CN109468951A - The portable quick detachable road and bridge engineering scaffold just assembled - Google Patents
The portable quick detachable road and bridge engineering scaffold just assembled Download PDFInfo
- Publication number
- CN109468951A CN109468951A CN201710798074.8A CN201710798074A CN109468951A CN 109468951 A CN109468951 A CN 109468951A CN 201710798074 A CN201710798074 A CN 201710798074A CN 109468951 A CN109468951 A CN 109468951A
- Authority
- CN
- China
- Prior art keywords
- fixed
- quick detachable
- support column
- bridge engineering
- portable quick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000758 substrate Substances 0.000 claims abstract description 10
- 238000010586 diagram Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses the portable quick detachable road and bridge engineering scaffolds just assembled, fixed substrate is equipped with the first fixation hole, connector includes connection end, one end of connection end is fixedly connected with the first fixation hole, the other end of connection end is equipped with fixed end, fixed end is arc-shaped, fixed end is equipped with multiple second fixation holes, the setting of multiple second fixation holes interval, one end of bottom support column is fixed by the second fixation hole, the other end of bottom support column is equipped with fixing sleeve, extension bar is fixed by fixing sleeve, the both ends of firm bar pass through adjacent base support column respectively and/or extension bar is fixed.The present invention provides the portable quick detachable road and bridge engineering scaffold just assembled, is convenient for carrying, assembly and disassembly are more convenient, and length can according to need any adjusting, and stability is good, and structure is simple, and practicability is stronger.
Description
Technical field
The present invention relates to road and bridge technical field, the especially portable quick detachable road and bridge engineering foot just assembled
Hand cradle.
Background technique
Currently, for existing road and bridge engineering staff, used protection body, volume is big, it has not been convenient to carry
And handling, and since volume is larger, occupied area is larger, it takes time and effort during transportation, in addition, structure is complicated,
Be inconvenient to install, labor intensity is larger.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides the portable quick detachable road and bridge engineerings just assembled
It with scaffold, is convenient for carrying, assembly and disassembly are more convenient, and length can according to need any adjusting, and stability is good, knot
Structure is simple, and practicability is stronger.
To achieve the goals above, the technical solution adopted by the present invention is that: the portable quick detachable road and bridge just assembled
Engineering scaffold, including fixed substrate, fixed substrate are equipped with the first fixation hole, and connector includes connection end, connecting pin
One end of head is fixedly connected with the first fixation hole, and the other end of connection end is equipped with fixed end, and fixed end is arc-shaped, Gu
Fixed end head is equipped with multiple second fixation holes, and one end of the setting of multiple second fixation holes interval, bottom support column is solid by second
Determine hole to be fixed, the other end of bottom support column is equipped with fixing sleeve, and extension bar is fixed by fixing sleeve, consolidates the two of bar
End is fixed by adjacent base support column and/or extension bar respectively.
Preferably, one end of the connection end and the first fixation hole are threadedly coupled.
Any of the above-described scheme is preferably, and is set in the fixed end there are five the second fixation hole, five the second fixation holes
Interval setting.
Any of the above-described scheme is preferably, and the fixing sleeve is equipped with internal screw thread, and one end of bottom support column and extension bar is set
There is the external screw thread being mutually matched.
Any of the above-described scheme is preferably, and the firm bar is obliquely installed.
Any of the above-described scheme is preferably, and one end of the fixed substrate is equipped with shank, and the other end is equipped with and shank
The spliced eye being mutually matched.
Any of the above-described scheme is preferably, and the bottom support column is identical with the length of extension bar.
Any of the above-described scheme is preferably, and the bottom support column is different with the length of extension bar.
Any of the above-described scheme is preferably, and connecting hole is equipped on the bottom support column and extension bar, and firm bar passes through
Connecting hole is fixed.
The beneficial effects of the present invention are: fixed substrate is equipped with the first fixation hole, connector includes connection end, connecting pin
One end of head is fixedly connected with the first fixation hole, and the other end of connection end is equipped with fixed end, and fixed end is arc-shaped, Gu
Fixed end head is equipped with multiple second fixation holes, and one end of the setting of multiple second fixation holes interval, bottom support column is solid by second
Determine hole to be fixed, the other end of bottom support column is equipped with fixing sleeve, and extension bar is fixed by fixing sleeve, consolidates the two of bar
End is fixed by adjacent base support column and/or extension bar respectively.The present invention provides the portable quick detachable road just assembled
Road science of bridge building scaffold, is convenient for carrying, and assembly and disassembly are more convenient, and length can according to need any adjusting, surely
Qualitative good, structure is simple, and practicability is stronger.
Detailed description of the invention
Fig. 1 is the overall structure diagram that new road science of bridge building of the invention protects a preferred embodiment;
Fig. 2 is a partial structural diagram of Fig. 1;
Fig. 3 is the cross-sectional view of Fig. 2.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
To achieve the goals above, the technical solution adopted by the present invention is that:
As shown in Figure 1-Figure 3, the portable quick detachable road and bridge engineering scaffold just assembled, including fixed substrate 1, it is fixed
Substrate 1 is equipped with the first fixation hole 2, and connector includes connection end 3, one end of connection end 3 and the fixed company of the first fixation hole 2
It connects, the other end of connection end 3 is equipped with fixed end 4.
Fixed end 4 is arc-shaped, and fixed end 4 is equipped with multiple second fixation holes 5, and multiple second fixation holes 5 are spaced
One end of setting, bottom support column 6 is fixed by the second fixation hole 5, and the other end of bottom support column 6 is equipped with fixing sleeve 7,
Extension bar 8 is fixed by fixing sleeve 7.The both ends of firm bar 9 pass through respectively adjacent base support column 6 and/or extension bar 8 into
Row is fixed, it is firm constituted between bar 9, adjacent base support column 6 and/or extension bar 8 it is irregular trapezoidal, to realize structure
Stablize.Multiple second fixation holes 5 are used to adjust the direction and position of bottom support column 6, enhance stability.
The technical solution that the present invention advanced optimizes, one end of connection end 3 and the first fixation hole 2 are threadedly coupled.It is described
It is set in fixed end 4 there are five the second fixation hole 5, five the second fixation hole 5 interval settings can according to need adjustment bottom branch
Second fixation hole 5 used in dagger 6.
The technical solution that the present invention advanced optimizes, fixing sleeve 7 be equipped with internal screw thread, the one of bottom support column 6 and extension bar 8
End is equipped with the external screw thread being mutually matched, to realize the adjusting of length.The firm bar 9 is obliquely installed.
One end of the technical solution that the present invention advanced optimizes, the fixed substrate 1 is equipped with shank 10, and the other end is equipped with
The spliced eye 11 being mutually matched with shank 10.The bottom support column 6 is different with the length of extension bar 8.The bottom support
It is equipped with connecting hole on column 6 and extension bar 8, firm bar 9 is fixed by connecting hole.
The present invention provides the portable quick detachable road and bridge engineering scaffold just assembled, is convenient for carrying, and organizes installation and dismantling
Unload more convenient, length can according to need any adjusting, and stability is good, and structure is simple, and practicability is stronger.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art,
It should be covered by the protection scope of the present invention.
Claims (9)
1. the portable quick detachable road and bridge engineering scaffold just assembled, which is characterized in that including fixed substrate, fixed base
Plate is equipped with the first fixation hole, and connector includes connection end, and one end of connection end is fixedly connected with the first fixation hole, connection
The other end of end is equipped with fixed end, and fixed end is arc-shaped, and fixed end is equipped with multiple second fixation holes, Duo Ge
The setting of two fixation hole intervals, one end of bottom support column are fixed by the second fixation hole, and the other end of bottom support column is set
There is fixing sleeve, extension bar is fixed by fixing sleeve, and the both ends of firm bar pass through adjacent base support column and/or lengthening respectively
Bar is fixed.
2. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In one end of the connection end and the first fixation hole are threadedly coupled.
3. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In being set in the fixed end there are five the second fixation hole, five the second fixation hole intervals settings.
4. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
Internal screw thread is equipped in, the fixing sleeve, and one end of bottom support column and extension bar is equipped with the external screw thread being mutually matched.
5. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In the firm bar is obliquely installed.
6. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In one end of the fixed substrate is equipped with shank, the spliced eye that the other end is equipped with and shank is mutually matched.
7. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In the bottom support column is identical with the length of extension bar.
8. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 1, feature exist
In the bottom support column is different with the length of extension bar.
9. the portable quick detachable road and bridge engineering scaffold just assembled according to claim 7 or 8, feature
It is, is equipped with connecting hole on the bottom support column and extension bar, firm bar is fixed by connecting hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710798074.8A CN109468951A (en) | 2017-09-07 | 2017-09-07 | The portable quick detachable road and bridge engineering scaffold just assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710798074.8A CN109468951A (en) | 2017-09-07 | 2017-09-07 | The portable quick detachable road and bridge engineering scaffold just assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109468951A true CN109468951A (en) | 2019-03-15 |
Family
ID=65657520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710798074.8A Pending CN109468951A (en) | 2017-09-07 | 2017-09-07 | The portable quick detachable road and bridge engineering scaffold just assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109468951A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7080959B1 (en) * | 2006-03-06 | 2006-07-25 | Guerra Rene A | Adjustable scaffold shoring accessory |
CN201411912Y (en) * | 2009-05-14 | 2010-02-24 | 张恒亮 | Corridor safety guard rail |
CN202672348U (en) * | 2011-10-24 | 2013-01-16 | 中冶天工上海十三冶建设有限公司 | Cross-core stiffening rib type spherical node support |
CN205134916U (en) * | 2015-12-05 | 2016-04-06 | 张媛 | Scaffold with detect function |
CN205153501U (en) * | 2015-11-24 | 2016-04-13 | 广州西码展览有限公司 | Exhibition room is built and is used rack with adjustable height |
CN205296962U (en) * | 2016-01-08 | 2016-06-08 | 谷沐远 | Safety electric pole |
CN205557848U (en) * | 2016-04-12 | 2016-09-07 | 杭州市园林绿化股份有限公司 | Metal framework node regulating part |
CN106285042A (en) * | 2016-08-05 | 2017-01-04 | 卓达新材料科技集团威海股份有限公司 | Adjustable reinforcing member |
CN206052527U (en) * | 2016-09-26 | 2017-03-29 | 韩少云 | A kind of new road science of bridge building protective frame |
CN207259970U (en) * | 2017-09-07 | 2018-04-20 | 河南海威路桥工程咨询有限公司 | A kind of new road science of bridge building protective frame |
-
2017
- 2017-09-07 CN CN201710798074.8A patent/CN109468951A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7080959B1 (en) * | 2006-03-06 | 2006-07-25 | Guerra Rene A | Adjustable scaffold shoring accessory |
CN201411912Y (en) * | 2009-05-14 | 2010-02-24 | 张恒亮 | Corridor safety guard rail |
CN202672348U (en) * | 2011-10-24 | 2013-01-16 | 中冶天工上海十三冶建设有限公司 | Cross-core stiffening rib type spherical node support |
CN205153501U (en) * | 2015-11-24 | 2016-04-13 | 广州西码展览有限公司 | Exhibition room is built and is used rack with adjustable height |
CN205134916U (en) * | 2015-12-05 | 2016-04-06 | 张媛 | Scaffold with detect function |
CN205296962U (en) * | 2016-01-08 | 2016-06-08 | 谷沐远 | Safety electric pole |
CN205557848U (en) * | 2016-04-12 | 2016-09-07 | 杭州市园林绿化股份有限公司 | Metal framework node regulating part |
CN106285042A (en) * | 2016-08-05 | 2017-01-04 | 卓达新材料科技集团威海股份有限公司 | Adjustable reinforcing member |
CN206052527U (en) * | 2016-09-26 | 2017-03-29 | 韩少云 | A kind of new road science of bridge building protective frame |
CN207259970U (en) * | 2017-09-07 | 2018-04-20 | 河南海威路桥工程咨询有限公司 | A kind of new road science of bridge building protective frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9556608B2 (en) | Roof erection system and assembly kit | |
CN109468951A (en) | The portable quick detachable road and bridge engineering scaffold just assembled | |
CN103410307A (en) | Scaffolding cross bar allowing length to be adjusted in stepless mode | |
CN207259970U (en) | A kind of new road science of bridge building protective frame | |
CN104264972A (en) | Wall connecting component | |
CN104514792A (en) | Extensible outer hexagon stainless steel bolt | |
US11471720B2 (en) | Playground | |
CN209339589U (en) | Scaffold is connected part | |
CN203213573U (en) | Self-locking welding-free scaffold connection device | |
CN203383496U (en) | Scaffold cross rod with steplessly-adjusted length | |
CN205531257U (en) | Installing support for building site | |
CN104315319A (en) | Simple suspension type projector bracket | |
CN209653331U (en) | A kind of assembled framework | |
CN105839979B (en) | A kind of telescopic tower of communication iron tower | |
CN108625563A (en) | L-type decorating building metope positioning device | |
CN209323702U (en) | Fixation kit for groove type embedded part | |
CN109098385A (en) | L-type decorating building metope positioning device | |
CN109723169A (en) | Chute-type external wall of house fixes device | |
CN104975707A (en) | Shed frame and triangular support frame body of shed frame | |
CN209799337U (en) | Detachable wall connecting piece | |
CN209369311U (en) | Monoblock type scaffold fastenings | |
CN204691198U (en) | Rise-withdraw fram for building | |
CN208937050U (en) | Adjustable forced centering apparatus is set in one kind | |
CN208455832U (en) | A kind of attachment device for assembled architecture | |
CN219909883U (en) | Telescopic lower supporting rod piece for overhanging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190315 |