CN109449961A - A kind of energy routing controller and its control method suitable for hybrid accumulator - Google Patents

A kind of energy routing controller and its control method suitable for hybrid accumulator Download PDF

Info

Publication number
CN109449961A
CN109449961A CN201811545142.0A CN201811545142A CN109449961A CN 109449961 A CN109449961 A CN 109449961A CN 201811545142 A CN201811545142 A CN 201811545142A CN 109449961 A CN109449961 A CN 109449961A
Authority
CN
China
Prior art keywords
energy storage
energy
power
plate
box assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811545142.0A
Other languages
Chinese (zh)
Inventor
唐学用
李庆生
薛毅
钟以林
黄玉辉
赵庆明
陈巨龙
刘金森
何向刚
邓朴
罗宁
刘影
张彦
糜雨彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811545142.0A priority Critical patent/CN109449961A/en
Publication of CN109449961A publication Critical patent/CN109449961A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/46Boxes; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a kind of energy routing controllers and its control method suitable for hybrid accumulator, and including mutually detachably connected upper box assembly and lower box assembly, upper box assembly includes left plate, back plate and lower plate;Lower box assembly, lower box assembly include right panel, foreboard and upper plate;Left plate upper end is provided with extension board;Upper plate upper side is equipped with extended slot, and it further includes the control circuit being mounted in the cabinet that box assembly and lower box assembly surround that buckle protrusion is limited with the slot cooperation that is clasped.Invent dismountable tuning controller body structure, in disassembly or installation, a large amount of manpower can be saved, and conveniently, it is at low cost, and in order to disassemble and install conveniently.

Description

A kind of energy routing controller and its control method suitable for hybrid accumulator
Technical field
The present invention relates to a kind of energy routing controllers and its control method suitable for hybrid accumulator, belong to energy storage Device energy routing controls equipment technical field.
Background technique
Intelligent power distribution network technology aims to solve the problem that power grid is compatible and uses extensive intermittent distributed energy, is promoted renewable The problems such as energy utilization rate, optimization primary energy structure.Energy storage device is primarily served in intelligent distribution network and is operated in system Reliable electric energy is provided to local load under isolated island, while reducing influence of the fluctuation of distributed energy output power to power grid Effect.Energy storage energy routing controller is that the first layer completion under intelligent distribution network layer distributed coordinated control frame controls on the spot The device of energy storage power output function in multiple the same areas is coordinated in energy storage.
In the prior art, in assembly coordination controller box, multiple planks is needed to be screwed, and needed in this way A large amount of manpower needs effectively to hold in the palm the plank for needing to connect while tightening or unscrewing screw.If plank less or When person's weight is little, assembly can be completed with a people, when the plank if necessary to connect is thicker, heavier, a process will need The more talent can complete, so very waste of manpower, and labor intensive cost is larger.
Summary of the invention
The technical problem to be solved by the present invention is provide a kind of energy routing controller suitable for hybrid accumulator and Its control method, to solve problems of the prior art.
The technical scheme adopted by the invention is as follows: a kind of energy storage energy routing controller, it includes:
One side of upper box assembly, including left plate, back plate and lower plate, the left plate is connected with the back plate, therewith Another vertical side is connected with the lower plate, and a side of the back plate is connected with the lower plate;
One side of lower box assembly, including right panel, foreboard and upper plate, the right panel is connected with the foreboard, therewith Another vertical side is connected with the upper plate, and a side of the foreboard is connected with the upper plate;
Wherein, the left plate upper end is provided with horizontal extension board, and the extension board is equipped with buckle protrusion;The upper plate Upper surface is equipped with extended slot, and the extended slot is equipped with the slot that is clasped, and the extension board or dynamic be placed in the extended slot are led To the buckle protrusion is limited with the slot cooperation that is clasped;
Wherein, upper box assembly and the lower box assembly are fixed by connector is assembled into cabinet;
It further include the control circuit being mounted in cabinet.
A kind of preferred embodiment as energy storage energy routing controller, in which: the back plate upper end is equipped with the first protrusion and connects Block is connect, the left plate upper end and front end are respectively equipped with the second protrusion link block and third protrusion link block, and first protrusion connects It connects and is equipped with fixation hole on block, the second protrusion link block and third protrusion link block;The upper plate and foreboard left end are all provided with There is through hole, the connector passes through fixation hole and the fixed upper box assembly of through hole and the lower box assembly.
A kind of preferred embodiment as energy storage energy routing controller, in which: the connector is screw, the fixation hole It is threaded hole with through hole.
A kind of preferred embodiment as energy storage energy routing controller, in which: it is fixed that first is equipped on rear side of the back plate right end Position part, first locating piece section is L-shaped, and one side and the back plate fit fixation, and another side mutually hangs down with the back plate Directly.
A kind of preferred embodiment as energy storage energy routing controller, in which: it is fixed that second is equipped on the outside of the foreboard right end Position part, second locating piece section is L-shaped, and one side and the foreboard fit fixation, and another side mutually hangs down with the foreboard Directly.
A kind of preferred embodiment as energy storage energy routing controller, in which: first locating piece and described second is determined Location hole is equipped on the part of position.
A kind of preferred embodiment as energy storage energy routing controller, in which: the location hole includes embedded hole and limit Hole, the diameter of the limit hole are less than the diameter of the embedded hole;Bolt is reached from after embedded hole insertion along location hole The limit hole is fixed;First locating piece and second locating piece are not arranged symmetrically.
A kind of preferred embodiment as energy storage energy routing controller, in which: be provided on the right panel reset keyhole and Grafting port.
A kind of preferred embodiment as energy storage energy routing controller, in which: energy storage energy routing controller further includes control Circuit processed, control circuit are placed in the cabinet that the upper box assembly and lower box assembly surround;The control circuit include wiring board, Reset key and serial ports, the reset key and serial ports are connected with the wiring board respectively;The reset key passes through the reset key Hole, the serial ports pass through the grafting port.
A kind of control method of energy storage energy routing controller, method includes the following steps:
The first step analyzes the characteristic of energy storage device: the capacity (SOC value) including energy storage, the maximum charge-discharge electric power of energy storage, The power response speed of energy storage, the type of hybrid energy-storing, the charge and discharge threshold value of each mixed type energy storage;
Second step realizes hybrid energy-storing power distribution according to high pass or low-pass filtering control;
Third step optimizes energy storage coordinated control efficiency, is set as only arriving in the SOC value for monitoring some energy storage device Up to setting threshold value when just change a sub-priority, which is moved to the end of priority sequence, and be set as no longer Continue, it can only opposite direction charge and discharge;
4th step formulates the control method of energy storage energy routing controller: receiving the target of layer distributed controller first Power is controlled, the high fdrequency component demand of variation is transmitted to the energy storage device of quick charge and discharge according to battery variety label, will slowly be become The low frequency component demand of change is transmitted to the energy storage device more than energy storage;Secondly, preventing super-charge super-discharge SOC from protecting threshold the setting of each equipment Value.Then the preferential charge and discharge priority orders table of energy storage device is established according to each energy storage SOC state, preferentially to the priority orders Forward energy storage is discharged in table, and energy storage preferentially low to priority is charged, and inputs full hair according to maximum output Determine the power output of each energy storage, which only just changes when there is energy storage device to reach charge and discharge threshold value, Will reach overcharge threshold value energy storage device move to priority orders table most before, by reach over-discharge threshold value energy storage device move to preferentially Grade sequence list can not continue to charge or can not continue electric discharge flag bit finally, the device for needing to be up to threshold value simultaneously is arranged, It is not involved in continuation charge or discharge in power allocation procedure later, and only carries out reverse procedure.According to priority orders table point Not carry out high frequency and smooth power when distributing, when can not dissolve if there is surplus power, need for dump power to be given to other one The energy storage of seed type is placed on tail portion and continues assigning process;
It completes that updated energy storage device operation information is uploaded to layer distributed controller after entire coordinated allocation process Carry out Partial controll next time.
Distributive mixing energy storage power uses high pass or low-pass filtering control, power distribution of the two on frequency domain in step 2 Expression formula are as follows:
Wherein, TfFor time constant filter, P is power, PL(s) low-pass filtering active-power P is indicatedLLaplace transformation, PH (s) high-pass filtering active-power P is indicatedHLaplace transformation.
Beneficial effects of the present invention: compared with prior art, the dismountable tuning controller body structure of the present invention is being torn open When unloading or installing, the mutually matched extension board and extended slot of setting can save a large amount of manpower, and conveniently, cost It is low, and in order to disassemble and install conveniently, click on fashion is set, is first pre-positioned, convenient for tightening or unclamping upper box assembly and nowel Connection between component.
Detailed description of the invention
Fig. 1 is the coordination control strategy flow chart of energy storage energy routing controller;
Fig. 2 is the overall structure diagram of the upper box of energy storage energy routing controller;
Fig. 3 is the overall structure diagram of the lower box of energy storage energy routing controller;
Fig. 4 is the integrally-built schematic diagram of energy storage energy routing controller;
Fig. 5 is the portion the A enlarged diagram of Fig. 4;
Fig. 6 is the partial enlargement diagram of the second locating piece junction of energy storage energy routing controller;
Fig. 7 is the overall structure diagram of the RJ45 connector of energy storage energy routing controller;
Fig. 8 is the overall structure diagram of the serial ports of energy storage energy routing controller.
Specific embodiment
With reference to the accompanying drawing and invention is described further in specific embodiment.
Embodiment 1: as shown in figs 2-4, a kind of energy storage energy routing controller, controller includes upper 100 He of box assembly Lower box assembly 200, upper box assembly 100 and lower box assembly 200 are fixed by connector, are assembled into cabinet, are further included being mounted on case Control circuit 300 in body.
Specifically, upper box assembly 100 includes left plate 101, back plate 102 and lower plate 103, a side of left plate 101 is with after Plate 102 is connected, and another side normal thereto is connected with lower plate 103, a side and 103 phase of lower plate of back plate 102 Connection forms the pattern for being similar to an apex angle of three faces composition by left plate 101, back plate 102 and lower plate 103;
Lower box assembly 200 includes right panel 201, foreboard 202 and upper plate 203, a side and 202 phase of foreboard of right panel 201 Connection, another side normal thereto are connected with upper plate 203, and a side of foreboard 202 is connected with upper plate 203, with Upper box assembly 100 is corresponding, forms one by right panel 201, foreboard 202 and upper plate 203 and is similar to the one of three faces composition The pattern of a apex angle.
The secure fit for passing through bolt screw between upper box assembly 100 and lower box assembly 200, forms a complete case Body.
Wherein, it should be noted that 101 upper end of left plate is provided with horizontal extension board 101a, and 203 upper surface of upper plate is set There are extended slot 203a, extension board 101a to be movably placed in limit in extended slot 203a, the meaning being arranged in this way is: when upper box assembly Between 100 and lower box assembly 200 disassembly perhaps install when without be artificially disassembled or install in tow the other half, pass through this Kind grafting handling are laborsaving, time saving, play the role of Auxiliary support, wherein extension board 101a is equipped with buckle protrusion 101a-1, prolongs Exhibition slot 203a is equipped with the slot 203a-1 that is clasped, and buckle protrusion 101a-1 and the slot 203a-1 cooperation that is clasped limit, in this way The meaning of design is:, can when can to pass through the secure fit of bolt screw between top box component 100 and lower box assembly 200 To be first pre-positioned by buckle protrusion 101a-1 and the slot 203a-1 cooperation that is clasped, box assembly 100 and nowel in guarantee Positional relationship between component 200.
Referring to Fig. 2 and Fig. 3,102 upper end of back plate is equipped with the first protrusion link block 102a, 101 upper end of left plate and front end difference Link block 101c, the first protrusion link block 102a, the second protrusion link block are protruded equipped with the second protrusion link block 101b third It is equipped with fixation hole b on 101b third protrusion link block 101c, through hole c is equipped on 203 left end of upper plate, connector passes through solid Determine box assembly 100 and lower box assembly 200 in hole b and through hole c fixation, connector is screw, and fixation hole b and through hole c are Threaded hole.
- Fig. 3 referring to Fig.1, back plate 102 right end rear side are equipped with the first locating piece 102b, and the first section locating piece 102b is in L Type, one side and back plate 102 fit fixation, and another side and back plate 102 are perpendicular.It is fixed that second is equipped on the outside of 202 right end of foreboard Position part 202a, the second section locating piece 202a is L-shaped, and one side and foreboard 202 fit fixation, another side and 202 phase of foreboard Vertically, and on the first locating piece 102b and the second locating piece 202a it is equipped with location hole a.
In order to reduce the use of screw, the first locating piece 102b and back plate 102, the second locating piece 202a and foreboard 202 connect When connecing, screw is replaced by Demountable.
Demountable includes locating part 202b, and locating part 202b includes sector pushing block 202b-1 and connecting column 202b- 2, fan-shaped pushing block 202b-1 and connecting column 202b-2 are hinged, and are equipped with rubber washer 202b-3 in hinged place.
It should be noted that sector pushing block 202b-1 is equipped with limiting groove 202b-11 and slide block 202b-12, pass through Slide block 202b-12 can push fan-shaped pushing block 202b-1 around the hinged place of fan-shaped pushing block 202b-1 and connecting column 202b-2 Rotation.
At the same time, the second locating piece 202a is equipped with " L " type groove, and foreboard 202 is equipped with convex column 202c, works as protrusion Column 202c falls on the least significant end of " L " type groove along the track of " L " type groove, and rotating fan pushing block 202b-1 makes fan-shaped pushing block The outer diameter of 202b-1 and convex column 202c are tangent, at this point, convex column 202 is limited completely, so that the second locating piece 202a is with before Plate 202 is fixedly connected.When disassembly is desired, reverse operating.
First locating piece 102b is identical as the fixed mode of 102 phase of back plate.
In order to enable can be limited after stirring fan-shaped pushing block 202b-1 and stirring, it is equipped on the second locating piece 202a small Protrusion, limiting groove 202b-11 and small protrusion match.
Right panel 201, which is equipped with, resets keyhole 201a and grafting port 201b.
Control circuit 300 is placed in the cabinet that box assembly 100 and lower box assembly 200 surround, and control circuit 300 includes line Road plate 301, reset key 302 and serial ports 303, reset key 302 and serial ports 303 are connected with wiring board 301 respectively, reset key 302 Across keyhole 201a is resetted, serial ports 303 passes through grafting port 201b.
Reset key 302 can be such that tuning controller resets, and after pressing reset key 302, tuning controller will restart.
Serial ports 303 generally uses RS232/RS485 serial ports, is adapted to automatically according to software configuration, does not need to set using other It sets, 303 pin definitions of serial ports are as follows, referring to table 1 and Fig. 7-8:
Table 1
PIN RS232 RS485-2W
1 --- ---
2 RXD ---
3 TXD ---
4 --- ---
5 GND GND
6 --- Data+(B)
7 --- Data-(A)
8 --- ---
9 --- ---
And the RJ45 interface 303 being plugged in RS232/RS485 serial ports has 8 pins, the definition of each pin is different, Referring to table 2 and Fig. 7-8:
Table 2
Be integrated in back plate 102 in the present embodiment a power input terminal of redundant power, system reset switch, Default switch, protective grounding terminal etc..
Embodiment 2: a kind of control method of energy storage energy routing controller, method includes the following steps:
The first step analyzes the characteristic of energy storage device: the capacity (SOC value) including energy storage, the maximum charge-discharge electric power of energy storage, The power response speed of energy storage, the type of hybrid energy-storing, the charge and discharge threshold value of each mixed type energy storage;
Second step realizes hybrid energy-storing power distribution according to high pass or low-pass filtering control;
Third step optimizes energy storage coordinated control efficiency, is set as only arriving in the SOC value for monitoring some energy storage device Up to setting threshold value when just change a sub-priority, which is moved to the end of priority sequence, and be set as no longer Continue, it can only opposite direction charge and discharge;
4th step formulates the control method of energy storage energy routing controller: receiving the target of layer distributed controller first Power is controlled, the high fdrequency component demand of variation is transmitted to the energy storage device of quick charge and discharge according to battery variety label, will slowly be become The low frequency component demand of change is transmitted to the energy storage device more than energy storage;Secondly, preventing super-charge super-discharge SOC from protecting threshold the setting of each equipment Value.Then the preferential charge and discharge priority orders table of energy storage device is established according to each energy storage SOC state, preferentially to the priority orders Forward energy storage is discharged in table, and energy storage preferentially low to priority is charged, and inputs full hair according to maximum output Determine the power output of each energy storage, which only just changes when there is energy storage device to reach charge and discharge threshold value, Will reach overcharge threshold value energy storage device move to priority orders table most before, by reach over-discharge threshold value energy storage device move to preferentially Grade sequence list can not continue to charge or can not continue electric discharge flag bit finally, the device for needing to be up to threshold value simultaneously is arranged, It is not involved in continuation charge or discharge in power allocation procedure later, and only carries out reverse procedure.According to priority orders table point Not carry out high frequency and smooth power when distributing, when can not dissolve if there is surplus power, need for dump power to be given to other one The energy storage of seed type is placed on tail portion and continues assigning process;
It completes that updated energy storage device operation information is uploaded to layer distributed controller after entire coordinated allocation process Carry out Partial controll next time.
5th step, the exploitation of energy storage energy routing controller software;
Wherein, the exploitation of energy storage energy routing controller software includes the design of algorithm groupware and setting for communication protocol plug-ins Meter;The design of algorithm groupware, including initialization function, filter function function, BMS acquisition of information function, priority orders table Tuning function and energy storage device power target value partition function;
Wherein, the design of communication protocol plug-ins including the ModBus protocol plug-in design communicated with BMS and PCS and divides The IEC 60870-5-104 protocol plug-in design of layer distribution control unit communication.
Distributive mixing energy storage power is controlled using high-pass filtering, the power distribution expression formula on frequency domain are as follows:
Wherein, TfFor time constant filter, P is power, PL(s) low-pass filtering active-power P is indicatedLLaplace transformation, PH(s) high-pass filtering active-power P is indicatedHLaplace transformation, determine the cutoff frequency of high low-pass filtering, that is, determine vibration frequency Line of demarcation second grade is often set to minute grade according to the charge and discharge electric frequency of two class energy storage.
According to such distribution principle it is found that high-pass filtering PHAs the variation of power P is in high-frequency fluctuation, and low-pass filtering PLThe remaining slowly varying part P is then undertaken, the distribution of power to energy type energy storage and power-type energy storage is achieved in.
The optimization energy storage coordinated control efficiency, the control target for needing to solve to be issued by layer distributed controller every time The variation of SOC state still results in the minimum energy storage of period SOC and becomes not least after a period of time of charging when value SOC value so as to cause at this moment if there is discharge target when again start electric discharge the problem of.It is led in order to avoid this charge and discharge are imperfect The case where charge and discharge circulation life of the very big reduction energy storage caused, it is set as only in the SOC value for monitoring some energy storage device Reach setting threshold value when just change one sub-priority, which is moved to the end of priority sequence, and be set as not followed by It is continuous, it can only opposite direction charge and discharge.Finally consume in addition to charge and discharge target value one is known according to such priority change rule Outside a energy storage device, other devices can all undergo the circulation from extremely low electricity to high electricity.Due to charge and discharge target values with Machine, therefore necessarily have the energy storage among priority sequence and can undergo charge and discharge back and forth, this is can not be by setting point It is avoided with strategy, but is constantly carrying out circulation sliding since entire sequence is equivalent to when energy storage device reaches threshold value, because The probability for the charge and discharge of small-power back and forth that this each energy storage device may be undergone is also roughly the same, therefore this strategy can guarantee and make The overall performance service life for obtaining multiple energy storage devices can reach maximum, and the control plan of charge and discharge sequence will not be determined as single priority Slightly equally necessarily cause the charge and discharge cycles of each energy storage device unequal and may be all in the severe operation of charge and discharge back and forth In operating condition, so that average life span substantially reduces, and replacing construction is different causes maintenance work cumbersome.
Obtain formulating the control strategy of energy storage energy routing controller, in the present embodiment, the specific control according to first three step System strategy are as follows:
The target control power for receiving layer distributed controller first, according to battery variety label (lithium battery, super capacitor Deng) by the high fdrequency component demand of variation be transmitted to super capacitor etc. can quick charge and discharge, service life long energy storage device will be slowly varying Low frequency component demand be transmitted to that the energy storage such as lithium battery are more, but the energy storage device that cycle life is short;Next needs to carry out energy storage The protection for filling over-discharge, since super-charge super-discharge can cause very big injury to energy storage device, it is therefore desirable to each equipment is arranged anti- Only super-charge super-discharge SOC protects threshold value.Then the preferential charge and discharge priority orders of energy storage device are established according to each energy storage SOC state Table preferentially discharges to energy storage forward in the priority orders table, and energy storage preferentially low to priority is charged, The power output that full hair (priority method) determines each energy storage is inputted according to maximum output, which, which only works as, has Energy storage device reach charge and discharge threshold value when just change, will arrival overcharge threshold value energy storage device move to priority orders table most before, The energy storage device for reaching over-discharge threshold value is moved into priority orders table finally, the device setting for needing to be up to threshold value simultaneously can not Continue to charge or can not continue the flag bit that discharges, continuation charge or discharge are not involved in power allocation procedure later, and only Carry out reverse procedure.When carrying out high frequency and smooth power distribution respectively according to priority orders table, if there is surplus power can not When consumption, needs for dump power to be given to a further type of energy storage and be placed on tail portion and continue assigning process.
It completes updated energy storage device operation information, such as voltage, SOC state, power after entire coordinated allocation process The information such as out-of-limit are uploaded to the decision that layer distributed controller carries out Partial controll next time.The flow chart of control is as shown in Figure 1.
In the present embodiment, initialization function uses initplug () function, has mainly used the offer of C2 embedded platform Real-time table log in, operation interface is read out the configuration information of device in device table.Filter function function uses filter () function, the relevant interface that the main reading real-time database telemetering scale provided using C2 embedded platform is read, with acquisition point Hereafter the control target that layer distribution control unit issues carries out discrete filter to the target using the filter function module of encapsulation, Obtain high frequency and smooth power Partial Power.BMS acquisition of information function uses GetCnInfo () function, the function major function For the effect for reading the energy storage current operational information that current energy storage energy routing controller has under its command, read BMS's from real-time database It is put into after telemetry value and is operated in the array ChuNengBiao [] that energy storage device prepares for algorithm groupware, so that every in the array A member is storage energy storage device operation information, such as SOC value, more limit information, energy storage device classification etc., for convenience storage storage Energy information, defines ChuNeng structural body, it is as shown in table 3 that structural body includes data member:
3 energy storage device structure body ChuNeng of table
It has used the real-time database of C2 embedded platform to read class interface to be read out the BMS telemetering amount in telemeter, deposit Storage.The energy storage for will move out the energy storage device of operation and removing and will resume operation from device table is realized by the remote signalling amount of BMS The function in running process is added in device again.
Priority orders table Tuning function uses priority () function, and energy storage device power target value partition function uses Hdispatch () function and Ldispatch () function.The design of smooth power distribution function Ldispatch () is thought Road and function Hdispatch () is identical, only different in the specific implementation for finally handling other additional coordination measures.
Energy storage energy routing controller mainly realizes region energy storage device in the case where intelligent distribution network is layered substep control framework The coordinated control of target power keeps the power-balance of system, improves the utilization rate and economic benefit of energy storage device.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Within protection scope of the present invention, therefore, protection scope of the present invention should be based on the protection scope of the described claims lid.

Claims (10)

1. a kind of energy storage energy routing controller, it is characterised in that: include:
Upper box assembly (100), including left plate (101), back plate (102) and lower plate (103), a side of the left plate (101) It is connected with the back plate (102), another side normal thereto is connected with the lower plate (103), the back plate (102) A side be connected with the lower plate (103);
Lower box assembly (200), including right panel (201), foreboard (202) and upper plate (203), a side of the right panel (201) It is connected with the foreboard (202), another side normal thereto is connected with the upper plate (203), the foreboard (202) A side be connected with the upper plate (203);
Wherein, left plate (101) upper end is provided with horizontal extension board (101a), and the extension board (101a) is equipped with buckle Raised (101a-1);
Upper plate (203) upper surface is equipped with horizontal extended slot (203a), and the extended slot (203a) is equipped with and is clasped Slot (203a-1), the extension board (101a) are movably placed in the extended slot (203a), the buckle raised (101a-1) and The slot that is clasped (203a-1) the cooperation limit;
Wherein, upper box assembly (100) and the lower box assembly (200) are fixed by connector, are assembled into cabinet;
It further include the control circuit (300) being mounted in cabinet.
2. a kind of energy storage energy routing controller according to claim 1, it is characterised in that: back plate (102) upper end Equipped with the first protrusion link block (102a), left plate (101) upper end and front end are respectively equipped with the second protrusion link block (101b) Link block (101c) is protruded with third, first protrusion link block (102a), second protrusion link block (101b) and the Fixation hole (b) is equipped on three protrusions link block (101c);
The upper plate (203) and foreboard (202) left end are equipped with through hole (c), the connector pass through fixation hole (102c) and The fixed upper box assembly (100) of through hole (c) and the lower box assembly (200).
3. a kind of energy storage energy routing controller according to claim 2, it is characterised in that: the connector is screw, The fixation hole (b) and through hole (c) are threaded hole.
4. a kind of energy storage energy routing controller according to claim 1 to 3, it is characterised in that: the back plate (102) be equipped with the first locating piece (102b) on rear side of right end, the first locating piece (102b) section is L-shaped, one side with it is described Back plate (102) fits fixation, and another side and the back plate (102) are perpendicular.
5. a kind of energy storage energy routing controller according to claim 4, it is characterised in that: foreboard (202) right end Outside is equipped with the second locating piece (202a), and the second locating piece (202a) section is L-shaped, one side and the foreboard (202) Fit fixation, and another side and the foreboard (202) are perpendicular.
6. a kind of energy storage energy routing controller according to claim 4, it is characterised in that: first locating piece Location hole (a) is equipped on (102b) and second locating piece (202a).
7. any a kind of energy storage energy routing controller in -3,7 or 8 according to claim 1, it is characterised in that: the right side It is provided on plate (201) and resets keyhole (201a) and grafting port (201b).
8. a kind of energy storage energy routing controller according to claim 7, it is characterised in that: the control circuit (300) Including wiring board (301), reset key (302) and serial ports (303), the reset key (302) and serial ports (303) respectively with the line Road plate (301) is connected;
The reset key (302) passes through the reset keyhole (201a), and the serial ports (303) passes through the grafting port (201b)。
9. a kind of control method of energy storage energy routing controller, it is characterised in that: method includes the following steps:
The first step analyzes the characteristic of energy storage device: the capacity (SOC value) including energy storage, the maximum charge-discharge electric power of energy storage, energy storage Power response speed, the type of hybrid energy-storing, the charge and discharge threshold value of each mixed type energy storage;
Second step realizes hybrid energy-storing power distribution according to high pass or low-pass filtering control;
Third step optimizes energy storage coordinated control efficiency, is set as only reaching setting in the SOC value for monitoring some energy storage device Threshold value when just change a sub-priority, which is moved to the end of priority sequence, and be set as not continuing to, only It can opposite direction charge and discharge;
4th step formulates the control method of energy storage energy routing controller: receiving the target control of layer distributed controller first The high fdrequency component demand of variation is transmitted to the energy storage device of quick charge and discharge according to battery variety label by power, will be slowly varying Low frequency component demand is transmitted to the energy storage device more than energy storage;Secondly, prevent super-charge super-discharge SOC from protecting threshold value the setting of each equipment, Then the preferential charge and discharge priority orders table of energy storage device is established according to each energy storage SOC state, preferentially to the priority orders table In forward energy storage discharge, and energy storage preferentially low to priority is charged, and it is true to input full hair according to maximum output The power output of fixed each energy storage, the priority orders table only just change when there is energy storage device to reach charge and discharge threshold value, will Before the energy storage device that arrival overcharges threshold value moves to priority orders table most, the energy storage device for reaching over-discharge threshold value is moved into priority Sequence list is finally, the device setting for needing to be up to threshold value simultaneously can not continue to charge or can not continue the flag bit that discharges, at it It is not involved in continuation charge or discharge in power allocation procedure afterwards, and only carries out reverse procedure.Distinguished according to priority orders table When carrying out high frequency and smooth power distribution, when can not dissolve if there is surplus power, need dump power being given to another The energy storage of type is placed on tail portion and continues assigning process;
It completes updated energy storage device operation information is uploaded to layer distributed controller after entire coordinated allocation process and carry out Partial controll next time.
10. a kind of control method of energy storage energy routing controller according to claim 9, it is characterised in that: step 2 Middle distributive mixing energy storage power uses high pass or low-pass filtering control, power distribution expression formula of the two on frequency domain are as follows:
Wherein, TfFor time constant filter, P is power, PL(s) low-pass filtering active-power P is indicatedLLaplace transformation, PH(s) table Show high-pass filtering active-power PHLaplace transformation.
CN201811545142.0A 2018-12-17 2018-12-17 A kind of energy routing controller and its control method suitable for hybrid accumulator Pending CN109449961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811545142.0A CN109449961A (en) 2018-12-17 2018-12-17 A kind of energy routing controller and its control method suitable for hybrid accumulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811545142.0A CN109449961A (en) 2018-12-17 2018-12-17 A kind of energy routing controller and its control method suitable for hybrid accumulator

Publications (1)

Publication Number Publication Date
CN109449961A true CN109449961A (en) 2019-03-08

Family

ID=65560207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811545142.0A Pending CN109449961A (en) 2018-12-17 2018-12-17 A kind of energy routing controller and its control method suitable for hybrid accumulator

Country Status (1)

Country Link
CN (1) CN109449961A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109921416A (en) * 2019-03-15 2019-06-21 国网冀北电力有限公司 The determination method and device of mixed energy storage system power and capacity
CN112991637A (en) * 2019-12-12 2021-06-18 青岛海尔滚筒洗衣机有限公司 Commercial clothes treating apparatus

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3404564A1 (en) * 1984-02-09 1985-08-14 Hans Kurt Dr.-Ing. 6233 Kelkheim Köthe Circuit arrangement for the optimum utilisation of excess energy with the aid of electrochemical accumulators
CN201323712Y (en) * 2008-12-05 2009-10-07 北京兴大豪科技开发有限公司 Electric control box
CN105024391A (en) * 2015-07-21 2015-11-04 清华大学 Micro power grid hybrid energy storage coordinative frequency modulation method
CN205051805U (en) * 2015-09-16 2016-02-24 成都三零凯天通信实业有限公司 Safe access equipment with encryption function
CN108808712A (en) * 2017-04-28 2018-11-13 中国电力科学研究院 A kind of mixed energy storage system complimentary control method and system
CN208113177U (en) * 2018-03-20 2018-11-16 东莞市长盈朗科实业有限公司 The network subrack of slide rail type dismounting
CN109638820A (en) * 2018-12-17 2019-04-16 贵州电网有限责任公司 A kind of energy source router convenient for suspended wall
CN209169966U (en) * 2018-12-17 2019-07-26 贵州电网有限责任公司 A kind of energy routing controller suitable for hybrid accumulator

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3404564A1 (en) * 1984-02-09 1985-08-14 Hans Kurt Dr.-Ing. 6233 Kelkheim Köthe Circuit arrangement for the optimum utilisation of excess energy with the aid of electrochemical accumulators
CN201323712Y (en) * 2008-12-05 2009-10-07 北京兴大豪科技开发有限公司 Electric control box
CN105024391A (en) * 2015-07-21 2015-11-04 清华大学 Micro power grid hybrid energy storage coordinative frequency modulation method
CN205051805U (en) * 2015-09-16 2016-02-24 成都三零凯天通信实业有限公司 Safe access equipment with encryption function
CN108808712A (en) * 2017-04-28 2018-11-13 中国电力科学研究院 A kind of mixed energy storage system complimentary control method and system
CN208113177U (en) * 2018-03-20 2018-11-16 东莞市长盈朗科实业有限公司 The network subrack of slide rail type dismounting
CN109638820A (en) * 2018-12-17 2019-04-16 贵州电网有限责任公司 A kind of energy source router convenient for suspended wall
CN209169966U (en) * 2018-12-17 2019-07-26 贵州电网有限责任公司 A kind of energy routing controller suitable for hybrid accumulator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109921416A (en) * 2019-03-15 2019-06-21 国网冀北电力有限公司 The determination method and device of mixed energy storage system power and capacity
CN112991637A (en) * 2019-12-12 2021-06-18 青岛海尔滚筒洗衣机有限公司 Commercial clothes treating apparatus

Similar Documents

Publication Publication Date Title
CN110803051B (en) Energy storage type charging pile and charging system
CN103501006B (en) Micro-capacitance sensor centralized control method
US20220393491A1 (en) Charging System for Swapping Station or Energy Storage Station
CN102368631B (en) Efficient and reliable power supply architecture of data center electronic equipment
CN103427458B (en) A kind of charging pile with multi output function
CN107346896A (en) A kind of light stores up micro-grid system energy accumulation current converter host-slave parallel control method
CN107968429B (en) Energy management device and system of light storage and charging system
CN102842936B (en) Distributed battery power supply device and method
CN103441562B (en) High voltage direct current electric power system
CN104795877A (en) Electric automobile integrated direct-current charger, system and method
CN103219723B (en) Direct-current micro-grid energy coordination control method based on intelligent multiple agents
CN102810909A (en) Energy management method capable of matching distributed power sources with loads
CN106329530A (en) AC/DC smart home micro-grid cooperative system and operation method thereof
CN109103939A (en) A kind of energy-storage system intelligent controlling device and method reducing photovoltaic plant loss
CN109449961A (en) A kind of energy routing controller and its control method suitable for hybrid accumulator
CN109193723A (en) A kind of knockdown base station standby energy storage power and control method
CN205986191U (en) Incessant on -vehicle mains operated system of synthesizing of dual input dual output
CN209169966U (en) A kind of energy routing controller suitable for hybrid accumulator
CN113725880B (en) 5G intelligent power management system, power supply system and power supply method of stock base station
CN202455149U (en) Power supply system for supplying electronic equipment and frame power supply
CN107154666A (en) A kind of batteries management system and electric power system
CN206658053U (en) A kind of mixed type idle compensating control
CN113258605A (en) Intelligent sharing method, system and control method for base station energy
CN209088551U (en) A kind of knockdown base station standby energy storage power
CN208046261U (en) The energy-storage system of low capacity old and useless battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination