CN109445824A - A kind of update method of measure and control device, system and terminal device - Google Patents

A kind of update method of measure and control device, system and terminal device Download PDF

Info

Publication number
CN109445824A
CN109445824A CN201811325465.9A CN201811325465A CN109445824A CN 109445824 A CN109445824 A CN 109445824A CN 201811325465 A CN201811325465 A CN 201811325465A CN 109445824 A CN109445824 A CN 109445824A
Authority
CN
China
Prior art keywords
measure
control device
update
default
pressing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811325465.9A
Other languages
Chinese (zh)
Other versions
CN109445824B (en
Inventor
王晓蔚
李宣义
李均强
栗会峰
郝晓光
胡雪凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811325465.9A priority Critical patent/CN109445824B/en
Publication of CN109445824A publication Critical patent/CN109445824A/en
Application granted granted Critical
Publication of CN109445824B publication Critical patent/CN109445824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention is suitable for power grid application technical field, provide a kind of update method of measure and control device, system and terminal device, if the update method includes: to detect that the quantity for opening the displacement information that plate is handled in the first preset time is more than default processing quantity, it then puts into default measure and control device and overhauls pressing plate, and exit default outlet hard pressing plate, obtain update of plug-in program and corresponding more new information, based on update of plug-in program, opening for measure and control device is updated into plug-in unit, if more new information is identical as pre-set programs more new information, then obtain running parameter and updated running parameter before measure and control device updates, if the running parameter before updating is matched with updated running parameter, it then determines to update and complete, exit default measure and control device maintenance pressing plate, and put into default outlet hard pressing plate, reduce renewal time, update it is high-efficient with And cost of labor is low.

Description

A kind of update method of measure and control device, system and terminal device
Technical field
The invention belongs to power grid application technical field more particularly to a kind of update methods of measure and control device, system and terminal Equipment.
Background technique
Electric power scheduling automatization system is the system for directly acquiring and monitoring for operation of power networks service data, and being is online each Grade power dispatching station production run personnel are provided at the data of Operation of Electric Systems information, analysis decision tool and control means Reason system.
In the prior art, when the version of the relative program in the measure and control device in electric power scheduling automatization system is too low, Staff is needed to be updated, staff needs first to check for program and needs to update, and if desired updates, then works Personnel need to first download the program of corresponding highest version, then be updated.Therefore, the journey by being manually updated in measure and control device The mode of sequence there are problems that updating low efficiency and high labor cost.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of update method of measure and control device, system and terminal device, with solution Certainly existed in the prior art by the mode for the program being manually updated in measure and control device and updates low efficiency and high labor cost The problem of.
The first aspect of the embodiment of the present invention provides a kind of update method of measure and control device, and the measure and control device includes to open Enter plate, the update method includes:
If detecting, the quantity for opening the displacement information that plate is handled in the first preset time is more than default processing number Amount then puts into default measure and control device and overhauls pressing plate, and exits default outlet hard pressing plate;
Obtain update of plug-in program and corresponding more new information;
Based on the update of plug-in program, opening for the measure and control device is updated into plug-in unit;
If the more new information is identical as pre-set programs more new information, obtain measure and control device update before running parameter and Updated running parameter;
If the running parameter before the update is matched with the updated running parameter, it is determined that update and complete, exit The default measure and control device overhauls pressing plate, and puts into the default outlet hard pressing plate.
The second aspect of the embodiment of the present invention provides a kind of more new system of measure and control device, and the measure and control device includes to open Enter plate, the more new system includes:
First pressing plate processing module, if for detecting the displacement information opening plate and handling in the first preset time Quantity be more than default processing quantity, then put into default measure and control device and overhaul pressing plate, and exit default outlet hard pressing plate;
Data obtaining module is updated, for obtaining update of plug-in program and corresponding more new information;
Open into update of plug-in module, for being based on the update of plug-in program, to the measure and control device open into plug-in unit into Row updates;
Running parameter obtains module, if identical as pre-set programs more new information for the more new information, obtains observing and controlling Running parameter and updated running parameter before device update;
Second pressing plate processing module, if for running parameter and the updated running parameter before the update Match, it is determined that update and complete, exit the default measure and control device maintenance pressing plate, and put into the default outlet hard pressing plate.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in In the memory and the computer program that can run on the processor, when the processor executes the computer program The step of realizing the update method of measure and control device as described above.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the computer program realizes the update side of measure and control device as described above when being executed by processor The step of method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention is detecting observing and controlling dress After the quantity for the displacement information that plate is handled in the first preset time that sets open is more than default processing quantity, observing and controlling is automatically determined Opening in device is updated into plug-in card program needs, then puts into default measure and control device and overhaul pressing plate, exits the hard pressure in default outlet Plate, it is automatic to obtain update of plug-in program and corresponding more new information, be based on update of plug-in information, it is automatic it is split enter plug-in unit carry out more Newly, if more new information is identical as pre-set programs more new information, show the corresponding more new information of more new procedures be correctly, then it is right The running parameter of running parameter and more front and back before measure and control device update is compared, if the two is consistent, it is determined that and it updates and completes, Default measure and control device maintenance pressing plate is exited, and puts into default outlet hard pressing plate, it is automatic to realize the update opened into plug-in card program, it is not necessarily to It manually carries out detecting whether to need to update, downloading program is then determined the need for according to corresponding testing result and is updated, Reduce renewal time, it is low to update high-efficient and cost of labor.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process schematic diagram of the update method of measure and control device provided by one embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the more new system of measure and control device provided by one embodiment of the present invention;
Fig. 3 is the schematic diagram of terminal device provided by one embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment 1:
Fig. 1 shows the implementation process of the update method of the measure and control device of one embodiment of the present of invention offer, observing and controlling dress It sets comprising opening into plate, details are as follows for the implementation process:
In step s101, if detecting, the quantity for opening the displacement information that plate is handled in the first preset time is more than pre- If handling quantity, then put into default measure and control device and overhaul pressing plate, and exits default outlet hard pressing plate.
In the present embodiment, the first preset time is the short period, for example, 10 minutes, acquisition is opened default first into plate The quantity of the displacement information handled in time, if detecting, the quantity is greater than default processing quantity, shows to have been over out Enter the processing capacity of plate, it is possible to will appear open into plug-in unit lose SOE message (Sequence Of Event, logout are suitable Sequence) and the case where the problem of open into remote signalling message, need to carry out upgrading update.For example, opening into frequent movement, involution, in short-term Interior open needs to handle a large amount of displacement information into plate, has been more than to open into plate processing capacity, has been upgraded.
Wherein, displacement information includes switch changed position information.
In the present embodiment, for opening the signal into frequent movement, involution, settable delay definite value appropriate is carried out different Normal dither mask.
In the present embodiment, if detect the quantity for opening the displacement information that plate is handled in the first preset time be less than or Equal to default processing quantity, then can wouldn't it is split enter plate upgraded.
In the present embodiment, hard pressing plate can accordingly be exported for observing and controlling screen cabinet interval by presetting outlet hard pressing plate.
In the present embodiment, remote control accidentally exports in escalation process in order to prevent, need to be set operation by investment maintenance pressing plate Standby and repair apparatus separates.
In step s 102, update of plug-in program and corresponding more new information are obtained.
In the present embodiment, more new packets include the version information and corresponding check code of update of plug-in program.
In step s 103, it is based on update of plug-in program, opening for measure and control device is updated into plug-in unit.
In one embodiment of the invention, before step S103, comprising:
The running parameter of measure and control device is backed up, the running parameter before updating is generated.
In the present embodiment, running parameter includes measure and control device configuration parameter, definite value and logical relation etc..
In the present embodiment, in order to prevent in escalation process, definite value after measure and control device power-off restarting, configuration parameter and/or There is abnormal situation in the running parameters such as logical relation, are backed up.
In the present embodiment, it is updated to opening for measure and control device to change update of plug-in program into plug-in card program.If powering off The case where restarting is reset according to the running parameter of backup.
In step S104, if more new information is identical as pre-set programs more new information, before obtaining measure and control device update Running parameter and updated running parameter.
In the present embodiment, pre-set programs more new packets include default version information and default check code.
In the present embodiment, if the version information of update of plug-in program is identical with default version information, and update of plug-in journey The check code of sequence is identical with default check code, then it represents that the version of the update of plug-in program and default upgrading scheme, check code one It causes, can be updated.
In step s105, if the running parameter before updating is matched with updated running parameter, it is determined that it updates and completes, Default measure and control device maintenance pressing plate is exited, and puts into default outlet hard pressing plate.
In the present embodiment, insertion control program update after, i.e., after upgraded version, need proving program whether with Whether other program compatibilities, the running parameter verified before updating match with updated undated parameter.
In the present embodiment, if update before definite value it is identical with updated definite value, update before measure and control device configuration join Logical relation before several identical as updated measure and control device configuration parameter and update is identical as updated logical relation, then really Determine edition compatibility, directly exits default measure and control device maintenance pressing plate and the default outlet hard pressing plate of investment.
In the present embodiment, if update before measure and control device configuration parameter, definite value and logical relation with it is corresponding update after Measure and control device configuration parameter, definite value and logical relation three exist it is different, then it represents that update failure, updated insertion controls Program version and other programs are incompatible, need to re-start upgrading.
In one embodiment of the invention, after step S105, comprising:
Detect the measure and control device whether normal operation.
It is in one embodiment of the invention, described to detect the measure and control device whether normal operation, comprising:
1) working condition of the warning light of measure and control device and the quantity of warning message are obtained.
2) it is zero that if working condition, which is the quantity of OFF state and warning message, it is determined that measure and control device operates normally.
In the present embodiment, it determining after opening promoted into plug-in unit of measure and control device, needs to verify measure and control device Whether normal operation.
In the present embodiment, the working condition of warning light includes OFF state and luminance.
In the present embodiment, if the working condition for getting the warning light of measure and control device is OFF state, warning message Quantity is zero, then it represents that measure and control device operates normally.
In one embodiment of the invention, measure and control device is detected whether normal operation, comprising:
1) in the second preset time, distant place handle on the spot is preset in the control continuous division of measure and control device, and obtains default prison Control device and the collected signal of default telemechanical apparatus.
If 2) signal with to a default distant place on the spot handle carry out division operation generate expection Signal Matching, it is determined that observing and controlling The remote signaling function of device is normal.
In the present embodiment, after verifying measure and control device operates normally, need to check measure and control device, default monitoring device, Whether the position signals such as switch, the disconnecting link of default telemechanical apparatus acquisition are correct.
In the present embodiment, it in the second preset time, continuously transmits open command to measure and control device and transmission closure and refers to To measure and control device, measure and control device continuously opens and is closed default distant place handle on the spot for order, obtains default monitoring device and presets remote The dynamic collected signal of device.If control measure and control device open and be closed a default distant place on the spot handle when, collected signal with To a default distant place, handle carries out the expection Signal Matching opened and closed procedure generates on the spot, it is determined that the remote signalling function of measure and control device Can be normal, if collected signal with to the default distant place expection signal that handle open on the spot and closed procedure generates not Match, it is determined that the remote signaling function of measure and control device is abnormal, needs to be upgraded again or notified related service personnel to check.
By taking a concrete application scene as an example, in the second preset time (for example, 12 minutes), control measure and control device is continuous Distant place handle on the spot is preset in division, is A, B, A, B from default monitoring device and the collected signal of default telemechanical apparatus, second In preset time, it is that A, B, A, C are got by comparing that the distant place tone signal that handle generates on the spot is preset in continuous division Signal and expected signal Incomplete matching, indicate that the remote signaling function of measure and control device is abnormal.
In the present embodiment, after verifying measure and control device operates normally, need to check measure and control device, default monitoring device, Whether the position signals such as switch, the disconnecting link of default telemechanical apparatus acquisition are correct, by the way that within a short period of time, a continuous division distant place is just Ground handle judges whether default monitoring device and the collected signal of default telemechanical apparatus are normal, whether judge remote signaling function Normally.
In one embodiment, measure and control device is detected whether normal operation, comprising:
1) in third preset time, distant place handle on the spot is preset in the control continuous division of measure and control device, obtains default monitoring Device and the collected SOE message of default telemechanical apparatus.
If 2) SOE message with to a default distant place on the spot handle carry out division operation generate expection SOE message matching, really The SOE function of determining measure and control device is normal.
In the present embodiment, after carrying out remote signaling function verifying, it is also necessary to carry out SOE verifying, whether verify it can be normal The time of origin and occurrence type of record event.In third preset time, the control continuous division of measure and control device is preset a distant place and is connect Ground handle obtains default monitoring device and the collected SOE message information of default telemechanical apparatus.The SOE message letter that will acquire It ceases and is compared with to the default distant place tone SOE message that handle carries out that division operation generates on the spot, if the two matches, it is determined that The SOE function of measure and control device is normal, if the two mismatches, it is determined that the SOE function of measure and control device is abnormal, needs to re-start Upgrading, or related service personnel is notified to check, it solves a problem promptly.
In one embodiment, it in the 4th preset time, counts and time being updated into plug-in unit is opened to measure and control device Number sends information warning to default contact person according to default sending method, information warning shows if number is greater than preset times The number that the measure and control device is updated upgrading in a short time is excessive, and personnel is needed to detect.
In the present embodiment, which is the CSI-200EA measure and control device in electric power scheduling automatization system, packet Include open into plate it is corresponding commonly open into plug-in card program version be V3.14, V3.13, V3.12, V3.11, V3.10, V3.01W、V3.02、V3.01、V3.00。
In the present embodiment, before step S101, the version information opened into plug-in unit is obtained, if opening the version letter into plug-in unit Breath is the first default version information, then without carrying out opening the update into plug-in unit.If the version information opened into plug-in unit is preset for first In version scope, then without considering compatibling problem after upgrading.If open into plug-in unit version information be the second default version scope It is interior, then upgraded, and need to consider compatibling problem.
Wherein, the first default version information is V3.14.
Wherein, the first default version scope includes V3.13, V3.12, V3.11, V3.10, V3.01W version.
Wherein, the second default version scope includes V3.02, V3.01, V3.00.
In the present embodiment, in the displacement information that plate is handled in the first preset time opened for detecting measure and control device After quantity is more than default processing quantity, determining open is updated into plug-in unit needs, then the default measure and control device of investment overhauls pressing plate, moves back Preset outlet hard pressing plate out, obtain update of plug-in program and corresponding more new information, be based on update of plug-in information, it is automatic it is split enter Plug-in unit is updated, if more new information is identical as pre-set programs more new information, shows that the corresponding more new information of more new procedures is Correctly, then the running parameter of running parameter and more front and back before updating to measure and control device is compared, if the two is consistent, really Fixed update is completed, and default measure and control device maintenance pressing plate is exited, and puts into default outlet hard pressing plate, and automatic realize is opened into plug-in card program Update, detect whether to need to update without manually carrying out, then according to corresponding testing result determine the need for downloading journey Sequence is updated, and reduces renewal time, and it is low to update high-efficient and cost of labor.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Embodiment 2:
Fig. 2 shows the more new systems 100 for the measure and control device that one embodiment of the present of invention provides, for executing Fig. 1 institute Method and step in corresponding embodiment, measure and control device include to open into plate.The more new system 100 of the measure and control device includes:
First pressing plate processing module 110, if for detecting the displacement information opening plate and handling in the first preset time Quantity be more than default processing quantity, then put into default measure and control device and overhaul pressing plate, and exit default outlet hard pressing plate.
Data obtaining module 120 is updated, for obtaining update of plug-in program and corresponding more new information.
It opens into update of plug-in module 130, for being based on update of plug-in program, opening for measure and control device is carried out more into plug-in unit Newly.
Running parameter obtains module 140, if identical as pre-set programs more new information for more new information, obtains observing and controlling dress Set the running parameter and updated running parameter before updating.
Second pressing plate processing module 150, if the running parameter for before updating is matched with updated running parameter, really Fixed update is completed, and default measure and control device maintenance pressing plate is exited, and puts into default outlet hard pressing plate.
In one embodiment of the invention, it opens and includes: into update of plug-in module 130
Running parameter backup units are backed up for the running parameter to measure and control device, generate the work ginseng before updating Number
In one embodiment of the invention, the second pressing plate processing module 150, comprising:
Detection unit is run, for detecting measure and control device whether normal operation.
In one embodiment of the invention, operation detection unit includes:
Warning information obtains subelement, for obtaining the working condition of the warning light of measure and control device and the number of warning message Amount.
Operating status determines subelement, if the quantity for working condition to be OFF state and warning message is zero, really Determine measure and control device normal operation.
In one embodiment of the invention, operation detection unit includes:
Signal acquisition subelement, in the second preset time, the control continuous division of measure and control device to preset a distant place on the spot Handle, and obtain default monitoring device and the collected signal of default telemechanical apparatus.
Remote signaling function determines subelement, if for signal with to a default distant place on the spot handle carry out division operation generate it is pre- Phase Signal Matching, it is determined that the remote signaling function of measure and control device is normal.
In one embodiment, the more new system 100 of measure and control device further includes other function module/unit, for realizing Method and step in embodiment 1 in each embodiment.
Embodiment 3:
Fig. 3 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 3, the terminal of the embodiment is set Standby 3 include: processor 30, memory 31 and are stored in the meter that can be run in the memory 31 and on the processor 30 Calculation machine program 32.The processor 30 realizes each embodiment as described in example 1 above when executing the computer program 32 Step, such as step S101 shown in FIG. 1 to step S105.Alternatively, when the processor 30 executes the computer program 32 Realize the function of each module/unit in each system embodiment as described in example 2 above, for example, module 110 shown in Fig. 2 to 150 function.
Illustratively, the computer program 32 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 31, and are executed by the processor 30, to complete the present invention.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for Implementation procedure of the computer program 32 in the terminal device 3 is described.For example, the computer program 32 can be divided It is cut into the first pressing plate processing module, data obtaining module is updated, opens into update of plug-in module, running parameter acquisition module and second Pressing plate processing module.Each module concrete function is as follows:
First pressing plate processing module, if for detecting the number for opening the displacement information that plate is handled in the first preset time Amount is more than default processing quantity, then puts into default measure and control device and overhaul pressing plate, and exits default outlet hard pressing plate.
Data obtaining module is updated, for obtaining update of plug-in program and corresponding more new information.
It opens into update of plug-in module, for being based on update of plug-in program, opening for measure and control device is updated into plug-in unit.
Running parameter obtains module, if identical as pre-set programs more new information for more new information, obtains measure and control device Running parameter and updated running parameter before update.
Second pressing plate processing module, if the running parameter for before updating is matched with updated running parameter, it is determined that It updates and completes, exit default measure and control device maintenance pressure, and put into default outlet hard pressing plate.
The terminal device 3 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The terminal device 3 may include, but be not limited only to, processor 30, memory 31.It will be understood by those skilled in the art that figure 3 be only the example of terminal device 3, does not constitute the restriction to terminal device 3, may include than illustrating more or fewer portions Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net Network access device, bus etc..
Alleged processor 30 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 31 can be the internal storage unit of the terminal device 3, such as the hard disk or interior of terminal device 3 It deposits.The memory 31 is also possible to the External memory equipment of the terminal device 3, such as be equipped on the terminal device 3 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge Deposit card (Flash Card) etc..Further, the memory 31 can also both include the storage inside list of the terminal device 3 Member also includes External memory equipment.The memory 31 is for storing needed for the computer program and the terminal device Other programs and data.The memory 31 can be also used for temporarily storing the data that has exported or will export.
Embodiment 4:
The embodiment of the invention also provides a kind of computer readable storage medium, computer-readable recording medium storage has meter Calculation machine program is realized the step in each embodiment as described in example 1 above, such as is schemed when computer program is executed by processor Step S101 shown in 1 to step S105.Alternatively, realizing when the computer program is executed by processor such as institute in embodiment 2 The function of each module/unit in each system embodiment stated, such as the function of module 110 to 150 shown in Fig. 2.
The computer program can be stored in a computer readable storage medium, and the computer program is by processor When execution, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, The computer program code can be source code form, object identification code form, executable file or certain intermediate forms etc..Institute State computer-readable medium may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), arbitrary access Memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It needs It is bright, the content that the computer-readable medium includes can according in jurisdiction make laws and patent practice requirement into Row increase and decrease appropriate, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electricity Carrier signal and telecommunication signal.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
The steps in the embodiment of the present invention can be sequentially adjusted, merged and deleted according to actual needs.
Module or unit in system of the embodiment of the present invention can be combined, divided and deleted according to actual needs.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of update method of measure and control device, which is characterized in that the measure and control device includes to open into plate, the update method packet It includes:
If detecting, the quantity for opening the displacement information that plate is handled in the first preset time is more than default processing quantity, It puts into default measure and control device and overhauls pressing plate, and exit default outlet hard pressing plate;
Obtain update of plug-in program and corresponding more new information;
Based on the update of plug-in program, opening for the measure and control device is updated into plug-in unit;
If the more new information is identical as pre-set programs more new information, the running parameter before measure and control device updates and update are obtained Running parameter afterwards;
If the running parameter before the update is matched with the updated running parameter, it is determined that update and complete, exit described Default measure and control device overhauls pressing plate, and puts into the default outlet hard pressing plate.
2. the update method of measure and control device as described in claim 1, which is characterized in that described to be based on the update of plug-in journey Sequence, to opening before plug-in unit is updated for the measure and control device, comprising:
The running parameter of the measure and control device is backed up, the running parameter before generating the update.
3. the update method of measure and control device as described in claim 1, which is characterized in that the investment default hard pressure in outlet After plate, comprising:
Detect the measure and control device whether normal operation.
4. the update method of measure and control device as claimed in claim 3, which is characterized in that whether the detection measure and control device It operates normally, comprising:
Obtain the working condition of the warning light of the measure and control device and the quantity of warning message;
If the quantity that the working condition is OFF state and the warning message is zero, it is determined that the measure and control device is normally transported Row.
5. the update method of measure and control device as claimed in claim 3, which is characterized in that whether the detection measure and control device It operates normally, further includes:
In the second preset time, controls the continuous division of the measure and control device and preset distant place handle on the spot, and obtain default monitoring Device and the collected signal of default telemechanical apparatus;
If the signal with to the default distant place on the spot handle carry out division operation generate expection Signal Matching, it is determined that institute The remote signaling function for stating measure and control device is normal.
6. a kind of more new system of measure and control device, which is characterized in that the measure and control device includes to open into plate, the more new system packet It includes:
First pressing plate processing module, if for detecting the number for opening the displacement information that plate is handled in the first preset time Amount is more than default processing quantity, then puts into default measure and control device and overhaul pressing plate, and exits default outlet hard pressing plate;
Data obtaining module is updated, for obtaining update of plug-in program and corresponding more new information;
It opens into update of plug-in module, for being based on the update of plug-in program, opening for the measure and control device is carried out more into plug-in unit Newly;
Running parameter obtains module, if identical as pre-set programs more new information for the more new information, obtains measure and control device Running parameter and updated running parameter before update;
Second pressing plate processing module, if the running parameter for before the update is matched with the updated running parameter, It determines to update and complete, exit the default measure and control device maintenance pressing plate, and put into the default outlet hard pressing plate.
7. the more new system of measure and control device as claimed in claim 6, which is characterized in that the second pressing plate processing module, packet It includes:
Detection unit is run, for detecting the measure and control device whether normal operation.
8. the more new system of measure and control device as claimed in claim 7, which is characterized in that the operation detection unit, comprising:
Warning information obtains subelement, for obtaining the working condition of the warning light of the measure and control device and the number of warning message Amount;
Operating status determines subelement, if the quantity for the working condition to be OFF state and the warning message is zero, Then determine that the measure and control device operates normally.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program The step of update method of described in any item measure and control devices.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In the update side of realization such as measure and control device described in any one of claim 1 to 5 when the computer program is executed by processor The step of method.
CN201811325465.9A 2018-11-08 2018-11-08 Updating method and system of measurement and control device and terminal equipment Active CN109445824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811325465.9A CN109445824B (en) 2018-11-08 2018-11-08 Updating method and system of measurement and control device and terminal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811325465.9A CN109445824B (en) 2018-11-08 2018-11-08 Updating method and system of measurement and control device and terminal equipment

Publications (2)

Publication Number Publication Date
CN109445824A true CN109445824A (en) 2019-03-08
CN109445824B CN109445824B (en) 2022-03-01

Family

ID=65551152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811325465.9A Active CN109445824B (en) 2018-11-08 2018-11-08 Updating method and system of measurement and control device and terminal equipment

Country Status (1)

Country Link
CN (1) CN109445824B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111103789A (en) * 2019-11-20 2020-05-05 国网河北省电力有限公司电力科学研究院 Source network load comprehensive energy scheduling analysis method, system and terminal equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104717252A (en) * 2013-12-16 2015-06-17 国家电网公司 Power line carrier remote upgrading method and terminal
CN105006891A (en) * 2015-07-06 2015-10-28 国电南瑞科技股份有限公司 On-line visual remote control terminal and method used for transformer station background upgrading
CN105005486A (en) * 2015-06-25 2015-10-28 许继集团有限公司 Program online upgrading system and method for intelligent transformer substation equipment
WO2016157489A1 (en) * 2015-04-01 2016-10-06 富士電機株式会社 Built-in plc function type drive control device
WO2016204186A1 (en) * 2015-06-16 2016-12-22 ヤマハ株式会社 Parameter control device, parameter control program, and parameter control method
CN106709580A (en) * 2017-01-13 2017-05-24 国家电网公司 Substation secondary system operation and maintenance cloud platform
CN107656749A (en) * 2017-09-26 2018-02-02 国网江苏省电力公司 A kind of device version management-control method and device
CN107797812A (en) * 2017-09-15 2018-03-13 许继电源有限公司 A kind of charger remote online upgrade method and system
CN108170488A (en) * 2016-12-07 2018-06-15 杭州海康威视数字技术股份有限公司 A kind of method and device for upgrading plug-in unit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104717252A (en) * 2013-12-16 2015-06-17 国家电网公司 Power line carrier remote upgrading method and terminal
WO2016157489A1 (en) * 2015-04-01 2016-10-06 富士電機株式会社 Built-in plc function type drive control device
WO2016204186A1 (en) * 2015-06-16 2016-12-22 ヤマハ株式会社 Parameter control device, parameter control program, and parameter control method
CN105005486A (en) * 2015-06-25 2015-10-28 许继集团有限公司 Program online upgrading system and method for intelligent transformer substation equipment
CN105006891A (en) * 2015-07-06 2015-10-28 国电南瑞科技股份有限公司 On-line visual remote control terminal and method used for transformer station background upgrading
CN108170488A (en) * 2016-12-07 2018-06-15 杭州海康威视数字技术股份有限公司 A kind of method and device for upgrading plug-in unit
CN106709580A (en) * 2017-01-13 2017-05-24 国家电网公司 Substation secondary system operation and maintenance cloud platform
CN107797812A (en) * 2017-09-15 2018-03-13 许继电源有限公司 A kind of charger remote online upgrade method and system
CN107656749A (en) * 2017-09-26 2018-02-02 国网江苏省电力公司 A kind of device version management-control method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王晓蔚等: "基于D5000系统的变电站综自调试试验系统方案与问题分析", 《电力系统保护与控制》 *
肖亮: "某火电厂低压厂用电自启动系统升级设计与应用研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111103789A (en) * 2019-11-20 2020-05-05 国网河北省电力有限公司电力科学研究院 Source network load comprehensive energy scheduling analysis method, system and terminal equipment
CN111103789B (en) * 2019-11-20 2023-04-18 国网河北省电力有限公司电力科学研究院 Source network load comprehensive energy scheduling analysis method, system and terminal equipment

Also Published As

Publication number Publication date
CN109445824B (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN106487589B (en) Terminal automatic access and configuration management method
CN108469725A (en) Clock calibration method and terminal device
CN109447288A (en) Multiple-energy-source operation management method and terminal device
CN107783857A (en) A kind of abnormal restorative procedure and device, computer installation, readable storage medium storing program for executing
CN110456725A (en) A kind of monitoring method of PLC device, device and intelligent terminal
CN103477607B (en) Energy automation installation and the method for running energy automation installation
CN101609407A (en) Detection method based on the full station model file coupling of publisher/subscriber's pattern
CN111882395A (en) Monitoring method and system for rental equipment, computer equipment and storage medium
CN110673938A (en) Task processing method, system, server and storage medium
CN110069925A (en) Software monitors method, system and computer readable storage medium
CN109218407A (en) Code management-control method and terminal device based on log monitoring technology
CN108320235A (en) A kind of management system for monitoring
CN109412902B (en) Intelligent monitoring method, storage device, terminal and system of power dispatching data network system
CN109445824A (en) A kind of update method of measure and control device, system and terminal device
CN104578419A (en) Transformer substation communication power supply monitoring system and method
CN110502257B (en) Transformer substation monitoring information management, control and checking method
CN109695976A (en) A kind of method, system and the terminal device of powering device management
CN106971272A (en) Synchronous system and method is operated between a kind of dispatching automation main preparation system
CN109862530A (en) A kind of automatic repair method of sensor node and device
CN115795359A (en) Signal type distinguishing method and device and computer equipment
CN105094899A (en) Distributed-type intelligent apparatus sub-module program automatic configuration method
CN113946465A (en) Big data fault processing method and related equipment thereof
CN109066419B (en) Diagnosis method and system for secondary equipment maintenance safety measure operation and terminal equipment
CN101799903A (en) Payment system, terminal and method for realizing tracking control
CN110275812A (en) The method and terminal device of faulted-phase judgment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant