CN109459996A - Production line analogy method and device - Google Patents

Production line analogy method and device Download PDF

Info

Publication number
CN109459996A
CN109459996A CN201811609436.5A CN201811609436A CN109459996A CN 109459996 A CN109459996 A CN 109459996A CN 201811609436 A CN201811609436 A CN 201811609436A CN 109459996 A CN109459996 A CN 109459996A
Authority
CN
China
Prior art keywords
production line
equipment
device model
model
modification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811609436.5A
Other languages
Chinese (zh)
Inventor
郑杨
宿春慧
高方方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING AEROSPACE INTELLIGENT TECHNOLOGY DEVELOPMENT Co.,Ltd.
CASICLOUD-TECH Co.,Ltd.
Original Assignee
Beijing Spaceflight Intelligent Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Spaceflight Intelligent Technology Development Co Ltd filed Critical Beijing Spaceflight Intelligent Technology Development Co Ltd
Priority to CN201811609436.5A priority Critical patent/CN109459996A/en
Publication of CN109459996A publication Critical patent/CN109459996A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32339Object oriented modeling, design, analysis, implementation, simulation language
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

This application discloses a kind of production line analogy methods, it include: at least equipment according to the first production line of composition, determine device parameter corresponding with the one-to-one device model of an at least equipment and each device model, and corresponding device parameter is configured for each device model, obtain the corresponding virtual unit of each equipment;Connection relationship according to each equipment in first production line, virtual unit corresponding with each equipment is connected, make as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, obtains simulation production line corresponding with first production line;It determines from the production procedure of first production line to simulated production process and at least target virtual devices for including to simulated production process, and the device parameter and operation logic of each target virtual devices are called, it controls each target virtual devices and runs and execute described to simulated production process;It obtains and executes the analog result to simulated production process.

Description

Production line analogy method and device
Technical field
The application belongs to machine learning techniques field, specifically, being related to a kind of production line analogy method and device.
Background technique
It is known that the planning and designing reasonability and operational efficiency of production line directly affect product quality and production cost. Traditional production line simulation design method is in such a way that planar design and mathematical computations combine, and the layout of production line uses The case where mode simplified to entity is arranged, and production line is run then passes through mathematical computations and is deduced, while rule of thumb Optimization layout, and finally instruct actual layout designs.
But location problem described in above scheme has been although done simplification, and actually differs greatly, and solves in algorithm It cannot accurately be solved in finite time, be difficult to carry out time update according to complicated actual change, it is more difficult to intuitive performance production The case where line actual motion.And the automation level of enterprises improves in modern production, production system is increasingly complicated, and speed of production is increasingly Accelerate, therefore need to face many problems when designing system: whether the design for how verifying system is reasonable, how to determine How the quantity of buffer area and neck region verify production outline and the control logic of logistics equipment etc..
Accordingly, it is desirable to provide a kind of scheme, with can variation according to the actual situation change layout at any time, intuitively to show The case where production line actual motion.
Summary of the invention
In view of this, being used the technical problem to be solved by the application is to provide a kind of production line analogy method and device The case where intuitively to show production line actual motion.
In order to solve the above-mentioned technical problem, this application discloses a kind of production line analogy methods, which comprises
According to an at least equipment for the first production line of composition, the determining and one-to-one device model of an at least equipment And the corresponding device parameter of each device model, and corresponding device parameter is configured for each device model, it is corresponding to obtain each equipment Virtual unit;
According to the connection relationship of each equipment in first production line, virtual unit corresponding with each equipment is connected Come, make as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, obtains and first life The corresponding simulation production line of producing line;
It is determining to simulated production process and described to simulated production process packet from the production procedure of first production line At least target virtual devices included, and the device parameter and operation logic of each target virtual devices are called, control each institute Target virtual devices are stated to run and execute described to simulated production process;
It obtains and executes the analog result to simulated production process.
Optionally, described when simulated production process in execution, further includes: corresponding rule-statistical model is called to count Utilization rate of equipment and installations, cargo general input, cargo general output, current cargo total amount, average size, minimum residence time, maximum Residence time, mean residence time.
Optionally, the method also includes:
The first modification instruction of modification device parameter is received, the first modification instruction includes what device parameter system was modified Device model mark;
The first modification instruction is executed, the device parameter that the device model identifies corresponding device model is modified.
Optionally, the method also includes:
The second modification instruction of modification device model connection relationship is received, the second modification instruction includes first after modification Connect the first device model mark and the second device model mark at both ends;
The second modification instruction is executed, first device model is connected and identifies corresponding device model and the second equipment The corresponding device model of model identification.
Optionally, the method also includes:
According to modified simulation production line, each virtual unit for calling the modified simulation production line to include is set Standby parameter and operation logic, control the production procedure that each virtual unit runs and executes the modified simulation production line;With And obtain the analog result for executing the production procedure of the modified simulation production line.
Disclosed herein as well is a kind of production line simulator, described device includes:
Configuration unit, for at least equipment according to the first production line of composition, a determining and at least equipment is one by one Corresponding device model and the corresponding device parameter of each device model, and corresponding device parameter is configured for each device model, Obtain the corresponding virtual unit of each equipment;
Connection unit will void corresponding with each equipment for the connection relationship according to each equipment in first production line It proposes for connecting, makes as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, obtain Simulation production line corresponding with first production line;
Analogue unit, for determining to simulated production process and described to mould from the production procedure of first production line At least target virtual devices that quasi- production procedure includes, and the device parameter of each target virtual devices and operation is called to patrol Volume, it controls each target virtual devices and runs and execute described to simulated production process;Acquiring unit executes institute for obtaining State the analog result to simulated production process.
Optionally, the analogue unit, is also used to: calling corresponding rule-statistical model to count utilization rate of equipment and installations, goods Object general input, current cargo total amount, average size, the minimum residence time, the maximum residence time, is averaged at cargo general output Residence time.
Optionally, described device further includes the first modification unit, is used for:
The first modification instruction of modification device parameter is received, the first modification instruction includes what device parameter system was modified Device model mark;
The first modification instruction is executed, the device parameter that the device model identifies corresponding device model is modified.
Optionally, described device further includes the second modification unit, is used for:
The second modification instruction of modification device model connection relationship is received, the second modification instruction includes first after modification Connect the first device model mark and the second device model mark at both ends;
The second modification instruction is executed, first device model is connected and identifies corresponding device model and the second equipment The corresponding device model of model identification.
Optionally, the analogue unit, is also used to: according to modified simulation production line, calling the modified mould The device parameter and operation logic for each virtual unit that quasi- production line includes control each virtual unit and run and execute the modification The production procedure of simulation production line afterwards;And
The acquiring unit is also used to obtain the simulation knot for executing the production procedure of the modified simulation production line Fruit.
Compared with prior art, the application can be obtained including following technical effect:
The embodiment of the present application can construct one and the identical simulation production line of actual production line, and can foundation Actual production flowsheeting production process, to obtain corresponding analog result, and then according to the simulated production process and simulation Led to the problem of in actual production line and production procedure as a result, it is possible to analyze, with can variation according to the actual situation at any time Change layout, the case where intuitively to show production line actual motion.
Certainly, any product for implementing the application must be not necessarily required to reach all the above technical effect simultaneously.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, this Shen Illustrative embodiments and their description please are not constituted an undue limitation on the present application for explaining the application.In the accompanying drawings:
Fig. 1 is the production line analogy method flow diagram that the application some embodiments provide;
Fig. 2 is the production line analogy method flow diagram that the application some embodiments provide;
Fig. 3 is the production line analogy method flow diagram that the application some embodiments provide;
Fig. 4 is the production line analogy method flow diagram that the application some embodiments provide;
Fig. 5 is the production line simulator schematic diagram that the application some embodiments provide.
Specific embodiment
Presently filed embodiment is described in detail below in conjunction with accompanying drawings and embodiments, how the application is applied whereby Technological means solves technical problem and reaches the realization process of technical effect to fully understand and implement.
For inventor during studying the disclosure, there are problems for the discovery prior art: traditional production line simulation design Method is in such a way that planar design and mathematical computations combine, and the layout of production line is carried out by the way of simplifying to entity The case where arrangement, production line is run, then passes through mathematical computations and is deduced, while rule of thumb optimization layout, and finally guidance is real The layout designs on border.But traditional technical solution although having done simplification, and actually differs greatly for location problem, in algorithm It cannot accurately be solved in the finite time of solution, be difficult to carry out time update according to complicated actual change, it is more difficult to intuitive table The case where existing production line actual motion.
In view of this, inventors herein proposing a kind of scheme, actual production line can be simulated, and control and simulate The production line come executes actual production procedure, leads to the problem of in actual production line and production procedure to analyze, with energy Enough variations according to the actual situation change layout at any time, the case where intuitively to show production line actual motion.
Referring to Fig. 1, the embodiment of the present application discloses a kind of production line analogy method, this method can be applied to terminal and set Standby (such as PC, smart phone, IPAD etc.), also can be applied to server, can also be using set on cloud or entity device Logical device, such as virtual machine.Method shown in FIG. 1 specifically includes step 102-108, for convenience of describing, the embodiment of the present application Actual production line is known as the first production line.
Step 102, at least equipment according to the first production line of composition, determination are one-to-one with an at least equipment Device model and the corresponding device parameter of each device model, and corresponding device parameter is configured for each device model, it obtains each The corresponding virtual unit of equipment.
In the embodiment of the present application, the first production line includes the various equipment positioned at the production line flow process node, Mei Geliu There is direct or indirect connection relationship between Cheng Jiedian and downstream node.This step is then set according to what the first production line included It is standby, determine corresponding device model and the corresponding device parameter of the device model, wherein device parameter is setting for physical device Standby parameter.Herein, device model is the virtual component for creating or developing according to existing equipment, by receiving matching for user's input Order is set, to configure corresponding device parameter for each device model.
For example, it is assumed that the production procedure of the manufacturing industry production line of planning are as follows: manufacturing equipment manufactures product, then will manufacture Product transported one by one by transmission equipment to shelf, shelf check the product data received by rays safety detection apparatus.So, The equipment that the manufacturing industry production line includes has manufacturing equipment, transmission equipment, rays safety detection apparatus.
Then through this embodiment, determine corresponding with manufacturing equipment, transmission equipment, rays safety detection apparatus manufacturing equipment model, Transmission equipment model, rays safety detection apparatus model.And the device parameter of each equipment is obtained, then set for the configuration of each device model is corresponding Standby parameter, with creation and entity device (including device type, functions of the equipments, equipment performance etc.) identical virtual unit.
Step 104, the connection relationship according to each equipment in first production line, will virtual unit corresponding with each equipment Connect, make as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, obtain with it is described The corresponding simulation production line of first production line.
After each equipment of acquisition corresponding virtual unit, the connection relationship of each equipment in available first production, then Each virtual unit is connected according to the connection relationship, make each equipment connection relationship and virtual unit corresponding with each equipment Connection relationship it is the same, obtain corresponding with first production line simulation production line.
Still by taking the manufacturing industry production line of aforementioned planning as an example, in the manufacturing industry production line of planning, the connection of each equipment is closed System is: manufacturing equipment connects transmission equipment, and transmission equipment connects rays safety detection apparatus.It is set obtaining virtual manufacturing device, virtually transmitting After standby, virtual rays safety detection apparatus, according to aforementioned connection relationship, virtual manufacturing device is connect with virtual transfer device, and will be virtual Transmission device is connect with virtual rays safety detection apparatus.
It should be understood that the present embodiment can also provide place, scene, object dummy model, and be dummy model After setting corresponding site parameter, scenario parameters, object parameters, corresponding virtual objects are obtained, and the virtual objects are added Enter into the corresponding flow nodes of production line.
Such as the warehouse in aforementioned manufacturing industry production line, it can determine corresponding storehouse model and relevant parameter, example Then it is good to have configured parameter for the storehouse model, has obtained corresponding virtual warehouse for such as area, space, humidity, temperature.Finally Warehouse is connect with rays safety detection apparatus.
Step 106, it determines from the production procedure of first production line to simulated production process and the life to be simulated At least target virtual devices that process includes are produced, and call the device parameter and operation logic of each target virtual devices, Each target virtual devices are controlled to run and execute described to simulated production process.
In the present embodiment, certain production procedures can be selected as to simulated production process from actual production procedure It is simulated, is being determined after simulated production process, can determine the target virtual devices for waiting for that simulated production process includes. Then the device parameter and operation logic of invocation target virtual unit controls each target virtual devices and runs and execute to mould Quasi- production procedure.
Still by taking aforementioned manufacturing industry production line as an example, production procedure are as follows: manufacturing equipment manufactures product, then will manufacture Product is transported one by one by transmission equipment to shelf, and shelf check the product data received by rays safety detection apparatus.
Assuming that selection to simulated production process 1 are as follows: manufacturing equipment manufacture product, the product manufactured is then passed through into biography Equipment is sent to be transported one by one, then the target virtual devices for including are virtual manufacturing device and virtual transmission equipment.Assuming that selection To simulated production process 2 are as follows: manufacturing equipment manufacture product, then the target virtual devices for including be virtual manufacturing device.It is false If selection to simulated production process 3 are as follows: manufacturing equipment manufacture product, then by product manufacture pass through transmission equipment by by A to transport shelf, shelf check the product data received by rays safety detection apparatus, then the target virtual devices for including are void It draws up manufacturing apparatus, virtual transmission equipment and virtual rays safety detection apparatus.
For to simulated production process 1, we call the device parameter and operation logic, virtual transmission of virtual manufacturing device The device parameter and operation logic of equipment, control virtual manufacturing device, the operation of virtual transmission equipment, to execute to simulated production stream Journey 1.
Step 108, it obtains and executes the analog result to simulated production process.
The embodiment of the present application can construct one and the identical simulation production line of actual production line, and can foundation Actual production flowsheeting production process, to obtain corresponding analog result, and then according to the simulated production process and simulation Led to the problem of in actual production line and production procedure as a result, it is possible to analyze, with can variation according to the actual situation at any time Change layout, the case where intuitively to show production line actual motion.
In another embodiment, step 106 is it may also is that call device parameter and the operation of each virtual unit Logic controls each virtual unit operation, to execute the production procedure.
When wanting the analog result of certain virtual unit of analysis, it can control other virtual units in simulation production line It is out of service.Specifically, can receive halt instruction, the halt instruction includes device model mark, executes the stopping and refers to It enables, it is out of service to control the corresponding virtual unit of the device model mark.
In order in simulation process can analysis mode together, can execute described when simulated production process, call Corresponding rule-statistical model, to count utilization rate of equipment and installations, cargo general input, cargo general output, current cargo total amount, put down Equal capacity, minimum residence time, maximum residence time, mean residence time.Wherein, each rule-statistical model is as follows.
The ratio of utilization rate of equipment and installations statistical model, i.e. average size and place capacity.
Cargo general input statistical model, that is, be added to the summation of the quantity of goods of this entity.
Cargo general output statistical model, that is, be output to the summation of the quantity of goods of other entities.
Average size statistical model, the i.e. ratio of cargo general input and simulation run total time.
Minimum residence time statistical model, i.e. residence time are i.e. from being input to the time for being output to other entities.Minimum value That the smallest value in i.e. total cargo.
Minimum big residence time statistical model, i.e. residence time are i.e. from being input to the time for being output to other entities.It is maximum Value is that maximum value in total cargo.
Mean residence time statistical model, i.e., the residence time of all cargos and the ratio with cargo general input.
It should be understood that above-mentioned only play the role of example, rule-statistical model can be specific according to different production lines Setting, the application are not particularly limited.
Change layout at any time in order to variation according to the actual situation, the embodiment of the present application can also modify equipment ginseng Number.Specifically, referring to Fig. 2, the method also includes:
Step 1010, the first modification instruction of modification device parameter is received, the first modification instruction includes device parameter It is the device model mark modified;The first modification instruction is executed, the device model is modified and identifies corresponding equipment mould The device parameter of type.
It should be understood that step 1010 synchronous with step 104-106 can execute, it can also be in step 104-106 It is executed before or after either step.
Change layout at any time in order to variation according to the actual situation, the embodiment of the present application can also be modified between equipment Connection relationship.Specifically, referring to Fig. 3, the method also includes:
Step 1012, the second modification instruction of modification device model connection relationship is received, the second modification instruction includes The first device model mark and the second device model mark at the first connection both ends after modification;The second modification instruction is executed, It connects first device model and identifies corresponding device model and the corresponding device model of the second device model mark.
It should be understood that step 1012 synchronous with step 104-106 can execute, it can also be in step 104-106 It is executed before or after either step.
Change layout at any time in order to variation according to the actual situation, the embodiment of the present application can also be according to modified Production line is simulated, specifically, in modification device parameter or connection relationship or after simulated production process, referring to Fig. 4, this Apply for that embodiment can also include: step 1014, according to modified simulation production line, calls the modified simulated production The device parameter and operation logic for each virtual unit that line includes control each virtual unit and run and execute the modified mould The production procedure of quasi- production line;And obtain the analog result for executing the production procedure of the modified simulation production line.
Referring to Fig. 5, disclosed herein as well is a kind of production line simulator, described device include: configuration unit 500, Connection unit 501, analogue unit 502 and acquiring unit 503.The function of each unit describes specific as follows shown.
Configuration unit 500, for at least equipment according to the first production line of composition, a determining and at least equipment one One corresponding device model and the corresponding device parameter of each device model, and corresponding equipment ginseng is configured for each device model Number, obtains the corresponding virtual unit of each equipment.
Connection unit 501 will be corresponding with each equipment for the connection relationship according to each equipment in first production line Virtual unit connects, and makes to obtain as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment Obtain simulation production line corresponding with first production line.
Analogue unit 502, for determining to simulated production process and described from the production procedure of first production line To at least target virtual devices that simulated production process includes, and call the device parameter and fortune of each target virtual devices Row logic controls each target virtual devices and runs and execute described to simulated production process.
Acquiring unit 503 executes the analog result to simulated production process for obtaining.
Optionally, the analogue unit 502, is also used to: call corresponding rule-statistical model count utilization rate of equipment and installations, Cargo general input, current cargo total amount, average size, the minimum residence time, the maximum residence time, is put down at cargo general output The equal residence time.
Optionally, described device further includes the first modification unit, is used for:
The first modification instruction of modification device parameter is received, the first modification instruction includes what device parameter system was modified Device model mark;
The first modification instruction is executed, the device parameter that the device model identifies corresponding device model is modified.
Optionally, described device further includes the second modification unit, is used for:
The second modification instruction of modification device model connection relationship is received, the second modification instruction includes first after modification Connect the first device model mark and the second device model mark at both ends;
The second modification instruction is executed, first device model is connected and identifies corresponding device model and the second equipment The corresponding device model of model identification.
Optionally, the analogue unit 502, is also used to: according to modified simulation production line, calling described modified The device parameter and operation logic for each virtual unit that simulation production line includes control each virtual unit and run and execute described repair The production procedure of simulation production line after changing;And
The acquiring unit 503 is also used to obtain the simulation for executing the production procedure of the modified simulation production line As a result.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or The forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable medium Example.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM), Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates Machine readable medium does not include non-temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
As used some vocabulary to censure specific components in the specification and claims.Those skilled in the art answer It is understood that hardware manufacturer may call the same component with different nouns.This specification and claims are not with name The difference of title is as the mode for distinguishing component, but with the difference of component functionally as the criterion of differentiation.Such as logical The "comprising" of piece specification and claim mentioned in is an open language, therefore should be construed to " include but do not limit In "." substantially " refer within the acceptable error range, those skilled in the art can within a certain error range solve described in Technical problem basically reaches the technical effect.In addition, " coupling " word includes any direct and indirect electric property coupling herein Means.Therefore, if it is described herein that a first device is coupled to a second device, then representing the first device can directly electrical coupling It is connected to the second device, or the second device indirectly electrically coupled through other devices or coupling means.Specification Subsequent descriptions be implement the application better embodiment, so it is described description be for the purpose of the rule for illustrating the application, It is not intended to limit the scope of the present application.The protection scope of the application is as defined by the appended claims.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability Include, so that commodity or system including a series of elements not only include those elements, but also including not clear The other element listed, or further include for this commodity or the intrinsic element of system.In the feelings not limited more Under condition, the element that is limited by sentence "including a ...", it is not excluded that in the commodity or system for including the element also There are other identical elements.
Several preferred embodiments of the invention have shown and described in above description, but as previously described, it should be understood that the present invention Be not limited to forms disclosed herein, should not be regarded as an exclusion of other examples, and can be used for various other combinations, Modification and environment, and the above teachings or related fields of technology or knowledge can be passed through within that scope of the inventive concept describe herein It is modified.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, then it all should be in this hair In the protection scope of bright appended claims.

Claims (10)

1. a kind of production line analogy method, which is characterized in that the described method includes:
According to an at least equipment for the first production line of composition, determination is with the one-to-one device model of an at least equipment and often The corresponding device parameter of one device model, and corresponding device parameter is configured for each device model, obtain the corresponding void of each equipment It proposes standby;
According to the connection relationship of each equipment in first production line, virtual unit corresponding with each equipment is connected, is made As the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, obtain and first production line pair The simulation production line answered;
It determines to simulated production process from the production procedure of first production line and described includes to simulated production process An at least target virtual devices, and the device parameter and operation logic of each target virtual devices are called, control each mesh Mark virtual unit runs and executes described to simulated production process;
It obtains and executes the analog result to simulated production process.
2. the method according to claim 1, wherein described when simulated production process executing, further includes: adjust Counted with corresponding rule-statistical model utilization rate of equipment and installations, cargo general input, cargo general output, current cargo total amount, Average size, minimum residence time, maximum residence time, mean residence time.
3. the method according to claim 1, wherein further include:
The first modification instruction of modification device parameter is received, the first modification instruction includes the equipment that device parameter system is modified Model identification;
The first modification instruction is executed, the device parameter that the device model identifies corresponding device model is modified.
4. the method according to claim 1, wherein further include:
The second modification instruction of modification device model connection relationship is received, the second modification instruction includes the first connection after modification The first device model mark and the second device model mark at both ends;
The second modification instruction is executed, first device model is connected and identifies corresponding device model and the second device model Identify corresponding device model.
5. according to the method described in claim 4, it is characterized by further comprising:
According to modified simulation production line, the equipment ginseng for each virtual unit for calling the modified simulation production line to include Several and operation logic, controls the production procedure that each virtual unit runs and executes the modified simulation production line;And it obtains Take the analog result for executing the production procedure of the modified simulation production line.
6. a kind of production line simulator, which is characterized in that described device includes:
Configuration unit, it is determining to be corresponded with an at least equipment for at least equipment according to the first production line of composition Device model and the corresponding device parameter of each device model, and configure corresponding device parameter for each device model, obtain The corresponding virtual unit of each equipment;
Connection unit corresponding with each equipment will virtually be set for the connection relationship according to each equipment in first production line It is standby to connect, make as the connection relationship of each equipment and the connection relationship of virtual unit corresponding with each equipment, acquisition and institute State the corresponding simulation production line of the first production line;
Analogue unit, for determining from the production procedure of first production line to simulated production process and the life to be simulated At least target virtual devices that process includes are produced, and call the device parameter and operation logic of each target virtual devices, Each target virtual devices are controlled to run and execute described to simulated production process;
Acquiring unit executes the analog result to simulated production process for obtaining.
7. device according to claim 6, which is characterized in that the analogue unit is also used to: calling corresponding rule system Meter model stops to count utilization rate of equipment and installations, cargo general input, cargo general output, current cargo total amount, average size, minimum Stay time, maximum residence time, mean residence time.
8. device according to claim 6, which is characterized in that further include the first modification unit, be used for:
The first modification instruction of modification device parameter is received, the first modification instruction includes the equipment that device parameter system is modified Model identification;
The first modification instruction is executed, the device parameter that the device model identifies corresponding device model is modified.
9. device according to claim 6, which is characterized in that further include the second modification unit, be used for:
The second modification instruction of modification device model connection relationship is received, the second modification instruction includes the first connection after modification The first device model mark and the second device model mark at both ends;
The second modification instruction is executed, first device model is connected and identifies corresponding device model and the second device model Identify corresponding device model.
10. device according to claim 9, which is characterized in that the analogue unit is also used to: according to modified mould Quasi- production line, the device parameter and operation logic of each virtual unit for calling the modified simulation production line to include, control Each virtual unit runs and executes the production procedure of the modified simulation production line;And
The acquiring unit is also used to obtain the analog result for executing the production procedure of the modified simulation production line.
CN201811609436.5A 2018-12-27 2018-12-27 Production line analogy method and device Pending CN109459996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811609436.5A CN109459996A (en) 2018-12-27 2018-12-27 Production line analogy method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811609436.5A CN109459996A (en) 2018-12-27 2018-12-27 Production line analogy method and device

Publications (1)

Publication Number Publication Date
CN109459996A true CN109459996A (en) 2019-03-12

Family

ID=65614995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811609436.5A Pending CN109459996A (en) 2018-12-27 2018-12-27 Production line analogy method and device

Country Status (1)

Country Link
CN (1) CN109459996A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111857063A (en) * 2019-04-29 2020-10-30 西门子股份公司 Method, device and system for acquiring digital data of factory
CN112327688A (en) * 2020-10-29 2021-02-05 四川绵阳鼎鑫智能装备有限公司 Digital workshop simulation system
CN113360185A (en) * 2021-05-10 2021-09-07 Tcl空调器(中山)有限公司 Processing method and device for micro control unit of air conditioner outdoor unit and micro control unit
CN113608503A (en) * 2020-05-04 2021-11-05 和硕联合科技股份有限公司 Method for determining productivity parameters and productivity parameter generation system
CN114817482A (en) * 2022-03-23 2022-07-29 赛美特科技有限公司 Method, device and equipment for determining product manufacturing program and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6788985B2 (en) * 2000-05-31 2004-09-07 Kabushiki Kaisha Toshiba Electronic commerce method for semiconductor products, electronic commerce thereof, production system, production method, production equipment design system, production equipment design method, and production equipment manufacturing method
CN102436236A (en) * 2011-10-26 2012-05-02 奇瑞汽车股份有限公司 Method used for planning production line and apparatus thereof
JP2012138039A (en) * 2010-12-28 2012-07-19 Hitachi Engineering & Services Co Ltd Production simulation device
CN106774223A (en) * 2017-02-14 2017-05-31 广州秉优信息科技有限公司 A kind of production line three-view diagram intelligent linkage method, system
CN107885581A (en) * 2017-11-24 2018-04-06 广东惠利普路桥信息工程有限公司 A kind of shop-floor management simulation system and its method
US20180250818A1 (en) * 2017-03-06 2018-09-06 Canon Kabushiki Kaisha Teaching method for teaching operations to a plurality of robots and teaching system used therefor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6788985B2 (en) * 2000-05-31 2004-09-07 Kabushiki Kaisha Toshiba Electronic commerce method for semiconductor products, electronic commerce thereof, production system, production method, production equipment design system, production equipment design method, and production equipment manufacturing method
US20050010492A1 (en) * 2000-05-31 2005-01-13 Kunihiro Mitsutake Electronic commerce method for semiconductor products, electronic commerce thereof, production system, production method, production equipment design system, production equipment design method, and production equipment manufacturing method
JP2012138039A (en) * 2010-12-28 2012-07-19 Hitachi Engineering & Services Co Ltd Production simulation device
CN102436236A (en) * 2011-10-26 2012-05-02 奇瑞汽车股份有限公司 Method used for planning production line and apparatus thereof
CN106774223A (en) * 2017-02-14 2017-05-31 广州秉优信息科技有限公司 A kind of production line three-view diagram intelligent linkage method, system
US20180250818A1 (en) * 2017-03-06 2018-09-06 Canon Kabushiki Kaisha Teaching method for teaching operations to a plurality of robots and teaching system used therefor
CN107885581A (en) * 2017-11-24 2018-04-06 广东惠利普路桥信息工程有限公司 A kind of shop-floor management simulation system and its method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111857063A (en) * 2019-04-29 2020-10-30 西门子股份公司 Method, device and system for acquiring digital data of factory
CN113608503A (en) * 2020-05-04 2021-11-05 和硕联合科技股份有限公司 Method for determining productivity parameters and productivity parameter generation system
CN112327688A (en) * 2020-10-29 2021-02-05 四川绵阳鼎鑫智能装备有限公司 Digital workshop simulation system
CN113360185A (en) * 2021-05-10 2021-09-07 Tcl空调器(中山)有限公司 Processing method and device for micro control unit of air conditioner outdoor unit and micro control unit
CN113360185B (en) * 2021-05-10 2023-06-23 Tcl空调器(中山)有限公司 Processing method and device of micro control unit of air conditioner external unit and micro control unit
CN114817482A (en) * 2022-03-23 2022-07-29 赛美特科技有限公司 Method, device and equipment for determining product manufacturing program and storage medium

Similar Documents

Publication Publication Date Title
CN109459996A (en) Production line analogy method and device
US10467059B2 (en) Determination of timing configurations for program dataflow models
US10063427B1 (en) Visualizing and interacting with resources of an infrastructure provisioned in a network
CN109753998A (en) The fault detection method and system, computer program of network are generated based on confrontation type
Yan et al. HANSEL: Adaptive horizontal scaling of microservices using Bi-LSTM
CN109582525A (en) Test code verification method, verifying device, equipment and storage medium
CN110311902A (en) A kind of recognition methods of abnormal behaviour, device and electronic equipment
US20170295084A1 (en) Methods, systems, and computer readable media for emulating network traffic patterns on a virtual machine
CN109840111A (en) A kind of patterned transaction processing system and method
CN108573355A (en) The method, apparatus and service server of operation are replaced after model modification
CN110046088A (en) A kind of interface test method, device and equipment
CN110471821A (en) Abnormal alteration detection method, server and computer readable storage medium
CN109582452A (en) A kind of container dispatching method, dispatching device and electronic equipment
CN109933315A (en) A kind of patterned transaction processing system and method
CN111159897B (en) Target optimization method and device based on system modeling application
CN110677413B (en) Method and device for security verification of attack of smart home Internet of things system
CN109376079A (en) The test method and server that interface calls
CN109002645A (en) EMU subsystem modeling method and device
CN110347593A (en) Flow testing method and device
Schou et al. Determining manufacturing system changes based on new product specifications
CN104765616B (en) A kind of method and system for automatically generating I/O model
Pawar et al. A strategic approach to model the machine-to-machine communication of industrial IoT system for MQTT protocol with a case study
Siegmund et al. Interoperability of non-functional requirements in complex systems
CN104657261A (en) Test case generation method and test case generation system
CN106776184A (en) A kind of high-speed link quality verification method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210207

Address after: 100036 1201, 12 / F, building 7, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing

Applicant after: BEIJING AEROSPACE INTELLIGENT TECHNOLOGY DEVELOPMENT Co.,Ltd.

Applicant after: CASICLOUD-TECH Co.,Ltd.

Address before: 100036 1201, 12 / F, building 7, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing

Applicant before: BEIJING AEROSPACE INTELLIGENT TECHNOLOGY DEVELOPMENT Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190312