CN109449822A - A kind of electric power overhaul Safety Management device - Google Patents

A kind of electric power overhaul Safety Management device Download PDF

Info

Publication number
CN109449822A
CN109449822A CN201811492476.6A CN201811492476A CN109449822A CN 109449822 A CN109449822 A CN 109449822A CN 201811492476 A CN201811492476 A CN 201811492476A CN 109449822 A CN109449822 A CN 109449822A
Authority
CN
China
Prior art keywords
electric power
fixedly connected
power overhaul
insulation
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811492476.6A
Other languages
Chinese (zh)
Other versions
CN109449822B (en
Inventor
罗源凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Electric Power Design Institute Co.,Ltd.
Original Assignee
Anhui Kaichengyuan Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Kaichengyuan Electronic Technology Co Ltd filed Critical Anhui Kaichengyuan Electronic Technology Co Ltd
Priority to CN201811492476.6A priority Critical patent/CN109449822B/en
Publication of CN109449822A publication Critical patent/CN109449822A/en
Application granted granted Critical
Publication of CN109449822B publication Critical patent/CN109449822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a kind of electric power overhaul Safety Management devices, belong to power construction engineering field.Existing electric power overhaul Safety Management devices support structures are unstable, repair the not high problem of inspection security performance, and many electric power overhaul construction auxiliary devices can not easily stretch and move, the present invention is provided with truck carrier and drive-controlling room, construction management device will be overhauled by, which being convenient to, moves, by being provided with retractable driving device and lifting device, it is more preferable relative to traditional electric power overhaul construction auxiliary device stability, improve the working efficiency of electric power overhaul high altitude operation, it is provided with insulation climbing device, in insulation climbing device upper end setting lock and elastic force safety belt, constructor, which puts on elastic force safety clothes --- with reflecting parts on clothes in construction, can prevent falling from high altitude, it is provided with insulation pole for climbing, reduce the hidden danger that constructor gets an electric shock in construction, the present invention is more humane relative to existing common electric power overhaul construction auxiliary device design.

Description

A kind of electric power overhaul Safety Management device
Technical field
The present invention relates to power construction engineering field more particularly to a kind of electric power overhaul Safety Management devices.
Background technique
With the development of the times, the development of electric power enterprise shows good situation.In recent years, power engineering development is fast Speed, and biggish contribution is made that push away economic growth, as the important composition technology in power engineering development process, electric power Maintenance is not only related to the development of power engineering itself with the technical development of power construction, but also for entire power domain Development also has important influence.However based on the problem of electric power overhaul construction technology, it is mainly manifested in electric power overhaul construction The problems such as technical level falls behind, and the awareness of safety of electric power overhaul construction technology is deficient, greatly limits electric power enterprise Development.
Due to particular job property of electric power overhaul and power construction, the dangerous property of action, so reinforcing Attention degree to safety in production is very necessary.During electric power overhaul constructs actual job, some electric power inspections The safe production awareness for repairing construction personnel is seriously deficient, the nonstandard construction behavior of operation often occurs, depends only on itself Previous experience carries out electric power overhaul and construction.In electric power overhaul and work progress, the operation mode of this danger, once It is careless slightly, serious injures and deaths will be caused to construction personnel, therefore electric power overhaul Safety Management device is examined as electric power It repairs necessary when auxiliary device when construction.There are support construction shakinesses for existing electric power overhaul Safety Management device It is fixed, the not high problem of inspection security performance is repaired, and many electric power overhaul construction auxiliary devices can not easily stretch and move.
Summary of the invention
The purpose of the present invention is to solve existing electric power overhaul Safety Management device, there are support construction shakinesses It is fixed, repair the not high problem of inspection security performance, and many electric power overhaul construction auxiliary devices can not easily stretch and move etc. and ask Topic, and a kind of electric power overhaul Safety Management device proposed.
To achieve the goals above, present invention employs following technical solutions:
A kind of electric power overhaul Safety Management device, including truck carrier, braced frame, lifting device and insulated working frame, Further include insulation climbing device, is fixedly connected on the right side of the truck carrier with lower end on the left of drive-controlling room, the truck carrier It is movably installed with wheel with drive-controlling room bottom, the truck carrier bosom is provided with power supply box, and the automobile carries Front and back is symmetrically installed with bearing A on the left of body upper surface, and front and back is symmetrically installed with bearing B, institute on the right side of the truck carrier upper surface It states and is flexibly connected on the upside of bearing A with braced frame bottom left, square groove, the side are provided among the braced frame bottom It is movably installed with a times strength cylinder on the downside of shape slot, is flexibly connected on the downside of described times of strength cylinder with middle side part on bearing B, described times of strength Cylinder and power supply box are electrically connected;
It is provided with retractable driving device on the wall surface of front and back on the outside of the braced frame, is all provided with inside the braced frame front and rear wall It is equipped with sliding slot A, the braced frame interior sidewall surface is flexibly connected with insulated working outer frame side wall surface, insulated working frame left end Front and back outer side surface is fixedly installed with threaded block, lives in the middle part of the threaded block through sliding slot A and in the middle part of retractable driving device Dynamic connection, braced frame left wall face inside and lifting device left side are fixedly connected, the lifting device right side and insulation work Make to be flexibly connected on the inside of frame, the insulated working frame inner right side is provided with electric power and repairs inspection tool box, and the electric power repairs inspection tool Multiple partitions are fixedly installed on the inside of case, it is described not have one matter storage lattice of formation between two partitions, the insulated working frame right side Wall surface top is fixedly connected with insulation climbing device bottom end, and the insulation climbing device top is provided with electric power and repairs inspection survey meter, The electric power repairs inspection survey meter and power supply box is electrically connected.Inspection tool box is repaired by the way that electric power is arranged on the inside of braced frame, is made It does not need to carry when with the present apparatus and repairs inspection tool, alleviate the workload that electric power repairs inspection staff, while being arranged Insulation climbing device had both facilitated the work of construction personnel, on the other hand provided guarantor again for the personal safety that electric power repairs inspection personnel Barrier.
Preferably, the braced frame bottom left is fixedly installed with cylindrical projection, the cylindrical projection internal activity set It is connected to shaft A, the rear and front end the shaft A is flexibly connected with shaft core position on the inside of bearing A, living inside described times of strength cylinder upper end Dynamic to be socketed with rotating shaft C, the rotating shaft C both ends are fixedly connected with square groove or so two interior sidewall surfaces, in described times of strength cylinder lower end Portion's movable sleeve is connected to shaft B, and the rear and front end the shaft B is flexibly connected with shaft core position on the inside of bearing B.By the way that times strength is arranged Cylinder can support braced frame A and the highland braced frame B high, and personnel convenient to overhaul carry out eminence electric power overhaul construction operation.
Preferably, the retractable driving device includes rotary electric machine, and the rotary electric machine and power supply box are electrically connected, described It is fixedly connected on the left of rotary electric machine with motor mounting plate right side, on the inside of the motor mounting plate and braced frame outer side surface left end It is fixedly connected, shaft core position is fixedly connected with screw rod left end on the right side of the rotary electric machine, and screw thread is socketed in spiral shell in the middle part of the screw rod Inside line block one end, the screw rod right end is fixedly connected with shaft core position on the left of fixed block, the fixed block inside and support frame Frame outer side surface right end is fixedly connected.By the way that retractable driving device is arranged, make when electric power overhaul personnel need to carry out eminence construction When industry, braced frame B is extended using retractable driving device.
Preferably, the lifting device includes hydraulic telescopic rod, be symmetrical arranged before and after the hydraulic telescopic rod there are two, institute It states and is fixedly connected on the left of hydraulic telescopic rod right end and limited block, sliding slot B, the cunning are provided on the hydraulic telescopic rod inner sidewall Be provided with bar shaped tooth on slot B bottom side, engage connection on the upside of the bar shaped tooth with gear downside, the gear axis position with it is defeated Shaft one end is fixedly connected, and the output shaft other end is fixedly connected with stepper motor axle center position, on the right side of the stepper motor It is fixedly connected with foot pedal left side, the stepper motor and power supply box are electrically connected.By the way that lifting device is arranged, work as electric power overhaul When personnel carry out high altitude operation, foot pedal is increased using lifting device, personnel convenient to overhaul carry out inspection operation.
Preferably, it fixes and connects with insulated working frame backside top left and right ends at left and right sides of the insulation climbing device bottom end Connect, the insulation climbing device be provided with from top to bottom several insulation pole for climbing, the insulation pole for climbing upper end with latch in Portion's pivot bush unit, the lock bottom end are fixedly connected with elastic force safety belt upper end, and elastic force safety belt lower end is provided with safety Vest, the insulation pole for climbing lower end right side are provided with fixed frame, and the fixed frame is internally provided with safety alarm, The safety alarm and power supply box are electrically connected.By being provided with climbing device in the upper end braced frame B, avoids maintenance and apply In construction cross-operation hidden danger occurs for worker person, and climbing device upper end is provided with lock and elastic force safety belt, constructs Person, which puts on safety clothes --- with reflecting parts on clothes in construction, can prevent falling from high altitude, by being provided with insulation pole for climbing, reduce constructor and constructing When the hidden danger got an electric shock, while safety alarm is set on insulation pole for climbing, can be timely feedbacked when constructor faces a danger To administrative staff, for rescue, injury personnel win the quality time.
Compared with prior art, the present invention provides a kind of electric power overhaul Safety Management devices, have following beneficial Effect:
(1) a kind of electric power overhaul Safety Management device, is provided with truck carrier and drive-controlling room, and electric power overhaul is often Construction operation is aloft carried out, and common electric power overhaul construction auxiliary equipment inconvenience is mobile and increases, as electric power overhaul people When member needs to carry out electric power overhaul construction operation, directly automobile can be driveed to maintenance department, can momentarily be overhauled, carried in automobile Braced frame and insulated working frame is arranged in body upper surface, and times strength cylinder, times strength is arranged in present invention bottom end in the middle part of braced frame Cylinder is fixedly connected with truck carrier upper end, can directly be supported the high highland in braced frame side by manipulation drive-controlling room It rises, and the braced frame bottom other side passes through shaft A and truck carrier to connection, height not only may be implemented in setting in this way On the other hand empty construction operation also ensures the stability of braced frame, for the person of electric power overhaul construction high altitude operation personnel Safety provides a guarantee, repairs inspection tool box by the way that electric power is arranged on the inside of braced frame, does not need when using the present apparatus It carries and repairs inspection tool, alleviate the workload that electric power repairs inspection staff, while the insulation climbing device being arranged is existing Help the work of construction personnel, on the other hand provides guarantee again for the personal safety that electric power repairs inspection personnel;
(2) a kind of electric power overhaul Safety Management device, is provided with retractable driving device and lifting device, as electric power overhaul people When member needs to carry out eminence construction operation, is operated by drive-controlling room, braced frame one end is first adjusted to certain branch Support height opens stepper motor, and stepper motor drives output shaft rotation, the gear being fixedly connected with output shaft is promoted to rotate, by It is connect in gear with the bar shaped tooth engagement in hydraulic telescopic rod, stepper motor can drive foot pedal to extend to longest, then drive liquid Pressure telescopic rod is extended, and rotary electric machine is further opened, and rotary electric machine drives screw rod rotation, the screw thread connecting with wire rod thread Block can be slided along sliding slot A, promote the insulated working frame being fixedly connected with threaded block to realize elongation upwards, foot pedal extends at this time Electric power overhaul construction operation height, the present invention is more preferable relative to traditional electric power overhaul construction auxiliary device stability, and can be square Being moved and being increased just, substantially increases safety and the working efficiency of electric power overhaul high altitude operation;
(3) a kind of electric power overhaul Safety Management device, is provided with insulation climbing device, and when electric power overhaul construction operation is frequent It needs aloft to climb, and this operation mode has very big risk, existing electric power overhaul construction auxiliary device is often Structure is simple, and safety precautions is insufficient, therefore, the present invention by being provided with insulation climbing device in insulated working frame upper end, Avoid maintenance construction personnel construction when occur cross-operation hidden danger, and insulation climbing device upper end be provided with lock and Elastic force safety belt, constructor, which puts on elastic force safety clothes --- with reflecting parts on clothes in construction, can prevent falling from high altitude, by being provided with insulation pole for climbing, The hidden danger that constructor gets an electric shock in construction is reduced, while safety alarm is set on insulation pole for climbing, it can be in constructor It is timely feedbacked when facing a danger to administrative staff, for rescue, injury personnel win the quality time, and the present invention is relative to existing general Logical electric power overhaul construction auxiliary device design is more humane.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of electric power overhaul Safety Management device proposed by the present invention;
Fig. 2 is a kind of partial top schematic diagram of electric power overhaul Safety Management device proposed by the present invention;
Fig. 3 is a kind of present invention looks up structural representation of the braced frame A of electric power overhaul Safety Management device proposed by the present invention;
Fig. 4 is a kind of structural schematic diagram of the lifting device of electric power overhaul Safety Management device proposed by the present invention;
Fig. 5 is a kind of partial structure diagram of the lifting device of electric power overhaul Safety Management device proposed by the present invention;
Fig. 6 is a kind of part-structure signal of hydraulic telescopic rod of electric power overhaul Safety Management device proposed by the present invention Figure;
Fig. 7 is a kind of partial structure diagram of the climbing device of electric power overhaul Safety Management device proposed by the present invention.
Figure label explanation:
1 drive-controlling room, 2 wheels, 3 truck carriers, 4 braced frames, 5 sliding slot A, 6 threaded blocks, 7 screw rods, 8 fixed blocks, 9 rotations Motor, 10 motor mounting plates, 11 cylindrical projections, 12 shaft A, 13 bearing A, 14 power supply boxs, 15 bearing B, 16 times of strength cylinders, 17 are stretched Contracting driving device, 18 lifting devices, 19 insulated working frames, 20 insulation climbing devices, 21 electric power repair inspection survey meter, 22 square grooves, 23 shaft B, 24 rotating shaft Cs, 25 hydraulic telescopic rods, 26 limited blocks, 27 foot pedals, 28 stepper motors, 29 output shafts, 30 sliding slot B, 31 Gear, 32 bar shaped teeth, 33 insulation pole for climbing, 34 locks, 35 elastic force safety belts, 36 safety clothings, 37 safety alarms, 38 are consolidated Determine frame, 39 electric power repair inspection tool box, 40 matter storage lattices, 41 partitions.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
Embodiment 1: a kind of electric power overhaul Safety Management device, including truck carrier 3, braced frame 4, lifting device 18 and insulated working frame 19, it further include insulation climbing device 20,3 right side of truck carrier is fixed with 1 left side lower end of drive-controlling room Connection, truck carrier 3 and 1 bottom of drive-controlling room are movably installed with wheel 2, and 3 bosom of truck carrier is provided with power supply Case 14,3 upper surface of truck carrier left side front and back are symmetrically installed with bearing A13, and front and back is symmetrically installed on the right side of 3 upper surface of truck carrier There is bearing B15, is flexibly connected, is provided among 4 bottom of braced frame rectangular with 4 bottom left of braced frame on the upside of bearing A13 Slot 22 is movably installed with a times strength cylinder 16 on the downside of square groove 22,16 downside of times strength cylinder and the upper middle side part activity company of bearing B15 It connects, times strength cylinder 16 and power supply box 14 are electrically connected.
It is provided with retractable driving device 17 on 4 outside front and back wall surface of braced frame, is all provided with inside 4 front and rear wall of braced frame It is equipped with sliding slot A5,4 interior sidewall surface of braced frame is flexibly connected with 19 outer side surface of insulated working frame, before 19 left end of insulated working frame Outer side surface is fixedly installed with threaded block 6 afterwards, in the middle part of threaded block 6 through sliding slot A5 and with 17 middle part activity of retractable driving device Connection, on the inside of 4 left wall face of braced frame be fixedly connected on the left of lifting device 18,18 right side of lifting device and insulated working frame 19 Inside is flexibly connected, and 19 inner right side of insulated working frame is provided with electric power and repairs inspection tool box 39, and electric power repairs 39 inside of inspection tool box Multiple partitions 41 are fixedly installed with, do not have one matter storage lattice 40 of formation, 19 right side wall surface top of insulated working frame between two partitions 41 End is fixedly connected with insulation 20 bottom end of climbing device, and insulation 20 top of climbing device is provided with electric power and repairs inspection survey meter 21, electric power It repairs inspection survey meter 21 and power supply box 14 is electrically connected.
4 bottom left of braced frame is fixedly installed with cylindrical projection 11, and 11 internal activity of cylindrical projection is socketed with shaft A12, the rear and front end shaft A11 are flexibly connected with shaft core position on the inside of bearing A13, and 16 upper end internal activity of times strength cylinder is socketed with Rotating shaft C 24,24 both ends of rotating shaft C are fixedly connected with 22 or so two interior sidewall surface of square groove, 16 lower end internal activity set of times strength cylinder It is connected to shaft B23, the rear and front end shaft B23 is flexibly connected with shaft core position on the inside of bearing B15
The present invention is provided with truck carrier 3 and drive-controlling room 1, and electric power overhaul often aloft carries out construction operation, and general Logical electric power overhaul construction auxiliary equipment inconvenience is mobile and increases, and makees when electric power overhaul personnel need to carry out electric power overhaul construction When industry, directly automobile can be driveed to maintenance department, can momentarily be overhauled, 4 He of braced frame is set in 3 upper surface of truck carrier Insulated working frame 19, the present invention is on 4 middle part bottom end of braced frame setting times strength cylinder 16, times strength cylinder 16 and truck carrier 3 End is fixedly connected, and can directly be supported 4 side of braced frame highland by manipulation drive-controlling room 1, and braced frame 4 By shaft A12 and truck carrier 3 to connection, setting in this way not only may be implemented high-altitude construction and make for the bottom other side On the other hand industry also ensures the stability of braced frame 4, the personal safety for electric power overhaul construction high altitude operation personnel provides A guarantee is repaired inspection tool box 39 by the way that electric power is arranged on the inside of braced frame 4, is not needed to take with oneself when using the present apparatus Band repairs inspection tool, alleviates the workload that electric power repairs inspection staff, while the insulation climbing device 20 being arranged both facilitated On the other hand the work of construction personnel provides guarantee again for the personal safety that electric power repairs inspection personnel.
Embodiment 2: based on embodiment 1 but different, retractable driving device 17 includes rotary electric machine 9, rotation electricity Machine 9 and power supply box 14 are electrically connected, 9 left side of rotary electric machine be fixedly connected on the right side of motor mounting plate 10, in motor mounting plate 10 Side is fixedly connected with 4 outer side surface left end of braced frame, and 9 right side shaft core position of rotary electric machine is fixedly connected with 7 left end of screw rod, silk 7 middle part screw thread of bar is socketed in inside 6 one end of threaded block, and 7 right end of screw rod is fixedly connected with 8 left side shaft core position of fixed block, fixed 8 inside of block is fixedly connected with 4 outer side surface right end of braced frame, and lifting device 18 includes hydraulic telescopic rod 25, hydraulic telescopic rod 25 front and backs are fixedly connected on the left of 25 right end of hydraulic telescopic rod and limited block 26 there are two being symmetrical arranged, 25 inside of hydraulic telescopic rod Be provided with sliding slot B30 on wall, be provided with bar shaped tooth 32 on sliding slot B30 bottom side, 32 upside of bar shaped tooth with engaged on the downside of gear 31 Connection, 31 shaft core position of gear are fixedly connected with 29 one end of output shaft, 29 other end of output shaft and 28 shaft core position of stepper motor Be fixedly connected, the right side of stepper motor 28 be fixedly connected on the left of foot pedal 27, stepper motor 28 and the electric connection of power supply box 14.
The present invention is provided with retractable driving device 17 and lifting device 18, when electric power overhaul personnel need to carry out eminence construction It when operation, is operated by drive-controlling room 1,4 one end of braced frame is first adjusted to certain bearing height, open stepping electricity Machine 28, stepper motor 28 drive output shaft 29 to rotate, and promote the gear 31 being fixedly connected with output shaft 29 to rotate, due to gear 31 Connection is engaged with the bar shaped tooth 32 in hydraulic telescopic rod 25, stepper motor 28 can drive foot pedal 27 to extend to longest, then drive Hydraulic telescopic rod 25 is extended, and rotary electric machine 9 is further opened, and rotary electric machine 9 drives the rotation of 7 bar of silk, connects with 7 screw thread of screw rod The threaded block 6 connect can be slided along sliding slot A5, and the insulated working frame 19 being fixedly connected with threaded block 6 is promoted to realize upward elongation, Foot pedal 27 extends to electric power overhaul construction operation height at this time, and the present invention is steady relative to traditional electric power overhaul construction auxiliary device It is qualitative more preferable, and easily can be moved and be increased, substantially increase the safety and work effect of electric power overhaul high altitude operation Rate.
Embodiment 3: based on Examples 1 and 2 but different, insulation 20 bottom end of the climbing device left and right sides and insulation 19 backside top left and right ends of process box are fixedly connected, and insulation climbing device 20 is provided with several insulation pole for climbing from top to bottom 33, insulation 33 upper end of pole for climbing and lock 34 internal activities socket, 34 bottom ends of lock are fixedly connected with 35 upper end of elastic force safety belt, 35 lower end of elastic force safety belt is provided with safety clothing 36, and insulation is provided with fixed frame 38 on the right side of 33 lower end of pole for climbing, fixed Frame 38 is internally provided with safety alarm 37, and safety alarm 37 and power supply box 14 are electrically connected.
The present invention is provided with insulation climbing device 20, and when electric power overhaul construction operation is frequently necessary to aloft climb, and this Kind operation mode has very big risk, and often structure is simple for existing electric power overhaul construction auxiliary device, and safeguard protection is arranged Deficiency is applied, therefore, the present invention avoids maintenance constructor by being provided with insulation climbing device 20 in 19 upper end of insulated working frame Cross-operation hidden danger occurs in construction for member, and insulation 20 upper end of climbing device is provided with lock 34 and elastic force safety belt 35, constructor, which puts on elastic force safety clothes --- with reflecting parts on clothes 36 in construction, can prevent falling from high altitude, by being provided with insulation pole for climbing 33, reduce The hidden danger that constructor gets an electric shock in construction, while safety alarm 37 is set on insulation pole for climbing 33, it can in constructor It is timely feedbacked when facing a danger to administrative staff, for rescue, injury personnel win the quality time, and the present invention is relative to existing general Logical electric power overhaul construction auxiliary device design is more humane.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of electric power overhaul Safety Management device, including truck carrier (3), braced frame (4), lifting device (18) and Insulated working frame (19), it is characterised in that: further include insulation climbing device (20), controlled on the right side of the truck carrier (3) with driving Lower end is fixedly connected on the left of room (1) processed, and the truck carrier (3) and drive-controlling room (1) bottom are movably installed with wheel (2), truck carrier (3) bosom is provided with power supply box (14), and front and back is symmetrical on the left of truck carrier (3) upper surface Bearing A(13 is installed), truck carrier (3) upper surface right side front and back is symmetrically installed with bearing B(15), the bearing A (13) upside is flexibly connected with braced frame (4) bottom left, is provided with square groove among braced frame (4) bottom (22), a times strength cylinder (16), described times of strength cylinder (16) downside and bearing B(15) are movably installed on the downside of the square groove (22) Upper middle side part is flexibly connected, and described times of strength cylinder (16) and power supply box (14) are electrically connected;
It is provided with retractable driving device (17) on the wall surface of front and back on the outside of the braced frame (4), before and after the braced frame (4) Pars intramuralis is provided with sliding slot A(5), braced frame (4) interior sidewall surface and insulated working frame (19) outer side surface activity connect It connects, outer side surface is fixedly installed with threaded block (6) before and after insulated working frame (19) left end, in the middle part of the threaded block (6) It is flexibly connected through sliding slot A(5) and with retractable driving device (17) middle part, on the inside of braced frame (4) the left wall face and goes up and down It is fixedly connected on the left of device (18), is flexibly connected on the right side of the lifting device (18) with insulated working frame (19) inside, it is described exhausted Edge process box (19) inner right side is provided with electric power and repairs inspection tool box (39), and the electric power repairs fixed peace on the inside of inspection tool box (39) It is described not have one matter storage lattice (40) of formation, the insulated working frame (19) between two partitions (41) equipped with multiple partitions (41) Right side wall surface top is fixedly connected with insulation climbing device (20) bottom end, and insulation climbing device (20) top is provided with electric power Inspection survey meter (21) is repaired, the electric power repairs inspection survey meter (21) and power supply box (14) are electrically connected.
2. a kind of electric power overhaul Safety Management device according to claim 1, it is characterised in that: the braced frame (4) bottom left is fixedly installed with cylindrical projection (11), and cylindrical projection (11) internal activity is socketed with shaft A(12), institute Stating shaft A(11) shaft core position is flexibly connected on the inside of rear and front end and bearing A(13), work inside described times of strength cylinder (16) upper end Dynamic to be socketed with rotating shaft C (24), rotating shaft C (24) both ends are fixedly connected with two interior sidewall surfaces of square groove (22) left and right, and described times Strength cylinder (16) lower end internal activity is socketed with shaft B(23), the shaft B(23) rear and front end and bearing B(15) inner shafts Heart position is flexibly connected.
3. a kind of electric power overhaul Safety Management device according to claim 1, it is characterised in that: the flexible driving Device (17) includes rotary electric machine (9), and the rotary electric machine (9) and power supply box (14) are electrically connected, and the rotary electric machine (9) is left It is fixedly connected on the right side of side and motor mounting plate (10), it is left with braced frame (4) outer side surface on the inside of the motor mounting plate (10) End is fixedly connected, and shaft core position is fixedly connected with screw rod (7) left end on the right side of the rotary electric machine (9), spiral shell in the middle part of the screw rod (7) Line is socketed in inside threaded block (6) one end, and screw rod (7) right end is fixedly connected with shaft core position on the left of fixed block (8), described It is fixedly connected on the inside of fixed block (8) with braced frame (4) outer side surface right end.
4. a kind of electric power overhaul Safety Management device according to claim 1, it is characterised in that: the lifting device (18) include hydraulic telescopic rod (25), be symmetrical arranged before and after the hydraulic telescopic rod (25) there are two, the hydraulic telescopic rod (25) it is fixedly connected on the left of right end and limited block (26), is provided with sliding slot B(30 on hydraulic telescopic rod (25) inner sidewall), institute State sliding slot B(30) it is provided with bar shaped tooth (32) on bottom side, connection is engaged with gear (31) downside on the upside of the bar shaped tooth (32), Gear (31) shaft core position is fixedly connected with output shaft (29) one end, output shaft (29) other end and stepper motor (28) shaft core position is fixedly connected, and is fixedly connected on the right side of the stepper motor (28) with foot pedal (27) left side, the stepping electricity Machine (28) and power supply box (14) are electrically connected.
5. a kind of electric power overhaul Safety Management device according to claim 1, it is characterised in that: the insulation climbing It is fixedly connected at left and right sides of device (20) bottom end with insulated working frame (19) backside top left and right ends, the insulation climbing device (20) it is provided with several insulation pole for climbing (33) from top to bottom, lives inside the insulation pole for climbing (33) upper end and lock (34) Dynamic socket, lock (34) bottom end are fixedly connected with elastic force safety belt (35) upper end, and elastic force safety belt (35) lower end is set It is equipped with safety clothing (36), is provided with fixed frame (38), the fixed frame on the right side of insulation pole for climbing (33) lower end (38) it is internally provided with safety alarm (37), the safety alarm (37) and power supply box (14) are electrically connected.
CN201811492476.6A 2018-12-07 2018-12-07 Electric power overhauls construction safety control device Active CN109449822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811492476.6A CN109449822B (en) 2018-12-07 2018-12-07 Electric power overhauls construction safety control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811492476.6A CN109449822B (en) 2018-12-07 2018-12-07 Electric power overhauls construction safety control device

Publications (2)

Publication Number Publication Date
CN109449822A true CN109449822A (en) 2019-03-08
CN109449822B CN109449822B (en) 2020-12-08

Family

ID=65556918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811492476.6A Active CN109449822B (en) 2018-12-07 2018-12-07 Electric power overhauls construction safety control device

Country Status (1)

Country Link
CN (1) CN109449822B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056344A (en) * 2019-04-18 2019-07-26 中国矿业大学 A kind of measurement device and its application method of coal seam punching shape
CN111371039A (en) * 2020-04-14 2020-07-03 北京天恒建设集团有限公司 Cable erecting device for building electromechanical installation
CN111668751A (en) * 2020-06-12 2020-09-15 金杰 High-altitude electric power maintenance vehicle
CN114906778A (en) * 2022-04-26 2022-08-16 林锡辉 Electric power construction safety monitoring equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761356A (en) * 2016-12-14 2017-05-31 国网山东省电力公司龙口市供电公司 A kind of power construction overhauls apparatus
KR20180051450A (en) * 2018-03-20 2018-05-16 주식회사 경신 Junction box
CN207449732U (en) * 2017-10-09 2018-06-05 陈耀 A kind of multifunction power breakdown van
CN207795043U (en) * 2017-11-09 2018-08-31 泉州泉港璟冠信息科技有限公司 A kind of UHV transmission line steel tower cross-arm aerial ladder
CN208069779U (en) * 2018-01-26 2018-11-09 深圳供电局有限公司 Open-air electric power construction car
CN108789685A (en) * 2018-06-16 2018-11-13 张雪燕 A kind of device for cutting groove on sheet of plate fitment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761356A (en) * 2016-12-14 2017-05-31 国网山东省电力公司龙口市供电公司 A kind of power construction overhauls apparatus
CN207449732U (en) * 2017-10-09 2018-06-05 陈耀 A kind of multifunction power breakdown van
CN207795043U (en) * 2017-11-09 2018-08-31 泉州泉港璟冠信息科技有限公司 A kind of UHV transmission line steel tower cross-arm aerial ladder
CN208069779U (en) * 2018-01-26 2018-11-09 深圳供电局有限公司 Open-air electric power construction car
KR20180051450A (en) * 2018-03-20 2018-05-16 주식회사 경신 Junction box
CN108789685A (en) * 2018-06-16 2018-11-13 张雪燕 A kind of device for cutting groove on sheet of plate fitment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056344A (en) * 2019-04-18 2019-07-26 中国矿业大学 A kind of measurement device and its application method of coal seam punching shape
CN110056344B (en) * 2019-04-18 2020-04-10 中国矿业大学 Device for measuring shape of punched hole of coal seam and using method thereof
CN111371039A (en) * 2020-04-14 2020-07-03 北京天恒建设集团有限公司 Cable erecting device for building electromechanical installation
CN111371039B (en) * 2020-04-14 2021-07-02 北京天恒建设集团有限公司 Cable erecting device for building electromechanical installation
CN111668751A (en) * 2020-06-12 2020-09-15 金杰 High-altitude electric power maintenance vehicle
CN114906778A (en) * 2022-04-26 2022-08-16 林锡辉 Electric power construction safety monitoring equipment

Also Published As

Publication number Publication date
CN109449822B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
CN109449822A (en) A kind of electric power overhaul Safety Management device
CN106006496B (en) A kind of power transformation equipment overhauling stand
CN107363805A (en) Detection workbench inside a kind of spherical tank
CN206511869U (en) A kind of high counterweight test self-powered platform of stability
CN211283637U (en) Power maintenance is with safe type lift platform
CN207295494U (en) Bridge construction platform
CN108313851A (en) A kind of safety cage for housing construction
CN209112447U (en) A kind of air rescue boom hoisting
CN211169599U (en) Swing arm crane with swing arm slewing device
CN206886584U (en) A kind of motor-driven grinding mill for being used to lift by crane vacuum circuit breaker
CN206541350U (en) A kind of engineering construction safety patrol handheld device
CN207572141U (en) A kind of open translation door of high winch
CN214611382U (en) Hoisting frame for maintaining large-scale wind power equipment
CN219117973U (en) Highway bridge construction hanging basket
CN213025651U (en) Leakage that can self-start overhauls uses protector
CN102182647B (en) Jigger positioning device of large direct-drive wind-power permanent magnet power generation set
CN206144539U (en) Safety device of beam -pumping unit
CN215905754U (en) Lifting machine for building engineering
CN213113754U (en) Linkage mechanism of weft knitting machine and weft knitting machine
CN217327160U (en) Safe ladder stand for outdoor wind driven generator
CN217756581U (en) Auxiliary tool device for transmission maintenance of crane trolley
CN208361744U (en) A kind of double beams electric hoist gantry crane
CN208532077U (en) A kind of Novel electric block
CN113753674B (en) Quick brake device of wire winding mechanism
CN212177017U (en) Electric power operation and maintenance overhaul device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201119

Address after: 224000 No. 189 Jiefang South Road, Jiangsu, Yancheng City

Applicant after: YANCHENG POWER SUPPLY BRANCH, STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Applicant after: XIANGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID JIANGSU ELECTRIC POWER Co.

Address before: 230001 Zhenxing Road (7 Rd building), Shushan new industrial park, Jinggang Road, Shushan District, Hefei City, Anhui Province

Applicant before: ANHUI KAICHENGYUAN ELECTRONIC TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220225

Address after: 224000 No. 18, Jianjun East Road, Yancheng City, Jiangsu Province

Patentee after: Yancheng Electric Power Design Institute Co.,Ltd.

Address before: No. 189, Jiefang Road, Yancheng City, Jiangsu Province

Patentee before: YANCHENG POWER SUPPLY BRANCH, STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Patentee before: State Grid Jiangsu Electric Power Co., Ltd. Xiangshui county power supply branch