CN109466405A - A kind of multi-functional shelter of lightweight and its forming method - Google Patents

A kind of multi-functional shelter of lightweight and its forming method Download PDF

Info

Publication number
CN109466405A
CN109466405A CN201811466511.7A CN201811466511A CN109466405A CN 109466405 A CN109466405 A CN 109466405A CN 201811466511 A CN201811466511 A CN 201811466511A CN 109466405 A CN109466405 A CN 109466405A
Authority
CN
China
Prior art keywords
shelter
layer
cabin
skeleton
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811466511.7A
Other languages
Chinese (zh)
Inventor
王绪超
常明阳
丁庚
彭学刚
胡俊
明鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AEROSPACE SCIENCE AND INDUSTRY WUHAN MAGNETISM-ELECTRON CO LTD
Original Assignee
AEROSPACE SCIENCE AND INDUSTRY WUHAN MAGNETISM-ELECTRON CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AEROSPACE SCIENCE AND INDUSTRY WUHAN MAGNETISM-ELECTRON CO LTD filed Critical AEROSPACE SCIENCE AND INDUSTRY WUHAN MAGNETISM-ELECTRON CO LTD
Priority to CN201811466511.7A priority Critical patent/CN109466405A/en
Publication of CN109466405A publication Critical patent/CN109466405A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/30Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
    • B29C70/34Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation
    • B29C70/342Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation using isostatic pressure

Abstract

The invention discloses a kind of multi-functional shelter of lightweight and its forming methods, the shelter includes shelter main body and door-plate, wherein wallboard of shelter includes successively from outside to inside exterior skin layer, laminboard layer and Inner Mongol cortex, is additionally provided with electro-magnetic screen layer between laminboard layer and Inner Mongol cortex.The shelter uses integrated molding mode, and made cabin shaping speed is fast, and product has many advantages, such as that light weight, intensity are high, stability is strong.

Description

A kind of multi-functional shelter of lightweight and its forming method
Technical field
The present invention relates to shelter technology fields, and the multi-functional shelter of in particular to a kind of lightweight and its forming method.
Background technique
The used material overwhelming majority in conventional metals skeleton cabin is steel, aluminium etc., covering generally use identical material with Skeleton welding rivets, and cabin weight is very big, and the effective equipment for having seriously affected vehicle is equipped etc..
Big plate assembly form predominantly uses composite material as bulkhead plate, built in aluminum alloy framework in weight side Face still accounts for larger a part of ratio, though the corner fittings of used aluminum alloy edge-wrapped, cornerite and aluminum provides cabin after splicing Biggish intensity, but it is also quite big to the weight brought into, and while splicing, need to open intensive rivet hole on bound edge cornerite Riveting, and encapsulation process need to need to be done to Mosaic face.Stress deformation during plate forming and possible in use Stress caused by external force can all have an impact sealing surface, or even cause local the case where seeping water.
Vacuum lead-in mode can longitudinally, laterally process diversion trench in required sandwich material, during injecting glue, respectively lead Full phase is filled in chute and answers resin, and increased weight has obvious influence for lightweight shelter product, is unfavorable for Light-weighted realization, and vacuum importing process is that irreversible procedure requires strictly, if it exists slightly final resin runner arrangement Situations such as vacuum leak or uneven temperature, may cause partial region starved and make entire scrap of the product.
Summary of the invention
The purpose of the present invention is to provide a kind of multi-functional shelter of lightweight and its forming method, which significantly drops Low cabin weight, meanwhile, which can shorten the formed product time, can optimize the lengthy and tedious process of cabin splicing, save big Measure manpower etc..
The present invention solves its technical problem and adopts the following technical solutions to realize.
The invention proposes a kind of multi-functional wallboard of shelter of lightweight, which successively includes exterior skin from outside to inside Layer, laminboard layer and Inner Mongol cortex, wherein be additionally provided with electro-magnetic screen layer between laminboard layer and Inner Mongol cortex.
The invention also provides a kind of multi-functional shelter of lightweight, which is built by above-mentioned wallboard of shelter, side Bulkhead plate includes cabin top walls panels, bilge siding, cabin back wall plate and two cabin sidewall panelings.
The present invention also proposes a kind of forming method of multi-functional shelter of lightweight, comprising the following steps:
Skeleton is placed in exterior skin by exterior skin layer paving on mold according to the cabin configuration design mold of shelter On layer, by laminboard layer paving on skeleton, by electro-magnetic screen layer paving on laminboard layer, by Inner Mongol cortex paving in electromagnetic shielding On layer, wallboard of shelter is obtained;Doorframe is placed at the doorframe position of skeleton again, obtains shelter main body;
By shelter main body progress vacuum bag, cured, demoulding, obtains integrated shelter main body;
Integrated shelter main body and door-plate are assembled, a kind of multi-functional shelter of lightweight is obtained.
The beneficial effects of the present invention are:
The present invention provides a kind of multi-functional shelter of lightweight and its forming method, the present invention uses integrated molding side Method, made cabin shaping speed is fast, and product has many advantages, such as that light weight, intensity are high, stability is strong, considerably reduces biography System type metal cabin, the big plate of composite material spell the technologies such as cabin and are difficult to the weight indicator broken through, while also improving the globality of shelter And airtightness.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the schematic diagram of the multi-functional shelter shape of lightweight in the embodiment of the present invention 3.
Fig. 2 is the flow chart of the multi-functional shelter preparation of lightweight in the embodiment of the present invention 4.
Specific embodiment
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention Technical solution be clearly and completely described.The person that is not specified actual conditions in embodiment, according to normal conditions or manufacturer builds The condition of view carries out.Reagents or instruments used without specified manufacturer is the conventional production that can be obtained by commercially available purchase Product.
A kind of multi-functional shelter of lightweight provided in an embodiment of the present invention and its forming method are specifically described below.
The embodiment of the present invention provides a kind of multi-functional wallboard of shelter of lightweight, which successively includes outer from outside to inside Skinning layer, laminboard layer and Inner Mongol cortex, are additionally provided with electro-magnetic screen layer between laminboard layer and Inner Mongol cortex.
The embodiment of the present invention provides a kind of multi-functional shelter of lightweight, the functional layer which is made of multilayer difference Composition, wherein the high-strength composite flitch of exterior skin layer and inside panel layer choosing with good mechanical strength and modulus, and will The radar wave injected through lamina rara externa can be effectively absorbed, and the laminboard layer of energy heat-insulation and heat-preservation is as middle layer, electro-magnetic screen layer With good electromagnetic shielding effect.The wallboard of shelter provided in the embodiment of the present invention is by the above-mentioned compound system of different functional layers At the composite laminate has stronger stiffness and strength, can resist the impact of explosion fragment and its siding is prevented to be pierced;Again With good absorbing property, radar detection can be served stealthy;Using the composite material laminated board convenient for the military spy of manufacture Kind shelter, and requirement of the shelter to intensity and wave-absorbing and camouflage performance can be met simultaneously.
In some embodiments, exterior skin layer and Inner Mongol cortex be by one of glass fabric, carbon cloth or Advanced glass-fibre ccmposites covering made of two kinds of laminations, exterior skin layer with a thickness of 0.4mm-1.2mm, Inner Mongol cortex with a thickness of 0.4mm-1mm;
Laminboard layer includes at least the layer of material in cellular board, suction wave cystosepiment and foaming cellular core, laminboard layer With a thickness of 15mm-50mm;
Electro-magnetic screen layer in copper, nickel, silver, iron, iron-nickel alloy, tin-nickel alloy and nickel cobalt (alloy) stratum reticulare at least one Kind, electro-magnetic screen layer is layer 2-3, electro-magnetic screen layer with a thickness of 0.3mm-2mm.
The wallboard of shelter material provided in the embodiment of the present invention includes exterior skin layer, laminboard layer and Inner Mongol cortex and electromagnetic screen Cover layer, wherein exterior skin layer and Inner Mongol cortex are used made of one or both of glass fabric, carbon cloth lamination Advanced glass-fibre ccmposites covering, electro-magnetic screen layer are made of conductive metal mesh, and laminboard layer is one or more layers structure, one layer of structure Material is selected from cellular board, inhales at least one of wave cystosepiment and foaming cellular core, and sandwich includes one layer of structural wood Expect at least one layer or sandwich of two sides, one or more layers structural material of two sides is in glass reinforced plastic, carbon fiber It is at least one.
The embodiment of the present invention also provides a kind of multi-functional shelter of lightweight, which includes shelter main body and door-plate, shelter Main body is built by the wallboard of shelter of aforementioned component, and wallboard of shelter includes cabin top walls panels, bilge siding, cabin back wall plate and two A cabin sidewall paneling.
The embodiment of the present invention also provides a kind of forming method of multi-functional shelter of above-mentioned lightweight, includes the following steps:
Skeleton is placed in exterior skin by exterior skin layer paving on mold according to the cabin configuration design mold of shelter On layer, by laminboard layer paving on skeleton, by electro-magnetic screen layer paving on laminboard layer, by Inner Mongol cortex paving in electromagnetic shielding On layer, wallboard of shelter is obtained;Doorframe is placed at the doorframe position of skeleton again, obtains shelter main body;
By shelter main body progress vacuum bag, cured, demoulding, obtains integrated shelter main body;
Integrated shelter main body and door-plate are assembled, a kind of multi-functional shelter of lightweight is obtained.
The embodiment of the present invention also provides a kind of forming method of multi-functional shelter of above-mentioned lightweight, first design mold, will Skeleton is placed on exterior skin layer by the paving of exterior skin layer on mold, then successively paving laminboard layer, electro-magnetic screen layer and Inner Mongol Cortex obtains wallboard of shelter, then doorframe is placed at the doorframe position of skeleton, shelter main body is obtained, then to shelter Main body is solidified, is demoulded, and integrated shelter main body is obtained;Integrated shelter main body and door-plate are assembled again, obtained a kind of light Quantify multi-functional shelter.
Preparation method in the embodiment of the present invention is totally different from existing assembled preparation method, existing assembly preparation side Method is usually that different functional layers is first carried out fitting to prepare wallboard of shelter, is then carried out above-mentioned siding and skeleton assembled. The preparation method of existing shelter, in splicing, though the corner fittings of used aluminum alloy edge-wrapped, cornerite and aluminum mentions cabin Intensive rivet need to be opened on bound edge cornerite when having supplied biggish intensity, but it is also quite big to the weight brought into, and having spliced Hole riveting, and encapsulation process need to need to be done to Mosaic face.Stress deformation during plate forming and in use may External force caused by stress sealing surface can all be had an impact, or even cause part the case where seeping water.
The shelter of above-mentioned preparation method preparation provided in an embodiment of the present invention, the cabin of shelter use in addition to shelter door-plate The integrated molding mode of prepreg, glue film, prefabricated board, skeleton etc. is made through one-step solidification moulding, and each on-deck is seamless, viscous Intensity height is connect, globality is high, has given full play to the high-strength light performance of composite material, each corner angle of cabin are without carrying out waterproof sealing Processing can guarantee the watertightness of cabin.
In some embodiments, the preparation of mold is the following steps are included: the cabin configuration design according to shelter goes out mold, Mold includes ceiling board, Ceiling, cabin backboard and two cabin side plates, and mold is former, and the interior molded dimension of mold is according to Cabin Body actual size is designed as negative common difference, in general, negative common difference is -2mm-0.
In some embodiments, mold is metal material composable mold, whole to be added using 20mm-30mm steel plate through machinery Work production, each interface process the half slot that radius is 2.8mm-4.5mm, and close using the sealing strip of respective diameters size Envelope.
In some embodiments, skeleton preparation is the following steps are included: skeleton uses 40mm × 40mm × 2mm carbon fiber Product or light-alloy product, the exterior cross-section of skeleton is having a size of 30mm-50mm, wall thickness 1mm-3.5mm, when skeleton is combined and spliced Trueness error within ± 0.5mm.
In some embodiments, assembly is carried out using tenon in skeleton preparation process, tenon is with carbon fiber or light-alloy For raw material, using carbon fiber molding or resin transfer molding, tenon and carbon fiber product or light-alloy product corresponding size It is customized.
Tenon provided in the embodiment of the present invention and skeleton, it is similar to prepare raw material, is all carbon fiber or light-alloy, can To mitigate the weight of shelter significantly, tenon can be formed in such a way that Nian Jie, riveting combines with certain rigidity with skeleton Monolithic devices skeleton realizes the carrying and transfer function of stress.
In some embodiments, in paving, each corner's overlap joint is wide for exterior skin layer, electro-magnetic screen layer and Inner Mongol cortex Degree is 4.5-5.5cm, and laminboard layer is completed according to each size of space blanking of skeleton, is placed in each interval, laminboard layer and skeleton The equal potting resin in the region being connected or glue film.
The connecting method of each functional layer provided in the embodiment of the present invention, wherein outer layer skinning layer and electro-magnetic screen layer and Internal layer skinning layer uses and takes the mode of taking that connects of width and carry out paving with centainly connecing, and ensure that each turning and edge of shelter The problem of infiltration, leak, the modes of emplacement solution of internal layer laminboard layer will not occur in the subsequent use process in good leakproofness Determined it is direct using honeycomb core encapsulated moulding when the problem of may moving, misplacing, while also achieving structure-multifunctional all Design, collect multi-functional in prefabricated board one, reduce the difficulty of later period Multifunctional layered laying, construction etc. in a mold.
In some embodiments, assembly is the following steps are included: the profile of the door-plate of shelter uses phase with sandwich formable layer With technique curing molding, and additional armour, armour use PE bullet resistant material, using the whole cementing or Hybrid connections shape that is spirally connected Formula completes the molding of door-plate;Integrated shelter main body is connect with door-plate, is assembled, and completes cabin internal interstices junction Shielding processing obtains a kind of lightweight multifunctional all shelter product.
Feature and performance of the invention are described in further detail with reference to embodiments.
Embodiment 1
A kind of multi-functional side's integration wallboard of shelter of lightweight
The wallboard of shelter successively includes exterior skin layer, laminboard layer and Inner Mongol cortex from outside to inside, wherein laminboard layer and Inner Mongol Electro-magnetic screen layer is additionally provided between cortex,
Exterior skin layer with a thickness of 0.4mm, laminboard layer with a thickness of 15mm, electro-magnetic screen layer with a thickness of 0.3mm, Inner Mongol Cortex with a thickness of 0.4mm.
Exterior skin layer and Inner Mongol cortex use the height made of one or both of glass fabric, carbon cloth lamination Strong composite fibre covering,
Laminboard layer successively includes outer layer, middle layer and internal layer from outside to inside, and outer layer is selected from glass reinforced plastic, and middle layer is selected from honeycomb Plate, internal layer are selected from glass reinforced plastic,
Electro-magnetic screen layer is selected from copper mesh layers, and electro-magnetic screen layer is 2 layers.
Embodiment 2
A kind of multi-functional side's integration wallboard of shelter of lightweight
The wallboard of shelter successively includes exterior skin layer, laminboard layer and Inner Mongol cortex from outside to inside, wherein laminboard layer and Inner Mongol Electro-magnetic screen layer is additionally provided between cortex,
Exterior skin layer with a thickness of 0.8mm, laminboard layer with a thickness of 30mm, electro-magnetic screen layer with a thickness of 1mm, inside panel Layer with a thickness of 0.8mm.
Exterior skin layer and Inner Mongol cortex use the height made of one or both of glass fabric, carbon cloth lamination Strong composite fibre covering,
Laminboard layer successively includes outer layer, middle layer and internal layer from outside to inside, and outer layer is selected from least one of carbon fiber, in Interbed, which is selected from, inhales wave cystosepiment, and internal layer is selected from least one of carbon fiber,
Electro-magnetic screen layer is selected from copper, nickel screen layer, and electro-magnetic screen layer is 2 layers.
Embodiment 3
A kind of multi-functional side's integration shelter of lightweight
Referring to Fig. 1, which includes shelter main body and door-plate, and shelter main body is by the wallboard of shelter that forms in embodiment 1 or 2 It builds, wallboard of shelter includes cabin top walls panels, bilge siding, cabin back wall plate and two cabin sidewall panelings.
Embodiment 4
A kind of forming method of the multi-functional side's integration shelter of lightweight
Referring to fig. 2, the forming method the following steps are included:
(1), mold design:
As shown in Figure 1, going out mold according to cabin configuration design, this mold is five faces, i.e. ceiling board, Ceiling, cabin back Plate and two cabin side plates, wherein the on-deck for not designing mold is generally the on-deck where hatch door plate.Mold is former, interior molded dimension Negative common difference, generally -2mm-0 are designed as according to cabin actual size.
Mold is metal material composable mold, whole to use the machined production of 20mm-30mm steel plate, and each interface adds Work goes out the half slot that radius is 2.8mm-4.5mm, is sealed using the high-temperature-resisting silicon rubber sealing strip of respective diameters size, realizes cabin The air-tightness of body single side.
(2), die treatment:
By die surface grinding process, rusty stain, grease stain etc. are removed, handles surface with release agents such as TP-01.
(3) prepared by skeleton:
Carbon fiber skeleton is 40mm × 40mm × 2mm carbon fiber square tube product or light-alloy product, exterior cross-section size Can be 30mm-50mm, wall thickness 1mm-3.5mm, carbon fiber square tube use autoclave process molding, used down when combined and spliced Material machine is cut, and trueness error is within ± 0.5mm.
Tenon uses carbon fiber molding or resin transfer molding product, with carbon fiber square tube product or light-alloy system Product corresponding size is customized, and aluminium alloy tenon is to be made using the machined mode of machining center, tenon and carbon fiber etc. Square tube skeleton can form the monolithic devices skeleton with certain rigidity, realize the carrying of stress in such a way that bonding, riveting combine With transfer function.
By carbon fiber skeleton according to the blanking of drawing given dimensional, cut, assembled, carbon fiber skeleton is 40mm × 40mm square tube Structure, wall thickness 2mm, jointing are connected using carbon fiber tenon.
(4) according to being paved into sequence paving:
Assembled good skeleton is placed in exterior skin layer, in the inner surface paving laminboard layer of outer skinning layer, in laminboard layer Inner surface paving Inner Mongol cortex, in which:
By the layer-by-layer paving of prepreg used in exterior skin on mold, each corner's lap width is taken in 5cm or so, each layer It connects region not overlapping, exterior skin thickness 0.4mm-1.2mm.
Laminboard layer be specific function cellular board or cystosepiment prefabrication, prefabricated board be cellular board, inhale wave cystosepiment and The coverings such as the two sides such as foaming cellular core adhering glass steel, carbon fiber are suppressed through molding, vacuum bag, are respectively spaced ruler according to skeleton Very little blanking is completed, and is placed in each interval, the equal potting resin in the region that laminboard layer is connected with skeleton or glue film etc. have solidify, The material of bonding effect, to guarantee the integral strength after solidifying.
In laminboard layer surface layer-by-layer laying conducting copper mesh glue film, layer 2-3, pays attention to adjacent faying surface lap width, generally altogether For 30mm-50mm,
By the paving of inside panel prepreg in electromagnetic shielding layer surface, each layer prepreg overlapping mode is interior with exterior skin requirement Covering overall thickness is that 0.4mm-1mm obtains shelter main body after paving is completed.
(5) it encapsulates:
Mold and shelter main body are coated into the vacuum solidifications auxiliary material such as release cloth, partitioned film, vacuum bag simultaneously, paid attention to Detect vacuum degree.
(6) vacuum bag is cured:
Mold and shelter main body are put into baking oven simultaneously, whole process keeps vacuum system operation, to bag vacuum, according to Curing cycle solidification, curing time determine that generally, room temperature 1h rises to 80 DEG C, heat preservation according to the characteristic of used prepreg 120 DEG C are warming up to through 0.5h after 1.5h, then keeps the temperature natural cooling after 2h.
(7) it demoulds:
It comes out of the stove after oven temperature is cooled to room temperature demoulding, opens baking oven, mold is taken out, is placed on workbench, Vacuum bag, isolation film, release cloth are successively removed, integrated shelter main body is obtained.
(8) assembling product:
Hatch door plate gate material and suction wave honeycomb sheet metal forming use same process curing molding, add armour thereafter, are formed The bulletproof function of cabin lateral surface, armour use PE bullet resistant material, using it is whole it is cementing, the Hybrid connections form such as be spirally connected, complete At the molding of door-plate.
Bullet-proof type door-plate is connected with integrated shelter main body, is assembled, and completes the shielding of cabin internal interstices junction Processing, obtains a kind of lightweight multifunctional all shelter product.
The embodiment of the present invention uses above-mentioned preparation method, using the shelter of composite material integrated molding compared to tradition Metal cabin, bound edge type big plate splicing cabin etc., largely plays lighting, the high specific strength, globality of composite material Etc. advantages, significantly reduce cabin weight, compared to traditional metal materials cabin, weight reduces about 70%, compared to packet Type bound edge type big plate in side, which spells cabin structure, can reduce about 30%.Meanwhile the molding can shorten the formed product time, can optimize cabin The lengthy and tedious process of splicing, saves a large amount of manpowers etc..
To sum up, the embodiment of the invention provides a kind of lightweight integrated molding shelter and preparation method thereof, the shelter Cabin is respectively that composite material exterior skin, interlayer, skeleton, inside panel form by outer layer to internal layer, wherein interlayer be honeycomb core or Foamed product has the function of radar-wave absorbing, insulation, electromagnetic shielding etc..The shelter removes hatch door institute close to cuboid shape One side, other five faces are integrally formed, and exterior skin, inside panel all have whole continuity, without any splicing between each face Gap is not required to do any sealing, water-proofing treatment etc., and the on-deck where hatch door is separately formed, subsequent and cabin main body molding assembly.This Cabin shaping speed made by inventive embodiments is fast, and product has many advantages, such as that light weight, intensity are high, stability is strong, significantly Reduce traditional metal cabin, the big plate of composite material spells the technologies such as cabin and is difficult to the weight indicator broken through, while also improving shelter Globality and airtightness.
The embodiment of the present invention has technical effect below:
1, cabin is in addition to shelter door-plate, using the integrated molding mode of prepreg, glue film, prefabricated board, skeleton etc., through one Secondary curing molding is made, and each on-deck is seamless, adhesive strength is high, and globality is high, has given full play to the high-strength light of composite material Performance, each corner angle of cabin are not necessarily to carry out the watertightness of the i.e. certifiable cabin of waterproof sealing processing.
2, by the way of multi-functional sandwich prefabricated board and skeleton splicing assembling, the honeycomb core used presss from both sides cabin The structures such as layer, foam layer have the function of radar-wave absorbing, insulation, electromagnetic screen etc., solve and are directly encapsulated using honeycomb core The problem of may moving, misplace when molding, while the design of structure-multifunctional all is also achieved, collect multi-functional in prefabricated Plate one, reduces the difficulty of later period Multifunctional layered laying, construction etc. in a mold.
3, cabin uses full composite material light-weight design, not using the materials such as aluminum, steel, during integrally curing The outer dimension of product is guaranteed that flatness is good by mold, without increasing the reinforcers such as bound edge, cornerite, significantly reduces product Weight.Cabin mode is spelled compared to big plate, can avoid big plate flatness deficiency caused by big plate mold process, to avoid to after The problem of whole cabin on-deck part verticality, flatness when the splicing of subsequent each on-deck etc. are unsatisfactory for index.
4, the embodiment of the present invention uses the bonding form of glue film, prepreg, when individually constructing with zero parts more High operability is conducive to the amendment of local error, is conducive to improve product total quality, while can also realize assembly line Formula production, improves integrated molding efficiency.
Embodiments described above is a part of the embodiment of the present invention, instead of all the embodiments.Reality of the invention The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts Every other embodiment, shall fall within the protection scope of the present invention.

Claims (10)

1. a kind of multi-functional wallboard of shelter of lightweight, which is characterized in that the wallboard of shelter successively includes exterior skin from outside to inside Layer, laminboard layer and Inner Mongol cortex, which is characterized in that be additionally provided with electro-magnetic screen layer between the laminboard layer and the Inner Mongol cortex.
2. the multi-functional wallboard of shelter of lightweight according to claim 1, which is characterized in that the exterior skin layer and the Inner Mongol Cortex is the advanced glass-fibre ccmposites covering made of one or both of glass fabric, carbon cloth lamination, the outer illiteracy Cortex with a thickness of 0.4mm-1.2mm, the Inner Mongol cortex with a thickness of 0.4mm-1mm;
The laminboard layer includes at least the layer of material in cellular board, suction wave cystosepiment and foaming cellular core, the sandwich Layer with a thickness of 15mm-50mm;
The electro-magnetic screen layer in copper, nickel, silver, iron, iron-nickel alloy, tin-nickel alloy and nickel cobalt (alloy) stratum reticulare at least one Kind, the electro-magnetic screen layer be layer 2-3, the electro-magnetic screen layer with a thickness of 0.3mm-2mm.
3. a kind of multi-functional shelter of lightweight, which is characterized in that the shelter includes shelter main body and door-plate, the shelter main body It is built by wallboard of shelter of any of claims 1 or 2, the wallboard of shelter includes cabin top walls panels, bilge siding, cabin back wall Plate and two cabin sidewall panelings.
4. a kind of forming method of the multi-functional shelter of lightweight according to claim 3, which is characterized in that including walking as follows It is rapid:
According to the cabin configuration design mold of shelter, by the exterior skin layer paving on the mold, skeleton is placed in institute It states on exterior skin layer, by the laminboard layer paving on the skeleton, by the electro-magnetic screen layer paving on the laminboard layer, By the Inner Mongol cortex paving on the electro-magnetic screen layer, the wallboard of shelter is obtained;Doorframe is placed in again described At the doorframe position of skeleton, shelter main body is obtained;
By shelter main body progress vacuum bag, cured, demoulding, obtains integrated shelter main body;
The integrated shelter main body and door-plate are assembled, a kind of multi-functional shelter of lightweight is obtained.
5. forming method according to claim 4, which is characterized in that the preparation of the mold is the following steps are included: according to side The cabin configuration design in cabin goes out mold, and the mold includes ceiling board, Ceiling, cabin backboard and two cabin side plates, the mold Interior molded dimension for former, the mold is designed as negative common difference according to the square-cabin body actual size.
6. forming method according to claim 5, which is characterized in that the mold is metal material composable mold, is integrally adopted With the machined production of 20mm-30mm steel plate, each interface processes radius in the half slot of 2.8mm-4.5mm, and uses The sealing strip of respective diameters size seals.
7. forming method according to claim 4, which is characterized in that the skeleton preparation is the following steps are included: the skeleton Using 40mm × 40mm × 2mm carbon fiber product or light-alloy product, the exterior cross-section of the skeleton is having a size of 30mm- Trueness error when 50mm, wall thickness 1mm-3.5mm, the skeleton are combined and spliced is within ± 0.5mm.
8. forming method according to claim 7, which is characterized in that spelled in the skeleton preparation process using tenon Dress, the tenon using carbon fiber or light-alloy as raw material, using carbon fiber molding or resin transfer molding, the tenon with The carbon fiber product or the light-alloy product corresponding size are customized.
9. forming method according to claim 4, which is characterized in that viscous using glue film between each layer of the wallboard of shelter It connects, in paving, each corner's lap width is 4.5- for the exterior skin layer, the electro-magnetic screen layer and the Inner Mongol cortex 5.5cm, the laminboard layer are completed according to each size of space blanking of the skeleton, are placed in each interval, the laminboard layer and institute State the equal potting resin in region or glue film that skeleton is connected.
10. forming method according to claim 4, which is characterized in that described to assemble the door the following steps are included: the shelter The profile of plate and the sandwich formable layer use same process curing molding, and additional armour, the armour are anti-using PE Material is played, using the whole cementing or Hybrid connections form that is spirally connected, completes the molding of door-plate;By the integrated shelter main body and institute Door-plate connection, assembly are stated, and completes the shielding processing of cabin internal interstices junction, obtains a kind of lightweight multifunctional all Shelter product.
CN201811466511.7A 2018-12-03 2018-12-03 A kind of multi-functional shelter of lightweight and its forming method Pending CN109466405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811466511.7A CN109466405A (en) 2018-12-03 2018-12-03 A kind of multi-functional shelter of lightweight and its forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811466511.7A CN109466405A (en) 2018-12-03 2018-12-03 A kind of multi-functional shelter of lightweight and its forming method

Publications (1)

Publication Number Publication Date
CN109466405A true CN109466405A (en) 2019-03-15

Family

ID=65674914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811466511.7A Pending CN109466405A (en) 2018-12-03 2018-12-03 A kind of multi-functional shelter of lightweight and its forming method

Country Status (1)

Country Link
CN (1) CN109466405A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110116510A (en) * 2019-05-28 2019-08-13 湖北三江航天万峰科技发展有限公司 A kind of integrated molding method of composite material cabin
CN110815866A (en) * 2019-11-15 2020-02-21 中国科学院长春光学精密机械与物理研究所 Integrated molding process of composite reflector
CN111086237A (en) * 2019-11-22 2020-05-01 江苏恒神股份有限公司 Forming method of carbon fiber composite material flow guide shell
CN111216422A (en) * 2019-11-05 2020-06-02 航天科工武汉磁电有限责任公司 Foam honeycomb composite interlayer wave-absorbing material and preparation method thereof
CN111809929A (en) * 2020-07-31 2020-10-23 衡阳泰豪通信车辆有限公司 Protective shelter system
CN111959538A (en) * 2020-08-28 2020-11-20 株洲时代新材料科技股份有限公司 Fire-resistant wheel cover of rail transit vehicle and manufacturing method thereof
CN112141226A (en) * 2020-08-31 2020-12-29 江苏新扬新材料股份有限公司 Method for assembling composite material lightweight electronic shelter
CN112590257A (en) * 2020-12-02 2021-04-02 江苏新扬新材料股份有限公司 Carbon fiber composite material door forming method
CN112959691A (en) * 2021-02-05 2021-06-15 中国电子科技集团公司第三十三研究所 Manufacturing method of carbon fiber composite shielding shelter based on autoclave process
CN113619693A (en) * 2021-09-14 2021-11-09 北京航空航天大学 Stealth bulletproof composite material, forming method thereof and vehicle cab

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104197785A (en) * 2014-09-02 2014-12-10 零八一电子集团四川红轮机械有限公司 Bulletproof and explosion-proof shelter wallboard with electromagnetic shielding function
CN105253154A (en) * 2015-10-30 2016-01-20 江苏恒神股份有限公司 Chassis equipment cabin baseplate for high-speed rail vehicle
CN205112535U (en) * 2015-11-13 2016-03-30 航天科工哈尔滨风华有限公司 Big board of foaming aluminium shelter
CN105737675A (en) * 2016-03-15 2016-07-06 中国航天科工集团第六研究院二一○所 High-performance bulletproof shelter
US20160330879A1 (en) * 2013-12-30 2016-11-10 Compagnie Plastic Omnium Semi-finished product made from composite material, comprising a flexible electromagnetic shielding film
CN206416588U (en) * 2017-01-19 2017-08-18 亚天顿(廊坊)复合材料科技有限公司 A kind of big plate of New Radar Absorbing composite shelter
CN108278928A (en) * 2017-11-29 2018-07-13 浙江三元电子科技有限公司 A kind of light-weighted shielding wallboard of shelter of infrared stealth function and preparation method thereof
CN108471703A (en) * 2018-05-30 2018-08-31 江苏恒神股份有限公司 A kind of electromagnetic shielding composite material babinet and its manufacturing method
CN108859172A (en) * 2018-03-19 2018-11-23 连云港神鹰复合材料科技有限公司 A kind of preparation method of the integrally formed composite material shelter of precast framework formula

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160330879A1 (en) * 2013-12-30 2016-11-10 Compagnie Plastic Omnium Semi-finished product made from composite material, comprising a flexible electromagnetic shielding film
CN104197785A (en) * 2014-09-02 2014-12-10 零八一电子集团四川红轮机械有限公司 Bulletproof and explosion-proof shelter wallboard with electromagnetic shielding function
CN105253154A (en) * 2015-10-30 2016-01-20 江苏恒神股份有限公司 Chassis equipment cabin baseplate for high-speed rail vehicle
CN205112535U (en) * 2015-11-13 2016-03-30 航天科工哈尔滨风华有限公司 Big board of foaming aluminium shelter
CN105737675A (en) * 2016-03-15 2016-07-06 中国航天科工集团第六研究院二一○所 High-performance bulletproof shelter
CN206416588U (en) * 2017-01-19 2017-08-18 亚天顿(廊坊)复合材料科技有限公司 A kind of big plate of New Radar Absorbing composite shelter
CN108278928A (en) * 2017-11-29 2018-07-13 浙江三元电子科技有限公司 A kind of light-weighted shielding wallboard of shelter of infrared stealth function and preparation method thereof
CN108859172A (en) * 2018-03-19 2018-11-23 连云港神鹰复合材料科技有限公司 A kind of preparation method of the integrally formed composite material shelter of precast framework formula
CN108471703A (en) * 2018-05-30 2018-08-31 江苏恒神股份有限公司 A kind of electromagnetic shielding composite material babinet and its manufacturing method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110116510A (en) * 2019-05-28 2019-08-13 湖北三江航天万峰科技发展有限公司 A kind of integrated molding method of composite material cabin
CN111216422A (en) * 2019-11-05 2020-06-02 航天科工武汉磁电有限责任公司 Foam honeycomb composite interlayer wave-absorbing material and preparation method thereof
CN110815866A (en) * 2019-11-15 2020-02-21 中国科学院长春光学精密机械与物理研究所 Integrated molding process of composite reflector
CN111086237A (en) * 2019-11-22 2020-05-01 江苏恒神股份有限公司 Forming method of carbon fiber composite material flow guide shell
CN111809929A (en) * 2020-07-31 2020-10-23 衡阳泰豪通信车辆有限公司 Protective shelter system
CN111959538A (en) * 2020-08-28 2020-11-20 株洲时代新材料科技股份有限公司 Fire-resistant wheel cover of rail transit vehicle and manufacturing method thereof
CN111959538B (en) * 2020-08-28 2022-02-08 株洲时代新材料科技股份有限公司 Fire-resistant wheel cover of rail transit vehicle and manufacturing method thereof
CN112141226A (en) * 2020-08-31 2020-12-29 江苏新扬新材料股份有限公司 Method for assembling composite material lightweight electronic shelter
CN112590257A (en) * 2020-12-02 2021-04-02 江苏新扬新材料股份有限公司 Carbon fiber composite material door forming method
CN112959691A (en) * 2021-02-05 2021-06-15 中国电子科技集团公司第三十三研究所 Manufacturing method of carbon fiber composite shielding shelter based on autoclave process
CN113619693A (en) * 2021-09-14 2021-11-09 北京航空航天大学 Stealth bulletproof composite material, forming method thereof and vehicle cab

Similar Documents

Publication Publication Date Title
CN109466405A (en) A kind of multi-functional shelter of lightweight and its forming method
RU2466905C2 (en) Skin element as aircraft fuselage part
CN102848622B (en) A kind of have sandwich material of PMI foam core material and preparation method thereof
US7197852B2 (en) Internally stiffened composite panels and methods for their manufacture
ES2691962T3 (en) Method for manufacturing an integrated trailing edge of composite material
CN102639317A (en) Sandwich structure having arrestment feature and method of making the same
CN105298167B (en) Light rigidity thin-walled insulated hold
CA2536294A1 (en) Liner panel having barrier layer
CN108859167A (en) A kind of light composite material train inside gadget with high-strength coating
CN112197646B (en) Stealth anti-damage shielding shelter
CN109253659A (en) A kind of radar invisible shelter exterior panel
CN104767035A (en) High-precision carbon fiber auxiliary reflection face forming method
CN204250662U (en) A kind of lightweight composite materials shelter
KR101207575B1 (en) Large composite structures and a process for fabricating large composite structures
CN112157928A (en) Six-surface one-step forming lightweight shelter and preparation method thereof
US20100104818A1 (en) Panel and method for manufacturing the same
CN108091998A (en) A kind of V-type Radome Antenna Structure and preparation method
US7981241B2 (en) Method for forming a feature in a piece of composite material
CN201745741U (en) Overall thin-walled structure of composite machine body
CN109228375B (en) Skin forming method
CN109263156B (en) Rail transit vehicle body apron board structure and forming method thereof
CN209366808U (en) A kind of carbon fibre composite buoy container
CN106564237A (en) Lightweight and multi-level orthogonal corrugated core sandwich structure and preparation method thereof
CN206765397U (en) A kind of fiber-reinforced composite deck board
CN112078153A (en) Sandwich composite material battery box for electric racing car and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315

RJ01 Rejection of invention patent application after publication