CN109447515A - Realize that reso urce matching method is disposed in emergency event based on BIM platform - Google Patents
Realize that reso urce matching method is disposed in emergency event based on BIM platform Download PDFInfo
- Publication number
- CN109447515A CN109447515A CN201811356878.3A CN201811356878A CN109447515A CN 109447515 A CN109447515 A CN 109447515A CN 201811356878 A CN201811356878 A CN 201811356878A CN 109447515 A CN109447515 A CN 109447515A
- Authority
- CN
- China
- Prior art keywords
- resource
- emergency
- event
- emergency event
- bim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Development Economics (AREA)
- Geometry (AREA)
- Educational Administration (AREA)
- Evolutionary Computation (AREA)
- Game Theory and Decision Science (AREA)
- Computer Hardware Design (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention, which is disclosed, realizes emergency event disposition reso urce matching method based on BIM platform, comprising the following steps: triggering alarm when event occurs;Event space positioning;Rank judgement is carried out according to rule;Prediction scheme is obtained according to event level;Event coordinates resource coordinate is calculated into linear distance according to prediction scheme rule;It is carried out according to pre-acquiring resource data, coordinate distance, model data resource matched;Judge whether resource meets;If resource is unsatisfactory in step 6, basic data typing and maintenance are carried out;If resource meets in step 6, emergency resources and emergency event position pass through BIM platform spacial flex relationship and resource data.The present invention realizes emergency resources matching process in emergency event disposal process, relationship and resource information between the intuitive showing resource of BIM model and event location are utilized according to emergency preplan when emergency event occurs, improving disposal efficiency reduces the beneficial effect of loss caused by emergency event.
Description
Technical field
The invention belongs to projects administrative skill fields, in particular to based on the emergency event of BIM operation platform disposition with
Emergency resources matching process.
Background technique
When emergency event occurs, traditional emergency command all carries out Resource allocation and smoothing by the way of human configuration,
For the information such as the quantity of emergency resources, position, validity period, custodian, responsible department and contact method can not real time inspection,
Therefore it causes such real-time property accuracy to relatively lag behind, and then influences the disposition speed and disposition effect of emergency event.
Summary of the invention
The present invention for the technical problems in the prior art, provides and realizes emergency event disposition money based on BIM platform
Source matching process, realize by emergency preplan according to disposition regulation it is prefabricated in systems, and to emergency resources carry out BIM parametrization
Modeling, while the real-time Dynamic Maintenance of emergency resource information is updated using platform, when emergency event occurs, according to emergency preplan
Resource allocation rule, the spatial relationship and emergency between emergency resources and emergency event position are intuitively shown using BIM model
Resource related information improves emergency emergency event disposal efficiency, and after resource confirmation, system can fast automatic notice resource management list
Corresponding preparation is carried out in position, improves whole emergency disposal ability, reduces the beneficial effect of loss caused by emergency event.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: emergency event disposition is realized based on BIM platform
Reso urce matching method, comprising the following steps:
(1) BIM operation platform triggering alarm (S100) when emergency event occurs;The data for triggering alarm can be from artificial
Report and system access alarm two ways.
(2) positioning of emergency event locational space (S200) is carried out according to coordinate information in BIM operation platform;It notifies by
Coordinate point data is manually extracted or is obtained automatically in event in breath, renders to platform, shape according to WGS84 coordinate system after acquisition
At emergency event location coordinate information.
(3) BIM operation platform carries out the judgement of emergency event rank (S300) according to rule;Class is determined in information according to reporting
Data information value carries out event level judgement according to decision rule, and platform judges automatically event level.
(4) BIM operation platform obtains prediction scheme data (S400) at database (S704) according to emergency event rank;According to not
Same emergency event rank obtains the Response project data of different stage.
(5) event coordinates (S201) and resource coordinate (S401) are calculated according to prediction scheme rule, calculates burst
Event location and the linear distance (S402) of resource location between the two;
(6) for BIM operation platform according to prediction scheme according to middle emergency event position and resource location distance, matching rule obtains money
Source data, coordinate distance and model data, and resource matched (S500) is carried out according to required distance;
(7) judge within the scope of current counter-plan requirement, whether matching resource meets resource requirement quantity (S600) in prediction scheme;
(8) if resource is unsatisfactory for counter-plan requirement quantity in step (6), basic data typing and maintenance can be carried out in platform
(S700);And expand range of search according to counter-plan requirement.
(9) if emergency resources meet counter-plan requirement quantity in step (6), all emergency resources pass through with emergency event position
BIM operation platform spacial flex relationship, while showing resource data information and the highlighted displaying (S800) of resource model.
Preferably, obtaining resource coordinate S401 in step (4) with event coordinates (S201) and calculating distance range
(S402), and model information, resource information and prediction scheme information (S403) are obtained.
Preferably, specifically including emergency resources typing maintenance (S701), emergency preplan establishment maintenance in step (8)
(S702), BIM models (S703), and emergency resources typing safeguards that (S701) includes resource quantity, resource coordinate, responsible person, connection
Phone (S7011);Emergency preplan establishment maintenance (S702) includes configuration rule, configuration quantity, disposal process (S7021), data
It stores to database (S704).
Compared with prior art, the present invention has the beneficial effects that the present invention by emergency preplan according to disposition regulation
It is prefabricated in systems, and to emergency resources carry out BIM parametric modeling, while using platform to emergency the real-time dynamic of resource information
Maintenance updates, and when emergency event occurs, according to emergency preplan resource allocation rule, emergency money is intuitively shown using BIM model
Spatial relationship and emergency resources relevant information between source and emergency event position improve emergency emergency event disposal efficiency,
After resource confirmation, system can fast automatic notice resource management unit, carry out corresponding preparation, improve entirety emergency disposal ability,
It reduces and is lost caused by emergency event.
Detailed description of the invention
Fig. 1 is flow diagram of the invention.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, in the following with reference to the drawings and specific embodiments
It elaborates to the present invention.
Embodiment of the invention discloses based on BIM platform realize emergency event dispose reso urce matching method, as shown,
Itself the following steps are included:
(1) BIM operation platform triggering alarm (S100) when emergency event occurs;The data for triggering alarm can be from artificial
Report and system access alarm two ways.
(2) positioning of emergency event locational space (S200) is carried out according to coordinate information in BIM operation platform;It notifies by
Coordinate point data is manually extracted or is obtained automatically in event in breath, renders to platform, shape according to WGS84 coordinate system after acquisition
At emergency event location coordinate information.
(3) BIM operation platform carries out the judgement of emergency event rank (S300) according to rule;Class is determined in information according to reporting
Data information value carries out event level judgement according to decision rule, and platform judges automatically event level.
(4) BIM operation platform obtains prediction scheme data (S400) at database (S704) according to emergency event rank;According to not
Same emergency event rank obtains the Response project data of different stage.
(5) event coordinates (S201) and resource coordinate (S401) are calculated according to prediction scheme rule, calculates burst
Event location and the linear distance (S402) of resource location between the two;
(6) for BIM operation platform according to prediction scheme according to middle emergency event position and resource location distance, matching rule obtains money
Source data, coordinate distance and model data, and resource matched (S500) is carried out according to required distance;
(7) judge within the scope of current counter-plan requirement, whether matching resource meets resource requirement quantity (S600) in prediction scheme;
(8) if resource is unsatisfactory for counter-plan requirement quantity in step (6), basic data typing and maintenance can be carried out in platform
(S700) and according to counter-plan requirement expand range of search;
(9) if emergency resources meet counter-plan requirement quantity in step (6), all emergency resources pass through with emergency event position
BIM operation platform spacial flex relationship, while showing resource data information and the highlighted displaying (S800) of resource model.
In the present embodiment, in step (4), resource coordinate S401 is obtained with event coordinates (S201) and calculates distance range
(S402), and model information, resource information and prediction scheme information (S403) are obtained.
In the present embodiment, in step (8), emergency resources typing maintenance (S701), emergency preplan establishment maintenance are specifically included
(S702), BIM models (S703), and emergency resources typing safeguards that (S701) includes resource quantity, resource coordinate, responsible person, connection
Phone (S7011);Emergency preplan establishment maintenance (S702) includes configuration rule, configuration quantity, disposal process (S7021), data
It stores to database (S704).
In the present embodiment, when such as emergency event being fire, fire rank is E class fire (electrification fire), on artificial
Fire information event into BIM operation platform is reported to trigger, platform carries out prediction scheme according to the substantially burnt area in reported data
With fire-fighting resource (fire-fighting resource includes hand-held fire-extinguisher, canned fire extinguisher, fire hydrant, miniature fire station), if counter-plan requirement
Distance is that resource occurs in 250 meters of spot diameter apart from accident, the coordinate position occurred according to event and fire-fighting resource coordinate position
It sets and is calculated.
The resource quantity within the scope of 250 meters is calculated first, judges whether resource quantity meets counter-plan requirement, is stopped when meeting
It only calculates, Boot Model is highlighted to be shown, and prompts resource quantity in present scope, position, custodian and custodian's correspondent party
The information such as formula, after resource confirmation, system notifies responsible person concerned automatically;
Automatic enlarged diameter distance is retrieved again when being unsatisfactory for, until meeting prediction scheme quantity, search largest is in system
The maximum value of this class resource when reaching maximum value and being still unsatisfactory for prediction scheme, stops retrieval, and actuated type is highlighted to be shown, and is prompted current
Resource quantity in range, position, the information such as custodian and custodian's contact method, after resource confirmation, system notifies phase automatically
Close person liable.
It is described the invention in detail above by embodiment, but the content is only exemplary implementation of the invention
Example, should not be considered as limiting the scope of the invention.Protection scope of the present invention is defined by the claims.All utilizations
Technical solutions according to the invention or those skilled in the art are under the inspiration of technical solution of the present invention, in reality of the invention
In matter and protection scope, designs similar technical solution and reach above-mentioned technical effect, or to made by application range
All the changes and improvements etc. should still belong to patent of the invention and cover within protection scope.It should be noted that in order to clear
It is stated, part and protection scope of the present invention is omitted in explanation of the invention without being directly significantly associated with but this field skill
The statement of component known to art personnel and processing.
Claims (3)
1. realizing that reso urce matching method is disposed in emergency event based on BIM platform, which comprises the following steps:
(1) BIM operation platform triggering alarm when emergency event occurs;The data for triggering alarm, which can derive from, manually to be reported and is
System access alarm two ways.
(2) positioning of emergency event locational space is carried out according to coordinate information in BIM operation platform;It will report in information in event
Coordinate point data is manually extracted or is obtained automatically, renders to platform according to WGS84 coordinate system after acquisition, forms emergency event
Location coordinate information.
(3) BIM operation platform carries out the judgement of emergency event rank according to rule;Class data information value is determined in information according to reporting
Event level judgement is carried out according to decision rule, platform judges automatically event level.
(4) BIM operation platform obtains prediction scheme data in database according to emergency event rank;According to different emergency event ranks
Obtain the Response project data of different stage.
(5) event coordinates and resource coordinate are calculated according to prediction scheme rule, calculates emergency event position and resource-niche
Set linear distance between the two;
(6) for BIM operation platform according to prediction scheme according to middle emergency event position and resource location distance, matching rule obtains number of resources
According to, coordinate distance and model data, and carry out according to required distance resource matched;
(7) judge within the scope of current counter-plan requirement, whether matching resource meets resource requirement quantity in prediction scheme;
(8) if resource is unsatisfactory for counter-plan requirement quantity in step (6), basic data typing can be carried out in platform and safeguards and presses
Expand range of search according to counter-plan requirement;
(9) if emergency resources meet counter-plan requirement quantity in step (6), all emergency resources and emergency event position pass through BIM
Operation platform spacial flex relationship, while showing resource data information and the highlighted displaying of resource model.
2. according to claim 1 realize that reso urce matching method is disposed in emergency event based on BIM platform, which is characterized in that
It in step (4), obtains resource coordinate and with event coordinates calculates distance range, and obtain model information, resource information and pre-
Case information.
3. according to claim 1 realize that reso urce matching method is disposed in emergency event based on BIM platform, which is characterized in that
In step (8), emergency resources typing maintenance, emergency preplan establishment maintenance, BIM modeling, emergency resources typing maintenance are specifically included
Including resource quantity, resource coordinate, responsible person, telephone number;Emergency preplan establishment maintenance include configuration rule, configuration quantity,
Disposal process, data are stored to database.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811356878.3A CN109447515A (en) | 2018-11-15 | 2018-11-15 | Realize that reso urce matching method is disposed in emergency event based on BIM platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811356878.3A CN109447515A (en) | 2018-11-15 | 2018-11-15 | Realize that reso urce matching method is disposed in emergency event based on BIM platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109447515A true CN109447515A (en) | 2019-03-08 |
Family
ID=65553444
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811356878.3A Pending CN109447515A (en) | 2018-11-15 | 2018-11-15 | Realize that reso urce matching method is disposed in emergency event based on BIM platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109447515A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110275992A (en) * | 2019-05-17 | 2019-09-24 | 阿里巴巴集团控股有限公司 | Emergency processing method, device, server and computer readable storage medium |
CN111080950A (en) * | 2019-12-30 | 2020-04-28 | 四川亨通网智科技有限公司 | Universal text travel emergency command platform |
CN113642927A (en) * | 2021-08-31 | 2021-11-12 | 平安医疗健康管理股份有限公司 | Emergency resource management method, device, equipment and storage medium |
CN114139243A (en) * | 2021-09-14 | 2022-03-04 | 江苏中云筑智慧运维研究院有限公司 | BIM-based bridge fire emergency rescue method, terminal and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104965854A (en) * | 2015-05-18 | 2015-10-07 | 济南创智电气科技有限公司 | Automatic plotting method and system for material allocation based on electrical network GIS |
CN105426972A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | Engineering project intelligent operation management method and system based on BIM |
US20160234653A1 (en) * | 2015-02-09 | 2016-08-11 | Winitech Co., Ltd | Indoor location measurement system and method using radio signal transmitters |
CN105931168A (en) * | 2016-04-15 | 2016-09-07 | 广州葵翼信息科技有限公司 | Smart city service configuration based on information grid service |
CN106131794A (en) * | 2016-08-29 | 2016-11-16 | 北斗羲和科技发展(北京)有限公司 | The method and device of indoor positioning |
CN107194861A (en) * | 2017-07-02 | 2017-09-22 | 四川藏区高速公路有限责任公司 | A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM |
CN108171410A (en) * | 2017-12-21 | 2018-06-15 | 天津联合智选科技有限公司 | A kind of railway freight wisdom station total management system and its application |
-
2018
- 2018-11-15 CN CN201811356878.3A patent/CN109447515A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160234653A1 (en) * | 2015-02-09 | 2016-08-11 | Winitech Co., Ltd | Indoor location measurement system and method using radio signal transmitters |
CN104965854A (en) * | 2015-05-18 | 2015-10-07 | 济南创智电气科技有限公司 | Automatic plotting method and system for material allocation based on electrical network GIS |
CN105426972A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | Engineering project intelligent operation management method and system based on BIM |
CN105931168A (en) * | 2016-04-15 | 2016-09-07 | 广州葵翼信息科技有限公司 | Smart city service configuration based on information grid service |
CN106131794A (en) * | 2016-08-29 | 2016-11-16 | 北斗羲和科技发展(北京)有限公司 | The method and device of indoor positioning |
CN107194861A (en) * | 2017-07-02 | 2017-09-22 | 四川藏区高速公路有限责任公司 | A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM |
CN108171410A (en) * | 2017-12-21 | 2018-06-15 | 天津联合智选科技有限公司 | A kind of railway freight wisdom station total management system and its application |
Non-Patent Citations (1)
Title |
---|
李少伟: "BIM提升运维管理的研究", 《山西建筑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110275992A (en) * | 2019-05-17 | 2019-09-24 | 阿里巴巴集团控股有限公司 | Emergency processing method, device, server and computer readable storage medium |
CN110275992B (en) * | 2019-05-17 | 2023-08-29 | 创新先进技术有限公司 | Emergency processing method, device, server and computer readable storage medium |
CN111080950A (en) * | 2019-12-30 | 2020-04-28 | 四川亨通网智科技有限公司 | Universal text travel emergency command platform |
CN113642927A (en) * | 2021-08-31 | 2021-11-12 | 平安医疗健康管理股份有限公司 | Emergency resource management method, device, equipment and storage medium |
CN114139243A (en) * | 2021-09-14 | 2022-03-04 | 江苏中云筑智慧运维研究院有限公司 | BIM-based bridge fire emergency rescue method, terminal and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109447515A (en) | Realize that reso urce matching method is disposed in emergency event based on BIM platform | |
CN112862153B (en) | BIM-based fire rescue method, device, storage medium and device | |
EP1994514B1 (en) | Method and apparatus to provide outbreak notification based on historical location data | |
US20140167917A2 (en) | Disease Mapping and Infection Control System and Method | |
CN111506645B (en) | Three-dimensional visual management platform based on GIS | |
CN202110642U (en) | Emergency rescue system | |
KR101796385B1 (en) | System and method for providing optimal path upon fire occurrence | |
US20220246012A1 (en) | Infrastructure construction digital integrated twin (icdit) | |
US20150309895A1 (en) | Decision-making support system and decision-making support method | |
CN105976563A (en) | Fire rescue system | |
KR102348358B1 (en) | Simulation apparatus and method for fire evacuation based on virtual reality | |
CN112488898B (en) | Emergency handling system and method based on intelligent building management and control | |
KR20140124462A (en) | A Fire Evacuees' Context- Information Providing Method and A System therefor | |
Cho et al. | Emergency response: Effect of human detection resolution on risks during indoor mass shooting events | |
Piao et al. | Dynamic fall risk assessment framework for construction workers based on dynamic Bayesian network and computer vision | |
KR20200072972A (en) | Firefighting safety management service providing system and method performing thereof | |
Gwynne et al. | Modeling and mapping dynamic vulnerability to better assess WUI evacuation performance | |
Marín‐García et al. | Distances of transmission risk of COVID‐19 inside dwellings and evaluation of the effectiveness of reciprocal proximity warning sounds | |
CN108681980A (en) | Interactive repair reporting system based on APP and method | |
KR20230042856A (en) | Method, apparatus and program for multi-dense facility large-scale fire situation management and decision support services | |
US20220157147A1 (en) | Systems and methods for generating hazard alerts for a site using wearable sensors | |
Safayet et al. | Development of building information modeling (BIM)-based real-time fire alert system to reduce fire impact in Bangladesh | |
CN111462436A (en) | Internet security protection monitored control system | |
CN112184079A (en) | Water engineering safety management system based on real-time spatial position and application thereof | |
Gwynne et al. | Assessing the Impact of Changes to Guidance on Evacuation from Fire in Multi-Occupancy High-rise Residential Buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190308 |
|
RJ01 | Rejection of invention patent application after publication |