CN109465130A - A kind of hanger structure in cable bridge spray painting pipeline - Google Patents
A kind of hanger structure in cable bridge spray painting pipeline Download PDFInfo
- Publication number
- CN109465130A CN109465130A CN201811372959.2A CN201811372959A CN109465130A CN 109465130 A CN109465130 A CN 109465130A CN 201811372959 A CN201811372959 A CN 201811372959A CN 109465130 A CN109465130 A CN 109465130A
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- cable bridge
- spray painting
- hanger structure
- fixed link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
- B05B13/0264—Overhead conveying means, i.e. the object or other work being suspended from the conveying means; Details thereof, e.g. hanging hooks
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses the hanger structures in a kind of cable bridge spray painting pipeline, including the first mounting plate, the second mounting plate, attachment base and fixed link, first mounting plate is hinged with the second mounting plate by bolt, two attachment bases are respectively fixedly connected on the first mounting plate and the second mounting plate, two fixed links be respectively fixedly connected on the lower end surface of the first mounting plate on the lower end surface of the second mounting plate.The configuration of the present invention is simple, it is easy to use, can be in order to the longer cable bridge of delivery size, using effect is good.
Description
Technical field:
The present invention relates to the hanger structures in a kind of cable bridge spray painting pipeline.
Background technique:
Existing cable bridge is in spray painting, the suspender since cable bridge length is longer, in existing spray painting pipeline
Cable bridge cannot be lifted, it is therefore desirable to which a kind of suspender is easy to lift cable bridge, and in the corner of pipeline, suspender
The corner of pipeline can smoothly be tided over.
Summary of the invention:
The present invention is provided in a kind of cable bridge spray painting pipeline to solve the above-mentioned problems of the prior art
Hanger structure.
The technical solution adopted in the present invention has: the hanger structure in a kind of cable bridge spray painting pipeline, including first
Mounting plate, the second mounting plate, attachment base and fixed link, first mounting plate are hinged with the second mounting plate by bolt,
Two attachment bases are respectively fixedly connected on the first mounting plate and the second mounting plate, and two fixed links are respectively fixedly connected with first
On the lower end surface of mounting plate and on the lower end surface of the second mounting plate.
Further, the bottom end of the fixed link is equipped with hanging rod, and the top of hanging rod is equipped with threaded shank, and threaded shank is connected to solid
In fixed pole, nut is threadedly coupled in threaded shank, and hanging rod is positioned in fixed link.
Further, the attachment base is equipped with lifting hole(eyelet).
Further, the left end of first mounting plate is equipped with first step portion, is equipped with the in the right end of the second mounting plate
Two stage portions, first step portion and the mutual split in second step portion, and be hinged by bolt.
The invention has the following beneficial effects:
The configuration of the present invention is simple, it is easy to use, can be in order to the longer cable bridge of delivery size, using effect is good.
Detailed description of the invention:
Fig. 1 is structure of the invention figure.
Fig. 2 is application structure figure of the present invention.
Specific embodiment:
The present invention will be further described below with reference to the drawings.
Such as Fig. 1 and Fig. 2, hanger structure in a kind of cable bridge spray painting pipeline of the present invention, including the first mounting plate 41,
Second mounting plate 42, attachment base 43 and fixed link 44, the first mounting plate 41 are hinged with the second mounting plate 42 by bolt, and two
A attachment base 43 is respectively fixedly connected on the first mounting plate 41 and the second mounting plate 42, is connected in pipeline hanging on idler wheel
Bar 34 is connected in attachment base 43, and two fixed links 44 are respectively fixedly connected on the lower end surface of the first mounting plate 41 and the second peace
On the lower end surface of loading board 42.
It is equipped with hanging rod 45 in the bottom end of fixed link 44, the top of hanging rod 45 is equipped with threaded shank, and threaded shank is connected to fixed link
On 44, nut is threadedly coupled in threaded shank, and hanging rod 45 is positioned in fixed link 44.Hanging rod 45 is equipped with hanging hole, hanging rod
45 can be rotated with relatively fixed bar 44.
Lifting hole(eyelet) is equipped on attachment base 43, the diameter of the lifting hole(eyelet) is greater than the diameter of sunpender 34.Suspender is connected by attachment base 43
It connects on sunpender 34, and suspender can be rotated relative to sunpender 34.
The first mounting plate 41 in suspender can be relatively rotated with the second mounting plate 42, be set in the left end of the first mounting plate 41
There is first step portion 411, is equipped with second step portion 432, first step portion 411 and second step in the right end of the second mounting plate 42
The mutual split in portion 432, and be hinged by bolt.
When in use, cable bridge to be painted is hung on the hanging rod of suspender by lifting rope, since hanging rod 45 can be with
It is rotated relative to fixed bar 44, the first mounting plate 41 in suspender can be relatively rotated with the second mounting plate 42, and suspender can phase
Sunpender 34 is rotated, therefore when conveying longer cable bridge, even if nor affecting on cable bridge in the corner of guide rail 1
The conveying of frame.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
It for member, can also make several improvements without departing from the principle of the present invention, these improvement also should be regarded as of the invention
Protection scope.
Claims (4)
1. the hanger structure in a kind of cable bridge spray painting pipeline, it is characterised in that: including the first mounting plate (41), the second peace
Loading board (42), attachment base (43) and fixed link (44), first mounting plate (41) pass through bolt phase with the second mounting plate (42)
Mutually hinged, two attachment bases (43) are respectively fixedly connected on the first mounting plate (41) and the second mounting plate (42), two fixations
Bar (44) be respectively fixedly connected on the lower end surface of the first mounting plate (41) on the lower end surface of the second mounting plate (42).
2. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: the fixed link
(44) bottom end is equipped with hanging rod (45), and the top of hanging rod (45) is equipped with threaded shank, and threaded shank is connected on fixed link (44), in spiral shell
It is threadedly coupled nut in bar portion, and hanging rod (45) is positioned on fixed link (44).
3. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: the attachment base
(43) it is equipped with lifting hole(eyelet).
4. the hanger structure in cable bridge spray painting pipeline as described in claim 1, it is characterised in that: first installation
The left end of plate (41) is equipped with first step portion (411), is equipped with second step portion (432) in the right end of the second mounting plate (42), the
One stage portion (411) and second step portion (432) mutual split, and be hinged by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811372959.2A CN109465130A (en) | 2018-11-19 | 2018-11-19 | A kind of hanger structure in cable bridge spray painting pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811372959.2A CN109465130A (en) | 2018-11-19 | 2018-11-19 | A kind of hanger structure in cable bridge spray painting pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109465130A true CN109465130A (en) | 2019-03-15 |
Family
ID=65674024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811372959.2A Pending CN109465130A (en) | 2018-11-19 | 2018-11-19 | A kind of hanger structure in cable bridge spray painting pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109465130A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2657635B2 (en) * | 1995-03-29 | 1997-09-24 | ジェイティ物流株式会社 | Open bottom flexible sheet container |
CN2747194Y (en) * | 2004-12-02 | 2005-12-21 | 福州泰康机械制造有限公司 | Conveyer chain of suspension transportation-line |
CN200985244Y (en) * | 2006-10-16 | 2007-12-05 | 青岛港(集团)有限公司 | Large-scale board discharging fastening tool |
CN202296806U (en) * | 2011-10-09 | 2012-07-04 | 北汽福田汽车股份有限公司 | Automobile body transfer lifting hook device |
CN102774737A (en) * | 2012-08-03 | 2012-11-14 | 上海电气电站设备有限公司 | Multi-claw hanger capable of adjusting positions of lifting claws synchronously |
CN204369419U (en) * | 2014-12-31 | 2015-06-03 | 东风襄阳旅行车有限公司 | Long head school bus vehicle body hanging apparatus |
CN104722699A (en) * | 2015-03-31 | 2015-06-24 | 东风设计研究院有限公司 | Hook automatic-return type longitudinal beam riveting production line |
CN106044553A (en) * | 2016-06-29 | 2016-10-26 | 合肥禾盛新型材料有限公司 | Composite steel plate production and transportation equipment |
CN106984471A (en) * | 2017-06-05 | 2017-07-28 | 南京胜捷电机制造有限公司 | A kind of conveying mechanism in electric motor end cap spray painting pipeline |
CN107042177A (en) * | 2017-06-05 | 2017-08-15 | 南京胜捷电机制造有限公司 | A kind of gear unit in motor paint-spraying line |
-
2018
- 2018-11-19 CN CN201811372959.2A patent/CN109465130A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2657635B2 (en) * | 1995-03-29 | 1997-09-24 | ジェイティ物流株式会社 | Open bottom flexible sheet container |
CN2747194Y (en) * | 2004-12-02 | 2005-12-21 | 福州泰康机械制造有限公司 | Conveyer chain of suspension transportation-line |
CN200985244Y (en) * | 2006-10-16 | 2007-12-05 | 青岛港(集团)有限公司 | Large-scale board discharging fastening tool |
CN202296806U (en) * | 2011-10-09 | 2012-07-04 | 北汽福田汽车股份有限公司 | Automobile body transfer lifting hook device |
CN102774737A (en) * | 2012-08-03 | 2012-11-14 | 上海电气电站设备有限公司 | Multi-claw hanger capable of adjusting positions of lifting claws synchronously |
CN204369419U (en) * | 2014-12-31 | 2015-06-03 | 东风襄阳旅行车有限公司 | Long head school bus vehicle body hanging apparatus |
CN104722699A (en) * | 2015-03-31 | 2015-06-24 | 东风设计研究院有限公司 | Hook automatic-return type longitudinal beam riveting production line |
CN106044553A (en) * | 2016-06-29 | 2016-10-26 | 合肥禾盛新型材料有限公司 | Composite steel plate production and transportation equipment |
CN106984471A (en) * | 2017-06-05 | 2017-07-28 | 南京胜捷电机制造有限公司 | A kind of conveying mechanism in electric motor end cap spray painting pipeline |
CN107042177A (en) * | 2017-06-05 | 2017-08-15 | 南京胜捷电机制造有限公司 | A kind of gear unit in motor paint-spraying line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204847764U (en) | Prefabricated component production is with hoist and mount frame | |
CN205555864U (en) | Automatic a tower section of thick bamboo of adjusting stands up hoist | |
CN109465130A (en) | A kind of hanger structure in cable bridge spray painting pipeline | |
CN204096832U (en) | Elevator used in small machine room compensated chain guide piece | |
CN103303772A (en) | Ultra-long wall attaching device of construction lift | |
CN208378295U (en) | Lift by crane the hanger of concrete prefabricated board class component | |
CN209156196U (en) | A kind of cable bridge spray painting pipeline | |
CN103306618A (en) | Casing and drilling tool conveying cableway device | |
CN109225724A (en) | A kind of cable bridge spray painting pipeline | |
CN204702399U (en) | A kind of Steel plate hoisting implement | |
CN203865822U (en) | Large-scale crankshaft horizontal lifting appliance | |
CN203319445U (en) | Super-long wall attaching device of construction elevator | |
CN209306748U (en) | One kind being used for steel strand wires preservative treatment actinobacillus device | |
CN207185637U (en) | One kind is portable to catch chicken device | |
CN207276049U (en) | A kind of gantry crane | |
CN205076674U (en) | Gantry crane's assembly auxiliary device | |
CN204643670U (en) | Split type arm tower crane Shears structure | |
CN204847783U (en) | Roof beam is hung to hoist | |
CN204897147U (en) | Horizontal panel hoist | |
CN204079227U (en) | A kind of suspender with tooth form control apparatus | |
CN205346622U (en) | Steel constructs component bikini and lifts by crane installation device | |
CN205204554U (en) | Narrow shaft rescue lifting mechanism | |
CN204265308U (en) | A kind of structure of fuel line hanger | |
CN207758219U (en) | A kind of Anti-fall die assembly | |
CN208500193U (en) | The lifting of blower high-speed brake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190315 |
|
RJ01 | Rejection of invention patent application after publication |