CN109459225A - Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand - Google Patents

Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand Download PDF

Info

Publication number
CN109459225A
CN109459225A CN201811568187.XA CN201811568187A CN109459225A CN 109459225 A CN109459225 A CN 109459225A CN 201811568187 A CN201811568187 A CN 201811568187A CN 109459225 A CN109459225 A CN 109459225A
Authority
CN
China
Prior art keywords
valve
shut
cavity
pipe clamp
control box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811568187.XA
Other languages
Chinese (zh)
Inventor
袁奕雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Special Equipment Supervision and Inspection Technology Institute
Original Assignee
Shanghai Special Equipment Supervision and Inspection Technology Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Special Equipment Supervision and Inspection Technology Institute filed Critical Shanghai Special Equipment Supervision and Inspection Technology Institute
Priority to CN201811568187.XA priority Critical patent/CN109459225A/en
Publication of CN109459225A publication Critical patent/CN109459225A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stands, including pipeline, the first shut-off valve, the second shut-off valve, shut-off valve-channel bend connection device for plugging and shut-off valve valve rod device for plugging, first shut-off valve and the second shut-off valve are installed in pipeline, elbow connection structure is formed between first shut-off valve and pipeline, pipeline is connect with liquid nitrogen gas cylinder, shut-off valve-channel bend connection device for plugging is mounted on the elbow junction of the first shut-off valve and pipeline, and shut-off valve valve rod device for plugging is mounted on the valve rod of the second shut-off valve.The present invention can block the leakage of liquefied natural gas tank car control box internal closure valve and channel bend junction and shut-off valve valve rod and carry out simulated experiment, achieve the purpose that verify plugging effect.

Description

Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand
Technical field
The invention belongs to the technical fields of pipeline equipment leakage blockage simulation, more particularly to a kind of low-temperature liquefaction vehicle fuel tank Vehicle control box pipeline equipment leakage blockage simulation testing stand.
Background technique
The energy is the power of foundation stone and development existing for human society.With the development of the social economy, being fired facing to fossil Expect the challenge of lack of energy, the exploitation of new energy is paid close attention in countries in the world one after another, and wherein natural gas is with its cleaning, pollution-free, efficiency Many advantages, such as high and favored.Currently, there are two types of the mainstream storing modes of natural gas: high-pressure gaseous storage and low temperature liquid Storage, liquefied petroleum gas (LNG) tank car using the mode storing liquid of Cryo Heat Insulation natural gas.
Liquefied natural gas (LNG) storage tank car is the land main mobile storage for transporting LNG, but due to LNG itself Physical characteristic, incident of leakage happens occasionally in liquefied natural gas (LNG) storage tank car driving process, row especially in control box Transfer pipeline, flange, valve of column etc. are the high risk positions that liquefied natural gas (LNG) storage tank car leaks.
Wouldn't exist in the prior art can connect liquefied natural gas tank car control box internal closure valve with channel bend Place, shut-off valve valve rod carry out the experimental provision that leakage blocks simulation.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipments Leakage blockage simulation testing stand, can be to liquefied natural gas tank car control box internal closure valve and channel bend junction and shut-off valve The leakage of valve rod, which blocks, carries out simulated experiment.
The technical solution adopted by the present invention to solve the technical problems is to provide a kind of low-temperature liquefaction vehicle fuel tank car behaviour Make case pipeline equipment leakage blockage simulation testing stand, including pipeline, the first shut-off valve and the second shut-off valve, first shut-off valve and Two shut-off valves are installed in pipeline, and elbow connection structure, the pipeline and liquid nitrogen are formed between first shut-off valve and pipeline Gas cylinder connection further includes shut-off valve-channel bend connection device for plugging and shut-off valve valve rod device for plugging, the shut-off valve-pipe Elbow connection device for plugging in road is mounted on the elbow junction of the first shut-off valve and pipeline, the shut-off valve-channel bend connection Device for plugging includes pipe clamp upper cover and pipe clamp lower cover, and the pipe clamp upper cover and pipe clamp lower cover are mutually matched obvolvent and connect and internal shape The first cavity being connect at the first shut-off valve is accommodated with channel bend, between the pipe clamp upper cover and the Mosaic face of pipe clamp lower cover, Cooperate nested leakproof seal slot and leakproof seal abaculus, the leakproof seal slot are respectively equipped with inside and outside first cavity Seal gasket is equipped between leakproof seal abaculus, lid is equipped with the first hole for injecting glue being connected to the first cavity on the pipe clamp, First rubber injecting valve is installed, the shut-off valve valve rod device for plugging is mounted on the valve rod of the second shut-off valve in first hole for injecting glue On, the shut-off valve valve rod device for plugging includes the first Hough half module and the second Hough half module, the first Hough half module and the Two Hough half modules are mutually matched obvolvent connection and internal the second cavity for forming the first shut-off valve valve rod of receiving, first Hough Half module and the second Hough half module have seal groove at the both ends of the second cavity, and sealing foot pad is equipped with inside the seal groove, The first Hough half module is equipped with the second hole for injecting glue being connected to the second cavity, installs the second injecting glue in second hole for injecting glue Valve.
Outside is respectively set to mutual corresponding ring flange in the pipe clamp upper cover and pipe clamp lower cover, and the ring flange is provided with First bolt hole passes through the first bolt hole by the first connection bolt between the pipe clamp upper cover and pipe clamp lower cover and carries out obvolvent company Connect locking.
The leakproof seal abaculus is arranged on pipe clamp on lid along the interior edge of the first cavity and outer respectively, and the leak-stopping is close Sealing groove is arranged under pipe clamp on lid along the interior edge of the first cavity and outer respectively.
First hole for injecting glue is set as two, and two the first hole for injecting glue are respectively arranged at the two close end end of the first cavity Position.
First cavity is in the right angle bend cavity body structure of rounded corner.
The two sides of the first Hough half module and the second Hough half module are respectively equipped with the connection wing, the first Hough half module The connection wing of the connection wing and the second Hough half module correspondence is provided with the second bolt hole, the first Hough half module and the second Hough half module Between by second connection bolt pass through the second bolt hole carry out obvolvent connection locking.
Second hole for injecting glue is set as two, and two the second hole for injecting glue are respectively arranged at the two close end end of the second cavity Position.
Second cavity is integrally cylindrical, middle part forms expanding cavity.
The testing stand further includes pedestal, and the pipeline is set to above the table top of pedestal.
Tool fitting pallet is equipped with below the table top of the pedestal.
Beneficial effect
In the present invention, simulation On Lng Leakage is connect with liquid nitrogen gas cylinder by pipeline, by the first shut-off valve It is connect device for plugging with the elbow junction of pipeline installation shut-off valve-channel bend, installation is cut on the valve rod of the second shut-off valve Only valve valve rod device for plugging carries out leakage blockage simulation to leak position at two respectively, can be realized and operates to liquefied natural gas tank car The leakage of case internal closure valve and channel bend junction and shut-off valve valve rod, which blocks, carries out simulated experiment.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram that shut-off valve of the present invention-channel bend connects device for plugging.
Fig. 3 is the structural schematic diagram for the pipe clamp upper cover that shut-off valve-channel bend connects device for plugging.
Fig. 4 is the structural schematic diagram for the pipe clamp lower cover that shut-off valve-channel bend connects device for plugging.
Fig. 5 is the structural schematic diagram of shut-off valve valve rod device for plugging of the present invention.
Fig. 6 is the structural schematic diagram of the first Hough half module of shut-off valve valve rod device for plugging.
Fig. 7 is the structural schematic diagram of the second Hough half module of shut-off valve valve rod device for plugging.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
A kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand as shown in Figure 1, including Pedestal 5, pipeline 1, the first shut-off valve, the second shut-off valve 2, shut-off valve-channel bend connection device for plugging 3 and shut-off valve valve rod are stifled Leakage device 4.Pipeline 1 is set to above the table top of pedestal 5, and pipeline 1 is connect with liquid nitrogen gas cylinder (not shown), the platform of pedestal 5 Tool fitting pallet is equipped with below face.First shut-off valve and the second shut-off valve 2 are installed in pipeline 1, the first shut-off valve and pipeline 1 Between formed elbow connection structure.
Shut-off valve-channel bend connection device for plugging 3 is mounted on the elbow junction of the first shut-off valve Yu pipeline 1.Such as figure Shown in 2-4, shut-off valve-channel bend connection device for plugging 3 includes pipe clamp upper cover 3-1 and pipe clamp lower cover 3-2.Pipe clamp upper cover 3-1 The first chamber that obvolvent connects and the first shut-off valve of internal formation receiving is connect with 1 elbow of pipeline is mutually matched with pipe clamp lower cover 3-2 Road 3-3.Outside is respectively set to mutual corresponding ring flange in pipe clamp upper cover 3-1 and pipe clamp lower cover 3-2, and ring flange is provided with first Between bolt hole 3-8, pipe clamp upper cover 3-1 and pipe clamp lower cover 3-2 by first connection bolt 3-9 pass through the first bolt hole 3-8 into Row obvolvent connection locking.First cavity 3-3 is in the right angle bend cavity body structure of rounded corner.
It is respectively equipped between pipe clamp upper cover 3-1 and the Mosaic face of pipe clamp lower cover 3-2, inside and outside the first cavity 3-3 mutually Cooperate nested leakproof seal slot 3-4 and leakproof seal abaculus 3-5, leakproof seal abaculus 3-5 is respectively along the first cavity 3-3 Edge and outer are arranged on pipe clamp upper cover 3-1, and leakproof seal slot 3-4 exists along the interior edge of the first cavity 3-3 and outer setting respectively On pipe clamp lower cover 3-2.Seal gasket is equipped between leakproof seal slot 3-4 and leakproof seal abaculus 3-5.
Pipe clamp upper cover 3-1 is equipped in the first hole for injecting glue 3-6, the first hole for injecting glue 3-6 being connected to the first cavity 3-3 and installs First rubber injecting valve 3-7.First hole for injecting glue 3-6 is set as two, and two the first hole for injecting glue 3-6 are respectively arranged at the first cavity 3-3 Two close end end position.It can be to shut-off valve of the collet inside the first cavity 3-3 and pipeline by the first hole for injecting glue 3-6 Elbow junction carries out injecting glue sealing, the generation that the elbow link position can be effectively prevent to reveal.
Shut-off valve valve rod device for plugging 4 is mounted on the valve rod of the second shut-off valve 2.Institute as illustrated in figs. 5-7, shut-off valve valve rod Device for plugging 4 includes the first Hough half module 4-1 and the second Hough half module 4-2.
First Hough half module 4-1 and the second Hough half module 4-2 is mutually matched obvolvent connection and internal formed accommodates first section Only the second cavity of 2 valve rod of valve.The two sides of first Hough half module 4-1 and the second Hough half module 4-2 are respectively equipped with the connection wing, and first The connection wing of the connection wing of Hough half module 4-1 and the second Hough half module 4-2 are corresponding to be provided with the second bolt hole 4-7, the first Hough half The second bolt hole 4-7 is passed through by the second connection bolt 4-8 between mould 4-1 and the second Hough half module 4-2 and carries out obvolvent connection lock Tightly.Second cavity is integrally cylindrical, middle part forms expanding cavity.
First Hough half module 4-1 and the second Hough half module 4-2 has seal groove 4-4, institute at the both ends of the second cavity It states and is equipped with sealing foot pad inside seal groove 4-4.First Hough half module 1 is equipped with the second hole for injecting glue 4-5 being connected to the second cavity, Second hole for injecting glue 4-6 is set as two, and two the second hole for injecting glue 4-6 are respectively arranged at the two close end end position of the second cavity. Second rubber injecting valve 4-6 is installed, it is close injecting glue can be carried out into the second cavity by the second rubber injecting valve 4-6 in the second hole for injecting glue 4-5 Envelope, the generation for effectivelying prevent the elbow link position to reveal.
The low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand can be to liquified natural gas tank The leakage of vehicle control box internal closure valve and channel bend junction and shut-off valve valve rod, which blocks, carries out simulated experiment.Pass through to Liquid nitrogen is filled in shut-off valve and its connecting line, is simulated its shut-off valve leakage process, is blocked, reached using dedicated device for plugging To the purpose for verifying its plugging effect.
The testing stand is arranged according to LNG tank vehicle shut-off valve and its connecting line position, and shut-off valve and its pipeline are prior Open up artificial defect together, bypass connection liquid nitrogen gas cylinder.When test, LNG is simulated by liquid nitrogen, is operated as follows:
(1) it opens liquid nitrogen bottle valve and adjusts pressure in pressure to LNG tank vehicle tank;
(2) liquid nitrogen from artificial defect by generating leakage in pipeline injection testing pipeline;
(3) operator dresses special protection, and shut-off valve-channel bend connection device for plugging 3 and shut-off valve valve rod are blocked up Leakage device 4 is assemblied on the shut-off valve and its connecting line on testing stand;
(4) injecting glue, observation envelope are carried out to shut-off valve-channel bend connection device for plugging 3 and shut-off valve valve rod device for plugging 4 Stifled effect;
(5) after the completion of testing, liquid nitrogen gas cylinder is closed.

Claims (10)

1. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand, including pipeline (1), first section Only valve and the second shut-off valve (2), first shut-off valve and the second shut-off valve (2) are installed in pipeline (1), first cut-off Elbow connection structure is formed between valve and pipeline (1), the pipeline (1) connect with liquid nitrogen gas cylinder, it is characterised in that: further include cutting Only valve-channel bend connection device for plugging (3) and shut-off valve valve rod device for plugging (4), the shut-off valve-channel bend connection are stifled Leakage device (3) is mounted on the elbow junction of the first shut-off valve Yu pipeline (1), the shut-off valve-channel bend connection leak stopping dress Setting (3) includes pipe clamp upper cover (3-1) and pipe clamp lower cover (3-2), the pipe clamp upper cover (3-1) and mutual of pipe clamp lower cover (3-2) It is connected with obvolvent and internal formed accommodates the first cavity (3-3) that the first shut-off valve is connect with pipeline (1) elbow, on the pipe clamp It is nested that mutual cooperation is respectively equipped between lid (3-1) and the Mosaic face of pipe clamp lower cover (3-2), inside and outside the first cavity (3-3) Leakproof seal slot (3-4) and leakproof seal abaculus (3-5), the leakproof seal slot (3-4) and leakproof seal abaculus (3-5) it Between be equipped with seal gasket, the pipe clamp upper cover (3-1) is equipped with the first hole for injecting glue (3-6) for being connected to the first cavity (3-3), institute It states in the first hole for injecting glue (3-6) and the first rubber injecting valve (3-7) is installed, the shut-off valve valve rod device for plugging (4) is mounted on second section Only on the valve rod of valve (2), the shut-off valve valve rod device for plugging (4) includes the first Hough half module (4-1) and the second Hough half module (4-2), the first Hough half module (4-1) and the second Hough half module (4-2) are mutually matched that obvolvent connects and internal formed accommodates Second cavity of the first shut-off valve (2) valve rod, the first Hough half module (4-1) and the second Hough half module (4-2) are in the second chamber The both ends in road have seal groove (4-4), and sealing foot pad, the first Hough half module are equipped with inside the seal groove (4-4) (1) it is equipped with the second hole for injecting glue (4-5) being connected to the second cavity, the second rubber injecting valve is installed in second hole for injecting glue (4-5) (4-6)。
2. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: outside is respectively set to mutual corresponding flange in the pipe clamp upper cover (3-1) and pipe clamp lower cover (3-2) Disk, the ring flange are provided with the first bolt hole (3-8), pass through first between the pipe clamp upper cover (3-1) and pipe clamp lower cover (3-2) It connects bolt (3-9) and passes through the first bolt hole (3-8) progress obvolvent connection locking.
3. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: the leakproof seal abaculus (3-5) is arranged along the interior edge of the first cavity (3-3) and outer in pipe clamp respectively In upper cover (3-1), the leakproof seal slot (3-4) is arranged along the interior edge of the first cavity (3-3) and outer in pipe clamp lower cover respectively On (3-2).
4. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: first hole for injecting glue (3-6) is set as two, and two the first hole for injecting glue (3-6) are respectively arranged at first The two close end end position of cavity (3-3).
5. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: first cavity (3-3) is in the right angle bend cavity body structure of rounded corner.
6. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: the two sides of the first Hough half module (4-1) and the second Hough half module (4-2) are respectively equipped with the connection wing, institute The connection wing correspondence of the connection wing and the second Hough half module (4-2) of stating the first Hough half module (4-1) is provided with the second bolt hole (4- 7), second is passed through by the second connection bolt (4-8) between the first Hough half module (4-1) and the second Hough half module (4-2) Bolt hole (4-7) carries out obvolvent connection locking.
7. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: second hole for injecting glue (4-6) is set as two, and two the second hole for injecting glue (4-6) are respectively arranged at second The two close end end position of cavity.
8. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: second cavity is integrally cylindrical, middle part forms expanding cavity.
9. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 1 Platform, it is characterised in that: the testing stand further includes pedestal (5), and the pipeline (1) is set to above the table top of pedestal (5).
10. a kind of low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation test according to claim 9 Platform, it is characterised in that: tool fitting pallet is equipped with below the table top of the pedestal (5).
CN201811568187.XA 2018-12-21 2018-12-21 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand Pending CN109459225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811568187.XA CN109459225A (en) 2018-12-21 2018-12-21 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811568187.XA CN109459225A (en) 2018-12-21 2018-12-21 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand

Publications (1)

Publication Number Publication Date
CN109459225A true CN109459225A (en) 2019-03-12

Family

ID=65614088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811568187.XA Pending CN109459225A (en) 2018-12-21 2018-12-21 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand

Country Status (1)

Country Link
CN (1) CN109459225A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110503871A (en) * 2019-08-08 2019-11-26 湖北三江航天江北机械工程有限公司 LNG double-purpose, which is unloaded, is pressurized the method for fast mfg of sled

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201651656U (en) * 2010-01-09 2010-11-24 余鸣雷 Bend forming leakage-stoppage fixture
CN201765743U (en) * 2010-07-09 2011-03-16 上海海鹰粘接科技有限公司 Chemical pipeline blocking leakage under pressure test training integrated equipment
CN202708461U (en) * 2012-02-09 2013-01-30 宁波二十冶建设有限公司 Pipeline leakage stoppage device
CN203131294U (en) * 2013-03-26 2013-08-14 克拉玛依市弘峰科技有限公司 Elbow quick repair device
CN203517093U (en) * 2013-08-20 2014-04-02 天津市港石密封机械有限公司 Bend leaking stoppage tool
CN103883839A (en) * 2014-03-20 2014-06-25 上海华力微电子有限公司 Emergency leakage stopping box of stainless steel pipeline and method for installing emergency leakage stopping box
CN203757287U (en) * 2014-03-19 2014-08-06 开封龙宇化工有限公司 Pressure leaking stoppage clamp for 90-degree bend pipeline
CN204213543U (en) * 2014-09-29 2015-03-18 彭志丹 A kind of universal pipeline agent injecting type Pressurized plugging clamp
CN204459607U (en) * 2015-01-14 2015-07-08 重庆科技学院 Conduit leak gripping device
CN105562967A (en) * 2014-10-14 2016-05-11 中国石油化工股份有限公司 Method for manufacturing leakage stopping clamp for punched bent pipe and use method for leakage stopping clamp
CN205504339U (en) * 2016-03-25 2016-08-24 泰兴协联众达化学有限公司 Little frame -type elbow of triumph anchor clamps for leaking stoppage
CN209342347U (en) * 2018-12-21 2019-09-03 上海市特种设备监督检验技术研究院 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201651656U (en) * 2010-01-09 2010-11-24 余鸣雷 Bend forming leakage-stoppage fixture
CN201765743U (en) * 2010-07-09 2011-03-16 上海海鹰粘接科技有限公司 Chemical pipeline blocking leakage under pressure test training integrated equipment
CN202708461U (en) * 2012-02-09 2013-01-30 宁波二十冶建设有限公司 Pipeline leakage stoppage device
CN203131294U (en) * 2013-03-26 2013-08-14 克拉玛依市弘峰科技有限公司 Elbow quick repair device
CN203517093U (en) * 2013-08-20 2014-04-02 天津市港石密封机械有限公司 Bend leaking stoppage tool
CN203757287U (en) * 2014-03-19 2014-08-06 开封龙宇化工有限公司 Pressure leaking stoppage clamp for 90-degree bend pipeline
CN103883839A (en) * 2014-03-20 2014-06-25 上海华力微电子有限公司 Emergency leakage stopping box of stainless steel pipeline and method for installing emergency leakage stopping box
CN204213543U (en) * 2014-09-29 2015-03-18 彭志丹 A kind of universal pipeline agent injecting type Pressurized plugging clamp
CN105562967A (en) * 2014-10-14 2016-05-11 中国石油化工股份有限公司 Method for manufacturing leakage stopping clamp for punched bent pipe and use method for leakage stopping clamp
CN204459607U (en) * 2015-01-14 2015-07-08 重庆科技学院 Conduit leak gripping device
CN205504339U (en) * 2016-03-25 2016-08-24 泰兴协联众达化学有限公司 Little frame -type elbow of triumph anchor clamps for leaking stoppage
CN209342347U (en) * 2018-12-21 2019-09-03 上海市特种设备监督检验技术研究院 Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐维普;马景勇;李昱;符明海;周路云;: "压力管道阀门型式试验技术研究", 化工装备技术, no. 03 *
薛小龙;鲁红亮;耿雪峰;: "基于事故树的高纯液氨罐式集装箱泄漏分析", 中国特种设备安全, no. 1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110503871A (en) * 2019-08-08 2019-11-26 湖北三江航天江北机械工程有限公司 LNG double-purpose, which is unloaded, is pressurized the method for fast mfg of sled
CN110503871B (en) * 2019-08-08 2021-08-10 湖北三江航天江北机械工程有限公司 Rapid manufacturing method of LNG dual-purpose unloading pressurizing pry

Similar Documents

Publication Publication Date Title
CN103672394B (en) A kind of without pump LNG refueling system and LNG Liquefied natural gas processing method
CN209342347U (en) Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand
CN102913752B (en) Unloading and liquid adding device for skid-type liquid adding station and unloading and liquid adding method
CN106813987A (en) Gas cylinder low-temperature test system
CN203656565U (en) Pump-free LNG (Liquefied Natural Gas) filling system
CN204099894U (en) A kind of sled of the liquefied natural gas filling for station of liquefying
CN107907466A (en) It is a kind of to change gas humidity and three axis seepage apparatus of port of export positive pressure
CN109459225A (en) Low-temperature liquefaction vehicle fuel tank car control box pipeline equipment leakage blockage simulation testing stand
CN105300614B (en) A kind of automobile-used LNG gas cylinders multifunction valve test system and test method
CN113357537B (en) Marine LNG filling system and operation method
CN209414873U (en) Low-temperature liquefaction vehicle fuel tank car control box shut-off valve connect leak stopping elbow with pipeline
CN203115497U (en) Residual gas recovery device for liquefied natural gas tanker
CN109469788A (en) Low-temperature liquefaction vehicle fuel tank car control box shut-off valve valve rod device for plugging
CN208907521U (en) Pipe pressurized quickly double closure air bags
CN203036241U (en) Low-temperature heat-insulating storage tank
CN209819033U (en) Valve rod plugging device for stop valve of fuel tank car operation box for low-temperature liquefaction vehicle
CN212177889U (en) Low-temperature valve capable of preventing leakage
CN201837564U (en) Calibration device for low-temperature gas bottle safety valve
CN209688341U (en) Low-temperature liquefaction vehicle fuel tank car control box blank flange device for plugging
CN109404655A (en) Low-temperature liquefaction vehicle fuel tank car control box shut-off valve connect leak stopping elbow with pipeline
CN203836579U (en) Prying-type LNG (liquefied natural gas) refueling station
CN102155597B (en) Connecting structure of low-temperature pipeline and valve
CN202790655U (en) Low-temperature ball valve
CN206804288U (en) Low-temperature test system
CN219866370U (en) Integrated packaging valve module for low-temperature pipeline of dual-fuel ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination