A kind of guarantor's power supply trouble excludes and stand-by equipment planing method Download PDFInfo
- Publication number
- CN109460881A CN109460881A CN201711470958.7A CN201711470958A CN109460881A CN 109460881 A CN109460881 A CN 109460881A CN 201711470958 A CN201711470958 A CN 201711470958A CN 109460881 A CN109460881 A CN 109460881A
- Authority
- CN
- China
- Prior art keywords
- equipment
- guarantor
- electric
- power supply
- stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 230000005611 electricity Effects 0.000 claims abstract description 45
- 238000007689 inspection Methods 0.000 claims abstract description 10
- 238000012544 monitoring process Methods 0.000 claims abstract description 5
- 238000013468 resource allocation Methods 0.000 claims abstract description 3
- 230000005484 gravity Effects 0.000 claims description 14
- 230000008439 repair process Effects 0.000 claims description 2
- 238000013024 troubleshooting Methods 0.000 abstract description 2
- 238000012545 processing Methods 0.000 description 4
- 238000007726 management method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- RYAUSSKQMZRMAI-YESZJQIVSA-N (S)-fenpropimorph Chemical compound C([C@@H](C)CC=1C=CC(=CC=1)C(C)(C)C)N1C[C@H](C)O[C@H](C)C1 RYAUSSKQMZRMAI-YESZJQIVSA-N 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of guarantor's power supply trouble excludes and stand-by equipment planing method: according to protecting electric user, protecting electric task, protect electricity and make an inspection tour and weather monitoring situation, by the progress priority division of each guarantors electric line;Every guarantor's electric equipment in same guarantor's electric line corresponds to different equipment preferred numbers;After receiving equipment alarm information, the repairing order of faulty equipment is first determined, then carry out repairing resource allocation layout;First device is set by important guarantor's electric equipment, each first device is equipped with stand-by equipment, when first device breaks down, first switches to stand-by equipment power supply, then determine repairing order, switches back into former first device after the completion of repairing again.The present invention protects power supply trouble around reply in time and excludes this target, emergency electric supply unit is set for important guarantor's electric equipment first, when an error occurs, first switch to emergency electric supply unit power supply, the comprehensive importance for protecting electric line and the same importance for protecting distinct device in electric line again, are ranked up the priority of troubleshooting.
Description
Technical field
The present invention relates to power industry safety management technology field, in particular to a kind of guarantor's power supply trouble is excluded and spare is set
Standby planing method.
Background technique
With the rapid development of economic life various aspects, face more and more some momentous conferences, high standard activity and
Heavyweight receives task, and protecting power supply capacity to power supply companies at different levels also proposed more higher requirements.Electric system guarantees to supply
Electricity demanding, processing burst accident, ensure electric power netting safe running platform, the key problem to be solved be emergency event occur after,
Comprehensive response how is made within the shortest time, guarantees the reliable, fast of power supply task, to reduce accident to greatest extent
Caused by lose, promoted electric service level and power supply supportability.
China Patent Publication No. CN10252170B, grant date on 2 18th, 2015, the entitled power train of innovation and creation
System early warning command system, this application discloses a kind of electric system early warning command system and its methods, including early warning commander's clothes
Be engaged in platform, Communications service equipment and subscriber terminal equipment, the early warning commander service platform by graphical user interface, using center
Module and bottom data interface are constituted, and processing result information are sent to graphical user interface or bottom data interface, this is
The reliability and operational efficiency of electric system early warning system can be improved in system and its method, is used for power system power supply management.Its
It is disadvantageous in that the description laid particular emphasis on to early warning command process, what it is to the description of power system power supply management method is not to have very much
Body.
Summary of the invention
It is an object of the invention to make comprehensive response to power supply trouble within the shortest time, according to the weight for protecting electric task
Degree is wanted, faulty equipment priority is ranked up, so that processing equipment failure in time, guarantees that the failure of important equipment is preferentially arranged
It removes, provides a kind of guarantor's power supply trouble and exclude and stand-by equipment planing method.
The technical solution adopted by the present invention to solve the technical problems is: a kind of guarantor's power supply trouble excludes and stand-by equipment rule
The method of drawing: according to protecting electricity user, the electric task of guarantor, protecting electricity tour and weather monitoring situation, by each guarantor's electric line progress priority
It divides;Every guarantor's electric equipment in same guarantor's electric line corresponds to different equipment preferred numbers;After receiving equipment alarm information,
It first determines the repairing order of faulty equipment, then carries out repairing resource allocation layout;Level-one is set by important guarantor's electric equipment to set
Standby, each first device is equipped with stand-by equipment, when first device breaks down, first switches to stand-by equipment power supply, then determine
Order is repaired, switches back into former first device after the completion of repairing again.
In the present invention, power supply trouble monitoring is protected around reply in time and excludes this target, after receiving warning message, is determined
Electric priority is protected, it is preferential to exclude the higher guarantor's electric equipment failure of priority level, it makes a distinction between the important and the lesser one, it is ensured that the validity of electric task is protected,
For important guarantor's electric equipment, stand-by equipment is equipped with to it in advance and is powered.
Preferably, the method for the determining repairing order is: guarantor is divided into several periods, each period root in the electric period
One minor sort is carried out to faulty equipment according to electric preferred number is protected, so that it is determined that repairing order.
Preferably, the electric preferred number=guarantor's electricity weight * equipment preferred number of the guarantor;Electric weight=user of the guarantor etc.
Grade * task grade * makes an inspection tour specific gravity * meteorology stability;The size of electric weight is protected by guarantor's electricity user, the Bao electricity Ren in guarantor's electric line
Situation and meteorologic factor decision are maked an inspection tour in business;If every guarantor's electric line connection Ganlei protects electric user, every class protects electric user and corresponds to phase
The user gradation answered;Each period undertakes the significance level of the electric task of guarantor according to electric line is protected, and corresponding task grade is arranged;
It makes an inspection tour situation to measure to make an inspection tour specific gravity, meteorologic factor is measured with meteorological stability.
Preferably, the priority that electric equipment is respectively protected in same guarantor's electric line is determined by equipment preferred number, it is described to set
Standby preferred number=∑ failure rate/(load number * utilization rate * specific gravity factor), equipment preferred number is by the company, guarantor's electric equipment institute
Loadtype, load number, load utilization rate and the load faulty rate connect determines;Each period sets for each loadtype
Set corresponding specific gravity factor.
Preferably, setting preferred number threshold value, the slave power distribution cabinet that equipment preferred number is greater than preferred number threshold value is set
For first device, equipment preferred number is less than the slave power distribution cabinet of preferred number threshold value alternately stand-by equipment;Stand-by equipment institute
Category task grade is lower than the corresponding affiliated task grade of first device.
Preferably, selection is set with the affiliated task rank difference of first device away from maximum power supply in alternative stand-by equipment
Standby middle percent ten five power supply unit of the surplus at least more than first device electricity consumption of powering is as stand-by equipment.
Preferably, the electricity consumption=∑ unit time electricity consumption * electricity consumption duration * load number * utilization rate.
Preferably, the power supply surplus=equipment maximum power supply volume-electricity consumption.
Substantial effect of the invention: power supply trouble is protected around timely reply and excludes this target, is first important guarantor
Emergency electric supply unit is arranged in electric equipment, when an error occurs, first switches to emergency electric supply unit power supply, then synthesis protects electric line
Importance and the same importance for protecting distinct device in electric line, according to electric preferred number is protected, to the preferential grading of troubleshooting
Row sequence, to guarantee the quality and efficiency of electric task.
Specific embodiment
Below by specific embodiment, technical scheme of the present invention will be further explained in detail.
A kind of guarantor's power supply trouble excludes and stand-by equipment planing method, according to protect electric user, protect electric task, protect electricity make an inspection tour with
And weather monitoring situation, each guarantor's electric line is subjected to priority division;Every guarantor's electric equipment in same guarantor's electric line is corresponding not
Same equipment preferred number;After receiving equipment alarm information, the repairing order of faulty equipment is first determined, then carry out repairing resource
Allotment layout;First device is set by important guarantor's electric equipment, each first device is equipped with stand-by equipment, when first device is sent out
When raw failure, stand-by equipment power supply is first switched to, then determines repairing order, switches back into former first device again after the completion of repairing, with
Guarantee the continuity of short time power supply.
The method for determining repairing order is: guarantor being divided into several periods the electric period, each period, electricity is preferential to be according to protecting
Several pairs of faulty equipments carry out a minor sort, so that it is determined that repairing order.Protect electric preferred number by guarantor's electricity weight of guarantor's electric line and
The equipment preferred number of connected power supply unit determines, protects electric preferred number=guarantor's electricity weight * equipment preferred number.Protect electricity power
It is reused in the importance of overall merit every guarantor's electric line, electric weight=user gradation * task grade * is protected and makes an inspection tour specific gravity * meteorology
Stability.The importance of electric line is protected by the electric task of guarantor's electricity user, guarantor, tour situation and the meteorologic factor in guarantor's electric line
It determines.It protects electric user and is divided into different grades, such as general meeting, momentous conference, high-level meeting etc., user gradation is the guarantor
The equivalent coefficient of electric user, user gradation is higher, and coefficient is smaller;According to the electricity consumption scene of different periods, electric task will be protected and be divided into
Meeting has dinner, lies fallow, going to bed, receiving ... several junior's tasks that wait, different periods, the importance of each junior's task
Be not quite similar, such as night will preferentially guarantee electricity consumption of going to bed, mealtime preferentially guarantee to have dinner electricity consumption ... need according to when
Between section the importance of these junior's tasks is divided, the significance level of junior's task, important journey are represented with task grade
Degree is higher, and task equivalent coefficient is smaller;Tour resource provisioned in the electric region of each guarantor is not quite similar, and tour resource is equipped with high
Regional processing efficiency is relatively high, and tour specific gravity factor is smaller, and it is more sufficient to represent tour resource;Meteorologic factor is to the electric task of guarantor
There is a very big influence, when thunderstorm weather, the task of rush repair can also be aggravated, and time and frequency all can be impacted, meteorological steady
Determine coefficient is smaller, represents meteorological more stable.
Equipment preferred number=∑ failure rate/(load number * utilization rate * specific gravity factor);The electricity consumption of every guarantor's electric equipment
Situation is related with loadtype, load number, utilization rate, failure rate, and specific gravity system is arranged for each loadtype in each period
Number, every kind of loadtype have quantity and frequency of use, the difference of failure rate.Such as a lighting apparatus, loadtype may wrap
Include: ceiling lamp, desk lamp, socket etc., when daytime is bright and clear, ceiling lamp, the specific gravity factor of desk lamp are relatively low, it is corresponding this when
The utilization rate and failure rate of section are also just lower;To night, ceiling lamp, desk lamp specific gravity factor will become larger, utilization rate and therefore
Barrier rate also just improves.The electricity consumption situation of every equipment of overall merit helps accurately to estimate overall electricity consumption, so which judge
A little equipment can be used as and the stand-by equipment of equipment guarantees overall power supply cloth under the premise of meeting power itself demand
Office.To sum up, protecting electric priority is to carry out dynamic update according to different periods, in order to according to specific service condition,
When an error occurs, the higher power demand protected electric task or protect electricity object of preferential guarantee priority, motor-driven carries out guarantor's electricity
The allotment of goods and materials.
According to actual guarantor's electricity demanding, preferred number threshold value is set, equipment preferred number is greater than preferred number threshold value
First device is set as from power distribution cabinet, and equipment preferred number is less than the slave power distribution cabinet of preferred number threshold value alternately stand-by equipment.
The setting of preferred number threshold value need to consider power supply unit quantity, and emphasis is needed to protect the quantity of the object of electricity.Stand-by equipment with it is corresponding
First device belong to different task grades, the affiliated task grade of stand-by equipment is lower than the corresponding affiliated task dispatching of first device
Grade.In alternative stand-by equipment, selection with the affiliated task rank difference of first device away from maximum power supply unit power surplus extremely
Less greater than 1 15 power supply unit of first device electricity consumption as stand-by equipment.Power supply unit belongs to first device
The equipment of different task grades, different task grade carries out intersection stand-by power supply, can expand whole power supply capacity, guarantees
The rational flow of overall power.Task rank difference is away from bigger, and a possibility that illustrating two equipment while powering is smaller, as level-one
The stand-by equipment of equipment is powered, on the stand-by equipment itself power task influence just it is smaller.The power supply surplus of stand-by equipment
At least more than the 1 15 of first device electricity consumption, it is selected to the electrical demand of stand-by equipment, it is therefore intended that guarantee standby
With equipment will not overload operation, guarantee power supply stability and safety.When electricity consumption=∑ unit time electricity consumption * electricity consumption
Long * load number * utilization rate connects several different power load on every power supply unit, and the electricity consumption of power supply unit is
The summation of all load electricity consumptions, the electricity consumption of load is by load number, electricity consumption duration, unit time electricity consumption and utilization rate
It determines, surplus=equipment maximum power supply volume-electricity consumption of powering, power supply surplus is for measuring the power supply unit as stand-by equipment
Power supply capacity.
Embodiment described above is a kind of preferable scheme of the invention, not makees limit in any form to the present invention
System, there are also other variants and remodeling on the premise of not exceeding the technical scheme recorded in the claims.
Claims (8)
1. a kind of guarantor's power supply trouble excludes and stand-by equipment planing method, which is characterized in that according to protect electric user, protect electric task,
Electricity tour and weather monitoring situation are protected, each guarantor's electric line is subjected to priority division;Every guarantor electricity in same guarantor's electric line
Equipment corresponds to corresponding equipment preferred number;After receiving equipment alarm information, first determine faulty equipment repairing order, then into
It robs and repairs resource allocation layout;Electric equipment is protected into part and is set as first device, each first device is equipped with stand-by equipment, when one
When grade device fails, stand-by equipment power supply is first switched to, then determines repairing order, switches back into former level-one after the completion of repairing again
Equipment.
2. a kind of guarantor's power supply trouble according to claim 1 excludes and stand-by equipment planing method, which is characterized in that described
The method for determining repairing order is: guarantor being divided into several periods the electric period, each period is according to the electric preferred number of guarantor to failure
Equipment carries out a minor sort, so that it is determined that repairing order.
3. a kind of guarantor's power supply trouble according to claim 2 excludes and stand-by equipment planing method, which is characterized in that described
It protects electric preferred number to be determined by the electric weight of guarantor of guarantor's electric line with the equipment preferred number for protecting the connected power supply unit of electric line, protect
Electric preferred number=guarantor's electricity weight * equipment preferred number;
Electric weight=user gradation * task grade the * of the guarantor makes an inspection tour specific gravity * meteorology stability;The size of electric weight is protected by the guarantor
The electric task of guarantor's electricity user, guarantor, tour situation and meteorologic factor in electric line determine;If every guarantor's electric line connection Ganlei protects
Electric user, every class protect electric user and correspond to corresponding user gradation;Each period undertakes the weight of the electric task of guarantor according to electric line is protected
Degree is wanted, corresponding task grade is set;It makes an inspection tour situation to measure to make an inspection tour specific gravity, meteorologic factor is weighed with meteorological stability
Amount.
4. a kind of guarantor's power supply trouble according to claim 3 excludes and stand-by equipment planing method, which is characterized in that same
The priority that electric equipment is respectively protected in guarantor's electric line is determining by equipment preferred number, and the equipment preferred number=∑ failure rate/
(load number * utilization rate * specific gravity factor), loadtype that equipment preferred number is connected by guarantor's electric equipment, load number,
It loads utilization rate and load faulty rate determines;Corresponding specific gravity factor is arranged for each loadtype in each period.
5. a kind of guarantor's power supply trouble according to claim 1 excludes and stand-by equipment planing method, which is characterized in that setting
The slave power distribution cabinet that equipment preferred number is greater than preferred number threshold value is set as first device by preferred number threshold value, and equipment is preferentially
Number is less than the slave power distribution cabinets alternately stand-by equipment of preferred number threshold value;The affiliated task grade of stand-by equipment is lower than corresponding level-one
The affiliated task grade of equipment.
6. guarantor's power supply trouble according to claim 5 excludes and stand-by equipment planing method, which is characterized in that alternative standby
With in equipment, selection is set away from surplus of powering in maximum power supply unit at least more than level-one with the affiliated task rank difference of first device
1 15 power supply unit of spare electricity is as stand-by equipment.
7. a kind of guarantor's power supply trouble according to claim 6 excludes and stand-by equipment planing method, which is characterized in that described
Electricity consumption=∑ unit time electricity consumption * electricity consumption duration * load number * utilization rate.
8. a kind of guarantor's power supply trouble according to claim 6 excludes and stand-by equipment planing method, which is characterized in that described
Power supply surplus=equipment maximum power supply volume-electricity consumption.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470958.7A CN109460881A (en) | 2017-12-28 | 2017-12-28 | A kind of guarantor's power supply trouble excludes and stand-by equipment planing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470958.7A CN109460881A (en) | 2017-12-28 | 2017-12-28 | A kind of guarantor's power supply trouble excludes and stand-by equipment planing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109460881A true CN109460881A (en) | 2019-03-12 |
Family
ID=65606215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711470958.7A Pending CN109460881A (en) | 2017-12-28 | 2017-12-28 | A kind of guarantor's power supply trouble excludes and stand-by equipment planing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109460881A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112488336A (en) * | 2020-12-09 | 2021-03-12 | 深圳供电局有限公司 | Power grid fault processing method and system used in extreme weather |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102623910A (en) * | 2012-04-27 | 2012-08-01 | 重庆大学 | Reliability-based maintenance decision method for switch equipment |
CN103679547A (en) * | 2013-11-29 | 2014-03-26 | 国家电网公司 | Optimization method for missed steps of relay protection |
CN104573989A (en) * | 2015-01-28 | 2015-04-29 | 国家电网公司 | Transmission line fault probability assessment method based on historical fault information |
CN108806014A (en) * | 2018-04-24 | 2018-11-13 | 佛山市中凯机电工程有限公司 | A kind of remote computer machine room intelligent cruising inspection system based on cloud computer |
-
2017
- 2017-12-28 CN CN201711470958.7A patent/CN109460881A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102623910A (en) * | 2012-04-27 | 2012-08-01 | 重庆大学 | Reliability-based maintenance decision method for switch equipment |
CN103679547A (en) * | 2013-11-29 | 2014-03-26 | 国家电网公司 | Optimization method for missed steps of relay protection |
CN104573989A (en) * | 2015-01-28 | 2015-04-29 | 国家电网公司 | Transmission line fault probability assessment method based on historical fault information |
CN108806014A (en) * | 2018-04-24 | 2018-11-13 | 佛山市中凯机电工程有限公司 | A kind of remote computer machine room intelligent cruising inspection system based on cloud computer |
Non-Patent Citations (3)
Title |
---|
无: "重要用户保电方案", 《百度》 * |
汤继生等: "基于GIS的电网抢修车辆综合调度技术研究", 《电力信息与通信技术》 * |
编纂委员会编: "《汶川特大地震抗震救灾志 卷5 抢险救灾志》", 31 August 2015, 北京:方志出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112488336A (en) * | 2020-12-09 | 2021-03-12 | 深圳供电局有限公司 | Power grid fault processing method and system used in extreme weather |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2011205871A (en) | Electric power supply system | |
CN111369021A (en) | Automatic maintenance method of power transmission and transformation equipment | |
CN207542843U (en) | Intelligent remote charge and discharge monitoring equipment | |
CN103490492B (en) | High voltage direct current electric power system | |
CN109472383A (en) | An a kind of method for optimizing scheduling protecting electric-examination and repairing | |
CN103887862B (en) | A kind of flexible management of charging and discharging rectification module, management tree device and system | |
CN103151790A (en) | Intelligent power supply system of peak moving and valley filling | |
CN109460881A (en) | A kind of guarantor's power supply trouble excludes and stand-by equipment planing method | |
CN102801204B (en) | A kind of 240VDC high voltage direct current electric power system and method | |
CN104951884A (en) | Visual display method of accident emergency repair and inversion based on distribution network | |
Malla et al. | Coordinated priority-aware charging of distributed batteries in oversubscribed data centers | |
CN106789278B (en) | The power failure restorative procedure of power failure repair system and the application system | |
CN105389667B (en) | Support that the distribution system framework of integration is robbed in allotment | |
CN110212526B (en) | Power supply system and micro-module data center | |
CN109472382A (en) | An a kind of method for optimizing scheduling protecting electric-examination and repairing | |
CN109472368A (en) | A kind of method for optimizing scheduling for protecting electric equipment troubleshooting and vehicle | |
CN202043327U (en) | Marker lamp with guiding light stream | |
CN107465258A (en) | A kind of electric power system and method for IDC computer rooms | |
CN109472427A (en) | A kind of guarantor's power supply trouble excludes and stand-by equipment planing method | |
CN109474000B (en) | Intelligent analysis system and method for distributed photovoltaic power supply of distribution transformer area | |
CN207677504U (en) | Communication base station moves energy source dispatch system | |
CN109784775A (en) | A kind of micro-grid system dispatching method and device | |
CN109472381A (en) | A kind of guarantor's electric equipment upkeep operation optimization method | |
CN112698714B (en) | Intelligent management method and system for virtual resources when UPS is started | |
CN204465136U (en) | A kind of communication power supply of Rail Transit System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190312 |
|
RJ01 | Rejection of invention patent application after publication |