseepage stake demolition blasting
CN112923820B (en) Perforation charge explosion method suitable for blasting demolition of middle upright column
CN101672613A (en) Vibration-reducing blasting construction method of air spring
CN113154978B (en) Frame cylinder high-rise building blasting demolition method
CN211178169U (en) Protection device for small-size tunnel blasting construction in city
CN112985209B (en) Detonation method suitable for blasting demolition
CN106440986A (en) Safety protection device for supporting beam blasting and dismantling and using method thereof
CN112880507B (en) Perforation explosive charging explosion method suitable for blasting demolition of middle shear wall
CN210108172U (en) Splicing type protective device for blasting demolition of supporting beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315