CN109446248A - A kind of floor energy consumption auto report completing and analysis system - Google Patents

A kind of floor energy consumption auto report completing and analysis system Download PDF

Info

Publication number
CN109446248A
CN109446248A CN201811195219.6A CN201811195219A CN109446248A CN 109446248 A CN109446248 A CN 109446248A CN 201811195219 A CN201811195219 A CN 201811195219A CN 109446248 A CN109446248 A CN 109446248A
Authority
CN
China
Prior art keywords
data
sensor
energy consumption
analysis system
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811195219.6A
Other languages
Chinese (zh)
Inventor
黄健
詹生锐
陈剑锋
王峰
徐雨祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiashi (group) Co Ltd
Original Assignee
Shanghai Jiashi (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiashi (group) Co Ltd filed Critical Shanghai Jiashi (group) Co Ltd
Priority to CN201811195219.6A priority Critical patent/CN109446248A/en
Publication of CN109446248A publication Critical patent/CN109446248A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Medical Informatics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Computing Systems (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of floor energy consumption auto report completing and analysis systems, include the following steps, S1: the multiple sensors of each position setting acquire information, send data to control centre;S2: control centre receives the data that transmitting comes, and arranges according to the rule of setting to data, while storing data is into memory module;S3: the data in database are called by control centre, compare with the data of collection, while according to comparison result, generating corresponding report;S4: think tank, enterprise analysis system is according to the statement analysis of generation and provides the Technology Ways and scheme of optimization;S5: think tank, enterprise analysis system, which is directed to, can not provide the corresponding early warning of energy consumption project generation of prioritization scheme, Added Management personnel's O&M decision;The present invention is to floor acquisition information, storage information, arrangement information, analysis information, to obtain corresponding report and floor energy consumption.

Description

A kind of floor energy consumption auto report completing and analysis system
Technical field
The present invention relates to building management technical field, specially a kind of floor energy consumption auto report completing and analysis system.
Background technique
After the development of the production and consumption in each city in the world reaches a certain level, there's no one who doesn't or isn't it is actively working to improve urban architecture The number of plies.It was verified that skyscraper can bring apparent economic results in society: firstly, making population concentration, using building The internal vertical connection distance between cross traffic shortening department, to improve efficiency;Large area can secondly built Land used significantly reduces, it is possible in downtown urban land addressing;It is again, it is possible to reduce urban construction investment and shortening building work Phase.
With the development of floor, the energy consumption of floor is also the problem confronted, since building contain multilayer floor, A large amount of HYDROELECTRIC ENERGYs are consumed, need to go and find out what's going in real time, regulates and controls in time, avoids the occurrence of dangerous situation, result in waste of resources or personnel Physical deterioration.
Summary of the invention
The technical problem to be solved by the present invention is in floor supply water, it is huge for electric energy consumption, go wrong not in real time solve meeting It results in waste of resources, while it is also possible to cause dangerous situation, a kind of floor energy consumption auto report completing and analysis system is provided, thus It solves the above problems.
In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions:
The present invention provides a kind of floor energy consumption auto report completing and analysis system, includes the following steps,
S1: the multiple sensors of each position setting acquire information, send data to control centre;
S2: control centre receives the data that transmitting comes, and arranges according to the rule of setting to data, while storing data is to depositing It stores up in module;
S3: the data in database are called by control centre, compare with the data of collection, while according to comparison result, generating Corresponding report;
S4: think tank, enterprise analysis system is according to the statement analysis of generation and provides the Technology Ways and scheme of optimization;
S5: think tank, enterprise analysis system, which is directed to, can not provide the corresponding early warning of energy consumption project generation of prioritization scheme, Added Management people Member's O&M decision.
As a preferred technical solution of the present invention, in the step S1, multiple sensors include but is not limited to: pressure Sensor, flow sensor, current sensor, voltage sensor, air quality sensor, temperature sensor, humidity sensor, Optical sensor, smoke sensor device, soil sensor;Wherein voltage sensor and current sensor are arranged in the total electricity of floor power supply On the parallel circuit of road and each house;Temperature sensor, humidity sensor, optical sensor, air quality sensor and cigarette Mist sensor is arranged inside floor passageway and each house;Pressure sensor, flow sensor are arranged in floor water main In the subtube of road and each house;Soil sensor is arranged in the soil of floor exterior circumferential, is arranged one every 50 meters It is a.
As a preferred technical solution of the present invention, in the step S1, the data of collection are transmitted to control by sensor The data transfer mode at center processed includes but is not limited to: definite transmission, WIFI transmission, Bluetooth transmission.
As a preferred technical solution of the present invention, in the step S2, control centre is foundation according to data source, By the finish message of the information or the same circuit of the information of the same area or same pipeline be portion, and according to collection when Between add temporal information.
As a preferred technical solution of the present invention, in the step S3, the database includes that last decade country is same Class building energy consumption standard database, international similar building standard database, the similar building energy consumption standard database in one's respective area and This construction history energy consumption data library;Same category information in the information and date library being collected into is compared, while production report, The comparative situation of all data is compared in display with data in database in report.
As a preferred technical solution of the present invention, in the step S4, when showing current information in report and originally build It builds in historical energy consumption data library and negative growth occurs with category information, and when negative growth amplitude is less than or equal to 5%, analysis system, think tank, enterprise System provides corresponding prioritization scheme for the item data.
As a preferred technical solution of the present invention, in the step S5, when showing current information in report and originally build Build in historical energy consumption data library with the negative growth amplitude of category information be greater than 5% when, think tank, enterprise analysis system is to the item data project Early warning is generated, administrative staff is notified to take corresponding measure.
The beneficial effects obtained by the present invention are as follows being: the present invention passes through receipts by the way that building are arranged with corresponding sensor everywhere Collection building information everywhere is simultaneously arranged, and is compared with the information in database, to monitor building information in real time, and raw At corresponding report, for personnel's more intuitive understanding energy consumption of building situation, while for the excessive part of negative growth provide to Optimizing application scheme, when negative growth, which reaches, to provide scheme, corresponding early warning is accordingly arranged with warning administrative staff to take in time Apply processing.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.
In the accompanying drawings:
Fig. 1 is overall schematic of the present invention;
Fig. 2 is overall step flow diagram of the present invention.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment: as shown, the present invention provides a kind of floor energy consumption auto report completing and analysis system, including as follows Step,
S1: the multiple sensors of each position setting acquire information, send data to control centre;
S2: control centre receives the data that transmitting comes, and arranges according to the rule of setting to data, while storing data is to depositing It stores up in module;
S3: the data in database are called by control centre, compare with the data of collection, while according to comparison result, generating Corresponding report;
S4: think tank, enterprise analysis system is according to the statement analysis of generation and provides the Technology Ways and scheme of optimization;
S5: think tank, enterprise analysis system, which is directed to, can not provide the corresponding early warning of energy consumption project generation of prioritization scheme, Added Management people Member's O&M decision.
In the step S1, multiple sensors include but is not limited to: pressure sensor, flow sensor, current sensor, Voltage sensor, air quality sensor, temperature sensor, humidity sensor, optical sensor, smoke sensor device, soil pass Sensor;Wherein voltage sensor and current sensor are arranged on the parallel circuit of floor power supply way circuit and each house;Temperature Sensor, humidity sensor, optical sensor, air quality sensor and smoke sensor device setting are spent in floor passageway and each Inside house;Pressure sensor, flow sensor are arranged in the subtube of floor water main road and each house;Soil Sensor is arranged in the soil of floor exterior circumferential, is arranged one every 50 meters.
Further, in the step S1, the data of collection are transmitted to the data transfer mode of control centre by sensor Including but not limited to: definite transmission, WIFI transmission, Bluetooth transmission.
Further, in the step S2, control centre is foundation according to data source, by the information of the same area or The information of same pipeline or the finish message of the same circuit are portion, and add temporal information according to the time of collection.
Further, in the step S3, the database include the similar building energy consumption standard database of last decade country, International similar building standard database, the similar building energy consumption standard database in one's respective area and this construction history energy consumption data library; Same category information in the information and date library being collected into is compared, while production report, display is with database in report Middle data compare the comparative situation of all data.
Further, same in current information and this construction history energy consumption data library when being shown in report in the step S4 There is negative growth in category information, and when negative growth amplitude is less than or equal to 5%, think tank, enterprise analysis system provides phase for the item data The prioritization scheme answered.
Further, same in current information and this construction history energy consumption data library when being shown in report in the step S5 When the negative growth amplitude of category information is greater than 5%, think tank, enterprise analysis system generates early warning to the item data project, notifies administrator Member takes corresponding measure.
It is specific: in step sl to be provided with building different location and can cover entire floor each sensor receive Collect data, is sent to control centre;The pressure being provided on the subtube of floor water main road and each house passes Sensor, flow sensor monitor pipeline water supply condition;Temperature sensor inside floor passageway and each house, humidity are set Every environmental index inside sensor, optical sensor, air quality sensor and smoke sensor device real time monitoring floor;Setting Voltage sensor and current sensor monitoring floor electricity consumption on the parallel circuit of floor power supply way circuit and each house supply Electric situation;Soil sensor monitoring soil information in the soil of floor exterior circumferential, Real-time Feedback are set;Every sensor Control centre is transmitted to as transmission mode information by obtained by of definite transmission or WIFI transmission or Bluetooth transmission.
Control centre receives information, while being that foundation is arranged according to the region where information, circuit, pipeline, simultaneously Temporal information is added, is stored;Data with portion information feedback are the information of same place environment different time, add the time Information is for distinguishing.Database is called to be compared in step S3, the database called are as follows: the similar building energy of last decade country Consumption standard database, international similar building standard database, the similar building energy consumption standard database in one's respective area and this building are gone through History energy consumption data library;Wherein former three mainly carries out ring ratio, understands the gap with standard, strives for improving, the last one data Library carries out on year-on-year basis, data being kept to maintain a relatively stable situation, develops towards excellent situation;Report is generated simultaneously, is reported Table includes the comparison situation with four databases, changes radian, so as to more intuitive performance.
In step S4 and step S5, when there is negative growth on year-on-year basis, if negative growth, less than 5 percent, think tank, enterprise divides Analysis system provides improved technology scheme;When negative growth is greater than 5 percent, the solution of think tank, enterprise analysis system offer It can not effectively solve, generate early warning, alert notification administrative staff take measures, and improve situation.
Finally, it should be noted that these are only the preferred embodiment of the present invention, it is not intended to restrict the invention, although Present invention has been described in detail with reference to the aforementioned embodiments, for those skilled in the art, still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (7)

1. a kind of floor energy consumption auto report completing and analysis system, which is characterized in that include the following steps,
S1: the multiple sensors of each position setting acquire information, send data to control centre;
S2: control centre receives the data that transmitting comes, and arranges according to the rule of setting to data, while storing data is to depositing It stores up in module;
S3: the data in database are called by control centre, compare with the data of collection, while according to comparison result, generating Corresponding report;
S4: think tank, enterprise analysis system is according to the statement analysis of generation and provides the Technology Ways and scheme of optimization;
S5: think tank, enterprise analysis system, which is directed to, can not provide the corresponding early warning of energy consumption project generation of prioritization scheme, Added Management people Member's O&M decision.
2. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S1, multiple sensors include but is not limited to: pressure sensor, flow sensor, current sensor, voltage sensor, sky Makings quantity sensor, temperature sensor, humidity sensor, optical sensor, smoke sensor device, soil sensor;Wherein voltage Sensor and current sensor are arranged on the parallel circuit of floor power supply way circuit and each house;Temperature sensor, humidity Sensor, optical sensor, air quality sensor and smoke sensor device are arranged inside floor passageway and each house;Pressure Sensor, flow sensor are arranged in the subtube of floor water main road and each house;Soil sensor setting exists In the soil of floor exterior circumferential, it is arranged one every 50 meters.
3. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S1, the data transfer mode that the data of collection are transmitted to control centre is included but is not limited to by sensor: definite transmission, WIFI transmission, Bluetooth transmission.
4. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S2, control centre is foundation according to data source, by the information of the information of the same area or same pipeline or same The finish message in circuit is portion, and adds temporal information according to the time of collection.
5. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S3, the database include the similar building energy consumption standard database of last decade country, international similar building standard database, The similar building energy consumption standard database in one's respective area and this construction history energy consumption data library;It will be in the information and date library that be collected into Same category information be compared, while production report, the comparison of all data is compared in display with data in database in report Situation.
6. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S4, when show in current information and this construction history energy consumption data library negative growth, and negative increasing occur with category information in report When long amplitude is less than or equal to 5%, think tank, enterprise analysis system provides corresponding prioritization scheme for the item data.
7. a kind of floor energy consumption auto report completing according to claim 1 and analysis system, which is characterized in that the step In rapid S5, it is greater than 5% with the negative growth amplitude of category information when being shown in current information and this construction history energy consumption data library in report When, think tank, enterprise analysis system generates early warning to the item data project, and administrative staff is notified to take corresponding measure.
CN201811195219.6A 2018-10-15 2018-10-15 A kind of floor energy consumption auto report completing and analysis system Pending CN109446248A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811195219.6A CN109446248A (en) 2018-10-15 2018-10-15 A kind of floor energy consumption auto report completing and analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811195219.6A CN109446248A (en) 2018-10-15 2018-10-15 A kind of floor energy consumption auto report completing and analysis system

Publications (1)

Publication Number Publication Date
CN109446248A true CN109446248A (en) 2019-03-08

Family

ID=65546618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811195219.6A Pending CN109446248A (en) 2018-10-15 2018-10-15 A kind of floor energy consumption auto report completing and analysis system

Country Status (1)

Country Link
CN (1) CN109446248A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236430A (en) * 2008-02-26 2008-08-06 浙江省建筑科学设计研究院有限公司 Wireless inner network architecture energy consumption and environment real time monitoring and analytical method
CN105425750A (en) * 2015-12-18 2016-03-23 合肥市恒昌自动化控制有限责任公司 Energy management system based on cloud platform
CN108182644A (en) * 2017-12-28 2018-06-19 广州柏诚智能科技有限公司 Building energy consumption measurement monitoring system
CN108256756A (en) * 2018-01-09 2018-07-06 国网山东省电力公司滨州供电公司 A kind of substation based on Internet of Things safeguards security risk managing and control system
CN108289127A (en) * 2018-01-30 2018-07-17 四川东鼎里智信息技术有限责任公司 A kind of Internet of things system for Medical Devices comprehensively monitoring

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236430A (en) * 2008-02-26 2008-08-06 浙江省建筑科学设计研究院有限公司 Wireless inner network architecture energy consumption and environment real time monitoring and analytical method
CN105425750A (en) * 2015-12-18 2016-03-23 合肥市恒昌自动化控制有限责任公司 Energy management system based on cloud platform
CN108182644A (en) * 2017-12-28 2018-06-19 广州柏诚智能科技有限公司 Building energy consumption measurement monitoring system
CN108256756A (en) * 2018-01-09 2018-07-06 国网山东省电力公司滨州供电公司 A kind of substation based on Internet of Things safeguards security risk managing and control system
CN108289127A (en) * 2018-01-30 2018-07-17 四川东鼎里智信息技术有限责任公司 A kind of Internet of things system for Medical Devices comprehensively monitoring

Similar Documents

Publication Publication Date Title
CN107831285B (en) A kind of dystrophication monitoring system and method based on Internet of Things
CN105426461B (en) The map visualization system and method for knowledge excavation is carried out based on space big data
Pan et al. Resilience model and recovery strategy of transportation network based on travel OD-grid analysis
CN106993059A (en) A kind of agriculture feelings monitoring system based on NB IoT
CN104867357B (en) Multiple no-manned plane scheduling and mission planning method towards Emergency Response to Earthquake
Bakhshi et al. IoT-enabled smart city waste management using machine learning analytics
CN107133702A (en) A kind of wind power plant whole audience power forecasting method
WO2011130474A2 (en) Modeling and simulation of power environments
CN107317706A (en) A kind of power transmission line intelligent monitoring system
CN102222169A (en) Method for predicting and analyzing pipe burst of urban water supply network
CN111199354A (en) Hopfield neural network-based power communication network operation and maintenance work order scheduling method
CN105872075A (en) Method of mapping Internet of Things equipment to smart city resource model
CN114757797B (en) Power grid resource service central platform architecture method based on data model drive
CN117893376A (en) Community carbon emission monitoring and regulating method based on space-time carbon footprint
CN107179731A (en) Multistage joint control water environment treatment system and monitoring method
CN109446248A (en) A kind of floor energy consumption auto report completing and analysis system
CN109492798A (en) City energy internet wisdom energy service information interaction system
Heidary et al. Smart buildings in the IoT era–necessity, challenges, and opportunities
CN117273242A (en) Virtual power plant management system and method based on block chain
Saad et al. Role of cyber-physical systems in smart cities
KR20130141549A (en) Social infrastructure control system, server, control method, and program
Wu et al. Urban comprehensive carrying capacity analysis in Zhejiang Province of China from the perspective of production, living, and ecological spaces
CN115903085A (en) Agricultural meteorological disaster early warning method and device and storage medium
CN103685409B (en) A kind of knowledge network towards autonomous service and construction method thereof
Chi et al. A case study of developing an intelligent management system for energy internet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190308